; OFC = McDermott;
Item Description DESIGN SUPPLY FABRICATION / INSTALL PRE-COMM COMM Comments Reference documentation and/or drawings Interface milestones Free issue materials
CONSTRUCTION identified
(1) Design, supply and installation from Beach Valve TJB including termination, up to
2 nos of 33KV power cables from BVS
microtunnel exit pit by OFC. OFC to provide ETAP study.
(Transition Joint Bay TJB) to micro Layout onshore power cble route map (402-30-PL-
(2) Handover of cables to ONC1 at microtunnel exit pit (Slug Catcher Area - Hilal
13.1 tunnelling exit pit near Plant Fence (Slug OFC (1) OFC (1) N/A OFC (1) (2) OFC (3) N/A PLN-00001_Sht-001 to 004) - Att. 1.1
Avenue) inside the trench by OFC.
Catcher area - Hilal Avenue) (cables on
(3) Pre-commissioning by OFC prior to handover (hi-pot test).
drum)
Refer to point # 101 for overall commissioning for power distribution & interlocks.
(1) Design, supply and installation from Beach Valve TJB including termination, up to
2 nos of 33KV power cables from the microtunnel exit pit by OFC. OFC to provide ETAP study.
OFC to ONC1
microtunnel exit pit (Slug Catcher area - ONC1 / OFC (2) Handover of cables to ONC1 at microtunnel exit pit (Slug Catcher Area - Hilal - Readiness of SS-6103 & - 2 nos of 33 KV cables +
14.1 OFC (1) OFC (1) N/A ONC1 (1) (2) N/A availability of power
Hilal Avenue) to substation tag # SS-6103. (3) Avenue) inside the trench by OFC. earth cable
(3) Pre-commissioning jointly by ONC1 and OFC (from Substation SS-6103 to BVS)
Refer to point # 101 for overall commissioning for power distribution & interlocks.
(1) 6.6 kV cable designed & supplied by ONC1. ONC1 to supply termination kit &
terminate at the SS-6001 end. OFC to supply to supply termination kit & terminate
the 6.6kV/415V transformer end.
2 nos of Beach valve (6.6kV) cable feeder
(2) ONC1 to install the 6.6kV cable from SS-6001 to Plant Fence (NMCB area - - Availability of cables, ONC1 to OFC
from LNG PLANT substation tag # SS-6001 ONC1 / OFC ONC1 / OFC ONC1 / OFC ONC1 / OFC readiness of SS-6001 & - 2 nos of 6.6 KV cables +
25.1 ONC1 (1) N/A Bader Street).
to BVS Interface Building. (1) (2) (3) (4) (4) availability of power earth cable
(3) OFC to install the 6.6kV cable from the Plant Fence (NMCB area - Bader Street)
to BVS Interface Building.
(4) Pre-commissioning jointly by ONC1 and OFC.
(5) Commissioning jointly by ONC1 and OFC.
Requirement to be confirmed.
(1) ONC1 to reserve space for VSR and control panels in SS-6103.
(2) 1x33kV feeder to be added on each side of 33kV switchgear SB-61131
1) Specification for Variable Shunt Reactor (101-
(3) Design, supply by OFC and "free-issue" to ONC1 for installation.
Variable Shunt Reactor (VSR) to be 91-EL- SPC-00021) - Delivery of Variable Shunt OFC to ONC1:
31.1 OFC / ONC1 OFC N/A ONC1 ONC1 OFC / ONC1 (4) Installation, site wiring, connection and pre-commissioning by ONC1
installed Onshore 2) Electrical Datasheet for Variable Shunt Reactor Reactor to Onshore EPC - Variable Shunt reactor
(5) Commissioning and powering up by OFC and support from ONC1 Note: Includes
(101- 91-EL-DTS-00001)
VSRs and associated control panels in the substation. Note: Installation
procedures/requirements to be developed by Onshore.
Applicable design / supply / procedures / specifications shall be provided by OFC.
108
OFC / ONC1
ELICS - integrated test, network and logic OFC OFC N/A N/A N/A (1) OFC leading the commissioning (from Topsides to NMCB) with support of ONC1
(1)
From (Offshore) To (Onshore)
NFE iBOD Reference Drawings
Tie-in Cable Tag Feeder / Remarks
Feeder / & Interface Agreement nos
reference Equipment tag Equipment Description Equipment Tag Equipment Description Terminal nos
Terminal nos
(HOLD-1)
33kV Switchgear at
SSJB-402101-FR1/ Feeder no (TBA) 1) OFC to supply 430m of cable in drum at tie-in point to route till SB-61131 switchgear (refer NFE-
13.1 SSJB-402101 Transition junction box-1 TBA SB-61131 NMCB SS-6103 1) 402-91-EL-DWG-00002
FY1/FB1-G1 at Beach Valve station substation & terminal no EPC1-OFC-IQ-EL-0313)
FR2/FY2/FB2 (TBA) 2) OFC to supply optical repeater & plug-in module required for R2R communication
SSJB-402102-FR1/ 33kV Switchgear at Feeder no (TBA) 1) OFC to supply 430m of cable in drum at tie-in point to route till SB-61131 switchgear (refer NFE-
13.1 SSJB-402102 Transition junction box-2 TBA SB-61131 1) 402-91-EL-DWG-00002
FY1/FB1-G1 at Beach Valve station NMCB SS-6103 & terminal no EPC1-OFC-IQ-EL-0313)
FR2/FY2/FB2 substation (TBA) 2) OFC to supply optical repeater & plug-in module required for R2R communication