Checklist for Alignment plan 2A (24-11-21)

1 Proposed ROW shown is as per DPR or not Done


2 Toe line with in ROW or Not Not Shown
3 Exisiting Road to be shown Done
4 Existing and Proposed Structure to be shown Existing detail of Structure is not shown
5 Proposal of Structure shall be check as per Schedule B and A
6 Full Topo details to be shown Not Shown
7 Contour Lines in hill roads Not Shown
8 Curve tables Done
9 Electric ilines / over passes etc where vertical clearance need to be checked Not Shown

Checklist for Profile


1 Gradient as per DPR drawings or not Done
2 Ground Levels at LHS & RHS from Centerline to be checked Done
3 Superelevation & Runoff Length Done
4 Structure in Box Cutting to be avoided Done
5 Profile in deep Cutting to be checked seperately Done
6 High Embankment more tham 3m to be checked seperately
7 Height of Embankment w.r.t HFL
8 Height of Embankment w.r.t ground levels

Checklist for Horizontal Alignment report


1 Radius as per Schedule 'D' is followed or not Done
2 Desing speed as per schedule 'D' is followed or not Done
3 Transition length as per IRC 38 is followed or not Done
4 Superelevation and runoff length to be checked Done
5 Extra widening to be checked Done
6 Distance between two horizontal curve for 10s travel time Done
7 Hair Pin Bands to be checked as per IRC SP 48 and IRC 52 Done
Checklist for Vertical Alignment report
1 K value or Radius of Curve to be checked Done
2 Curve Length to be checked Done
3 Distance between two grade changes Done

Checklist for Typicall Cross sections


1 Width of TCS is followed as per Schedule B or not Done
2 Length of TCS is followed as per Schedule B or not
3 All features like drain, Walls, Crash barriers, Street Lighting, Side Slopes etc.. Done
4 Thickness of Pavement layers to be checked as per Schedule B DBM thickness is 50mm in place of 70mm
5 Title of TCS to be checked as per Schedule B Done