KEY PLAN

THE SITE

8 7 6 5 4 3 2 1 1
EMERGENCY
ENTRANCE & EXIT

LAR 6427
MAIN
ENTRANCE & EXIT

PROPOSED
2 4
GUARD HOUSE BUILDING 6

PROPERTY LIMIT
3 5

12 D
12
FIRE EXIT DOOR FIRE EXIT DOOR

COLLECTING POND
PROPOSED

RUN-OFF WATER
FINISHED PRODUCT
STORAGE BUILDING

SLIDING DOOR

SLIDING DOOR
D

13 D
13

FIRE EXIT DOOR FIRE EXIT DOOR


D

12 D
12
SLIDING DOOR

ROLL UP DOOR

ROLL UP DOOR
PROPOSED
MAINTENANCE SERVICES BUILDING

ROLL UP DOOR

ROLL UP DOOR
PROPOSED
U&OO
BUILDING

PROPOSED
RAW MTERIAL
BUILDING

8 7

NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.
2. ALL PANELBOARDS AND DISCONNECT SWITCHES ENCLOSURES SHALL BE
GROUNDED INTO ONE GROUNDING CONNECTION POINT OF THE GROUNDING
GRID.
3. MINIMUM WIRE SIZE OF RECEPTACLE OUTLET BRANCH CIRCUITS SHALL BE
4mm² UNLESS OTHERWISE SPECIFIED.
4. MINIMUM CONDUIT SIZE SHALL BE 20mmØ UL-LISTED, SASO APPROVED,
UNLESS OTHERWISE SPECIFIED.
5. FOR LOADS AND WIRE SIZE, REFER TO PANELBOARDS SCHEDULE.
6. THE LOCATION OF DISCONNECT SWITCHES IS ONLY NOTIONAL. THE
CONTRACTOR SHALL COORDINATE WITH THE MECHANICAL DRAWINGS FOR
LOCATION OF AC EQUIPMENT UNITS.
7. DO NOT SCALE FROM THIS DRAWING.
8. ALL DIMENSIONS TO BE CHECKED ON SITE AND ANY DISCREPANCIES SHALL
BE REPORTED IMMEDIATELY TO THE ARCHITECT.
9. CONTRACTOR SHALL VERIFY ALL LEVELS AT SITE PRIOR TO EXECUTION OF
WORK AND IN CASE OF ANY DISCREPANCIES, BRING TO KNOWLEDGE OF THE
ENGINEER.
10. THE CONTRACTOR SHALL CONFIRM THE SETTING OUT OF THE BUILDING
PRIOR TO COMMENCEMENT OF WORK.
11. THE CONTRACTOR SHALL OBTAIN ALL APPROVALS AND N.O.C.'S FROM ALL
CONCERNED LOCAL STATUTORY AUTHORITIES AND SHALL INCLUDE FOR ALL
WORKS WITH RESPECT TO THE DIVERSION/PROTECTION OF THE SERVICES
DURING THE PERIOD OF CONSTRUCTION, TO THE SATISFACTION OF THE
CONCERNED AUTHORITIES AND THE ENGINEER.
12. THE CONTRACTOR TO PREPARED SHOP DRAWINGS.

SYMBOL DESCRIPTION

BIA
K IN
G

RA
D
M A

O
O F S A U DI

EMDAD ANTHRACITE DRYING PROJECT


CONSTRUCTION PACKAGES

TANAGHOM CONSULTING
LIC. NO. 2013,P.O BOX: 9021 / CODE: 35811-4692 JUBAIL IND. CITY -
OFFICE NO. 2-12, NABA COMMERCIAL CENTER, AL-FANATEER-/
TEL-/(03) 3472261 / 3473926 / 3473950 //FAX: (03) 3472259/
Website:www.tanaghomconsulting.com

Smart Projects Construction Company


P.O. Box 1861| ZIP Code 31952 Khobar
KSA Tel.: +966 13 894 1919|Fax: +966 13 896 5511

MSB ELECTRICAL EQUIPMENT ELEVATION


(MS) BUILDING
1 ELECTRICAL EQUIPMENT ELEVATION 3 - 07 - 41J - B08A J 02 14
ANT-21-008-INK-SPCC-R.0
ANT-21-008-SD-GPP-EL-LA-0005-Rev.01
ANT-21-008-SD-GPP-EL-0094-Rev.01
1: 75M 7/7