Professional Documents
Culture Documents
Update Pages
UK Filling Pipe
2788591-0200
TBA/19 010V, 020V, 030V
WARNING
Read and follow all safety precaution instructions throughout this manual
and on safety signs attached to this equipment.
Failure to follow all safety precaution instructions could result in death or
serious injury.
, Tetra Pak, and all other trademarks displayed in this document are the property of
the Tetra Pak Group.
The content of this manual is in accordance with the design and construction of the machine
or equipment at the time of publishing. The Tetra Pak Group reserves the right to introduce
design modifications without prior notice.
The English language version of this document contains the original instructions. All other
language versions are translations of the original instructions.
This document was produced by:
Tetra Pak Packaging Solutions AB
Ruben Rausings gata
SE 221 86 Lund
Sweden
Additional copies can be ordered from the Tetra Pak Group. When ordering additional copies,
always provide the document number.
Doc. No. UP-3172998-0102
Issue 2013-12
i Introduction
UP Maintenance Manual Updates
UP Spare Parts Catalogue Updates
UP Operation Manual Updates
UP
Update Pages
UK Filling Pipe
2788591–0200
®
Doc. No. UP-3172998-0102 i-1 (8)
i Introduction
®
Doc. No. UP-3172998-0102 i-3 (8)
Table of Contents i Introduction
®
Doc. No. UP-3172998-0102 i-5 (8)
Safety Precautions i Introduction
Safety Precautions
Before starting any work on the equipment, it is compulsory to read the Safety
Precautions chapter in any of the existing manuals of the equipment.
The safety alert symbol is used to alert about potential personal injury hazards. To
avoid hazards, obey all safety messages that follow this symbol.
The following safety alert symbols and signal words are used in this manual to
inform the user of hazards.
Reference Documents
• RM-1531142-0105
®
Doc. No. UP-3172998-0102 i-7 (8)
Information About this Manual i Introduction
The Update Pages is used for updating the machine’s existing delivered manuals.
Use the content of the Update Pages chapters to update the machine manuals. The
Rebuilding Instructions chapter of the Rebuilding Manual describes how to update
the machine manuals with the content of the Update Pages.
The Update Pages chapters use the chapter designation UP to identify the update
pages in the existing machine manual.
The page number for the pages in the Update Pages chapter has three parts:
• the chapter designation (1)
• the consecutive page number (2) within the Update Pages chapter
• the total number of pages (3) in the Update Pages chapter
UP - 11 (18)
1 2 3
1 Chapter designation
2 Consecutive page
number
3 Total number of pages
®
Doc. No. UP-3172998-0102 UP-1 (56)
UP Maintenance Manual Updates
Description
This chapter contains the pages used to update the existing machine Maintenance
Manual. See Section Updating the Manuals in RM-1531142-0105.
Description. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . UP-2
®
Doc. No. UP-3172998-0102 UP-3 (56)
Table of Contents UP Maintenance Manual Updates
MM Update Pages
The following pages must be use to update the Maintenance Manual for the machine.
Added Pages
Date Installed Kit (Doc. No.) Removed Pages Signature
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-5 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
Added Pages
Date Installed Kit (Doc. No.) Removed Pages Signature
®
Doc. No. UP-3172998-0102 UP-7 (56)
MM Update Pages UP Maintenance Manual Updates
Note! The values in the tables are intended as a basic setting. It may be
necessary to fine set to function correctly. See Function Check.
a) Apply a spirit level to the level probe (2).
b) Loosen the screws (1) and set the level probe (2) vertically. At the same time,
set the distance A between the level probe (2) and the pressure flange (3).
See the table below.
1 Screw
2 Level probe
3 Pressure flange
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-9 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
c) Pull down the packaging material and step the machine up to TUBE SEALING.
d) Set the level probe (2) parallel to the packaging material.
e) Set the distance B between the level probe (2) and the
packaging material tube (5) according to the table below. Adjust
using the screw (4).
4
5
2
B
2 Level probe
4 Screw
5 Packaging material
tube
(Cont’d)
(Cont’d)
Function Check
a) Connect the voltmeter to terminal connections 3 and 2 (VDC) on the back
plane of the TMCC2 card A310.
b) Cut a piece of packaging material just above the pressure flange, so that it
is possible to reach the float.
c) Step the machine up to PREHEATING II.
d) Lift up the float and let it drop down to its lower position. Check that the
voltmeter shows approximately 0.6 VDC.
e) Repeat the check (lifting and dropping the float) and, at the same time, move
the pressure flange backwards, forwards and in sideways directions. The
voltmeter should still show approximately 0.6.
Note! See Section Filling Control System (FCS) for LED description.
f) Verify the setting by moving the float up and down and check that the movement
is indicated on the level indicator on the TMCC2 card LED is lit up.
g) Rotate the float one complete turn (360°) and verify that there are no LEDs
flashing.
h) Perform the TMCC2 card calibration. See Section Filling Control System (FCS).
®
Doc. No. UP-3172998-0102 UP-11 (56)
MM Update Pages UP Maintenance Manual Updates
For machines with a metal float: The first time you dismantle the filling pipe,
make a note of the weight engraved on the float (2) and save it in a safe place.
b) Remove the float (2), locking fork (3), and locking fork (4).
c) CAUTION
Risk of unsterility
Leakage into the float might result in product unsterility.
d) Visually check that the float (2) is intact and slides freely.
For machines with a metal float: Shake the float (2) and check that there is
no liquid in it. If you suspect leakage into the float, weigh the float (2) and check
that its weight equals the weight engraved on the float.
e) If necessary, change the float (2).
(Cont’d)
(Cont’d)
f) Visually check the locking fork (3) and locking fork (4) at the arrow according to
the table below.
44
33
A
3 Locking fork
4 Locking fork
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-13 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
h) Visually check the lower filling pipe (1) at the arrows according to the table below.
Change the O-ring between the upper and the lower filling pipe when
assembling. See Section Preparation After Daily Care in the Operation Manual.
11
B
a) Remove the locking fork (1) and the pressure flange (2) from the
lower filling pipe (3).
1 Locking fork
2 Pressure flange
3 Lower filling pipe
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-15 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
b) Visually check the pressure flange (2) at the arrows according to the table below.
2
2 Pressure flange
Concerning the O-ring (5), see Section Daily Care in the Operation Manual.
2
3
1 Spring 4 Radius
2 Locking pin 5 O-ring
3 Pressure roller
®
Doc. No. UP-3172998-0102 UP-17 (56)
MM Update Pages UP Maintenance Manual Updates
A = 56.0 ±3.0 mm
1 Nut 4 Nut
2 Nut 5 Nut
3 Nut 6 Pin
(Cont’d)
(Cont’d)
B
A
A = 56.0 ±3.0 mm
B = 0 mm
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-19 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
i) Move the counter roller (8) up to the operation position by activating the valve
Y26.
j) Check the height of the counter roller (8). See Section Tube Forming.
k) Put a double layer of packaging material between the counter roller (8) and
the pressure roller (7).
l) Check the spring force using a dynamometer. Set if required. See Procedure
1.16-3 Filling Pipe - 1.16-3 Filling Pipe - Check Pressure Roller Spring Force.
7 Pressure roller
8 Counter roller
(Cont’d)
(Cont’d)
m) Attach the template (9), see the table below, between the upper
filling pipe (10) and the environment ring (11).
n) Adjust the position of the upper filling pipe (10) using the nuts (3) and (4).
Adjust sideways measurement using the nut (5).
o) Check that the upper filling pipe (10) is centred with the environment ring (11) by
moving the template (9). It must move freely.
Note! If adjustments have been done, check item l) again.
3 11
10
4 5
3 Nut 9 Template
4 Nut 10 Filling pipe
5 Nut 11 Ring
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-21 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
14
14
14
12
12
13
12 Filling pipe
13 Support roller
14 Screw
a) Put a double layer of packaging material between the pressure roller (5) and
the counter roller (4).
b) Activate the valve Y26 for the counter roller (4).
c) Measure the spring force by pushing the dynamometer (3) against the fork
head until the pressure roller (5) just eases off. Compare the value with those
in the table below.
d) The spring (1) must not touch the cover (2). Change the spring if required.
e) Deactivate valve Y26, set the electrical supply disconnecting device in position
O (OFF), and close for compressed air.
4 5
1 Spring 4 Counter roller
2 Cover 5 Pressure roller
3 Dynamometer
®
Doc. No. UP-3172998-0102 UP-23 (56)
MM Update Pages UP Maintenance Manual Updates
Note! The values in the tables are intended as a basic setting, it may be
necessary to fine set to function correctly, see Function Check.
a) Apply a spirit level to the level probe (2).
b) Loosen the screws (1) and set the level probe (2) vertically. At the same time,
set the distance A between the level probe (2) and the pressure flange (3).
See the table below.
Package A ± 0.5mm
(basic setting)
TPA 220 Sq 20
TPA 250 Sq 21.5
TPA 330 Sq 31
1 Screw
2 Level probe
3 Pressure flange
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-25 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
c) Pull down the packaging material and step the machine up to TUBE SEALING.
d) Set the level probe (2) parallel to the packaging material.
e) Set the distance B between the level probe (2) and the
packaging material tube (5), according to the table below. Adjust
using the screw (4).
Package B ± 1 mm
TPA 200 Sq 5
TPA 250 Sq 5
TPA 330 Sq 10
4
5
2
B
2 Level probe
4 Screw
5 Packaging material
tube
(Cont’d)
(Cont’d)
Function Check
a) Connect the voltmeter to terminal connections 3 and 2 (VDC) on the back
plane of the TMCC2 card A310.
b) Cut a piece of packaging material just above the pressure flange, so that it
is possible to reach the float.
c) Step the machine up to PREHEATING II.
d) Lift up the float and let it drop down to its lower position. Check that the
voltmeter shows approximately 0.6 VDC.
e) Repeat the check (lifting and dropping the float) and, at the same time, move
the pressure flange backwards, forwards and in sideways directions. The
voltmeter should still show approximately 0.6.
Note! See Section Filling Control System (FCS) for LED description.
f) Verify the setting by moving the float up and down and check that the movement
is indicated on the level indicator on the TMCC2 card LED is lit up.
g) Rotate the float one complete turn (360°) and verify that there are no LEDs
flashing.
h) Perform the TMCC2 card calibration. See Section Filling Control System (FCS).
®
Doc. No. UP-3172998-0102 UP-27 (56)
MM Update Pages UP Maintenance Manual Updates
For machines with a metal float: The first time you dismantle the filling pipe,
make a note of the weight engraved on the float (2) and save it in a safe place.
b) Remove the float (2), locking fork (3), and locking fork (4).
c) CAUTION
Risk of unsterility
Leakage into the float might result in product unsterility.
d) Visually check that the float (2) is intact and slides freely.
For machines with a metal float: Shake the float (2) and check that there is
no liquid in it. If you suspect leakage into the float, weigh the float (2) and check
that its weight equals the weight engraved on the float.
e) If necessary, change the float (2).
(Cont’d)
(Cont’d)
f) Visually check the locking fork (3) and locking fork (4) at the arrow according to
the table below.
44
33
A
3 Locking fork
4 Locking fork
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-29 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
h) Visually check the lower filling pipe (1) at the arrows according to the table below.
Change the O-ring between the upper and the lower filling pipe when
assembling. See Section Preparation After Daily Care in the Operation Manual.
11
B
a) Remove the locking fork (1) and the pressure flange (2) from the
lower filling pipe (3).
1 Locking fork
2 Pressure flange
3 Lower filling pipe
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-31 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
b) Visually check the pressure flange (2) at the arrows according to the table below.
2
2 Pressure flange
Concerning the O-ring (5), see Section Daily Care in the Operation Manual.
2
3
1 Spring 4 Radius
2 Locking pin 5 O-ring
3 Pressure roller
®
Doc. No. UP-3172998-0102 UP-33 (56)
MM Update Pages UP Maintenance Manual Updates
A = 56.0 ±3.0 mm
1 Nut 4 Nut
2 Nut 5 Nut
3 Nut 6 Pin
(Cont’d)
(Cont’d)
B
A
A = 56.0 ±3.0 mm
B = 0 mm
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-35 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
i) Move the counter roller (8) up to the operation position by activating the valve
Y26.
j) Check the height of the counter roller (8). See Section Tube Forming.
k) Put a double layer of packaging material between the counter roller (8) and
the pressure roller (7).
l) Check the spring force using a dynamometer. Set if required. See Procedure
1.16-3 Filling Pipe - 1.16-3 Filling Pipe - Check Pressure Roller Spring Force.
7 Pressure roller
8 Counter roller
(Cont’d)
(Cont’d)
m) Attach the template (9), see the table below, between the upper
filling pipe (10) and the environment ring (11).
n) Adjust the position of the upper filling pipe (10) using the nuts (3) and (4).
Adjust sideways measurement using the nut (5).
o) Check that the upper filling pipe (10) is centred with the environment ring (11) by
moving the template (9). It must move freely.
Note! If adjustments have been done, check item l) again.
3 11
10
4 5
3 Nut 9 Template
4 Nut 10 Filling pipe
5 Nut 11 Ring
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-37 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
14
14
14
12
12
13
12 Filling pipe
13 Support roller
14 Screw
a) Put a double layer of packaging material between the pressure roller (5) and
the counter roller (4).
b) Activate the valve Y26 for the counter roller (4).
c) Measure the spring force by pushing the dynamometer (3) against the fork
head until the pressure roller (5) just eases off. Compare the value with those
in the table below.
d) The spring (1) must not touch the cover (2). Change the spring if required.
e) Deactivate valve Y26, set the electrical supply disconnecting device in position
O (OFF), and close for compressed air.
4 5
1 Spring 4 Counter roller
2 Cover 5 Pressure roller
3 Dynamometer
®
Doc. No. UP-3172998-0102 UP-39 (56)
MM Update Pages UP Maintenance Manual Updates
Note! The values in the tables are intended as a basic setting. It may be
necessary to fine set to function correctly. See Function Check.
a) Apply a spirit level to the level probe (2).
b) Loosen the screws screws (1) and set the level probe (2) vertically. At the same
time, set the distance A between the level probe (2) and the pressure flange (3).
See the table below.
1 Screw
2 Level probe
3 Pressure flange
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-41 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
c) Pull down the packaging material and step the machine up to TUBE SEALING.
d) Set the level probe (2) parallel to the packaging material.
e) Set the distance B between the level probe (2) and the
packaging material tube (5), according to the table below. Adjust
using the screw (4).
Package B ± 1 mm
TWA 125 S 7
TWA 200 S 5
4
5
2
B
2 Level probe
4 Screw
5 Packaging material
tube
(Cont’d)
(Cont’d)
Function Check
a) Connect the voltmeter to terminal connections 3 and 2 (VDC) on the back
plane of the TMCC2 card A310.
b) Cut a piece of packaging material just above the pressure flange, so that it
is possible to reach the float.
c) Step the machine up to PREHEATING II.
d) Lift up the float and let it drop down to its lower position. Check that the
voltmeter shows approximately 0.6 VDC.
e) Repeat the check (lifting and dropping the float) and, at the same time, move
the pressure flange backwards, forwards and in sideways directions. The
voltmeter should still show approximately 0.6.
Note! See Section Filling Control System (FCS) for LED description.
f) Verify the setting by moving the float up and down and check that the movement
is indicated on the level indicator on the TMCC2 card LED is lit up.
g) Rotate the float one complete turn (360°) and verify that there are no LEDs
flashing.
h) Perform the TMCC2 card calibration see Section Filling Control System (FCS).
®
Doc. No. UP-3172998-0102 UP-43 (56)
MM Update Pages UP Maintenance Manual Updates
For machines with a metal float: The first time you dismantle the filling pipe,
make a note of the weight engraved on the float (2) and save it in a safe place.
b) Remove the float (2), locking fork (3), and locking fork (4).
c) CAUTION
Risk of unsterility
Leakage into the float might result in product unsterility.
d) Visually check that the float (2) is intact and slides freely.
For machines with a metal float: Shake the float (2) and check that there is
no liquid in it. If you suspect leakage into the float, weigh the float (2) and check
that its weight equals the weight engraved on the float.
e) If necessary, change the float (2).
(Cont’d)
(Cont’d)
f) Visually check the locking fork (3) and locking fork (4) at the arrow according to
the table below.
44
33
A
3 Locking fork
4 Locking fork
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-45 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
h) Visually check the lower filling pipe (1) at the arrows according to the table below.
Change the O-ring between the upper and the lower filling pipe when
assembling. See Section Preparation After Daily Care in the Operation Manual.
11
B
a) Remove the locking fork (1) and the pressure flange (2) from the
lower filling pipe (3).
1 Locking fork
2 Pressure flange
3 Lower filling pipe
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-47 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
b) Visually check the pressure flange (2) at the arrows according to the table below.
2
2 Pressure flange
Concerning the O-ring (5), see Section Daily Care in the Operation Manual.
2
3
1 Spring 4 Radius
2 Locking pin 5 O-ring
3 Pressure roller
®
Doc. No. UP-3172998-0102 UP-49 (56)
MM Update Pages UP Maintenance Manual Updates
A = 56.0 ±3.0 mm
1 Nut 4 Nut
2 Nut 5 Nut
3 Nut 6 Pin
(Cont’d)
(Cont’d)
B
A
A = 56.0 ±3.0 mm
B = 0 mm
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-51 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
i) Move the counter roller (8) up to the operation position by activating the valve
Y26.
j) Check the height of the counter roller (8). See Section Tube Forming.
k) Put a double layer of packaging material between the counter roller (8) and
the pressure roller (7).
l) Check the spring force using a dynamometer. Set if required. See Procedure
1.16-3 Filling Pipe - Check Pressure Roller Spring Force - 1.16-3 Filling Pipe -
Check Pressure Roller Spring Force.
7 Pressure roller
8 Counter roller
(Cont’d)
(Cont’d)
m) Attach the template (9), see the table below, between the upper
filling pipe (10) and the environment ring (11).
n) Adjust the position of the upper filling pipe (10) using the nuts (3) and (4).
Adjust sideways measurement using the nut (5).
o) Check that the upper filling pipe (10) is centred with the environment ring (11) by
moving the template (9). It must move freely.
Note! If adjustments have been done, check item l) again.
3 11
10
4 5
3 Nut 9 Template
4 Nut 10 Filling pipe
5 Nut 11 Ring
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-53 (56)
MM Update Pages UP Maintenance Manual Updates
(Cont’d)
14
14
14
12
12
13
12 Filling pipe
13 Support roller
14 Screw
a) Put a double layer of packaging material between the pressure roller (5) and
the counter roller (4).
b) Activate the valve Y26 for the counter roller (4).
c) Measure the spring force by pushing the dynamometer (3) against the fork
head until the pressure roller (5) just eases off. Compare the value with those
in the table below.
d) The spring (1) must not touch the cover (2). Change the spring if required.
e) Deactivate valve Y26, set the electrical supply disconnecting device in position
O (OFF), and close for compressed air.
4 5
1 Spring 4 Counter roller
2 Cover 5 Pressure roller
3 Dynamometer
®
Doc. No. UP-3172998-0102 UP-55 (56)
MM Update Pages UP Maintenance Manual Updates
®
Doc. No. UP-3172998-0102 UP-1 (20)
UP Spare Parts Catalogue Updates
Description
This chapter contains the pages used to update the existing machine Spare Parts
Catalogue. See Section Updating the Manuals in RM-1531142-0105.
Description. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . UP-2
®
Doc. No. UP-3172998-0102 UP-3 (20)
Table of Contents UP Spare Parts Catalogue Updates
Added Pages
Date Installed Kit (Doc. No.) Removed Pages Signature
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-5 (20)
SPC Update Pages UP Spare Parts Catalogue Updates
(Cont’d)
Added Pages
Date Installed Kit (Doc. No.) Removed Pages Signature
®
Doc. No. UP-3172998-0102 UP-7 (20)
SPC Update Pages UP Spare Parts Catalogue Updates
Pos Part No UN Qty Description Page No Pos Part No UN Qty Description Page No
TBA/19-020V TBA 0330S NOHVA, TBA/19-030V TBA 0330S NOHVA 010 2826640-0000 1 UPPER FILLING PIPE
010 2826640-0000 1 UPPER FILLING PIPE 020 2826638-0001 1 LOWER FILLING PIPE
020 2826638-0005 1 LOWER FILLING PIPE 050 3271443-0000 1 PRESSURE FLANGE
050 3271438-0000 1 PRESSURE FLANGE 060 3271429-0000 6 FORK
060 3271429-0000 6 FORK TBA/19-020V TBA 0200B NOHVA, TBA/19-020V TBA 0180B NOHVA, TBA/19-030V TBA 0200B NOHVA,
TBA/19-020V TWA 0125S NOHVA, TBA/19-030V TWA 0125S NOHVA TBA/19-030V TBA 0180B NOHVA
010 2826636-0001 1 UPPER FILLING PIPE 010 2826640-0000 1 UPPER FILLING PIPE
020 2826637-0005 1 LOWER FILLING PIPE 020 2826638-0001 1 LOWER FILLING PIPE
050 3271431-0000 1 PRESSURE FLANGE 050 3271435-0000 1 PRESSURE FLANGE
060 3271430-0000 6 FORK 060 3271429-0000 6 FORK
TBA/19-030V TPA 0200SQ NOHVA TBA/19-020V TBA 0200M HVA, TBA/19-030V TBA 0200M HVA
010 2826636-0001 1 UPPER FILLING PIPE 010 2826636-0002 1 UPPER FILLING PIPE
020 2826637-0007 1 LOWER FILLING PIPE 020 2826637-0003 1 LOWER FILLING PIPE
050 3271432-0000 1 PRESSURE FLANGE 050 3271448-0000 1 PRESSURE FLANGE
060 3271430-0000 6 FORK 060 3271430-0000 6 FORK
TBA/19-030V TPA 0250SQ NOHVA TBA/19-020V TBA 0200M NOHVA, TBA/19-030V TBA 0200M NOHVA
010 2826636-0001 1 UPPER FILLING PIPE 010 2826636-0002 1 UPPER FILLING PIPE
020 2826637-0006 1 LOWER FILLING PIPE 020 2826637-0003 1 LOWER FILLING PIPE
050 3271432-0000 1 PRESSURE FLANGE 050 3271433-0000 1 PRESSURE FLANGE
060 3271430-0000 6 FORK 060 3271430-0000 6 FORK
TBA/19-030V TPA 0330SQ NOHVA TBA/19-020V TBA 0200S HVA, TBA/19-020V TBA 0160S HVA, TBA/19-030V TBA 0200S HVA, TBA/19-030V
010 2826640-0000 1 UPPER FILLING PIPE TBA 0160S HVA
020 2826638-0005 1 LOWER FILLING PIPE 010 2826636-0001 1 UPPER FILLING PIPE
050 3271434-0000 1 PRESSURE FLANGE 020 2826637-0002 1 LOWER FILLING PIPE
060 3271429-0000 6 FORK 050 3271446-0000 1 PRESSURE FLANGE
TBA/19-010V TWA 0125S NOHVA 060 3271430-0000 6 FORK
010 2796080-0001 1 UPPER FILLING PIPE TBA/19-020V TBA 0200S NOHVA, TBA/19-020V TBA 0160S NOHVA, TBA/19-030V TBA 0200S NOHVA,
020 2826637-0005 1 LOWER FILLING PIPE TBA/19-030V TBA 0160S NOHVA, TBA/19-020V TWA 0200S NOHVA, TBA/19-030V TWA 0200S NOHVA
050 3271431-0000 1 PRESSURE FLANGE 010 2826636-0001 1 UPPER FILLING PIPE
060 3271430-0000 6 FORK 020 2826637-0002 1 LOWER FILLING PIPE
TBA/19-020V TBA 0125S HVA, TBA/19-020V TBA 0100B HVA, TBA/19-030V TBA 0125S HVA 050 3271432-0000 1 PRESSURE FLANGE
010 2826636-0001 1 UPPER FILLING PIPE 060 3271430-0000 6 FORK
020 2826637-0001 1 LOWER FILLING PIPE TBA/19-020V TBA 0250B HVA, TBA/19-030V TBA 0250B HVA
050 3271445-0000 1 PRESSURE FLANGE 010 2826640-0000 1 UPPER FILLING PIPE
060 3271430-0000 6 FORK 020 2826638-0004 1 LOWER FILLING PIPE
TBA/19-020V TBA 0125S NOHVA, TBA/19-020V TBA 0100B NOHVA, TBA/19-030V TBA 0125S NOHVA 050 3271447-0000 1 PRESSURE FLANGE
010 2826636-0001 1 UPPER FILLING PIPE 060 3271429-0000 6 FORK
020 2826637-0001 1 LOWER FILLING PIPE TBA/19-020V TBA 0250B NOHVA, TBA/19-030V TBA 0250B NOHVA
050 3271431-0000 1 PRESSURE FLANGE 010 2826640-0000 1 UPPER FILLING PIPE
060 3271430-0000 6 FORK 020 2826638-0004 1 LOWER FILLING PIPE
TBA/19-020V TBA 0200B HVA, TBA/19-020V TBA 0180B HVA, TBA/19-030V TBA 0200B HVA, TBA/19-030V 050 3271437-0000 1 PRESSURE FLANGE
TBA 0180B HVA 060 3271429-0000 6 FORK
Machine Type Group Description Used-In Group Number Page No
Tetra Pak No. 2788591-0200 UK FILLING PIPE Pos. 010 2788591-0200 1-3 (8)
Doc No: UP-3172998-0102
Used in group:
Tetra Pak Pos. 010 UK FILLING PIPE Drawing file: 2788591-2_1_AA.hpgl
1-4 (8)
ECM: 647949 - 20131114
Group number: 2788591-0200
Assembly Drawing: 2788591-2_1_AA This list covers pages from 1-2 to 1-7
Pos Part No UN Qty Description Page No Pos Part No UN Qty Description Page No
TBA/19-020V TBA 0250B NOHVA, TBA/19-030V TBA 0250B NOHVA (Cont'd) 020 2826638-0001 1 LOWER FILLING PIPE
050 3271437-0000 1 PRESSURE FLANGE 050 3271443-0000 1 PRESSURE FLANGE
060 3271429-0000 6 FORK 060 3271429-0000 6 FORK
TBA/19-020V TBA 0250S HVA, TBA/19-030V TBA 0250S HVA TBA/19-010V TBA 0200B NOHVA, TBA/19-010V TBA 0180B NOHVA
010 2826636-0002 1 UPPER FILLING PIPE 010 2826630-0000 1 UPPER FILLING PIPE
020 2826637-0004 1 LOWER FILLING PIPE 020 2826638-0001 1 LOWER FILLING PIPE
050 3271448-0000 1 PRESSURE FLANGE 050 3271435-0000 1 PRESSURE FLANGE
060 3271430-0000 6 FORK 060 3271429-0000 6 FORK
TBA/19-020V TBA 0250S NOHVA, TBA/19-030V TBA 0250S NOHVA TBA/19-010V TBA 0200M NOHVA
010 2826636-0002 1 UPPER FILLING PIPE 010 2796080-0002 1 UPPER FILLING PIPE
020 2826637-0004 1 LOWER FILLING PIPE 020 2826637-0003 1 LOWER FILLING PIPE
050 3271433-0000 1 PRESSURE FLANGE 050 3271433-0000 1 PRESSURE FLANGE
060 3271430-0000 6 FORK 060 3271430-0000 6 FORK
TBA/19-020V TBA 0300S HVA, TBA/19-020V TBA 0284B HVA, TBA/19-030V TBA 0300S HVA, TBA/19-030V TBA/19-010V TBA 0200S NOHVA, TBA/19-010V TBA 0160S NOHVA, TBA/19-010V TWA 0200S NOHVA
TBA 0284B HVA 010 2796080-0001 1 UPPER FILLING PIPE
010 2826640-0000 1 UPPER FILLING PIPE 020 2826637-0002 1 LOWER FILLING PIPE
020 2826638-0003 1 LOWER FILLING PIPE 050 3271432-0000 1 PRESSURE FLANGE
050 3271444-0000 1 PRESSURE FLANGE 060 3271430-0000 6 FORK
060 3271429-0000 6 FORK TBA/19-010V TBA 0200SQ NOHVA
TBA/19-020V TBA 0300S NOHVA, TBA/19-020V TBA 0284B NOHVA, TBA/19-030V TBA 0284B NOHVA, 010 2826630-0000 1 UPPER FILLING PIPE
TBA/19-030V TBA 0300S NOHVA 020 2826638-0002 1 LOWER FILLING PIPE
010 2826640-0000 1 UPPER FILLING PIPE 050 3271439-0000 1 PRESSURE FLANGE
020 2826638-0003 1 LOWER FILLING PIPE 060 3271429-0000 6 FORK
050 3271436-0000 1 PRESSURE FLANGE TBA/19-010V TBA 0250B HVA
060 3271429-0000 6 FORK 010 2826630-0000 1 UPPER FILLING PIPE
TBA/19-020V TBA 0330S HVA, TBA/19-030V TBA 0330S HVA 020 2826638-0004 1 LOWER FILLING PIPE
010 2826640-0000 1 UPPER FILLING PIPE 050 3271447-0000 1 PRESSURE FLANGE
020 2826638-0005 1 LOWER FILLING PIPE 060 3271429-0000 6 FORK
050 3271444-0000 1 PRESSURE FLANGE TBA/19-010V TBA 0250B NOHVA
060 3271429-0000 6 FORK 010 2826630-0000 1 UPPER FILLING PIPE
TBA/19-010V TBA 0125S HVA 020 2826638-0004 1 LOWER FILLING PIPE
010 2796080-0001 1 UPPER FILLING PIPE 050 3271437-0000 1 PRESSURE FLANGE
020 2826637-0001 1 LOWER FILLING PIPE 060 3271429-0000 6 FORK
050 3271445-0000 1 PRESSURE FLANGE TBA/19-010V TBA 0250S NOHVA
060 3271430-0000 6 FORK 010 2796080-0002 1 UPPER FILLING PIPE
TBA/19-010V TBA 0125S NOHVA, TBA/19-010V TBA 0100B NOHVA 020 2826637-0004 1 LOWER FILLING PIPE
010 2796080-0001 1 UPPER FILLING PIPE 050 3271433-0000 1 PRESSURE FLANGE
020 2826637-0001 1 LOWER FILLING PIPE 060 3271430-0000 6 FORK
050 3271431-0000 1 PRESSURE FLANGE TBA/19-010V TBA 0300S HVA, TBA/19-010V TBA 0284B HVA
060 3271430-0000 6 FORK 010 2826630-0000 1 UPPER FILLING PIPE
TBA/19-010V TBA 0200B HVA 020 2826638-0003 1 LOWER FILLING PIPE
010 2826630-0000 1 UPPER FILLING PIPE 050 3271444-0000 1 PRESSURE FLANGE
Machine Type Group Description Used-In Group Number Page No
Tetra Pak No. 2788591-0200 UK FILLING PIPE Pos. 010 2788591-0200 1-5 (8)
Doc No: UP-3172998-0102
Used in group:
Tetra Pak Pos. 010 UK FILLING PIPE Drawing file: 2788591-2_1_AA.hpgl
1-6 (8)
ECM: 647949 - 20131114
Group number: 2788591-0200
Assembly Drawing: 2788591-2_1_AA This list covers pages from 1-2 to 1-7
Pos Part No UN Qty Description Page No Pos Part No UN Qty Description Page No
TBA/19-010V TBA 0300S HVA, TBA/19-010V TBA 0284B HVA (Cont'd)
060 3271429-0000 6 FORK
TBA/19-010V TBA 0300S NOHVA, TBA/19-010V TBA 0284B NOHVA
010 2826630-0000 1 UPPER FILLING PIPE
020 2826638-0003 1 LOWER FILLING PIPE
050 3271436-0000 1 PRESSURE FLANGE
060 3271429-0000 6 FORK
TBA/19-010V TBA 0330S NOHVA
010 2826630-0000 1 UPPER FILLING PIPE
020 2826638-0005 1 LOWER FILLING PIPE
050 3271438-0000 1 PRESSURE FLANGE
060 3271429-0000 6 FORK
TBA/19-010V TPA 0200SQ NOHVA
010 2796080-0001 1 UPPER FILLING PIPE
020 2826637-0007 1 LOWER FILLING PIPE
050 3271432-0000 1 PRESSURE FLANGE
060 3271430-0000 6 FORK
TBA/19-010V TPA 0250SQ NOHVA
010 2796080-0001 1 UPPER FILLING PIPE
020 2826637-0006 1 LOWER FILLING PIPE
050 3271432-0000 1 PRESSURE FLANGE
060 3271430-0000 6 FORK
TBA/19-010V TPA 0330SQ NOHVA
010 2826630-0000 1 UPPER FILLING PIPE
020 2826638-0005 1 LOWER FILLING PIPE
050 3271434-0000 1 PRESSURE FLANGE
060 3271429-0000 6 FORK
Common Parts
1531142-0105 1 REBUILDING MANUAL
3172998-0102 1 UPDATE PAGES
030 927421-0006 52 O-RING 17.3X2.4 SILICONE
040 3271429-0000 6 FORK
Tetra Pak No. 2788591-0200 UK FILLING PIPE Pos. 010 2788591-0200 1-7 (8)
Doc No: UP-3172998-0102
Tetra Pak
SPC
Spare Parts Catalogue
®
Doc. No. UP-3172998-0102 UP-1 (10)
UP Operation Manual Updates
Description
This chapter contains the pages used to update the existing machine Operation
Manual. See Section Updating the Manuals in RM-1531142-0105.
Description. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . UP-2
®
Doc. No. UP-3172998-0102 UP-3 (10)
Table of Contents UP Operation Manual Updates
Instruction:
a) Find your machine in the tables below. Note the procedure number next to it.
b) Replace the corresponding pages in the Operation Manual, in Procedure Daily
Care, with the updated pages.
c) On the updated pages, write the procedure number on the empty line by
Procedure no_____ with a black permanent pen.
TBA/19-0100
TBA/19-2000
TBA/19-0300
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-5 (10)
OM Update Pages: Instruction UP Operation Manual Updates
(Cont’d)
Added Pages
Date Installed Kit (Doc. No.) Removed Pages Signature
(Cont’d)
®
Doc. No. UP-3172998-0102 UP-7 (10)
OM Update Pages: Instruction UP Operation Manual Updates
(Cont’d)
Added Pages
Date Installed Kit (Doc. No.) Removed Pages Signature
1 WARNING
Hazardous substances
Risk of personal injury.
Cleaning compound. Follow the Safety
Precautions.
®
Doc. No. UP-3172998-0102 UP-9 (10)
OM Update Pages: Instruction UP Operation Manual Updates
5 4
Do one of the following:
• Store the lower filling pipe (2) in a clean,
dry area until the next production run. In
preparation for the next production run,
dismantle the lower filling pipe (2) and
clean it. Use cleaning compound code D,
see Chapter Technical Data. Reassemble
the lower filling pipe (2) and put it in
a container with cleaning compound
code F3 (see Chapter Technical Data), no
1
more than 1 hour before the production
run.
or:
CAUTION
3 Risk of unsterility
Change the cleaning compound at intervals
recommended by the supplier. Follow the
supplier’s recommendations for the correct
concentration.
1 Float
2 Filling pipe • Put the lower filling pipe (2) in a container
3 Pressure flange with cleaning compound code F3 (see
4 Locking fork Chapter Technical Data) until the next
5 Spring production run.