You are on page 1of 1

GENERAL NOTES: GENERAL NOTES:

1. ALL DIMENSIONS ARE IN FEET AND INCHES REMOVAL OF FORM WORK (SHUTTERING):
2. ONLY WRITTEN DIMENSIONS TO BE FOLLOWED. THE FOLLOWING MINIMUM PERIOD (AFTER FINAL POUR)
SHALL BE ALLOWED BEFORE REMOVAL OF SHUTTERING AS PER
3. ANY DISCREPENCIES NOTICED IN THE DWG. SHALL BE CLAUSE 11.3.1 OF IS456 : 2000
BROUGHT TO OUR KNOWLEDGE IMMEDIATELY.
N 4. THIS DWG. SHOULD TO BE READ IN CONJUNCTION WITH A. VERTICAL SIDE OF SHUTTERING OF COLUMNS,
WALLS AND & BEAMS ------------------------------------ 24 HOURS.
THE ARCHITECTURAL DWG. (LATEST REVISION).
5. GRADE OF CONCRETE SHALL CONFIRM TO IS 456 : 2000 B. BOTTOM SHUTTERING OF SLABS
GRADE OF CONCRETE FOR COLUMN, ROOF BEAM AND (KEEP THE PROPS UNDER) ------------------------------- 3 DAYS.
ROOF SLAB - M25. C. BOTTOM SHUTTERING OF BEAMS
6. "Y" DENOTES HIGH STRENGTH DEFORMED BARS OF GRADE (KEEP THE PROPS UNDER) ------------------------------- 7 DAYS.
A B C D E F G FE 500 CONFIRMING TO IS 1786 : 2008 D. BOTTOM PROPS TO SLAB
i) SPANNING UP TO 4.50M ----------------------------- 7 DAYS.
7. CLEAR COVER TO THE REINFORCEMENT
42'-5" A. COLUMNS ------------ 1½" ii) SPANNING OVER 4.50M ----------------------------- 14 DAYS.
B . ROOF BEAM ------------ 1" E. BOTTOM PROPS TO BEAMS
6'-9" 6'-721" 8'-021" 13'-9" 6'-0" 1'-3" C. ROOF SLAB ------------ 3 4" i) SPANNING UP TO 6.00M ----------------------------- 14 DAYS.
ii) SPANNING OVER 6.00M ----------------------------- 21DAYS.
8. DEPTH OF BEAM IS INCLUSIVE OF SLAB THICKNESS
LAP JOINTS FOR REINFORCEMENT BARS:
i). AT ANY CROSS SECTION OF A MEMBER NOT MORE THAN
50% OF THE BARS SHALL BE LAPPED.
ii). LAPS SHALL BE STAGGERED WITH A MINIMUM CENTRE TO
CENTRE DISTANCE OF 1.3 TIMES THE LAP LENGTH OF THE
B1
6 9"x15"
BAR FOR TENSION AND COMPRESSION MEMBERS.
iii). DEVELOPMENT LENGTH (Ld) SHALL BE AS PER SP: 34 - 1999
AND THE MINIMUM Ld=50d, WHERE d= Dia. of Rod TO BE LAPPED
iv). LAPS IN COLUMNS SHALL BE PROVIDED AT MID HEIGHT OF
FLOOR AND NOT AT SLAB LEVEL.
12'-421"

v). LAPS IN BEAM AND SLAB SHALL BE PROVIDED AT THE


LOW TERRACE POINT OF CONTRAFLEXURE.

9"x15"

B6
9"x15"
vi). WELDING OF BARS SHALL BE DONE AS A STITCH WELD FOR

B7
5 TIMES THE DIAMETER OF BAR AND A GAP OF 5 TIMES OF
9" 5'-9" 1'-0" 6'-3" BAR AND AGAIN WELDING FOR ANOTHER 5 TIMES DIAMETER
OF BAR USING ARC WELDING AND SPECIAL ELECTRODES
FC B8 B3 B3
5 AFTER GETTING PRIOR WRITTEN APPROVAL FROM THE
STRUCTURAL CONSULTANT.
27'-0"

9"x18" 9"x15" 9"x15"


4'-1021"

vii). DETAILING OF REBARS SHALL CONFIRM TO SP-34 & IS 13920.


9" 6'-0" 9" 9'-221" 9"
B1
4 BEAM SCHEDULE
9"x15"

9"x15"

9"x15"

9"x15"
B2

B6

B6

SL.NO. NAME SIZE

9"x15"

9"x15"
5'-9"

B3

B3
LIFT
01. B1 9" x 15"
B5 B5
3 02. B2 9" x 15"
1'-521"

9"x15" 9"x15" concealed beam 9"x15" 9"x15"

9"x15"
2

BC2
03. B3 9" x 15"

B4
9"x15"
2'-621"

B3 B7

9"x15"
01 ISSUED FOR CONSTRUCTION MD ESK 27.10.22

BR1
9"x15" 9"x15" 04. B3a 9" x 15"
1

6'-9"
00 ISSUED FOR APPROVAL MD ESK 22.09.22
B2 05. B4 9" x 15" REV. DESCRIPTION DRN. CHK. DATE

9"x15"
9"x15"
BC2

BC1
11'-10" 9"x15" 06. B5 9" x 15" PROJECT NAME :
PROPOSED RESIDENCE FOR Mr.KARTHIK PLOT NO:1.

9"
B1
07. B6 9" x 15"
9" 7'-021" 9" 08. B7 9" x 15" AT PILLAYAR KOIL STREET,MEDAVAKKAM, CHENNAI.
09. B8 9" x 15" DRAWING TITLE:
10. BC1 9" x 15" THIRD FLOOR ROOF BEAM LAYOUT
11. BC2 9" x 15"
THIRD FLOOR ROOF BEAM LAYOUT 12. BR1 9" x 15"
JOB NO.
KA -
DWG. NO.
S-14
REV. NO. 01
Date 27.10.22
REF. CODE
2 -Y16 ALL SLAB 5" TK. UNLESS NOTED OTHERWISE STRUCTURAL CONSULTANTS:
ES.KUMAR.,M.Tech. (structures),
KIRTE ASSOCIATES, CIVIL & STRUCTURAL
2 -Y12 ENGINEERING CONSULTANTS,
Y8 ST2 @ 6" c/c PLOT NO:1233, FIRST FLOOR,
FLAT NO:1B,PRIYA AJAY ARCADE,
18th MAIN ROAD, ANNA NAGAR, (WEST)
Chennai - 600 040. Mob: 98404 48613.
2 -Y16
ARCHITECTS:
Rajappa Shobana Architects
FLOATING COLUMN "FC" #10, B.M Garden Street,
Alwarpet, Ch - 18. # 044 24996906
SIZE (9" x 12")
Drawn: M.D Designed: ES Checked : ES.KUMAR
Scale : Date: 22.09.2022 Approved : ES.KUMAR