The document provides checklists for alignment plans, profiles, horizontal alignment reports, vertical alignment reports, and typical cross sections. Key items to check include the right-of-way, toe lines, existing and proposed structures, contours, clearances, gradients, superelevation, radii, transitions, extra widening, curve lengths, pavement thicknesses, and more. One checklist item notes that the DBM thickness shown is 50mm instead of the scheduled 70mm.
The document provides checklists for alignment plans, profiles, horizontal alignment reports, vertical alignment reports, and typical cross sections. Key items to check include the right-of-way, toe lines, existing and proposed structures, contours, clearances, gradients, superelevation, radii, transitions, extra widening, curve lengths, pavement thicknesses, and more. One checklist item notes that the DBM thickness shown is 50mm instead of the scheduled 70mm.
The document provides checklists for alignment plans, profiles, horizontal alignment reports, vertical alignment reports, and typical cross sections. Key items to check include the right-of-way, toe lines, existing and proposed structures, contours, clearances, gradients, superelevation, radii, transitions, extra widening, curve lengths, pavement thicknesses, and more. One checklist item notes that the DBM thickness shown is 50mm instead of the scheduled 70mm.
2 Toe line with in ROW or Not Not Shown 3 Exisiting Road to be shown Done 4 Existing and Proposed Structure to be shown Existing detail of Structure is not shown 5 Proposal of Structure shall be check as per Schedule B and A 6 Full Topo details to be shown Not Shown 7 Contour Lines in hill roads Not Shown 8 Curve tables Done 9 Electric ilines / over passes etc where vertical clearance need to be checked Not Shown
Checklist for Profile
1 Gradient as per DPR drawings or not Done 2 Ground Levels at LHS & RHS from Centerline to be checked Done 3 Superelevation & Runoff Length Done 4 Structure in Box Cutting to be avoided Done 5 Profile in deep Cutting to be checked seperately Done 6 High Embankment more tham 3m to be checked seperately 7 Height of Embankment w.r.t HFL 8 Height of Embankment w.r.t ground levels
Checklist for Horizontal Alignment report
1 Radius as per Schedule 'D' is followed or not Done 2 Desing speed as per schedule 'D' is followed or not Done 3 Transition length as per IRC 38 is followed or not Done 4 Superelevation and runoff length to be checked Done 5 Extra widening to be checked Done 6 Distance between two horizontal curve for 10s travel time Done 7 Hair Pin Bands to be checked as per IRC SP 48 and IRC 52 Done Checklist for Vertical Alignment report 1 K value or Radius of Curve to be checked Done 2 Curve Length to be checked Done 3 Distance between two grade changes Done
Checklist for Typicall Cross sections
1 Width of TCS is followed as per Schedule B or not Done 2 Length of TCS is followed as per Schedule B or not 3 All features like drain, Walls, Crash barriers, Street Lighting, Side Slopes etc.. Done 4 Thickness of Pavement layers to be checked as per Schedule B DBM thickness is 50mm in place of 70mm 5 Title of TCS to be checked as per Schedule B Done