You are on page 1of 6

Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Responsible Completion
Observations Yes No Action Taken
Sr.No Person Date

1. Is Toolbox Talk Conducting Every Day? √ Tin Htun Naing

Is the use of Personal Protection Gears such as Safety


2. √ Tin Htun Naing
Helmet , Safety Vest , Safety Footwear , Mask ?

Is the conditions of Scaffolding,Ladders and Work


3. √ Tin Htun Naing
Platforms Satisfactory ?
Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Responsible Completion
Sr.No Observations Yes No Action Taken
Person Date

Are openings and other potential fall points are


4. √ Tin Htun Naing
appropriately protected or barricade and marked ?

Are distribution and switch boards properly insulated/


5. √ Htet Zaw Oo
locked ?

Are electric connections proper and without bare


6. √ Htet Zaw Oo
conductors visible ?
Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Responsible Completion
Sr.No Observations Yes No Action Taken
Person Date

7. Is the installed conditions of cable satisfactory ? √ Htet Zaw Oo

Are Combustible and Inflammable materials properly


8. stocked to prevent fire hazards? √ Htet Zaw Oo

9. Warning Signs and Hazard Signs installed ? √ Tin Htun Naing


Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Responsible Completion
Sr.No Observations Yes No Action Taken
Person Date

Are First Aid Kit adequately equipped and medication


10. √ Tin Htun Naing
available ?

Is fire extinguishers adequately and serviceable and fire


11. √ Tin Htun Naing
extinguishers tags checked regularly ?

Is any accidect / incident reported ? If yes then attach


12. Tin Htun Naing NA
report's copy.
Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Responsible Complecation
Sr.No Observations Yes No Action Taken
Person Date

13. Is site and office toilets are clean? √ Tin Htun Naing

Is housekeeping in site office and on site being taken


14. Tin Htun Naing
care of ?

Are usual have mosquito & COVID-19 prevention at site


15. √ Tin Htun Naing
office and on site ?
Project – The Central RKA-EHS / WEHSR

Construction – R8 A (Substructure) Doc. Ref. No.032


Company Name – River King Ayeyar Week ; 3rd
Weekly EHS Report Date ; 19.01.22

Signed By:

Safety Representative Project Engineer Project Manager