ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4

Summary of Cost Estimate

S. N. ITEMS AMOUNT IN NRS

1 GENERAL 0.00

2 SITE CLEARANCE #NAME?

3 Cycle Track #NAME?

4 #NAME? #NAME?

5 #NAME? #NAME?

6 #NAME? #NAME?

7 #NAME? #NAME?

8 #NAME? #NAME?

9 #NAME? #NAME?

10 #NAME? #NAME?

11 #NAME? #NAME?

12 #NAME? #NAME?

13 #NAME? #NAME?
TOTAL #NAME?
VAT 13 % #NAME?
Grand Total #NAME?

Per km cost #NAME?

Page 1 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Item Bill of Quantities


Description
No. Unit Quantity Rate, NRs. Amount, NRs.
1 GENERAL
Provision of Insurances as specified in the Contract
LS 0.00
Documents. (SS/SP- 119)
Provide, operate and maintain Quality Control laboratory
including equipment,accessories and consumables for both
no. 0.00
field testing facilities and off-site tests with manpower as per
the Contract Documents. (SS/SP- 502, 511)
Carry out routine maintenance of the existing road to keep the
road serviceable through out the contract period : (SS/SP-
107)
During construction km-mth 0.00
During Defects Liability Period until issue of Defects Liability
km-mth 0.00
Certificate.
Provide photographs of the works.(SS/SP- 110) no. 0.00
Provide and establish camp for contractor's labor and staff and
demolish after completion of works as per the Specifications. LS `` ``
(SS/SP- 109)
Relocation of services as instructed by the engineer (SS/SP-
PS 0.00
103)
Sub - Total Section 1 0.00
2 SITE CLEARANCE
Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up
to 300 mm, removal of stumps of trees cut earlier and disposal
of unserviceable materials and stacking of serviceable
Material to be used or auctioned, up to a lead of 30 meters
including removal and disposal of top organic soil not
exceeding 150 mm in thickness.
Clearance of landslides, debris from culverts and side-drains
including haulage for disposal within 50 m, all complete. cu.m 0.00
(SS/SP- 201)

Cutting of trees, including cutting of trunks, branches and


removal of stumps, roots, stacking of serviceable Material with
all lifts and up to a lead of 1000 meters and earth filling in the
depression/pit.

above 300mm to 600mm no. 0.00


above 600mm to 900mm no. 0.00
above 900mm to 1800mm no. 0.00
Dismantling Works
Dismantaling Bridge, culvert and other structures ( Reinforced
cement concrete work) including stockpiling the resuable
materials and disposable of unsuable materials within 50m.
Lead.

3 Side Drain

Earthwork excavation in Soft soil for drain and trenches


3.1 including shoring, struting, bracing, sheeting and necessary
disposal and lift etc. as per specification, all complete work.

For Side Drain


For Bridges and Culverts

Providing and placing cement concrete M10/40 including


3.2
compaction, curing, testing etc., all complete (SS/SP- 2000)
For Side Drain
For Bridges and Culverts

Page 2 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Item Bill of Quantities


Description
No. Unit Quantity Rate, NRs. Amount, NRs.
Providing, Preparing and Installing formwork including
3.3 necessary supports and removing after completion for
foundation and footings using timber (SS/SP -1804,1805)
For Side Drain
For Bridges and Culverts

Providing and placing cement concrete M20/20 including


3.4
compaction, curing, testing etc. all complete (SS/SP- 2000)
For Side Drain
For Bridges and Culverts

3.5 Precast cover drain (Derived rate)


For Side Drain

Providing and laying Reinforcement including cutting,


3.6 bending, binding, fixing in position and lead etc. all complete
as per specification and drawing
For Side Drain
For Bridges and Culverts

Providing and laying of /20 precast cement concrete Kerb


325mm * 165mm * 250 mm ( H*B*L) with 12 mm thick 1:3
cement sand mortar bedding and joints including
3.7
foundationexcavation levelling but excluding foundation
concrete for foundation or sand gravel material, all complete
as per Drawing and techincal
For Road

4 Foothpath
Excavation for foothpath

Formation of embankment from borrow site including


compaction in layers not exceeding 150mm compaction depth,
watering and necessary haulage etc. as per specification, all
complete work.
For Foothpath
For Road

Construction of Median and Island with Soil Taken from


Borrow Areas Providing and laying Median and Island above
road level with approved Material deposited including
compacted as per Drawing and Specifications. ( using material
from borrow area).
Green zone
Median

Providing, laying, spreading and compacting graded stone


aggregate to wet mix macadam specification including
premixing the Material withwater at OMC laying in uniform
layers in sub-base / base course on well prepared surface
and compacting to achieve required density as perDrawing
and Technical Specifications. Base course with B2 material

For Foothpath
For Road

Providing and filling sand in Foundation Trences as per


Drawing & Technical Specification
For Foothpath

Page 3 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Item Bill of Quantities


Description
No. Unit Quantity Rate, NRs. Amount, NRs.

Provide & laying 60mm thick Heavy duty interlocking concrete


block over 50mm thick stone dust in perfect line & level, all
complete work.
For Foothpath

5 Green Zone Area


Edge Kerb
Construction of Median and Island with Soil Taken from
Borrow Areas Providing and laying Median and Island above
road level with approved Material deposited including
compacted as per Drawing and Specifications. ( using material
from borrow area).
For Foothpath
For Road

Planting single node culm cutting of grass (e.g. napier) on


fill slopes<45 and embankment slopes in plain areas.
Approx. length 15-, including digging planting hole 10 -
20 cm depth using a metal rod or hardwood peg.
For Foothpath
For Road

Page 4 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Item Bill of Quantities


Description
No. Unit Quantity Rate, NRs. Amount, NRs.

6 Cycle Track
Road-way excavation including haulage and disposal upto 10
m distance, all complete. (SS/SP- 900)
For Cycle Track

Formation of embankment including excavation, compaction in


layers and watering, all complete. (SS/SP- 900)
For Cycle Track

Construction of Subgrade and Earthen Shoulders with


approved Material ( capping layer) 10.4 1003, 1005, Providing
and laying sub-grade and earthen shoulders with approved
Material obtained from borrow pits with all lifts & leads as per
Drawing and Technical Specifications
For Cycle Track

Providing, laying, spreading and compacting graded stone


aggregate to wet mix macadam specification including
premixing the Material withwater at OMC laying in uniform
layers in sub-base / base course on well prepared surface
and compacting to achieve required density as perDrawing
and Technical Specifications. Base course with B2 material

For Cycle Track

Providing and filling sand in Foundation Trences as per


Drawing & Technical Specification
For Cycle Track

Provide & laying 60mm thick Heavy duty interlocking concrete


block over 50mm thick stone dust in perfect line & level, all
complete work.
For Cycle Track

6 Carriageway
Road-way excavation including haulage and disposal upto 10
m distance, all complete. (SS/SP- 900)

Construction of Embankment with Material


obtained from Borrow pits
Providing, laying, spreading and compacting
embankment with borrow material as per Drawingand
Technical Specifications.

Construction of Subgrade and Earthen Shoulders with


approved Material ( capping layer) 10.4 1003, 1005, Providing
and laying sub-grade and earthen shoulders with approved
Material obtained from borrow pits with all lifts & leads as per
Drawing and Technical Specifications

Page 5 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Item Bill of Quantities


Description
No. Unit Quantity Rate, NRs. Amount, NRs.

Providing, laying, spreading and compacting graded stone


aggregate to wet mix macadam specification including
premixing the Material withwater at OMC laying in uniform
layers in sub-base / base course on well prepared surface
and compacting to achieve required density as perDrawing
and Technical Specifications. Base course with B2 material

Providing and spraying prime coat [1301, 1302]

Providing and laying dense bituminous macadam using


crushed aggregates of specified grading, premixed with
bituminous binder and filler as per Drawing and Technical
Specifications.

Supply and application of tack coat using cutback bitumen


including cleaning the surface by wire brushes, brooms etc
before applying primecoat.

Providing, laying and compaction of hot mix asphalt concrete


(HMAC) wearing course ( Maximum aggregates size 19 mm )
with compaction as per specification.

Supplying and applying paint for Road marking including


cleaning, watering, brooming etc. all complete (10cm. wide
strip):
More than two coats over new bitumin surface

Providing and laying of /20 precast cement concrete Kerb


325mm * 165mm * 250 mm ( H*B*L) with 12 mm thick 1:3
cement sand mortar bedding and joints including
foundationexcavation levelling but excluding foundation
concrete for foundation or sand gravel material, all complete
as per Drawing and techincal

7 ROAD FURNITURE AND TRAFFIC SAFETY MEASURES

Providing and fixing of road stud 100 x 100 mm, die-cast in


aluminum, resistant to corrosive effect of salt and grit, fitted
with lenses reflectors, installed in concrete or asphaltic surface
by drilling hole 30 mm upto a depth of 60 mm and bedded in a
suitable bituminous grout or epoxy mortar, all as per Drawing
and Technical Specifications
Supplying and erecting traffic sign in place including required
size of steel tubes, steel plates, cement concrete, painting,
writing and supporting steel angle nut and bolt etc., all
complete, as per Drawings.(SS/SP- 1501)
Single post.
Two or more posts.
Supplying and placing Stone Marker (R.C.C. kilometer post)
including excavation, back filling, painting and writing etc. all
complete as per Drawings.(SS/SP- 1503)
Standard kilometer marker stone (placed at each km
distance).

Page 6 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Item Bill of Quantities


Description
No. Unit Quantity Rate, NRs. Amount, NRs.
5th kilometer marker stone (placed at each 5 km distance).
Supplying and fixing in place R.C.C. delineator post including
excavation, back filling, painting and erection etc., all
complete as per Drawings.(SS/SP- 1504)
Supply and application of approved enamel paints for traffic
sign post, KM posts and similar works.
Relocation of Km posts and delinator posts with necessary
maintainance
Bollards
8 Street Lighting

Providing and erecting street light mounted on a steel circular


hollow pole of standard specifications for street lighting, 9 m
high spaced 15 m apart, 1.8 m overhang on both sides if fixed
in the median and on one side if fixed on the footpath, fitted
with sodium vapor lamp and fixed firmly in concrete foundation
as per design ,Drawing and Technical Specifications..

9 MISCELLANEOUS WORKS

10 RETAINING AND BREAST WALLS

11 Bridges and Culverts

Page 7 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Remarks

Page 8 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Remarks

Page 9 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Remarks

Page 10 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Remarks

Page 11 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Remarks

Page 12 of 313
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Bill of Quantities

Remarks

Page 13 of 313
DETAILED QUANTITY ESTIMATE

Name of Road :Bijule - Lekhkharka - Dubekol - Aeselukharka Sadak Starunnah Kalspatre to


Complete Ch0+000 - ch29+923.25km
Item Breadth Height
Description of works No. Length (m) Quantity Unit
No. (m) (m)
1 GENERAL
1.1 e 1 Pkg
Provision of Site Office at mid section of road (two
rooms Size: 3mx4m ) at location acceptable to
1.2
the project manager within the Contract package
with accommodation facilities. 4 month
Carry out additional tests for material and works
1.3
as required and instructed by the Project Manager.
1 Pkg
Relocation of the utilities and services as
1.4
instructed by the Project Manager 1 Pkg
2 SITE CLEARANCE WORK
Site Clearance :s Clearing and Grubbing including
cutting of trees having girth of less than 30 cm
2.1 when measured at 1m above the ground. 0.5 29923.25 5.5 82288.94 Sqm
3 EARTHWORK
Excavation in roadway, drain and foundation of
structure including removal and satisfactory
disposal of all materials up to a lead of 50m using
excavator or breaker as instructed by Engineer for
different types of soils as follows :
3.1 Ordinary soil 50641.91 cum
3.2 Hard soil 151442.12 cum
3.3 Ordinary rock 8010.65 cum
3.4 Medium rock 8010.65 cum
Hard rock (chiseling, wedging, tempering,
3.5 breaking by transport / hauling equipment etc) 1237.25 cum
Construction of embankments, shoulders and
othermiscellaneous filling and backfilling as per
3.6 design and drawing 38016.03 cum
4 STRUCTURAL WORKS
4.1 Gabion works
Supply and fabrication of gabion boxes with
hexagonal mesh size of 100 mm x 120 mm
including rolling, cutting and weaving (mesh wire
10 SWG, selvedge wire 7 SWG, binding wire 12
SWG, all heavy zinc coated wires) of following size
4.1.1 boxes:
Box size (3*1*1) 2079.00 Box
Box size (2*1*1) 4159.00 Box
Box size (1.5*1*1) 4159.00 Box
Packing and filling of gabion crates with rubble
4.1.2 stones 20794.20 cum
4.2 Masonry Walls
Stone masonry work including full compensation
for all labour, materials and other incidentals
required to complete the work as per the
specifications and drawings. It includes full
compensation for using specially dressed stones
on the face of wall with batter and provisions for
weep hole as necessary as mentioned in
specification and directed by the Engineer :
Uncoursed stone rubble masonry works in dry
5.1 stone. 0 Cu.m.
Uncoursed stone rubble masonry works in 1:4
cement sand mortar 6529.969 Cu.m.
5 DRAINAGE WORKS
Side drain: Construction of composit drain
(concrete + masonry drain in 1:4 cement sand
mortar) all complete works as mentioned in
5.1 specification and directed by the Engineer. 34371.82 Rm
Item Breadth Height
Description of works No. Length (m) Quantity Unit
No. (m) (m)
5.3 RCC Hume Pipe Culvert all complete work

Supplying , Laying fitting and fixing of NP3 RCC


Hume pipe. It include all operation required to
complete the works up to a trench depth of 2.2m
below the ground level and jointing of pipes with
1:2 cement sand mortar all complete as
mentioned in specification and directed by the
Engineer
900mm 58.00 Nos
6 PAVEMENT WORKS
Preparation of subgrade as mentioned in the
6.1 specification and directed by the Engineer.
At carriageway including extrawidening and
passing bays 1 29923.25 7 240882.16 Sqm
240882.16 Sqm

Providing, laying, spreading, watering, leveling and


compaction of natural sand gravel sub base
grading as per table 12.1 of standard specification
and lead upto 10m according to the designed
camber all complete as mentioned in the
6.2 specification and directed by the Engineer.
At carriageway including extrawidening and
passing bays 1 29923.25 7 0.15 36132.32 Cu.m.
Total 36132.32 Cu.m.
Providing, laying, spreading, watering, leveling and
compaction of crusher run materials for base
course lead up to 10m according to the designed
camber all complete as mentioned in the
6.3 specification and directed by the Engineer.
At carriageway including extrawidening and
passing bays 1 29923.25 3.75 0.10 12904.401563 Cu.m.
Total 12904.40 Cu.m.

Providing and spraying bituminous prime coat


MC30/MC70 including cleaning the road surface
using wire, brushes, broom etc before applying
prime coat as mentioned in the specification. Spray
6.4 rate as instructed by engineer
At carriageway including extrawidening and
passing bays 1 29923.25 3.75 129044.02 Litre
Total 129044.02 Litre

Providing and spraying bituminous tack coat


MC30/MC70 including cleaning the road surface
using wire, brushes, broom etc before applying
prime coat as mentioned in the specification. Spray
6.5 rate as instructed by engineer 64522.01 Litre

Providing, mixing, laying and compaction of Premix


6.6 concrete of 40 mm thick all complete
At carriageway including extrawidening and
passing bays 1 29923.25 3.75 0.04 5161.760625 Cu.m.
Total 5161.76 Cu.m.

7 ROAD FURNITURE / TRAFFIC SIGN BOARD


Supplying and placing standard RCC kilometer
post (place at each km) all complete including
painting, and writing etc. all complete as per
7.1 specification and drawings. 7.00 Nos
Supplying and placing standard RCC kilometer
post (place at 5km interval ) all complete including
painting, and writing etc. all complete as per
7.2 specification and drawings. 2.00 Nos
Supplying and fixing in place R.C.C.delineater and
guard post including excavation,paintng,and
7.3 erectionetc. all complete as final drawing 150.00 Nos
Item Breadth Height
Description of works No. Length (m) Quantity Unit
No. (m) (m)

Supplying and erecting traffic sign in place


including 50 mm dia steel tube, 2mm thick steel
plate, cement concrete, painting, writing and
7.4 supporting steel angle nut and bolt etc complete

a) 60 cm dia circular, 60 cm equilateral triangle and


60 x 45 cm rectangular shaped sign (Single post) 10.00 Nos
b) 1.2m x 0.75 m size bigger traffic sign with back
support and two or more post 5.00 Nos
7.5 Provision of Project information board 2.00 Nos

8 DAY WORKS
Cost for labour input during the construction period
as per preamble and as directed by the Engineer.
8.1
Unskilled labour 10.00 m/d
Skilled Labour 3.00 m/d
Cost of excavator for maintenance of road beyond
8.2
contract 5.00 hrs
9 Miscellaneous Work
9.1 Supply and Laying of HDPE pipe for retaining structure 4436.25 Rm
Provide and place Geo-textile all complete as per drawing and
9.2
specifications. 18060.35 Sqm
Ch0+000 - ch29+923.25km

Remarks
Remarks

@1 litre per sqm

@0.50 litre per sqm

HPB*30+>12%*3
0
Remarks

Total=HPBx2+>12%x
2+10
Government of Nepal
#REF!
#REF!
#REF!
#REF!

Summary Of Cost
#REF! F/Y:2078/079

#REF!

Nature of the work: Asphalt pavement, drain, cross drainage and associated works

Name of the Road: Birtamode Muktichowk Sanischare Road ko Kaptanbari chowk, Puspalal chowk, Bihibare hat
Kharbandi Buddha chowk, Kalisthan bazar, Buddhashanti-2, Jaypur Budhabare road, jhapa

S.No Description Amounts Remarks


1 General Work 0.00
2 Carriageway 65,764,605,582.15
3 Drain, Retaining wall and Cross drainage structures 0.00
4 Trafic sign, Road markings & other appurtenances 0.00
Sub- Total with PS 65,764,605,582.15
Sub- Total without PS 65,764,605,582.15
VAT @13% 8,549,398,725.68
Office Management Contingency @ 4% 2,630,584,223.29
Total including PS,VAT & Contingency 76,944,588,531.12
Physical Contingency 10% 6,576,460,558.22
Price adjustment Contingency 10% 6,576,460,558.22
Grand Total 90,097,509,647.55

Total (1+2+3+4+5+6+7+8+9+10) With PS


Total Without PS
VAT @13%
Contingency @ 5%
Total including VAT & Contingency
10% Price adjustment Contingency
10% Physical Contingency
Grand Total

Cost Per km Without Vat & Contingencies


Cost Per km Without Vat Contingencies & PS
Cost Per km With Vat & Contingencies
Total Cost Per km

Prepared by: Checked by: Approved by:


773660

9978829.89 124000
34182192.02
0.72992700729927 #REF!
1068606748 #REF!
138918877.3 #REF!
53430337.42 #REF!
1260955963 #REF!

197293816.74645

- 100%
(198,460.09)
- 25,799.81
-
- 25,799.81
-
-
- 25,799.81

-
(25,959.46)
(3,374.73)
(3,374.73)

Prepared by: Checked by: Approved by:


248000

excluding pipe and box culvert


excluding pipe and box culvert

Prepared by: Checked by: Approved by:


Government of Nepal
#REF!
#REF!
#REF!
#REF!

Abstract Of Cost

#REF! F/Y:2078/079

#REF!

Nature of the work: Asphalt pavement, drain, cross drainage and associated works

Name of the Road: Birtamode Muktichowk Sanischare Road ko Kaptanbari chowk, Puspalal chowk, Bihibare hat Kharbandi Buddha chowk,
. Kalisthan bazar, Buddhashanti-2, Jaypur Budhabare road, jhapa

Item
Description Unit Quantity Rate, NRs. Amount, NRs. Remarks
No.

1 General Work
Provision of Insurances as specified in the
1.01 LS 1.00 0.00
Contract Documents. (SS/SP- 119)

Providing and installation of project signboards with size


1.02 of 1.8 x 1.2 m as per specification and instruction of Nos. 2.00 0.00
engineer. [SS-110]
Relocation of services / minor infrastructures and other
1.03 relevant unforseen works items as neccessiated, as per PS 1.00 0.00
specifications and instruction of the Engineer.[SS/SP-111]

Carrying out laboratary test as per QAP(Quality


1.04 Assurance Plan), Specification and as instructed by Job 1.00 0.00
Engineers all complete.
Sub - Total Section 1 0.00
2 Carriageway

Clearing and grubbing road land including uprooting rank


vegetation, grass, bushes, shrubs, saplings and trees girth
up to 300 mm, removal of stumps of trees cut earlier and
disposal of unserviceable materials and stacking of
2.01 serviceable Material to be used or auctioned, up to a lead sqm 37800.00 0.00
of 30 meters including removal and disposal of top
organic soil not exceeding 150 mm in thickness all
complete as per drawing, specification and instruction.
[SS-201]

Scarifying Existing road Surface to a depth of 50 mm by


Mechanical Means, Scarifying the existing bituminous
2.02 road surface to a depth of 50 mm and disposal of scarified sqm 14652.00 0.00
Material with in all lifts and lead as per Drawing and
Technical Specifications. [SS-1003]

Loosening, leveling and Compacting original ground


supporting embankment to facilitate placement of first
layer of embankment, scarified to a depth of 150 mm,
2.03 sqm 662141.00 99,321.15 65,764,605,582.20
mixed with water at OMC and then compacted by rolling
so as to achieve dry density as per Drawing and Technical
Specifications. [SS 1003,1005]

Construction of Embankment, Providing, laying,


spreading and compacting embankment and compact to
the density not less than 15.2 KN/Cum as per Drawing and
Technical Specifications. (CBR of Borrow Material shall
2.04 Cum 26327.32 0.00
not be less than 10% , For technical details and borrow pit
IRC: 36-1970. RECOMMENDED PRACTICE FOR THE
CONSTRUCTION. OF EARTH EMBANKMENTS FOR
ROAD WORKS shall prevail). [SS 909, 910]

Providing and laying granular sub-base on prepared


surface, mixing at OMC, and compacting to achieve the
2.05 Cum 15572.09 0.00
desired density, complete as per Drawing and Technical
Specifications., By Mechanical means. [SS -1201]

Providing and laying Crusher Run Macadam on a


prepared surface, spreading and mixing , watering and
2.06 compacting to form a layer of sub-base/Base course as Cum 10721.07 0.00
per Drawing and Technical Specifications., By Mix in
Place Method. [SS-1204]

Prepared by: Checked by: Approved by:


Item
Description Unit Quantity Rate, NRs. Amount, NRs. Remarks
No.

Prime Coat, with MC 30 / 70 by Mechanical Means,


Providing and applying prime coat with Hot Bitumen
( including cutter) on prepared surface of granular base
2.07 including cleaning of road surface and spraying by lit. 46184.40 0.00
mechanical means as per Technical Specification .,
Bitumen ( cutback) MC 30 ( for stabilized soil base/
crusher run macadam) [SS-1202]

Tack coat with Bitumen By Mechanical Means, Providing


and applying tack coat with hot Bitumen at specified rate
2.08 lit. 25658.00 0.00
on the prepared non-bituminous surfaces including
cleaning as per Technical Speciation. [SS-1302]

Bituminous Concrete / Asphalt Concrete, Providing and


laying Bituminous concrete/ Asphalt concrete using
crushed aggregates of specified grading, premixed with
2.09 bituminous binder and filler as per Drawing and Cum 2052.64 0.00
Technical Specifications, Grading - II-13 mm (Nominal
Size), In case BC is laid over freshly laid tack coat. [SS-
1309]

Sub Total 65,764,605,582.15


3 Drain, Retaining wall and Cross drainage structures

Dismantling of existing structures like culverts, bridges,


retaining walls and other structure comprising of masonry,
cement concrete, wood work, steel work, including
scaffolding wherever necessary, sorting the dismantled
3.01 Cum 176.00 0.00
Material, disposal of unserviceable Material and stacking
the serviceable Material with all lifts and lead of 1000
meters, Stone Masonry, Rubble Stone Masonry in cement
mortar. [SS-202]

Earth work in excavation of foundation of structures,


including construction of shoring and bracing, removal of
3.02 stumps and other deleterious matter and backfilling with Cum 3552.23 0.00
approved Material as per Drawing and Technical
Specifications., in all type of soil. [SS/SP 907]

Providing, laying and levelling of dry stone soling works


3.03 Cum 480.08 0.00
in the foundation all complete. (old Norms)

Providing and laying of Plain/Reinforced Cement


Concrete in Foundation complete as per Drawing and
3.04 Cum 429.11 0.00
Technical Specifications., RCC Grade M 15 including F2
finish formwork .[SS/SP-2000]

Providing and laying Plum concrete ( Boulder mixed


concrete) as per Drawing and Specifications, 60% M 15
3.05 Cum 2714.11 0.00
concrete and 40% boulders/stones, using Mechanical
Aids. [SS-2421]

Providing , Preparing and Installing form work including


necessary supports and removing after completion for
3.06 sqm 6271.00 0.00
foundation and footings., (Class F1 Finish), Using timber
(soft wood ) [SS 1804, 1805]

Providing and Laying Reinforced cement concrete NP3


Flush jointed pipe for culverts including fixing with
3.07 RM. 187.50 0.00
cement mortar 1:2 as per Drawing and Technical
Specifications., 900 mm internal dia.

Providing and laying of Plain/Reinforced Cement


Concrete in Foundation complete as per Drawing and
3.08 Cum 932.97 0.00
Technical Specifications., RCC Grade M 25 including F2
finish formwork .(SS/SP-2000)

Providing and laying , fitting and placing un-coated Mild


3.09 steel / HYSD reinforcement complete in foundation as per MT. 69.31 0.00
drawing and technical specification. [SS-2014]

Prepared by: Checked by: Approved by:


Item
Description Unit Quantity Rate, NRs. Amount, NRs. Remarks
No.

Supply and Transportation of Machine Made


Mechanically selvedged double twisted hexagonal mesh
type 100mm x 120 mm Gabion boxes / mattresses with
diapharagms, with binding wire 2.4 mm, mesh wire 3.0
mm and selvedged wire 3.90 mm, placing in position
3.1 Cum 3562.45 0.00
including stretching, forming compartments; tying with
bracing wires and tie wires; tying down the lid, providing
and filling stone / boulder in gabion boxes / mattresses etc.
including dressing, beding, bonding etc. all complete as
per special specification and drawings. [SS-2402]

Providing and laying and fixing of Geo-membrane all


3.11 sqm 2685.00 0.00
complete as per specification. [SS-2404]

Sub Total 0.00


4 Trafic sign, Road markings & other appurtenances

Retro-Reflectorized Traffic Signs, Providing and fixing of


retro- reflectorized warning, Regulatory and informatory
sign as per specification clause 1501 made of high
intensity grade sheeting , fixed over aluminum sheeting,
1.5 mm thick supported on a Heavy Duty Steel Tube
4.01 internal 50 mm dia. firmly fixed to the ground by means of Nos 65.00 0.00
properly designed foundation with M 10/40 grade cement
concrete 30 cm x 30 cm , 30 cm below ground level or as
per Drawing and Technical Specifications., 80 mm * 60
mm rectangular, Heavy Duty Steel Tube internal 50 mm
dia. [SS-1501].

Road Marking with Hot Applied Thermoplastic


Compound with Reflectorizing Glass Beads on
Bituminous Surface, On smooth surface (similar to
Asphalt concrete and rigid pavement), Providing and
4.02 laying of hot applied thermoplastic compound at least 2 sqm 2906.75 0.00
mm thick including reflectorizing glass beads as per DOR
Traffic sign manual/ Specifications .The finished surface
to be level, uniform and free from streaks and holes.(old
norms)

Road Delineators Post, Providing and installation of 150


mm * 150 mm 1. 5 m long delineators (road way
indicators, hazard markers, object markers), 80-100 cm
4.03 high above ground level, painted black and white in 20 cm Nos. 195.00 0.00
wide strips, buried or pressed into the ground and
conforming to the drawings and Technical Specifications.
[SS-1507]
Sub Total 0.00
Total(1+2+3+4+5+6 65,764,605,582.15
Sub Total With PS 65,764,605,582.15
Sub Total Without PS 65,764,605,582.15
VAT @13% 8,549,398,725.68
Contingency @ 4% 2,630,584,223.29
Total including VAT, PS & Contingency 76,944,588,531.12
Physical Contingency 10% 6,576,460,558.22
Price adjustment Contingency 10% 6,576,460,558.22
Grand Total 90,097,509,647.55

Prepared by: Checked by: Approved by:


Government of Nepal
भौतिक पूर्वाधार तथा यातायात मन्त्रालय
Department of Roads
Province-1
सडक विभाग

Summary of Quantity
RD-DMK/33701176-4/2078/79-
F/Y:2078/079
024

Asphalt pavement, drain, cross drainage and associated works

Name of the Road: Birtamode Muktichowk Sanischare Road ko Kaptanbari chowk, Puspalal chowk, Bihibare hat Kharbandi Buddha chowk, Kalisthan bazar, Buddhashanti-2, Jaypur Budhabare road, jhapa

Length Breadth Height


S.N. Description of works Unit No. Quantity Remarks
(m) (m) (m)
1 General Work
Provision of Insurances as specified in the Contract Documents. (SS/SP-
1.01 LS 1 1.00
119)
Total : 1.00

1.02 Providing and installation of project signboards with size of 1.8 x 1.2 m as per Nos. 2 2.00
specification and instruction of engineer. [SS-110]
Total : 2.00

Relocation of services / minor infrastructures and other relevant unforseen works


1.03 items as neccessiated, as per specifications and instruction of the Engineer.[SS/SP- PS 1 1.00
111]
Total : 1.00

Carrying out laboratary test as per QAP(Quality Assurance Plan), Specification and as
1.04 Job 1 1.00
instructed by Engineers all complete.
Total : 1.00
2 Carriageway

Clearing and grubbing road land including uprooting rank vegetation, grass, bushes,
shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier
2.01 and disposal of unserviceable materials and stacking of serviceable Material to be sqm
used or auctioned, up to a lead of 30 meters including removal and disposal of top
organic soil not exceeding 150 mm in thickness all complete as per drawing,
specification and instruction. [SS-201]
From carriageway calculation sheet: 37800.00
Total : 37800.00

Scarifying Existing road Surface to a depth of 50 mm by Mechanical Means,


Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of
2.02 sqm
scarified Material with in all lifts and lead as per Drawing and Technical
Specifications. [SS-1003]
From carriageway calculation sheet: 14652.00
Total : 14652.00

Loosening, leveling and Compacting original ground supporting embankment to


facilitate placement of first layer of embankment, scarified to a depth of 150 mm,
2.03 sqm
mixed with water at OMC and then compacted by rolling so as to achieve dry density
as per Drawing and Technical Specifications. [SS 1003,1005]
From carriageway calculation sheet: 662141.00
Total : 662141.00

Construction of Embankment, Providing, laying, spreading and compacting


embankment and compact to the density not less than 15.2 KN/Cum as per Drawing
and Technical Specifications. (CBR of Borrow Material shall not be less than 10% ,
2.04 Cum
For technical details and borrow pit IRC: 36-1970. RECOMMENDED PRACTICE
FOR THE CONSTRUCTION. OF EARTH EMBANKMENTS FOR ROAD WORKS
shall prevail). [SS 909, 910]
From carriageway calculation sheet: 25302.93
Total : 26327.32
Providing and laying granular sub-base on prepared surface, mixing at OMC, and
2.05 compacting to achieve the desired density, complete as per Drawing and Technical Cum
Specifications., By Mechanical means. [SS -1201]
From carriageway calculation sheet: 15572.09
Total : 15572.09 Subbase in Sohoulder =5308.894
Providing and laying Crusher Run Macadam on a prepared surface, spreading and
2.06 mixing , watering and compacting to form a layer of sub-base/Base course as per Cum
Drawing and Technical Specifications., By Mix in Place Method. [SS-1204]
From carriageway calculation sheet: 10721.07

Total : 10721.07

Prime Coat, with MC 30 / 70 by Mechanical Means, Providing and applying prime


coat with Hot Bitumen ( including cutter) on prepared surface of granular base
2.07 including cleaning of road surface and spraying by mechanical means as per lit.
Technical Specification ., Bitumen ( cutback) MC 30 ( for stabilized soil base/ crusher
run macadam) [SS-1202]
From carriageway calculation sheet: 46184.40
Total : 46184.40

Prepared by: Checked by: Approved by:


Length Breadth Height
S.N. Description of works Unit No. Quantity Remarks
(m) (m) (m)
Tack coat with Bitumen By Mechanical Means, Providing and applying tack coat
2.08 with hot Bitumen at specified rate on the prepared non-bituminous surfaces lit.
including cleaning as per Technical Speciation. [SS-1302]
From carriageway calculation sheet: 25658.00
Total : 25658.00

Bituminous Concrete / Asphalt Concrete, Providing and laying Bituminous concrete/


Asphalt concrete using crushed aggregates of specified grading, premixed with
2.09 Cum
bituminous binder and filler as per Drawing and Technical Specifications, Grading -
II-13 mm (Nominal Size), In case BC is laid over freshly laid tack coat. [SS-1309]

From carriageway calculation sheet: 2052.64


Total : 2052.64
3 Drain, Retaining wall and Cross drainage structures

Dismantling of existing structures like culverts, bridges, retaining walls and other
3.01 structure comprising of masonry, cement concrete, wood work, steel work, including Cum
scaffolding wherever necessary, sorting the dismantled Material, disposal of
unserviceable Material and stacking the serviceable Material with all lifts and lead of
1000 meters, Stone Masonry, Rubble Stone Masonry in cement mortar. [SS-202]
From Humepipe culvert calculation sheet: 176.00
Total : 176.00
Earth work in excavation of foundation of structures, including construction of
shoring and bracing, removal of stumps and other deleterious matter and backfilling
3.02 Cum
with approved Material as per Drawing and Technical Specifications., in all type of
soil. [SS/SP 907]
From Plum Retaining wall calculation sheet: 350.00
From plum slab culvert by approach road calculation sheet: 259.00
From Gabion Retaining wall calculation sheet: 1200.00
From RCC drain calculation sheet: 792.00
From Humepipe culvert calculation sheet: 540.90
From 4 m. slab culvert calculation sheet: 199.63
From 5m. Slab culvert calculation sheet: 210.70
Total : 3552.23
Providing, laying and levelling of dry stone soling works in the foundation all
3.03 Cum
complete. (old Norms)
From Plum Retaining wall calculation sheet: 105.00
From plum slab culvert by approach road calculation sheet: 77.70
From RCC drain calculation sheet: 198.00
From Humepipe culvert calculation sheet: 46.20
From 4 m. slab culvert calculation sheet: 23.71
From 5m. Slab culvert calculation sheet: 29.47
Total : 480.08
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as
3.04 per Drawing and Technical Specifications., RCC Grade M 15 including F2 finish Cum
formwork .[SS/SP-2000]
From Plum Retaining wall calculation sheet: 70.00

From plum slab culvert by approach road calculation sheet: 51.80

From RCC drain calculation sheet: 132.00

From Humepipe culvert calculation sheet: 30.75

From 4 m. slab culvert calculation sheet: 70.36

From 5m. Slab culvert calculation sheet: 74.20

Total : 429.11
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and
3.05 Specifications, 60% M 15 concrete and 40% boulders/stones, using Mechanical Aids. Cum
[SS-2421]
From Plum Retaining wall calculation sheet: 787.50

From plum slab culvert by approach road calculation sheet: 582.75

From Humepipe culvert calculation sheet: 265.50

From 4 m. slab culvert calculation sheet: 808.50

From 5m. Slab culvert calculation sheet: 269.86

Total : 2714.11

Providing , Preparing and Installing form work including necessary supports and
3.06 removing after completion for foundation and footings., (Class F1 Finish), Using sqm
timber (soft wood ) [SS 1804, 1805]
From Plum Retaining wall calculation sheet: 2310.00
From plum slab culvert by approach road calculation sheet: 1709.40
From Humepipe culvert calculation sheet: 768.00
From 4 m. slab culvert calculation sheet: 1117.95
From 5m. Slab culvert calculation sheet: 365.65
Total : 6271.00
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for culverts
3.07 including fixing with cement mortar 1:2 as per Drawing and Technical RM.
Specifications., 900 mm internal dia.

Prepared by: Checked by: Approved by:


Length Breadth Height
S.N. Description of works Unit No. Quantity Remarks
(m) (m) (m)
From Humepipe culvert calculation sheet: 187.50
Total : 187.50
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as
3.08 per Drawing and Technical Specifications., RCC Grade M 25 including F2 finish Cum
formwork .(SS/SP-2000)
From plum slab culvert by approach road calculation sheet: 82.88
From RCC drain calculation sheet: 731.50
From 4 m. slab culvert calculation sheet: 83.79
From 5m. Slab culvert calculation sheet: 34.80
Total : 932.97

Providing and laying , fitting and placing un-coated Mild steel / HYSD reinforcement
3.09 MT.
complete in foundation as per drawing and technical specification. [SS-2014]

From Plum Retaining wall calculation sheet: 6.67


From RCC drain calculation sheet: 53.60
From 4 m. slab culvert calculation sheet: 6.22
From 5m. Slab culvert calculation sheet: 2.82
Total : 69.31

Supply and Transportation of Machine Made Mechanically selvedged double twisted


hexagonal mesh type 100mm x 120 mm Gabion boxes / mattresses with
diapharagms, with binding wire 2.4 mm, mesh wire 3.0 mm and selvedged wire 3.90
3.10 mm, placing in position including stretching, forming compartments; tying with Cum
bracing wires and tie wires; tying down the lid, providing and filling stone / boulder
in gabion boxes / mattresses etc. including dressing, beding, bonding etc. all complete
as per special specification and drawings. [SS-2402]
From Gabion Retaining wall calculation sheet: 3360.00
From Humepipe culvert calculation sheet: 157.50
From 4 m. slab culvert calculation sheet: 32.61
From 5m. Slab culvert calculation sheet: 12.34
Total : 3562.45
Providing and laying and fixing of Geo-membrane all complete as per specification.
3.11 sqm
[SS-2404]
From Gabion Retaining wall calculation sheet: 2640.00
From Humepipe culvert calculation sheet: 45.00
Total : 2685.00
4 Trafic sign, Road markings & other appurtenances

Retro-Reflectorized Traffic Signs, Providing and fixing of retro- reflectorized


warning, Regulatory and informatory sign as per specification clause 1501 made of
4.01 high intensity grade sheeting , fixed over aluminum sheeting, 1.5 mm thick supported Nos
on a Heavy Duty Steel Tube internal 50 mm dia. firmly fixed to the ground by means
of properly designed foundation with M 10/40 grade cement concrete 30 cm x 30 cm ,
30 cm below ground level or as per Drawing and Technical Specifications., 80 mm *
60 mm rectangular, Heavy Duty Steel Tube internal 50 mm dia. [SS-1501].
From Trafffic sign, Road markings & Other appurtenances calculation sheet:

90 cm height equilateral triangle 20.00

60 cm circular 30.00

80 cm x 60 cm rectangular 15.00

Total : 65.00

Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass
Beads on Bituminous Surface, On smooth surface (similar to Asphalt concrete and
rigid pavement), Providing and laying of hot applied thermoplastic compound at least
4.02 sqm
2 mm thick including reflectorizing glass beads as per DOR Traffic sign manual/
Specifications .The finished surface to be level, uniform and free from streaks and
holes.(old norms)

From Trafffic sign, Road markings & Other appurtenances calculation sheet: 2906.75

Total : 2906.75

Road Delineators Post, Providing and installation of 150 mm * 150 mm 1. 5 m long


delineators (road way indicators, hazard markers, object markers), 80-100 cm high
4.03 above ground level, painted black and white in 20 cm wide strips, buried or pressed Nos.
into the ground and conforming to the drawings and Technical Specifications. [SS-
1507]
From Trafffic sign, Road markings & Other appurtenances calculation sheet: 195.00
Total : 195.00

Prepared by: Checked by: Approved by:


Government of Nepal
#REF!
#REF!
#REF!
#REF!

Summary of Rates
### F/Y:2078/079
#REF!
Nature of the work: Asphalt pavement, drain, cross drainage and associated works
Name of the Road: Birtamode Muktichowk Sanischare Road ko Kaptanbari chowk, Puspalal chowk, Bihibare hat Kharbandi Buddha
chowk,Kalisthan bazar, Buddhashanti-2, Jaypur Budhabare road, jhapa

Specification
S.N. Norms No Description Unit Rate (NRs)
Clause No.

Providing and installation of project signboards with size of 1.8 x 1.2 m as per specification and
1 1.3 110 nos
instruction of engineer. [SS-110]

Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs,
saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of
2 2.1.I.ii.A 201 sqm
unserviceable materials and stacking of serviceable Material to be used or auctioned, up to a
lead of 30 meters including removal and disposal of top organic soil not exceeding 150 mm in
thickness all complete as per drawing, specification and instruction. [SS-201]

Earth work in excavation of foundation of structures, including construction of shoring and


3 9.4.I.B.i 907 bracing, removal of stumps and other deleterious matter and backfilling with approved Material cum
as per Drawing and Technical Specifications., in all type of soil. [SS/SP 907]

Construction of Embankment, Providing, laying, spreading and compacting embankment and


compact to the density not less than 15.2 KN/Cum as per Drawing and Technical Specifications.
4 9.9.B 909, 910 (CBR of Borrow Material shall not be less than 10% , For technical details and borrow pit IRC: cum
36-1970. RECOMMENDED PRACTICE FOR THE CONSTRUCTION. OF EARTH
EMBANKMENTS FOR ROAD WORKS shall prevail). [SS 909, 910]

5 10.8. N/A Providing, laying and levelling of dry stone soling works in the foundation all complete. (old Cum
Norms)
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per
6 20.2.A 2000 Drawing and Technical Specifications., RCC Grade M 15 including F2 finish formwork cum
.[SS/SP-2000]
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per
7 20.2.E 2000 Drawing and Technical Specifications., RCC Grade M 25 including F2 finish formwork cum
.(SS/SP-2000)
8 20.5 2014 Providing and laying , fitting and placing un-coated Mild steel / HYSD reinforcement complete MT.
in foundation as per drawing and technical specification. [SS-2014]
Providing , Preparing and Installing form work including necessary supports and removing after
9 18.1.a 1804, 1805 completion for foundation and footings., (Class F1 Finish), Using timber (soft wood ) [SS 1804, sqm
1805]
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and
10 24.21.A.I 2421 Specifications, 60% M 15 concrete and 40% boulders/stones, using Mechanical Aids. [SS- cum
2421]
Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for culverts including
11 7.2.D 701 fixing with cement mortar 1:2 as per Drawing and Technical Specifications., 900 mm internal meter
dia. [SS-701]
12 24.06 2404 Providing and laying and fixing of Geo-membrane all complete as per specification. [SS-2404] sqm

Retro-Reflectorized Traffic Signs, Providing and fixing of retro- reflectorized warning,


Regulatory and informatory sign as per specification clause 1501 made of high intensity grade
sheeting , fixed over aluminum sheeting, 1.5 mm thick supported on a Heavy Duty Steel Tube
13 15.2 1501 internal 50 mm dia. firmly fixed to the ground by means of properly designed foundation with no
M 10/40 grade cement concrete 30 cm x 30 cm , 30 cm below ground level or as per Drawing
and Technical Specifications., 80 mm * 60 mm rectangular, Heavy Duty Steel Tube internal 50
mm dia. [SS-1501].
Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on
Bituminous Surface, On smooth surface (similar to Asphalt concrete and rigid pavement),
14 15.9.i 1504 Providing and laying of hot applied thermoplastic compound at least 2 mm thick including sqm
reflectorizing glass beads as per DOR Traffic sign manual/ Specifications .The finished surface
to be level, uniform and free from streaks and holes.(old norms)

Prepared by: Checked by: Approved by:


Specification
S.N. Norms No Description Unit Rate (NRs)
Clause No.

Loosening, leveling and Compacting original ground supporting embankment to facilitate


15 10.4.II_a 1003, 1005 placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at sqm
OMC and then compacted by rolling so as to achieve dry density as per Drawing and Technical
Specifications. [SS 1003,1005]
Scarifying Existing road Surface to a depth of 50 mm by Mechanical Means, Scarifying the
16 10.2.B 1003 existing bituminous road surface to a depth of 50 mm and disposal of scarified Material with in sqm
all lifts and lead as per Drawing and Technical Specifications. [SS-1003]
Providing and laying granular sub-base on prepared surface, mixing at OMC, and compacting
17 12.1.A 1201 to achieve the desired density, complete as per Drawing and Technical Specifications., By cum
Mechanical means. [SS -1201]
Providing and laying Crusher Run Macadam on a prepared surface, spreading and mixing ,
18 12.7_a 1204 watering and compacting to form a layer of sub-base/Base course as per Drawing and cum
Technical Specifications., By Mix in Place Method. [SS-1204]
Prime Coat, with MC 30 / 70 by Mechanical Means, Providing and applying prime coat with
Hot Bitumen ( including cutter) on prepared surface of granular base including cleaning of road
19 13.1.A_b 1302 lit
surface and spraying by mechanical means as per Technical Specification ., Bitumen ( cutback)
MC 30 ( for stabilized soil base/ crusher run macadam) [SS-1202]
Tack coat with Bitumen By Mechanical Means, Providing and applying tack coat with hot
20 13.2.A 1302 Bitumen at specified rate on the prepared non-bituminous surfaces including cleaning as per lit
Technical Speciation. [SS-1302]
Bituminous Concrete / Asphalt Concrete, Providing and laying Bituminous concrete/ Asphalt
21 13.6_i 1309 concrete using crushed aggregates of specified grading, premixed with bituminous binder and cum
filler as per Drawing and Technical Specifications, Grading - II-13 mm (Nominal Size), In case
BC is laid over freshly laid tack coat. [SS-1309]
Dismantling of existing structures like culverts, bridges, retaining walls and other structure
comprising of masonry, cement concrete, wood work, steel work, including scaffolding
22 2.4.ii.B 202 wherever necessary, sorting the dismantled Material, disposal of unserviceable Material and cum
stacking the serviceable Material with all lifts and lead of 1000 meters, Stone Masonry, Rubble
Stone Masonry in cement mortar. [SS-202]

Supply and Transportation of Machine Made Mechanically selvedged double twisted


hexagonal mesh type 100mm x 120 mm Gabion boxes / mattresses with diapharagms, with
binding wire 2.4 mm, mesh wire 3.0 mm and selvedged wire 3.90 mm, placing in position
23 24.01 A i) 2402 cu.m.
including stretching, forming compartments; tying with bracing wires and tie wires; tying down
the lid, providing and filling stone / boulder in gabion boxes / mattresses etc. including
dressing, beding, bonding etc. all complete as per special specification and drawings. [SS-2402]

Road Delineators Post, Providing and installation of 150 mm * 150 mm 1. 5 m long delineators
24 15.12 1507 (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, No.
painted black and white in 20 cm wide strips, buried or pressed into the ground and conforming
to the drawings and Technical Specifications. [SS-1507]
Carrying out laboratary test as per QAP(Quality Assurance Plan), Specification and as
25 1.5 111 Month
instructed by Engineers all complete.

Prepared by: Checked by: Approved by:


Summary of Quantity Of Gabion Retaining Wall
Item Code Name Quantity Unit
20.01 PCC Capping M10 67.514 M3
26.06(A) RRM (1 in 6 C/S Ratio) 623.891 M3
10.08 Stone Soling 79.22 M3
Total 770.625
Structure (MasonryRetainingWall) Quantity
Chainage Length Right
(m) (m) MasonryRetainingWall Height M PCC Capping M10 M3 RRM (1 in 6 C/S Ratio) M3 PCC Base M10 M3 Stone Soling M3 Remarks
1+370 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 RIGHT
1+380 6.502 Plumb Retaining Wall 1.5 0.163 7.039 0.594 0.891 RIGHT
1+383.004 4.836 Plumb Retaining Wall 1.5 0.121 5.236 0.442 0.663 RIGHT
1+389.672 3.498 Plumb Retaining Wall 1.5 0.087 3.787 0.32 0.479 RIGHT
1+390 3.3335 Plumb Retaining Wall 1.5 0.083 3.609 0.305 0.457 RIGHT
1+396.339 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 RIGHT
1+400 6.8305 Plumb Retaining Wall 1.5 0.171 7.395 0.624 0.936 RIGHT
1+410 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 RIGHT
1+420 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 RIGHT
1+550 5.564 Plumb Retaining Wall 1.2 0.139 4.209 0.407 0.61 RIGHT
1+554.809 5 Plumb Retaining Wall 1.3 0.125 4.295 0.396 0.594 RIGHT
1+560 7.5955 Plumb Retaining Wall 1.3 0.19 6.525 0.601 0.902 RIGHT
1+570 5.2265 Plumb Retaining Wall 1.4 0.131 5.058 0.446 0.668 RIGHT
1+570.453 5 Plumb Retaining Wall 1.4 0.125 4.839 0.426 0.639 RIGHT
1+580 5.385 Plumb Retaining Wall 1.4 0.135 5.212 0.459 0.689 RIGHT
1+581.223 5 Plumb Retaining Wall 1.4 0.125 4.839 0.426 0.639 RIGHT
1+590 5.3845 Plumb Retaining Wall 1.3 0.135 4.626 0.426 0.639 RIGHT
1+591.992 4.3425 Plumb Retaining Wall 1.3 0.109 3.731 0.344 0.516 RIGHT
1+650 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 RIGHT
1+660 5.9005 Plumb Retaining Wall 1.6 0.148 7.101 0.575 0.862 RIGHT
1+661.801 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 RIGHT
1+670 7.637 Plumb Retaining Wall 1 0.191 4.349 0.465 0.698 RIGHT

3+900 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 LEFT
3+910 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 LEFT
3+920 9.782 Plumb Retaining Wall 1.5 0.245 10.59 0.894 1.34 LEFT
3+980 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 LEFT
3+990 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 LEFT
4+000 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 LEFT
4+010 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 LEFT
4+020 8.0965 Plumb Retaining Wall 1.5 0.202 8.765 0.74 1.109 LEFT

6+800 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 LEFT
6+810 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 LEFT
6+820 7.994 Plumb Retaining Wall 1.5 0.2 8.654 0.73 1.095 LEFT
6+825.988 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 LEFT
6+830 7.006 Plumb Retaining Wall 1.5 0.175 7.585 0.64 0.96 LEFT
6+840 5.152 Plumb Retaining Wall 1.5 0.129 5.578 0.471 0.706 LEFT
6+840.304 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 LEFT
6+850 9.848 Plumb Retaining Wall 2 0.246 17.214 1.199 1.799 LEFT
6+860 10 Plumb Retaining Wall 2 0.25 17.48 1.218 1.827 LEFT
6+870 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 LEFT
7+580 8.0175 Plumb Retaining Wall 1.5 0.2 8.68 0.732 1.099 RIGHT
7+586.035 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 RIGHT
7+590 6.9825 Plumb Retaining Wall 1.5 0.175 7.559 0.638 0.957 RIGHT
7+600 6.8525 Plumb Retaining Wall 1.5 0.171 7.419 0.626 0.939 RIGHT
7+603.705 2.739 Plumb Retaining Wall 1.5 0.068 2.965 0.25 0.375 RIGHT
7+605.478 3.1475 Plumb Retaining Wall 1.5 0.079 3.408 0.288 0.431 RIGHT
7+610 7.261 Plumb Retaining Wall 1.5 0.182 7.861 0.663 0.995 RIGHT
7+630 7.9635 Plumb Retaining Wall 1.5 0.199 8.621 0.727 1.091 RIGHT
7+635.927 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 RIGHT
7+640 7.0365 Plumb Retaining Wall 1.5 0.176 7.618 0.643 0.964 RIGHT
7+650 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 RIGHT
7+660 8.1885 Plumb Retaining Wall 1.5 0.205 8.865 0.748 1.122 RIGHT
7+666.377 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 RIGHT
7+670 6.8115 Plumb Retaining Wall 1.5 0.17 7.374 0.622 0.933 RIGHT
7+680 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 RIGHT
7+690 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 RIGHT
7+700 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 RIGHT
7+710 8.828 Plumb Retaining Wall 1.5 0.221 9.557 0.806 1.21 RIGHT
7+717.656 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 RIGHT
7+720 6.172 Plumb Retaining Wall 1 0.154 3.515 0.376 0.564 RIGHT
7+766.154 4.5725 Plumb Retaining Wall 1.5 0.114 4.95 0.418 0.627 LEFT
7+769.145 1.923 Plumb Retaining Wall 1.5 0.048 2.082 0.176 0.263 LEFT
7+770 5.4275 Plumb Retaining Wall 1.5 0.136 5.876 0.496 0.744 LEFT
7+780 5.4885 Plumb Retaining Wall 1.5 0.137 5.942 0.501 0.752 LEFT
7+780.977 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 LEFT
7+790 5.9155 Plumb Retaining Wall 1.5 0.148 6.404 0.54 0.811 LEFT
7+792.808 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 LEFT
7+890 9.5385 Plumb Retaining Wall 1.5 0.238 10.327 0.871 1.307 LEFT
7+899.713 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 LEFT
7+900 5.1435 Plumb Retaining Wall 1.5 0.129 5.568 0.47 0.705 LEFT
7+910 9.395 Plumb Retaining Wall 1.5 0.235 10.171 0.858 1.287 LEFT
7+918.79 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 LEFT
7+920 1.5025 Plumb Retaining Wall 1.5 0.038 1.627 0.137 0.206 LEFT
7+921.795 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 LEFT
7+930 9.1025 Plumb Retaining Wall 1.5 0.228 9.855 0.832 1.247 LEFT
7+940 10 Plumb Retaining Wall 1.5 0.25 10.826 0.913 1.37 LEFT
7+950 5.377 Plumb Retaining Wall 1.5 0.134 5.821 0.491 0.737 LEFT
7+950.754 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 LEFT
7+960 9.623 Plumb Retaining Wall 1.5 0.241 10.418 0.879 1.319 LEFT
7+970 9.857 Plumb Retaining Wall 1.5 0.246 10.671 0.9 1.351 LEFT
7+979.714 5 Plumb Retaining Wall 1.5 0.125 5.413 0.457 0.685 LEFT
7+980 5.143 Plumb Retaining Wall 1.5 0.129 5.568 0.47 0.705 LEFT
7+990 10 Plumb Retaining Wall 1 0.25 5.695 0.609 0.913 LEFT
8+000 10 Plumb Retaining Wall 1 0.25 5.695 0.609 0.913 LEFT
PLUM CONCRETE WORKS at RETAINING WALL

S. No. Description of Works Unit Nos. Length (m) Width (m) Height (m) Quantity Remarks
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and
1 other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications., in all type of
soil. [SS/SP 907]
At different chainages Cu.m. 700 1 0.5 350
TOTAL= 350
2 Providing, laying and levelling of dry stone soling works in the foundation all complete. (old Norms)
At different chainages Cu.m. 700 1 0.15 105
TOTAL= 105
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical
3
Specifications, PCC Grade M 15 including formwork
At different chainages Cu.m. 700 1 0.1 70
TOTAL= 70
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and Specifications, 60% M 15 concrete and
4
40% boulders/stones, using Mechanical Aids
At different chainages Cu.m. From Plum as Masonry RW Calculation Sheet 770.625
TOTAL= 770.625 1.63
Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation
5
and footings., (Class F1 Finish), Using timber (soft wood )
From Ch-1+560 to Ch-3+400 sq.m. 700 3.3 2310
TOTAL= 2310

Prepared by: Checked by: Approved by:


PLUM SLAB CULVERT BY APPROACH ROAD

S. No. Description of Works Unit Nos. Length (m) Width (m) Height (m) Quantity Remarks
Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps
1 and other deleterious matter and backfilling with approved Material as per Drawing and Technical Specifications., in all
type of soil. [SS/SP 907]
for crossdrain by the branch road cu.m. 37 14 1 0.5 259
TOTAL= 259
2 Providing, laying and levelling of dry stone soling works in the foundation all complete. (old Norms)
for crossdrain by the branch road cu.m. 37 14 1 0.15 77.7
TOTAL= 77.7
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical
3
Specifications., RCC Grade M 15 including F2 finish formwork .[SS/SP-2000]
for crossdrain by the branch road cu.m. 37 14 1 0.1 51.8
TOTAL= 51.8
Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and Specifications, 60% M 15 concrete
4
and 40% boulders/stones, using Mechanical Aids
for crossdrain by the branch road cu.m. 37 14 0.75 1.5 582.75
TOTAL= 582.75
Providing , Preparing and Installing form work including necessary supports and removing after completion for
5
foundation and footings., (Class F1 Finish), Using timber (soft wood )
for crossdrain by the branch road sq.m. 37 14 3.3 1709.4
TOTAL= 1709.4
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical
6
Specifications., RCC Grade M 25 including F2 finish formwork .(SS/SP-2000)
for crossdrain by the branch road cu.m. 37 7 1.6 0.2 82.88
TOTAL= 82.88
Providing and laying , fitting and placing un-coated Mild steel / HYSD reinforcement complete in foundation as per
7
drawing and technical specification. [SS-2014]
for crossdrain by the branch road MT.
main bars 12 mm dia 200 mm c/c 2664 1.6 0.889 kg.per Rm. 3789.27
dist. Bars 10 mm dia 200 mm c/c 666 7 0.620 kg.per Rm. 2890.44
TOTAL= 6.67

Prepared by: Checked by: Approved by:


RCC Drain Quantities

S.No Description Unit Nos Length Breadth Height Quantity Remarks


Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of
1 stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical
Specifications., in all type of soil. [SS/SP 907]
At different chainages Cum 792.00
Total Quantity 792.00

2 Providing, laying and levelling of dry stone soling works in the foundation all complete. (old Norms)
At different chainages cum. 1 2200.00 0.60 0.15 198.00
Total Quantity 198.00
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical
3
Specifications., RCC Grade M 15 including F2 finish formwork .[SS/SP-2000]
At different chainages Cum 1 2200.00 0.60 0.10 132.00
Total Quantity 132.00
Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical
4
Specifications., RCC Grade M 25 including F2 finish formwork .(SS/SP-2000)
Cum
drain 1 2200.00 AREA 0.2075 456.50
drain cover 1 2200.00 0.50 0.125 275.00
Total Quantity 731.50
Providing and laying , fitting and placing HYSD bar reinforcement in sub-structure complete as per Drawing and
5
Technical Specifications
For side drain and cover of drain MT
drain
main bars 8 mm dia. 100 mm c/c 22001 2.30 0.395 kg.per Rm. 19987.90
22001 1.60 0.395 kg.per Rm. 13904.63
distribution bars 6 mm dia. 200 mm
22 2200.00 0.222 kg.per Rm. 10500.60
c/c
drain cover
main bars 12 mm dia. 250 mm c/c 8801 0.48 0.888 kg.per Rm. 3751.33
distribution bars 10 mm dia. 200
4.00 2200.00 0.620 kg.per Rm. 5456.00
mm c/c
Total Quantity 53.60

Prepared by: Checked by: Approved by:


DRAIN QUANTITY
Chainage Left Right
Drain Length
Chainage To Dr.Type Area(m2) Volume(m3) Dr.Type Area(m2) Volume(m3)
1+000 1+500 500 typical RCC 0.36 180 typical RCC 0.36 180
3+400 3+700 200.000 typical RCC 0.36 72.000 typical RCC 0.000 0.000
At 5 different chowks 1000.000 typical RCC 0.36 360.000 typical RCC 0.000 0.000
Total Length 2200.000 612.000 180.000

DRAIN QUANTITY
Chainage
Drain Length(m) Cummulative Length(m)
Remarks Chainage To
As it is(Muktichowk) 1+000 1+500 500 500
4+050 to 4+250(Drained to HPC 4+050 4+250 200 700
Kaptanbari chowk 3+606 4+050 444 1144
Puspalal Chowk 4+250 4+530 280 1424
Near chowk of Shiv Mandhir 6+900 7+000 100 1524
Boudh Chowk 7+620 7+820 200 1724
Near shanti Tole 8+510 8+980 470 2194

Prepared by: Checked by: Approved by:


#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

GREEN ZONE

#REF!

S.No Description Unit Nos Length Breadth Height Quantity Rate Amount
Construction of Median and Island with Soil Taken from Borrow Areas Providing and laying Median and Island above road level with
1 approved Material deposited including compacted as per Drawing and Specifications. ( using material from borrow area) all complete as per
drawing, specification and instruction
For median from Ch 0+00 to 8+628.44 at
0 8628.44 1.50 0.15 0
carriagway
cum
For median from Ch 0+00 to 8+628.44
0 8628.44 1.00 0.15 0
between foothpath and cycle track
Total Quantity 0 #REF! #REF!

Planting single node culm cutting of grass (e.g. napier) on fill slopes<45 and embankment slopes in plain areas. Approx. length 15-, including
2
digging planting hole 10 -20 cm depth using a metal rod or hardwood peg all complete as per drawing, specification and instruction
For median from Ch 0+00 to 8+628.44 at
0 8628.44 0
carriagway
Nos
For median from Ch 0+00 to 8+628.44
0 8628.44 0
between foothpath and cycle track
Total Quantity 0 #REF! #REF!
Grand Total #REF!

36 of 313
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

FOOTPATH

#REF!

S.No Description Unit Nos Length Breadth Height Quantity Rate Amount
Earthfilling in footpath including compaction in layers not exceeding 150mm compaction depth, watering and necessary
1
haulage etc. as per specification, all complete as per drawing, specification and instruction
For Foothpath Cum 2 8510 1.4 0.5 11970.00
Total Quantity 11970.00 #REF! #REF!

2 Providing and filling sand in Foundation Trenches all complete as per drawing, specification and instruction
For Foothpath Cum 2 8510 1.4 0.15 3591.00
Total Quantity 3591.00 #REF! #REF!

Provide & laying 60mm thick Heavy duty interlocking concrete block over 50mm thick stone dust in perfect line & level,
3
all complete as per drawing, specification and instruction
For Foothpath Sqm 2 8510.00 1.40 23940.00
Total Quantity 23940.00 #REF! #REF!
Grand Total

37 of 313
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

CYCLE TRACK

#REF!

S.No Description Unit Nos Length Breadth Height Quantity Rate Amount
Formation of embankment from borrow site including compaction in layers not exceeding 150mm compaction depth,
1
watering and necessary haulage etc. as per specification, all complete as per drawing, specification and instruction
For Cycle track Cum 0 8628.44 1.5 0.5 0
Total Quantity 0 #REF! #REF!

Providing and laying sub-grade and earthen shoulders with approved Material obtained from borrow pits with all lifts &
2
leads all complete as per drawing, specification and instruction
For Cycle track Cum 0 8628.44 1.5 0.25 0
Total Quantity 0 #REF! #REF!

Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including
premixing the Material withwater at OMC laying in uniform layers in sub-base / base course on well prepared surface and
3
compacting to achieve required density all complete as per drawing, specification and instruction. Base course with B2
material
For Cycle track Cum 0 8628.44 1.5 0.2 0
Total Quantity 0 #REF! #REF!

4 Providing and filling sand in Foundation Trences all complete as per drawing, specification and instruction
For Cycle track Cum 0 8628.44 1.5 0.03 0
Total Quantity 0 #REF! #REF!

Provide & laying 60mm thick Heavy duty interlocking concrete block over 50mm thick stone dust in perfect line & level,
5
all complete as per drawing, specification and instruction
For Cycle track Sqm 0 8628.44 1.50 0
Total Quantity 0 #REF! #REF!
Grand Total #REF!

38 of 313
Summary
of
Quantity
Item Code Name Quantity Unit
13.06 Surface Course_AC 2053.994 M3
13.01(B) Prime Coat 46667.31 L
13.02(B) Tack Coat 25926.3 L
12.06(B) Base Material 10275.72 M3
12.01(A) SubBase Material 10508 M3
10.04(II) SubGrade Material 9932.155 M3
10.02(B) SubGrade Preparation 3997.513 M3

Pavement Base SubBase SubGrade SubGrade


Chainage Preparation
(m) Mean Distance (m)
Surface Co Prime Coat L Tack Coat L Surface CouBase Material M3 SubBase Material SubGrade Material MSubGrade Preparation M3
0+494 3 1.8 40.5 22.5 9 9 9.643 6.75
0+500 8 4.8 108 60 24 24 25.714 18
0+510 10 6 135 75 30 30 32.143 22.5
0+520 10 6 135 75 30 30 32.143 22.5
0+530 10 6 135 75 30 30 32.143 22.5
0+540 10 6 135 75 30 30 32.143 22.5
0+550 10 6 135 75 30 30 32.143 22.5
0+560 10 6 135 75 30 30 32.143 22.5
0+570 10 6 135 75 30 30 32.143 22.5
0+580 10 6 135 75 30 30 32.143 22.5
0+590 10 6 135 75 30 30 32.143 22.5
0+600 10 6 135 75 30 30 32.143 22.5
0+610 10 6 135 75 30 30 32.143 22.5
0+620 10 6 135 75 30 30 32.143 22.5
0+630 10 6 135 75 30 30 32.143 22.5
0+640 8.963 5.378 121 67.223 26.889 26.889 28.81 20.167
0+647.926 5 3 67.5 37.5 15 15 16.071 11.25
0+650 1.104 0.662 14.904 8.28 3.312 3.312 3.549 2.484
0+650.134 1.171 0.703 15.808 8.783 3.513 3.513 3.764 2.635
0+652.342 4.933 2.96 66.595 36.998 14.799 14.799 15.856 11.099
0+660 8.829 5.297 119.191 66.217 26.487 26.487 28.379 19.865
0+670 10 6 135 75 30 30 32.143 22.5
0+680 10 6 135 75 30 30 32.143 22.5
0+690 10 6 135 75 30 30 32.143 22.5
0+700 10 6 135 75 30 30 32.143 22.5
0+710 10 6 135 75 30 30 32.143 22.5
0+720 10 6 135 75 30 30 32.143 22.5
0+730 10 6 135 75 30 30 32.143 22.5
0+740 10 6 135 75 30 30 32.143 22.5
0+750 10 6 135 75 30 30 32.143 22.5
0+760 10 6 135 75 30 30 32.143 22.5
0+770 10 6 135 75 30 30 32.143 22.5
0+780 10 6 135 75 30 30 32.143 22.5
0+790 10 6 135 75 30 30 32.143 22.5
0+800 10 6 135 75 30 30 32.143 22.5
0+810 10 6 135 75 30 30 32.143 22.5
0+820 6.881 4.129 92.894 51.607 20.643 20.643 22.117 15.482
0+823.762 2.092 1.255 28.242 15.69 6.276 6.276 6.724 4.707
0+824.184 0.422 0.253 5.697 3.165 1.266 1.266 1.356 0.95
0+824.606 2.908 1.745 39.258 21.81 8.724 8.724 9.347 6.543
0+830 7.697 4.618 103.91 57.728 23.091 23.091 24.74 17.318
0+840 10 6 135 75 30 30 32.143 22.5
0+850 10 6 135 75 30 30 32.143 22.5
0+860 10 6 135 75 30 30 32.143 22.5
0+870 10 6 135 75 30 30 32.143 22.5
0+880 10 6 135 75 30 30 32.143 22.5
0+890 5.2655 3.159 71.084 39.491 15.797 15.797 16.925 11.847
0+890.531 1.7545 1.053 23.686 13.159 5.264 5.264 5.639 3.948
0+893.509 2.9775 1.786 40.196 22.331 8.932 8.932 9.571 6.699
0+896.486 3.2455 1.947 43.814 24.341 9.736 9.736 10.432 7.302
0+900 6.757 4.054 91.219 50.678 20.271 20.271 21.719 15.203
0+910 10 6 135 75 30 30 32.143 22.5
0+920 7.056 4.234 95.256 52.92 21.168 21.168 22.68 15.876
0+924.112 5 3 67.5 37.5 15 15 16.071 11.25
0+930 7.944 4.766 107.244 59.58 23.832 23.832 25.534 17.874
0+940 7.102 4.261 95.877 53.265 21.306 21.306 22.828 15.98
0+944.204 5 3 67.5 37.5 15 15 16.071 11.25
0+950 7.898 4.739 106.623 59.235 23.694 23.694 25.386 17.771
0+960 7.1485 4.289 96.505 53.614 21.445 21.445 22.977 16.084
0+964.297 5 3 67.5 37.5 15 15 16.071 11.25
0+970 6.8665 4.12 92.698 51.499 20.6 20.6 22.071 15.45
0+978.03 5 3 67.5 37.5 15 15 16.071 11.25
0+980 4.997 2.998 67.459 37.478 14.991 14.991 16.062 11.243
0+988.024 5 3 67.5 37.5 15 15 16.071 11.25
0+990 4.997 2.998 67.459 37.478 14.991 14.991 16.062 11.243
0+998.018 5 3 67.5 37.5 15 15 16.071 11.25
1+000 5.991 3.595 80.878 44.932 17.973 17.973 19.257 13.48
1+010 10 6 135 75 30 30 32.143 22.5
1+020 10 6 135 75 30 30 32.143 22.5
1+030 10 6 135 75 30 30 32.143 22.5
1+040 10 6 135 75 30 30 32.143 22.5
1+050 9.1135 5.468 123.032 68.351 27.34 27.34 29.293 20.505
1+058.227 5 3 67.5 37.5 15 15 16.071 11.25
1+060 5.8865 3.532 79.468 44.149 17.66 17.66 18.921 13.245
1+070 10 6 135 75 30 30 32.143 22.5
1+080 10 6 135 75 30 30 32.143 22.5
1+090 6.4995 3.9 87.743 48.746 19.499 19.499 20.891 14.624
1+092.999 5 3 67.5 37.5 15 15 16.071 11.25
1+100 8.5005 5.1 114.757 63.754 25.501 25.501 27.323 19.126
1+110 10 6 135 75 30 30 32.143 22.5
1+120 8.8855 5.331 119.954 66.641 26.656 26.656 28.561 19.992
1+127.771 5 3 67.5 37.5 15 15 16.071 11.25
1+130 6.1145 3.669 82.546 45.859 18.344 18.344 19.654 13.758
1+140 10 6 135 75 30 30 32.143 22.5
1+150 10 6 135 75 30 30 32.143 22.5
1+160 10 6 135 75 30 30 32.143 22.5
1+170 10 6 135 75 30 30 32.143 22.5
1+180 10 6 135 75 30 30 32.143 22.5
1+190 10 6 135 75 30 30 32.143 22.5
1+200 10 6 135 75 30 30 32.143 22.5
1+210 10 6 135 75 30 30 32.143 22.5
1+220 10 6 135 75 30 30 32.143 22.5
1+230 6.742 4.045 91.017 50.565 20.226 20.226 21.671 15.17
1+233.484 5 3 67.5 37.5 15 15 16.071 11.25
1+240 8.258 4.955 111.483 61.935 24.774 24.774 26.544 18.581
1+250 5.683 3.41 76.72 42.623 17.049 17.049 18.267 12.787
1+251.366 5 3 67.5 37.5 15 15 16.071 11.25
1+260 8.941 5.365 120.703 67.058 26.823 26.823 28.739 20.117
1+269.248 5 3 67.5 37.5 15 15 16.071 11.25
1+270 5.376 3.226 72.576 40.32 16.128 16.128 17.28 12.096
1+280 10 6 135 75 30 30 32.143 22.5
1+290 6.839 4.103 92.326 51.292 20.517 20.517 21.982 15.388
1+293.678 5 3 67.5 37.5 15 15 16.071 11.25
1+300 3.305 1.983 44.618 24.788 9.915 9.915 10.623 7.436
1+300.288 5 3 67.5 37.5 15 15 16.071 11.25
1+310 9.856 5.914 133.056 73.92 29.568 29.568 31.68 22.176
1+320 8.497 5.098 114.709 63.728 25.491 25.491 27.312 19.118
1+326.994 5 3 67.5 37.5 15 15 16.071 11.25
1+330 6.503 3.902 87.79 48.772 19.509 19.509 20.902 14.632
1+340 10 6 135 75 30 30 32.143 22.5
1+350 6.85 4.11 92.475 51.375 20.55 20.55 22.018 15.413
1+353.7 5 3 67.5 37.5 15 15 16.071 11.25
1+360 8.15 4.89 110.025 61.125 24.45 24.45 26.196 18.338
1+370 10 6 135 75 30 30 32.143 22.5
1+380 6.502 3.901 87.777 48.765 19.506 19.506 20.899 14.63
1+383.004 4.836 2.902 65.286 36.27 14.508 14.508 15.544 10.881
1+389.672 3.498 2.099 47.223 26.235 10.494 10.494 11.244 7.871
1+390 3.3335 2 45.002 25.001 10 10 10.715 7.5
1+396.339 5 3 67.5 37.5 15 15 16.071 11.25
1+400 6.8305 4.098 92.212 51.229 20.492 20.492 21.955 15.369
1+410 10 6 135 75 30 30 32.143 22.5
1+420 10 6 135 75 30 30 32.143 22.5
1+430 7.04 4.224 95.04 52.8 21.12 21.12 22.629 15.84
1+434.08 5 3 67.5 37.5 15 15 16.071 11.25
1+440 7.96 4.776 107.46 59.7 23.88 23.88 25.586 17.91
1+450 10 6 135 75 30 30 32.143 22.5
1+460 10 6 135 75 30 30 32.143 22.5
1+470 5.986 3.592 80.811 44.895 17.958 17.958 19.241 13.469
1+471.972 5 3 67.5 37.5 15 15 16.071 11.25
1+480 9.014 5.408 121.689 67.605 27.042 27.042 28.974 20.282
1+490 10 6 135 75 30 30 32.143 22.5
1+500 9.9325 5.959 134.089 74.494 29.798 29.798 31.926 22.348
1+509.865 5 43.821 24.345 0 7.304
1+510 5.0675 44.084 24.491 0 7.347
1+520 10 63 35 0 10.5
1+530 6.2765 39.542 21.968 0 6.59
1+532.553 5 31.5 17.5 0 5.25
1+540 5.564 35.053 19.474 0 5.842
1+543.681 5 31.5 17.5 0 5.25
1+550 5.564 1.558 35.053 19.474 7.79 7.79 8.346 5.842
1+554.809 5 1.4 31.5 17.5 7 7 7.5 5.25
1+560 7.5955 2.127 47.852 26.584 10.634 10.634 11.393 7.975
1+570 5.2265 1.463 32.927 18.293 7.317 7.317 7.84 5.488
1+570.453 5 1.4 31.5 17.5 7 7 7.5 5.25
1+580 5.385 1.508 33.925 18.847 7.539 7.539 8.077 5.654
1+581.223 5 1.4 31.5 17.5 7 7 7.5 5.25
1+590 5.3845 1.508 33.922 18.846 7.538 7.538 8.077 5.654
1+591.992 4.3425 1.216 27.358 15.199 6.079 6.079 6.514 4.56
1+598.685 4.004 1.121 25.225 14.014 5.606 5.606 6.006 4.204
1+600 1.7805 0.499 11.217 6.232 2.493 2.493 2.671 1.87
1+602.246 2.904 0.813 18.295 10.164 4.066 4.066 4.356 3.049
1+605.808 2.7775 0.778 17.498 9.721 3.888 3.888 4.166 2.916
1+607.801 2.096 0.587 13.205 7.336 2.934 2.934 3.144 2.201
1+610 6.0995 1.714 38.561 21.423 8.569 8.569 9.181 6.427
1+620 10 2.854 64.22 35.678 14.271 14.271 15.291 10.703
1+630 10 2.899 65.219 36.233 14.493 14.493 15.528 10.87
1+640 10 2.943 66.22 36.789 14.716 14.716 15.767 11.037
1+650 10 2.988 67.219 37.344 14.938 14.938 16.005 11.203
1+660 5.9005 1.789 40.253 22.363 8.945 8.945 9.584 6.709
1+661.801 5 1.52 34.2 19 7.6 7.6 8.143 5.7
1+670 7.637 2.322 52.237 29.021 11.608 11.608 12.437 8.706
1+677.075 5 1.52 34.2 19 7.6 7.6 8.143 5.7
1+680 6.4625 1.965 44.203 24.557 9.823 9.823 10.525 7.367
1+690 6.175 1.877 42.237 23.465 9.386 9.386 10.056 7.04
1+692.35 5 1.52 34.2 19 7.6 7.6 8.143 5.7
1+700 8.825 2.683 60.363 33.535 13.414 13.414 14.372 10.061
1+710 10 3.04 68.4 38 15.2 15.2 16.286 11.4
1+720 10 3.04 68.4 38 15.2 15.2 16.286 11.4
1+730 10 3.04 68.4 38 15.2 15.2 16.286 11.4
1+740 8.175 2.485 55.917 31.065 12.426 12.426 13.314 9.32
1+746.35 3.41 1.037 23.324 12.958 5.183 5.183 5.553 3.887
1+746.82 1.825 0.555 12.483 6.935 2.774 2.774 2.972 2.081
1+750 6.59 2.003 45.076 25.042 10.017 10.017 10.732 7.513
1+760 5.287 1.607 36.163 20.091 8.036 8.036 8.61 6.027
1+760.574 5 1.52 34.2 19 7.6 7.6 8.143 5.7
1+770 6.877 2.091 47.039 26.133 10.453 10.453 11.2 7.84
1+774.328 5 1.52 34.2 19 7.6 7.6 8.143 5.7
1+780 3.175 0.965 21.717 12.065 4.826 4.826 5.171 3.619
1+780.678 5 1.52 34.2 19 7.6 7.6 8.143 5.7
1+790 9.661 2.937 66.081 36.712 14.685 14.685 15.734 11.014
1+800 10 3.04 68.4 38 15.2 15.2 16.286 11.4
1+810 7.986 2.428 54.624 30.347 12.139 12.139 13.006 9.104
1+815.972 5 1.52 34.2 19 7.6 7.6 8.143 5.7
1+820 7.014 2.132 47.976 26.653 10.661 10.661 11.423 7.996
1+830 10 3.04 68.4 38 15.2 15.2 16.286 11.4
1+840 10 3.04 68.4 38 15.2 15.2 16.286 11.4
1+850 5.6325 1.712 38.526 21.404 8.561 8.561 9.173 6.421
1+851.265 3.87 1.176 26.471 14.706 5.882 5.882 6.303 4.412
1+857.74 4.3675 1.328 29.874 16.597 6.639 6.639 7.113 4.979
1+860 5.3395 1.623 36.522 20.29 8.116 8.116 8.696 6.087
1+868.419 5 1.52 34.2 19 7.6 7.6 8.143 5.7
1+870 5.34 1.623 36.526 20.292 8.117 8.117 8.697 6.088
1+879.099 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
1+880 5.4505 1.594 35.858 19.921 7.968 7.968 8.538 5.976
1+890 6.7635 1.894 42.61 23.672 9.469 9.469 10.145 7.102
1+893.527 5 1.4 31.5 17.5 7 7 7.5 5.25
1+900 8.2365 2.306 51.89 28.828 11.531 11.531 12.355 8.648
1+910 6.841 1.915 43.098 23.944 9.577 9.577 10.261 7.183
1+913.682 5 1.4 31.5 17.5 7 7 7.5 5.25
1+920 8.159 2.285 51.402 28.556 11.423 11.423 12.238 8.567
1+930 6.9185 1.937 43.587 24.215 9.686 9.686 10.378 7.264
1+933.837 3.757 1.052 23.669 13.149 5.26 5.26 5.635 3.945
1+937.514 3.0815 0.863 19.413 10.785 4.314 4.314 4.622 3.236
1+940 2.514 0.704 15.838 8.799 3.52 3.52 3.771 2.64
1+942.542 3.785 1.06 23.845 13.248 5.299 5.299 5.677 3.974
1+947.57 3.729 1.044 23.493 13.052 5.221 5.221 5.593 3.915
1+950 6.215 1.74 39.154 21.753 8.701 8.701 9.322 6.526
1+960 10 2.8 63 35 14 14 15 10.5
1+970 10 2.8 63 35 14 14 15 10.5
1+980 10 2.8 63 35 14 14 15 10.5
1+990 8.367 2.343 52.712 29.285 11.714 11.714 12.55 8.785
1+996.734 5 1.4 31.5 17.5 7 7 7.5 5.25
2+000 6.633 1.857 41.788 23.215 9.286 9.286 9.949 6.965
2+010 10 2.8 63 35 14 14 15 10.5
2+020 10 2.8 63 35 14 14 15 10.5
2+030 10 2.8 63 35 14 14 15 10.5
2+040 10 2.8 63 35 14 14 15 10.5
2+050 9.625 2.695 60.637 33.688 13.475 13.475 14.437 10.106
2+059.25 5 1.4 31.5 17.5 7 7 7.5 5.25
2+060 1.6235 0.455 10.228 5.682 2.273 2.273 2.435 1.705
2+062.497 5 1.4 31.5 17.5 7 7 7.5 5.25
2+070 8.7515 2.478 55.746 30.97 12.388 12.388 13.273 9.291
2+080 10 2.872 64.629 35.905 14.362 14.362 15.388 10.771
2+090 10 2.914 65.561 36.423 14.569 14.569 15.61 10.927
2+100 10 2.955 66.492 36.94 14.776 14.776 15.831 11.082
2+110 10 2.997 67.423 37.457 14.983 14.983 16.053 11.237
2+120 5.2485 1.594 35.875 19.931 7.972 7.972 8.542 5.979
2+120.497 3.5175 1.069 24.06 13.366 5.347 5.347 5.728 4.01
2+127.035 4.7515 1.444 32.5 18.056 7.222 7.222 7.738 5.417
2+130 3.269 0.994 22.36 12.422 4.969 4.969 5.324 3.727
2+133.573 5 1.52 34.2 19 7.6 7.6 8.143 5.7
2+140 8.2135 2.475 55.689 30.939 12.375 12.375 13.259 9.282
2+150 10 2.972 66.87 37.15 14.86 14.86 15.921 11.145
2+160 10 2.931 65.939 36.633 14.653 14.653 15.7 10.99
2+170 10 2.889 65.009 36.116 14.446 14.446 15.478 10.835
2+180 10 2.848 64.078 35.599 14.24 14.24 15.257 10.68
2+190 5.7865 1.624 36.539 20.3 8.12 8.12 8.7 6.09
2+191.573 5 1.4 31.5 17.5 7 7 7.5 5.25
2+200 9.2135 2.58 58.045 32.247 12.899 12.899 13.82 9.674
2+210 10 2.8 63 35 14 14 15 10.5
2+220 6.272 1.756 39.514 21.952 8.781 8.781 9.408 6.586
2+222.544 5 1.4 31.5 17.5 7 7 7.5 5.25
2+230 8.728 2.444 54.986 30.548 12.219 12.219 13.092 9.164
2+240 10 2.8 63 35 14 14 15 10.5
2+250 10 2.8 63 35 14 14 15 10.5
2+260 9.144 2.56 57.607 32.004 12.802 12.802 13.716 9.601
2+268.288 5 1.4 31.5 17.5 7 7 7.5 5.25
2+270 5.856 1.64 36.893 20.496 8.198 8.198 8.784 6.149
2+280 10 2.8 63 35 14 14 15 10.5
2+290 6.137 1.718 38.663 21.479 8.592 8.592 9.205 6.444
2+292.274 5 1.4 31.5 17.5 7 7 7.5 5.25
2+300 5.2715 1.476 33.21 18.45 7.38 7.38 7.907 5.535
2+302.817 5 1.4 31.5 17.5 7 7 7.5 5.25
2+310 5.271 1.476 33.207 18.448 7.379 7.379 7.906 5.535
2+313.359 5 1.4 31.5 17.5 7 7 7.5 5.25
2+320 8.3205 2.33 52.419 29.122 11.649 11.649 12.481 8.737
2+330 9.225 2.583 58.118 32.287 12.915 12.915 13.837 9.686
2+338.45 5 1.4 31.5 17.5 7 7 7.5 5.25
2+340 1.1485 0.322 7.236 4.02 1.608 1.608 1.723 1.206
2+340.747 1.5225 0.426 9.592 5.329 2.132 2.132 2.284 1.599
2+343.045 4.6265 1.295 29.147 16.193 6.477 6.477 6.94 4.858
2+350 8.4775 2.374 53.408 29.671 11.868 11.868 12.716 8.901
2+360 10 2.8 63 35 14 14 15 10.5
2+370 10 2.8 63 35 14 14 15 10.5
2+380 10 2.8 63 35 14 14 15 10.5
2+390 10 2.8 63 35 14 14 15 10.5
2+400 10 2.8 63 35 14 14 15 10.5
2+410 5.729 1.604 36.093 20.052 8.021 8.021 8.593 6.015
2+411.458 4.727 1.324 29.78 16.545 6.618 6.618 7.09 4.963
2+419.454 4.271 1.196 26.907 14.948 8.969 5.979 6.406 4.485
2+420 3.998 1.119 25.187 13.993 8.396 5.597 5.997 4.198
2+427.45 5 1.4 31.5 17.5 7 7 7.5 5.25
2+430 6.275 1.757 39.532 21.962 8.785 8.785 9.412 6.589
2+440 10 2.8 63 35 14 14 15 10.5
2+450 10 2.8 63 35 14 14 15 10.5
2+460 10 2.8 63 35 14 14 15 10.5
2+470 10 2.8 63 35 14 14 15 10.5
2+480 10 2.8 63 35 14 14 15 10.5
2+490 10 2.8 63 35 14 14 15 10.5
2+500 10 2.8 63 35 14 14 15 10.5
2+510 9.437 2.642 59.453 33.029 13.212 13.212 14.155 9.909
2+518.874 5 1.4 31.5 17.5 7 7 7.5 5.25
2+520 3.521 0.986 22.182 12.323 4.929 4.929 5.281 3.697
2+525.916 5 1.4 31.5 17.5 7 7 7.5 5.25
2+530 3.521 0.986 22.182 12.323 4.929 4.929 5.281 3.697
2+532.958 5 1.4 31.5 17.5 7 7 7.5 5.25
2+540 8.521 2.386 53.682 29.823 11.929 11.929 12.781 8.947
2+550 10 2.8 63 35 14 14 15 10.5
2+560 10 2.8 63 35 14 14 15 10.5
2+570 10 2.8 63 35 14 14 15 10.5
2+580 10 2.8 63 35 14 14 15 10.5
2+590 10 2.8 63 35 14 14 15 10.5
2+600 10 2.8 63 35 14 14 15 10.5
2+610 10 2.8 63 35 14 14 15 10.5
2+620 10 2.8 63 35 14 14 15 10.5
2+630 10 2.8 63 35 14 14 15 10.5
2+640 8.754 2.451 55.15 30.639 12.256 12.256 13.131 9.192
2+647.508 4.9925 1.398 31.453 17.474 6.99 6.99 7.489 5.242
2+649.985 1.246 0.349 7.85 4.361 1.744 1.744 1.869 1.308
2+650 1.2385 0.347 7.803 4.335 1.734 1.734 1.858 1.3
2+652.462 5 1.4 31.5 17.5 7 7 7.5 5.25
2+660 8.769 2.455 55.245 30.691 12.277 12.277 13.153 9.207
2+670 10 2.8 63 35 14 14 15 10.5
2+680 10 2.8 63 35 14 14 15 10.5
2+690 10 2.8 63 35 14 14 15 10.5
2+700 10 2.8 63 35 14 14 15 10.5
2+710 10 2.8 63 35 14 14 15 10.5
2+720 10 2.8 63 35 14 14 15 10.5
2+730 10 2.8 63 35 14 14 15 10.5
2+740 10 2.8 63 35 14 14 15 10.5
2+750 7.139 1.999 44.976 24.986 9.995 9.995 10.708 7.496
2+754.278 2.921 0.818 18.402 10.224 4.089 4.089 4.381 3.067
2+755.842 1.5645 0.438 9.856 5.476 2.19 2.19 2.347 1.643
2+757.407 2.079 0.582 13.098 7.277 2.911 2.911 3.118 2.183
2+760 6.2965 1.763 39.668 22.038 8.815 8.815 9.445 6.611
2+770 10 2.8 63 35 14 14 15 10.5
2+780 10 2.8 63 35 14 14 15 10.5
2+790 10 2.8 63 35 14 14 15 10.5
2+800 10 2.8 63 35 14 14 15 10.5
2+810 10 2.8 63 35 14 14 15 10.5
2+820 10 2.8 63 35 14 14 15 10.5
2+830 10 2.8 63 35 14 14 15 10.5
2+840 10 2.8 63 35 14 14 15 10.5
2+850 10 2.8 63 35 14 14 15 10.5
2+860 10 2.8 63 35 14 14 15 10.5
2+870 10 2.8 63 35 14 14 15 10.5
2+880 10 2.8 63 35 14 14 15 10.5
2+890 10 2.8 63 35 14 14 15 10.5
2+900 10 2.8 63 35 14 14 15 10.5
2+910 10 2.8 63 35 14 14 15 10.5
2+920 10 2.8 63 35 14 14 15 10.5
2+930 10 2.8 63 35 14 14 15 10.5
2+940 10 2.8 63 35 14 14 15 10.5
2+950 10 2.8 94.5 52.5 0 14 14 15 10.5
2+960 10 2.8 63 35 14 14 15 10.5
2+970 10 2.8 63 35 14 14 15 10.5
2+980 10 2.8 63 35 14 14 15 10.5
2+990 10 2.8 63 35 14 14 15 10.5
3+000 10 2.8 94.5 52.5 0 14 14 15 10.5
3+010 10 2.8 63 35 14 14 15 10.5
3+020 10 2.8 63 35 14 14 15 10.5
3+030 10 2.8 63 35 14 14 15 10.5
3+040 10 2.8 63 35 14 14 15 10.5
3+050 10 2.8 63 35 14 14 15 10.5
3+060 10 2.8 63 35 14 14 15 10.5
3+070 10 2.8 63 35 14 14 15 10.5
3+080 10 2.8 63 35 14 14 15 10.5
3+090 10 2.8 63 35 14 14 15 10.5
3+100 10 2.8 63 35 14 14 15 10.5
3+110 7.371 2.064 69.656 38.698 0 10.319 10.319 11.056 7.74
3+114.742 2.371 14.937 8.299 0 2.49

3+660 10 2.8 63 35 14 14 15 10.5


3+670 10 2.8 63 35 14 14 15 10.5
3+680 5.3995 1.581 35.573 19.763 7.905 7.905 8.47 5.929
3+680.799 3.6335 1.076 24.199 13.444 5.378 5.378 5.762 4.033
3+687.267 4.6005 1.399 31.467 17.482 6.993 6.993 7.492 5.245
3+690 3.2345 0.983 22.124 12.291 4.916 4.916 5.268 3.687
3+693.736 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
3+700 8.132 2.277 51.232 28.462 11.385 11.385 12.198 8.539
3+710 10 2.8 63 35 14 14 15 10.5
3+720 10 2.8 63 35 14 14 15 10.5
3+730 10 2.8 63 35 14 14 15 10.5
3+740 10 2.8 63 35 14 14 15 10.5
3+750 10 2.8 63 35 14 14 15 10.5
3+760 10 2.8 63 35 14 14 15 10.5
3+770 10 2.8 63 35 14 14 15 10.5
3+780 7.374 2.065 46.456 25.809 10.324 10.324 11.061 7.743
3+784.748 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
3+790 4.304 1.308 29.439 16.355 6.542 6.542 7.009 4.907
3+793.356 5 1.52 34.2 19 7.6 7.6 8.143 5.7
3+800 4.3035 1.308 29.422 16.346 6.538 6.538 7.005 4.904
3+801.963 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
3+810 9.0185 2.525 56.817 31.565 12.626 12.626 13.528 9.469
3+820 10 2.8 63 35 14 14 15 10.5
3+830 10 2.8 63 35 14 14 15 10.5
3+840 10 2.8 63 35 14 14 15 10.5
3+850 10 2.8 63 35 14 14 15 10.5
3+860 10 2.8 63 35 14 14 15 10.5
3+870 10 2.8 63 35 14 14 15 10.5
3+880 10 2.8 63 35 14 14 15 10.5
3+890 10 2.8 63 35 14 14 15 10.5
3+900 10 2.8 63 35 14 14 15 10.5
3+910 10 2.8 63 35 14 14 15 10.5
3+920 9.782 2.739 61.627 34.237 13.695 13.695 14.673 10.271
3+929.564 4.792 1.342 30.19 16.772 6.709 6.709 7.188 5.032
3+929.584 0.02 0.006 0.126 0.07 0.028 0.028 0.03 0.021
3+929.604 0.208 0.058 1.31 0.728 0.291 0.291 0.312 0.218
3+930 5.198 1.455 32.747 18.193 7.277 7.277 7.797 5.458
3+940 10 2.8 63 35 14 14 15 10.5
3+950 10 2.8 63 35 14 14 15 10.5
3+960 10 2.8 63 35 14 14 15 10.5
3+970 10 2.8 63 35 14 14 15 10.5
3+980 10 2.8 63 35 14 14 15 10.5
3+990 10 2.8 63 35 14 14 15 10.5
4+000 10 2.8 63 35 14 14 15 10.5
4+010 10 2.8 63 35 14 14 15 10.5
4+020 8.0965 2.267 51.008 28.338 11.335 11.335 12.145 8.501
4+026.193 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
4+030 3.0615 0.931 20.941 11.634 4.653 4.653 4.986 3.49
4+032.316 4.2195 1.283 28.861 16.034 6.414 6.414 6.872 4.81
4+038.439 3.842 1.137 25.588 14.215 5.686 5.686 6.092 4.265
4+040 5.7805 1.675 37.686 20.936 8.375 8.375 8.973 6.281
4+050 10 2.8 63 35 14 14 15 10.5
4+060 10 2.8 63 35 14 14 15 10.5
4+070 10 2.8 63 35 14 14 15 10.5
4+080 10 2.8 63 35 14 14 15 10.5
4+090 10 2.8 63 35 14 14 15 10.5
4+100 10 2.8 63 35 14 14 15 10.5
4+110 10 2.8 63 35 14 14 15 10.5
4+120 5.481 1.601 36.029 20.016 8.006 8.006 8.578 6.005
4+120.962 4.5975 1.361 30.619 17.011 6.804 6.804 7.29 5.103
4+129.195 4.519 1.374 30.91 17.172 6.869 6.869 7.36 5.152
4+130 4.1165 1.251 28.157 15.643 6.257 6.257 6.704 4.693
4+137.428 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
4+140 6.286 1.796 40.41 22.45 8.98 8.98 9.621 6.735
4+150 10 2.8 63 35 14 14 15 10.5
4+160 10 2.8 63 35 14 14 15 10.5
4+170 10 2.8 63 35 14 14 15 10.5
4+180 9.7805 2.739 61.617 34.232 13.693 13.693 14.671 10.27
4+189.561 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
4+190 5.2195 1.554 34.968 19.426 7.771 7.771 8.326 5.828
4+200 6.7655 2.057 46.276 25.709 10.284 10.284 11.018 7.713
4+203.531 5 1.52 34.2 19 7.6 7.6 8.143 5.7
4+210 6.9855 2.124 47.781 26.545 10.618 10.618 11.376 7.963
4+217.502 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
4+220 6.249 1.787 40.213 22.341 8.936 8.936 9.575 6.702
4+230 10 2.8 63 35 14 14 15 10.5
4+240 10 2.8 63 35 14 14 15 10.5
4+250 10 2.8 63 35 14 14 15 10.5
4+260 10 63 35 0 10.5
4+270 10 2.8 63 35 14 14 15 10.5
4+280 10 2.8 63 35 14 14 15 10.5
4+290 10 2.8 63 35 14 14 15 10.5
4+300 10 2.8 63 35 14 14 15 10.5
4+310 10 2.8 63 35 14 14 15 10.5
4+320 10 2.8 63 35 14 14 15 10.5
4+330 7.49 2.097 47.187 26.215 10.486 10.486 11.235 7.865
4+334.98 2.6095 0.731 16.44 9.133 3.653 3.653 3.914 2.74
4+335.219 0.2395 0.067 1.509 0.838 0.335 0.335 0.359 0.251
4+335.459 2.3905 0.669 15.06 8.367 3.347 3.347 3.586 2.51
4+340 7.2705 2.036 45.804 25.447 10.179 10.179 10.906 7.634
4+350 10 2.8 63 35 14 14 15 10.5
4+360 7.1455 2.001 45.017 25.009 10.004 10.004 10.718 7.503
4+364.291 5 1.4 31.5 17.5 7 7 7.5 5.25
4+370 7.8545 2.219 49.932 27.74 11.096 11.096 11.888 8.322
4+380 10 2.87 64.571 35.873 14.349 14.349 15.374 10.762
4+390 10 2.914 65.57 36.428 14.571 14.571 15.612 10.928
4+400 10 2.959 66.571 36.984 14.794 14.794 15.85 11.095
4+410 9.1455 2.747 61.796 34.331 13.733 13.733 14.713 10.299
4+418.291 5 1.52 34.2 19 7.6 7.6 8.143 5.7
4+420 5.8545 1.78 40.045 22.247 8.899 8.899 9.534 6.674
4+430 10 3.04 68.4 38 15.2 15.2 16.286 11.4
4+440 9.1215 2.773 62.391 34.662 13.865 13.865 14.855 10.399
4+448.243 5 1.52 34.2 19 7.6 7.6 8.143 5.7
4+450 5.8785 1.787 40.209 22.338 8.935 8.935 9.574 6.701
4+460 10 3.04 68.4 38 15.2 15.2 16.286 11.4
4+470 9.0975 2.766 62.227 34.57 13.828 13.828 14.816 10.371
4+478.195 5 1.52 34.2 19 7.6 7.6 8.143 5.7
4+480 5.9025 1.79 40.267 22.37 8.948 8.948 9.587 6.711
4+490 10 2.988 67.219 37.344 14.938 14.938 16.005 11.203
4+500 10 2.943 66.22 36.789 14.716 14.716 15.767 11.037
4+510 10 2.899 65.219 36.233 14.493 14.493 15.528 10.87
4+520 10 2.854 64.22 35.678 14.271 14.271 15.291 10.703
4+530 6.0975 1.713 38.548 21.416 8.566 8.566 9.178 6.425
4+532.195 5 1.4 31.5 17.5 7 7 7.5 5.25
4+540 8.404 2.353 52.945 29.414 11.766 11.766 12.606 8.824
4+549.003 5 1.4 31.5 17.5 7 7 7.5 5.25
4+550 1.2565 0.352 7.916 4.398 1.759 1.759 1.885 1.319
4+551.516 2.0145 0.564 12.691 7.051 2.82 2.82 3.022 2.115
4+554.029 4.242 1.188 26.725 14.847 5.939 5.939 6.363 4.454
4+560 7.9855 2.236 50.309 27.949 11.18 11.18 11.978 8.385
4+570 10 2.8 63 35 14 14 15 10.5
4+580 10 2.8 63 35 14 14 15 10.5
4+590 9.897 2.771 62.351 34.639 13.856 13.856 14.845 10.392
4+599.794 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
4+600 5.103 1.515 34.081 18.934 7.573 7.573 8.114 5.68
4+610 5.7705 1.754 39.47 21.928 8.771 8.771 9.398 6.578
4+611.541 5 1.52 34.2 19 7.6 7.6 8.143 5.7
4+620 5.873 1.785 40.171 22.317 8.927 8.927 9.565 6.695
4+623.287 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
4+630 8.3565 2.34 52.646 29.248 11.699 11.699 12.535 8.774
4+640 10 2.8 63 35 14 14 15 10.5
4+650 10 2.8 63 35 14 14 15 10.5
4+660 10 2.8 63 35 14 14 15 10.5
4+670 10 2.8 63 35 14 14 15 10.5
4+680 10 2.8 63 35 14 14 15 10.5
4+690 10 2.8 63 35 14 14 15 10.5
4+700 10 2.8 63 35 14 14 15 10.5
4+710 10 2.8 63 35 14 14 15 10.5
4+720 7.586 2.124 47.792 26.551 10.62 10.62 11.379 7.965
4+725.172 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
4+730 7.414 2.254 50.712 28.173 11.269 11.269 12.074 8.452
4+740 5.4065 1.644 36.98 20.545 8.218 8.218 8.805 6.163
4+740.813 5 1.52 34.2 19 7.6 7.6 8.143 5.7
4+750 7.8205 2.377 53.492 29.718 11.887 11.887 12.736 8.915
4+756.454 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
4+760 6.773 1.909 42.947 23.859 9.544 9.544 10.225 7.158
4+770 10 2.8 63 35 14 14 15 10.5
4+780 10 2.8 63 35 14 14 15 10.5
4+790 10 2.8 63 35 14 14 15 10.5
4+800 10 2.8 63 35 14 14 15 10.5
4+810 10 2.8 63 35 14 14 15 10.5
4+820 9.1775 2.57 57.818 32.121 12.849 12.849 13.766 9.636
4+828.355 5 1.4 31.5 17.5 7 7 7.5 5.25
4+830 4.4555 1.248 28.07 15.594 6.238 6.238 6.683 4.678
4+837.266 3.633 1.017 22.888 12.715 5.086 5.086 5.449 3.815
6+532 4 1.12 25.2 14 5.6 5.6 6 4.2
6+540 9 2.52 56.7 31.5 12.6 12.6 13.5 9.45
6+550 10 2.8 63 35 14 14 15 10.5
6+560 10 2.8 63 35 14 14 15 10.5
6+570 10 2.8 63 35 14 14 15 10.5
6+580 10 2.8 63 35 14 14 15 10.5
6+590 10 2.8 63 35 14 14 15 10.5
6+600 10 2.8 63 35 14 14 15 10.5
6+610 10 2.8 63 35 14 14 15 10.5
6+620 10 2.8 63 35 14 14 15 10.5
6+630 5.3755 1.505 33.866 18.814 7.526 7.526 8.063 5.644
6+630.751 5 1.4 31.5 17.5 7 7 7.5 5.25
6+640 9.6245 2.695 60.634 33.686 13.474 13.474 14.437 10.106
6+650 10 2.8 63 35 14 14 15 10.5
6+660 10 2.8 63 35 14 14 15 10.5
6+670 10 2.8 63 35 14 14 15 10.5
6+680 10 2.8 63 35 14 14 15 10.5
6+690 10 2.8 63 35 14 14 15 10.5
6+700 6.579 1.842 41.448 23.027 9.211 9.211 9.868 6.908
6+703.158 5 1.4 31.5 17.5 7 7 7.5 5.25
6+710 8.421 2.358 53.052 29.473 11.789 11.789 12.631 8.842
6+720 10 2.8 63 35 14 14 15 10.5
6+730 10 2.8 63 35 14 14 15 10.5
6+740 10 2.8 63 35 14 14 15 10.5
6+750 10 2.8 63 35 14 14 15 10.5
6+760 10 2.8 63 35 14 14 15 10.5
6+770 10 2.8 63 35 14 14 15 10.5
6+780 10 2.8 63 35 14 14 15 10.5
6+790 10 2.8 63 35 14 14 15 10.5
6+800 10 2.8 63 35 14 14 15 10.5
6+810 10 2.8 63 35 14 14 15 10.5
6+820 7.994 2.238 50.362 27.979 11.192 11.192 11.991 8.394
6+825.988 5 1.4 31.5 17.5 7 7 7.5 5.25
6+830 7.006 1.962 44.138 24.521 9.808 9.808 10.509 7.356
6+840 5.152 1.443 32.458 18.032 7.213 7.213 7.728 5.41
6+840.304 5 1.4 31.5 17.5 7 7 7.5 5.25
6+850 9.848 2.801 63.016 35.009 14.003 14.003 15.004 10.503
6+860 10 2.889 65.007 36.115 14.446 14.446 15.478 10.835
6+870 10 2.934 66.026 36.681 14.672 14.672 15.72 11.004
6+880 10 2.98 67.045 37.247 14.899 14.899 15.963 11.174
6+890 6.652 2.012 45.276 25.153 10.061 10.061 10.78 7.546
6+893.304 2.0145 0.612 13.779 7.655 3.062 3.062 3.281 2.297
6+894.029 0.7245 0.22 4.956 2.753 1.101 1.101 1.18 0.826
6+894.753 2.9855 0.908 20.421 11.345 4.538 4.538 4.862 3.403
6+900 7.6235 2.318 52.145 28.969 11.588 11.588 12.415 8.691
6+910 10 3.04 68.4 38 15.2 15.2 16.286 11.4
6+920 10 3.04 68.4 38 15.2 15.2 16.286 11.4
6+930 10 3.04 68.4 38 15.2 15.2 16.286 11.4
6+940 8.8765 2.698 60.715 33.731 13.492 13.492 14.456 10.119
6+947.753 5 1.52 34.2 19 7.6 7.6 8.143 5.7
6+950 1.9845 0.603 13.574 7.541 3.016 3.016 3.232 2.262
6+951.722 5 1.52 34.2 19 7.6 7.6 8.143 5.7
6+960 5.3145 1.616 36.351 20.195 8.078 8.078 8.655 6.059
6+962.351 5 1.52 34.2 19 7.6 7.6 8.143 5.7
6+970 5.3145 1.616 36.351 20.195 8.078 8.078 8.655 6.059
6+972.98 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
6+980 8.51 2.383 53.613 29.785 11.914 11.914 12.765 8.936
6+990 10 2.8 63 35 14 14 15 10.5
7+000 8.2885 2.321 52.218 29.01 11.604 11.604 12.433 8.703
7+006.577 3.5895 1.005 22.614 12.563 5.025 5.025 5.384 3.769
7+007.179 0.602 0.169 3.793 2.107 0.843 0.843 0.903 0.632
7+007.781 1.4105 0.395 8.886 4.937 1.975 1.975 2.116 1.481
7+010 6.1095 1.711 38.49 21.383 8.553 8.553 9.164 6.415
7+020 10 2.8 63 35 14 14 15 10.5
7+030 10 2.8 63 35 14 14 15 10.5
7+040 10 2.8 63 35 14 14 15 10.5
7+050 10 2.8 63 35 14 14 15 10.5
7+060 10 2.8 63 35 14 14 15 10.5
7+070 8.172 2.288 51.484 28.602 11.441 11.441 12.258 8.581
7+076.344 3.404 0.953 21.445 11.914 4.766 4.766 5.106 3.574
7+076.808 0.4635 0.13 2.92 1.622 0.649 0.649 0.695 0.487
7+077.271 1.596 0.447 10.055 5.586 2.234 2.234 2.394 1.676
7+080 6.3645 1.782 40.096 22.276 8.91 8.91 9.547 6.683
7+090 10 2.8 63 35 14 14 15 10.5
7+100 9.0015 2.52 56.709 31.505 12.602 12.602 13.502 9.452
7+108.003 4.09 1.145 25.767 14.315 5.726 5.726 6.135 4.294
7+108.18 0.1765 0.049 1.112 0.618 0.247 0.247 0.265 0.185
7+108.356 0.91 0.255 5.733 3.185 1.274 1.274 1.365 0.956
7+110 5.822 1.63 36.679 20.377 8.151 8.151 8.733 6.113
7+120 10 2.8 63 35 14 14 15 10.5
7+130 10 2.8 63 35 14 14 15 10.5
7+140 10 2.8 63 35 14 14 15 10.5
7+150 10 2.8 63 35 14 14 15 10.5
7+160 10 2.8 63 35 14 14 15 10.5
7+170 10 2.8 63 35 14 14 15 10.5
7+180 5.2815 1.551 34.908 19.393 7.757 7.757 8.311 5.818
7+180.563 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
7+190 6.2355 1.896 42.651 23.695 9.478 9.478 10.155 7.108
7+193.034 5 1.52 34.2 19 7.6 7.6 8.143 5.7
7+200 6.236 1.896 42.654 23.697 9.479 9.479 10.156 7.109
7+205.506 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
7+210 7.247 2.029 45.656 25.365 10.146 10.146 10.87 7.609
7+220 10 2.8 63 35 14 14 15 10.5
7+230 10 2.8 63 35 14 14 15 10.5
7+240 10 2.8 63 35 14 14 15 10.5
7+250 10 2.8 63 35 14 14 15 10.5
7+260 10 2.8 63 35 14 14 15 10.5
7+270 10 2.8 63 35 14 14 15 10.5
7+280 10 2.8 63 35 14 14 15 10.5
7+290 9.1685 2.567 57.762 32.09 12.836 12.836 13.753 9.627
7+298.337 5 1.4 31.5 17.5 7 7 7.5 5.25
7+300 1.74 0.487 10.962 6.09 2.436 2.436 2.61 1.827
7+301.817 2.6485 0.742 16.686 9.27 3.708 3.708 3.973 2.781
7+305.297 4.0915 1.146 25.776 14.32 5.728 5.728 6.137 4.296
7+310 7.3515 2.058 46.314 25.73 10.292 10.292 11.027 7.719
7+320 9.251 2.59 58.281 32.379 12.951 12.951 13.876 9.714
7+328.502 5 1.4 31.5 17.5 7 7 7.5 5.25
7+330 1.389 0.389 8.751 4.861 1.945 1.945 2.083 1.458
7+331.28 2.029 0.568 12.783 7.102 2.841 2.841 3.043 2.13
7+334.058 1.588 0.445 10.004 5.558 2.223 2.223 2.382 1.667
7+334.456 2.971 0.832 18.717 10.399 4.159 4.159 4.456 3.12
7+340 7.772 2.207 49.662 27.59 11.036 11.036 11.824 8.277
7+350 10 2.912 65.518 36.399 14.56 14.56 15.6 10.92
7+360 10 2.984 67.138 37.299 14.92 14.92 15.985 11.19
7+370 10 3.056 68.758 38.199 15.28 15.28 16.371 11.46
7+380 7.228 2.261 50.869 28.261 11.304 11.304 12.112 8.478
7+384.456 5 1.58 35.55 19.75 7.9 7.9 8.464 5.925
7+390 6.036 1.907 42.916 23.842 9.537 9.537 10.218 7.153
7+396.528 5 1.58 35.55 19.75 7.9 7.9 8.464 5.925
7+400 6.036 1.907 42.916 23.842 9.537 9.537 10.218 7.153
7+408.6 5 1.58 35.55 19.75 7.9 7.9 8.464 5.925
7+410 5.7 1.795 40.398 22.443 8.977 8.977 9.619 6.733
7+420 10 3.078 69.253 38.474 15.39 15.39 16.489 11.542
7+430 10 3.006 67.633 37.574 15.03 15.03 16.103 11.272
7+440 10 2.934 66.013 36.674 14.67 14.67 15.717 11.002
7+450 9.3 2.662 59.886 33.27 13.308 13.308 14.258 9.981
7+458.6 5 1.4 31.5 17.5 7 7 7.5 5.25
7+460 5.7 1.596 35.91 19.95 7.98 7.98 8.55 5.985
7+470 6.9875 1.957 44.021 24.456 9.783 9.783 10.481 7.337
7+473.975 5 1.4 31.5 17.5 7 7 7.5 5.25
7+480 8.0125 2.243 50.479 28.044 11.217 11.217 12.019 8.413
7+490 5.1965 1.455 32.738 18.188 7.275 7.275 7.795 5.456
7+490.393 5 1.4 31.5 17.5 7 7 7.5 5.25
7+500 9.8035 2.745 61.762 34.312 13.725 13.725 14.705 10.294
7+510 10 2.8 63 35 14 14 15 10.5
7+520 5.94 1.714 38.555 21.42 8.568 8.568 9.18 6.426
7+521.88 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
7+530 6.071 1.846 41.526 23.07 9.228 9.228 9.887 6.921
7+534.022 5 1.52 34.2 19 7.6 7.6 8.143 5.7
7+540 6.0705 1.845 41.522 23.068 9.227 9.227 9.886 6.92
7+546.163 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
7+550 6.9185 1.942 43.687 24.271 9.708 9.708 10.402 7.281
7+560 9.1825 2.571 57.85 32.139 12.856 12.856 13.774 9.642
7+568.365 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
7+570 5.8175 1.76 39.6 22 8.8 8.8 9.429 6.6
7+580 8.0175 2.437 54.84 30.467 12.187 12.187 13.057 9.14
7+586.035 5 1.52 34.2 19 7.6 7.6 8.143 5.7
7+590 6.9825 2.123 47.76 26.533 10.613 10.613 11.371 7.96
7+600 6.8525 2.083 46.871 26.039 10.416 10.416 11.16 7.812
7+603.705 2.739 0.833 18.735 10.408 4.163 4.163 4.461 3.122
7+605.478 3.1475 0.957 21.529 11.96 4.784 4.784 5.126 3.588
7+610 7.261 2.207 49.665 27.592 11.037 11.037 11.825 8.278
7+620 10 0
7+630 7.9635 2.421 54.47 30.261 12.105 12.105 12.969 9.078
7+635.927 5 1.52 34.2 19 7.6 7.6 8.143 5.7
7+640 7.0365 2.139 48.13 26.739 10.695 10.695 11.459 8.022
7+650 10 3.04 68.4 38 15.2 15.2 16.286 11.4
7+660 8.1885 2.489 56.009 31.116 12.447 12.447 13.336 9.335
7+666.377 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
7+670 6.8115 1.917 43.143 23.968 9.587 9.587 10.272 7.19
7+680 10 2.8 63 35 14 14 15 10.5
7+690 10 2.8 63 35 14 14 15 10.5
7+700 10 2.8 63 35 14 14 15 10.5
7+710 8.828 2.472 55.616 30.898 12.359 12.359 13.242 9.269
7+717.656 5 1.4 31.5 17.5 7 7 7.5 5.25
7+720 6.172 1.728 38.884 21.602 8.641 8.641 9.258 6.481
7+730 6.905 1.933 43.501 24.167 9.667 9.667 10.357 7.25
7+733.81 5 1.4 31.5 17.5 7 7 7.5 5.25
7+740 6.358 1.78 40.055 22.253 8.901 8.901 9.537 6.676
7+746.526 5 1.4 31.5 17.5 7 7 7.5 5.25
7+750 6.737 1.886 42.443 23.58 9.432 9.432 10.105 7.074
7+760 8.077 2.262 50.885 28.27 11.308 11.308 12.115 8.481
7+766.154 4.5725 1.299 29.222 16.234 6.494 6.494 6.958 4.87
7+769.145 1.923 0.569 12.807 7.115 2.846 2.846 3.049 2.135
7+770 5.4275 1.625 36.564 20.314 8.125 8.125 8.706 6.094
7+780 5.4885 1.669 37.541 20.856 8.343 8.343 8.938 6.257
7+780.977 5 1.52 34.2 19 7.6 7.6 8.143 5.7
7+790 5.9155 1.798 40.462 22.479 8.992 8.992 9.634 6.744
7+792.808 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
7+800 8.596 2.407 54.155 30.086 12.034 12.034 12.894 9.026
7+810 10 2.8 63 35 14 14 15 10.5
7+820 10 2.8 63 35 14 14 15 10.5
7+830 10 2.8 63 35 14 14 15 10.5
7+840 10 2.8 63 35 14 14 15 10.5
7+850 6.8165 1.909 42.944 23.858 9.543 9.543 10.225 7.157
7+853.633 2.375 0.665 14.962 8.313 3.325 3.325 3.562 2.494
7+854.75 1.117 0.313 7.037 3.909 1.564 1.564 1.675 1.173
7+855.867 2.625 0.735 16.538 9.188 3.675 3.675 3.937 2.756
7+860 7.0665 1.979 44.519 24.733 9.893 9.893 10.6 7.42
7+870 10 2.8 63 35 14 14 15 10.5
7+880 5.318 1.561 35.113 19.507 7.803 7.803 8.36 5.852
7+880.636 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
7+890 9.5385 2.9 65.243 36.246 14.499 14.499 15.534 10.874
7+899.713 5 1.52 34.2 19 7.6 7.6 8.143 5.7
7+900 5.1435 1.564 35.182 19.545 7.818 7.818 8.377 5.864
7+910 9.395 2.856 64.262 35.701 14.28 14.28 15.3 10.71
7+918.79 5 1.52 34.2 19 7.6 7.6 8.143 5.7
7+920 1.5025 0.457 10.277 5.709 2.284 2.284 2.447 1.713
7+921.795 5 1.52 34.2 19 7.6 7.6 8.143 5.7
7+930 9.1025 2.767 62.261 34.59 13.836 13.836 14.824 10.377
7+940 10 3.04 68.4 38 15.2 15.2 16.286 11.4
7+950 5.377 1.635 36.779 20.433 8.173 8.173 8.757 6.13
7+950.754 5 1.52 34.2 19 7.6 7.6 8.143 5.7
7+960 9.623 2.925 65.821 36.567 14.627 14.627 15.672 10.97
7+970 9.857 2.997 67.422 37.457 14.983 14.983 16.053 11.237
7+979.714 5 1.48 33.3 18.5 7.4 7.4 7.929 5.55
7+980 5.143 1.516 34.12 18.956 7.582 7.582 8.124 5.687
7+990 10 2.8 63 35 14 14 15 10.5
8+000 10 2.8 63 35 14 14 15 10.5
8+010 10 2.8 63 35 14 14 15 10.5
8+020 10 2.8 63 35 14 14 15 10.5
8+030 10 2.8 63 35 14 14 15 10.5
8+040 10 2.8 63 35 14 14 15 10.5
8+050 8.964 2.51 56.473 31.374 12.55 12.55 13.446 9.412
8+057.928 3.964 1.11 24.973 13.874 5.55 5.55 5.946 4.162

8+510 5 1.4 31.5 17.5 5.25 7 7.5 5.25


8+520 10 2.8 63 35 10.5 14 15 10.5
8+530 10 2.8 63 35 10.5 14 15 10.5
8+540 10 2.8 63 35 10.5 14 15 10.5
8+550 10 2.8 63 35 10.5 14 15 10.5
8+560 10 2.8 63 35 10.5 14 15 10.5
8+570 10 2.8 63 35 10.5 14 15 10.5
8+580 10 2.8 63 35 10.5 14 15 10.5
8+590 10 2.8 63 35 10.5 14 15 10.5
8+600 10 2.8 63 35 10.5 14 15 10.5
8+610 10 2.8 63 35 10.5 14 15 10.5
8+620 10 2.8 63 35 10.5 14 15 10.5
8+630 10 2.8 63 35 10.5 14 15 10.5
8+640 10 2.8 63 35 10.5 14 15 10.5
8+650 10 2.8 63 35 10.5 14 15 10.5
8+660 10 2.8 63 35 10.5 14 15 10.5
8+670 10 2.8 63 35 10.5 14 15 10.5
8+680 10 2.8 63 35 10.5 14 15 10.5
8+690 10 2.8 63 35 10.5 14 15 10.5
8+700 10 2.8 63 35 10.5 14 15 10.5
8+710 10 2.8 63 35 10.5 14 15 10.5
8+720 10 2.8 63 35 10.5 14 15 10.5
8+730 9.454 2.647 59.56 33.089 9.927 13.236 14.181 9.927
8+738.908 5 1.4 31.5 17.5 5.25 7 7.5 5.25
8+740 5.546 1.553 34.94 19.411 5.823 7.764 8.319 5.823
8+750 7.964 2.23 50.173 27.874 8.362 11.15 11.946 8.362
8+755.928 5 1.4 31.5 17.5 5.25 7 7.5 5.25
8+760 7.036 1.97 44.327 24.626 7.388 9.85 10.554 7.388
8+770 7.85 2.198 49.455 27.475 8.243 10.99 11.775 8.243
8+775.7 5 1.4 31.5 17.5 5.25 7 7.5 5.25
8+780 7.15 2.002 45.045 25.025 7.508 10.01 10.725 7.508
8+790 7.7355 2.166 48.734 27.074 8.122 10.83 11.603 8.122
8+795.471 5 1.4 31.5 17.5 5.25 7 7.5 5.25
8+800 7.2645 2.034 45.766 25.426 7.628 10.17 10.897 7.628
8+810 10 2.8 63 35 10.5 14 15 10.5
8+820 10 2.8 63 35 10.5 14 15 10.5
8+830 10 2.8 63 35 10.5 14 15 10.5
8+840 10 2.8 63 35 10.5 14 15 10.5
8+850 7.002 1.961 44.113 24.507 7.352 9.803 10.503 7.352
8+854.004 5 1.4 31.5 17.5 5.25 7 7.5 5.25
8+860 7.998 2.239 50.387 27.993 8.398 11.197 11.997 8.398
8+870 8.3715 2.344 52.74 29.3 8.79 11.72 12.557 8.79
8+876.743 5 1.4 31.5 17.5 5.25 7 7.5 5.25
8+880 6.6285 1.856 41.76 23.2 6.96 9.28 9.943 6.96
8+890 10 2.8 63 35 10.5 14 15 10.5
8+900 8.047 2.253 50.696 28.164 8.449 11.266 12.07 8.449
8+906.094 5 1.4 31.5 17.5 5.25 7 7.5 5.25
8+910 6.953 1.947 43.804 24.336 7.301 9.734 10.429 7.301
8+920 10 2.8 63 35 10.5 14 15 10.5
8+930 10 2.8 63 35 10.5 14 15 10.5
8+940 10 2.8 63 35 10.5 14 15 10.5
8+950 10 2.8 63 35 10.5 14 15 10.5
8+960 10 2.8 63 35 10.5 14 15 10.5
8+970 7.266 2.034 45.776 25.431 7.629 10.172 10.899 7.629
8+974.532 5 1.4 31.5 17.5 5.25 7 7.5 5.25
8+980 7.734 2.166 48.724 27.069 8.121 10.828 11.601 8.121
8+990 7.5115 2.103 47.322 26.29 7.887 10.516 11.267 7.887
8+995.023 5 1.4 31.5 17.5 5.25 7 7.5 5.25
9+000 7.4885 2.097 47.178 26.21 7.863 10.484 11.233 7.863
9+010 10 2.8 63 35 10.5 14 15 10.5
9+020 10 2.8 63 35 10.5 14 15 10.5
9+030 8.283 2.319 52.183 28.99 8.697 11.596 12.424 8.697
9+036.566 5 1.4 31.5 17.5 5.25 7 7.5 5.25
9+040 6.717 1.881 42.317 23.51 7.053 9.404 10.075 7.053
9+050 10 2.8 63 35 10.5 14 15 10.5
9+060 10 2.8 63 35 10.5 14 15 10.5
9+070 10 2.8 63 35 10.5 14 15 10.5
9+080 10 2.8 63 35 10.5 14 15 10.5
9+090 10 2.8 63 35 10.5 14 15 10.5
9+100 10 2.8 63 35 10.5 14 15 10.5
9+110 10 2.8 63 35 10.5 14 15 10.5
9+120 6.739 1.887 42.456 23.587 7.076 9.435 10.108 7.076
9+123.478 5 1.4 31.5 17.5 5.25 7 7.5 5.25
9+130 8.261 2.313 52.044 28.913 8.674 11.565 12.391 8.674
9+140 8.147 2.281 51.326 28.514 8.554 11.406 12.22 8.554
9+146.294 5 1.4 31.5 17.5 5.25 7 7.5 5.25
9+150 3.345 0.937 21.073 11.708 3.512 4.683 5.017 3.512
9+152.984 5 1.4 31.5 17.5 5.25 7 7.5 5.25
9+160 8.508 2.502 56.287 31.27 9.381 12.508 13.402 9.381
9+170 10 3.14 70.657 39.254 11.776 15.702 16.823 11.776
9+180 6.492 2.169 48.792 27.107 8.132 10.843 11.617 8.132
9+182.984 2.0965 0.713 16.038 8.91 2.673 3.564 3.819 2.673
9+184.193 1.209 0.411 9.249 5.138 1.541 2.055 2.202 1.541
9+185.402 2.9035 0.987 22.212 12.34 3.702 4.936 5.289 3.702
9+190 7.299 2.415 54.327 30.182 9.055 12.073 12.935 9.055
9+200 10 3.108 69.931 38.851 11.655 15.54 16.65 11.655
9+210 7.701 2.239 50.388 27.994 8.398 11.197 11.997 8.398
9+215.402 5 1.4 31.5 17.5 5.25 7 7.5 5.25
9+220 7.299 2.044 45.984 25.546 7.664 10.219 10.948 7.664
9+230 10 2.8 63 35 10.5 14 15 10.5
9+240 9.668 2.707 60.908 33.838 10.151 13.535 14.502 10.151
9+249.336 5 1.48 33.3 18.5 5.55 7.4 7.929 5.55
9+250 5.332 1.592 35.83 19.905 5.972 7.962 8.531 5.972
9+260 10 3.04 68.4 38 11.4 15.2 16.286 11.4
9+270 10 3.04 68.4 38 11.4 15.2 16.286 11.4
9+280 5.334 1.622 36.485 20.269 6.081 8.108 8.687 6.081
9+280.668 5 1.52 34.2 19 5.7 7.6 8.143 5.7
9+290 9.666 2.938 66.115 36.731 11.019 14.692 15.742 11.019
9+300 10 3.04 68.4 38 11.4 15.2 16.286 11.4
9+310 6 1.824 41.04 22.8 6.84 9.12 9.771 6.84
9+312 5 1.48 33.3 18.5 5.55 7.4 7.929 5.55
9+320 4 1.12 25.2 14 4.2 5.6 6 4.2
Summary of
Quantity
Item Code Name Quantity Unit
09.01(I-B) Cut 1533.851 M3
09.09(B) Fill 25302.932 M3
09.04(I-B-i) StructureCut 3111.41 M3
BFIC1 BackFill 259.35 M3

AREA (m2) VOLUME (m3)


Chainage
(m) Mean Distance (m) Cut Fill Structure Cut Drain Cut BackFill Cut Fill Structure Cut Drain Cut BackFill Soil Type
Cut Fill StructureCut DrainCut BackFill Cut Fill StructureCut DrainCut BackFill
0+494 3 0 6.389 0 0 0 0 19.168 0 0 0 OS [OS-100% ]
0+500 8 0 6.37 0 0 0 0 50.958 0 0 0 OS [OS-100% ]
0+510 10 0 5.926 0 0 0 0 59.259 0 0 0 OS [OS-100% ]
0+520 10 0 6.267 0 0 0 0 62.674 0 0 0 OS [OS-100% ]
0+530 10 0 6.183 0 0 0 0 61.832 0 0 0 OS [OS-100% ]
0+540 10 0 6.676 0 0 0 0 66.761 0 0 0 OS [OS-100% ]
0+550 10 0 5.922 0 0 0 0 59.223 0 0 0 OS [OS-100% ]
0+560 10 0 5.359 0 0 0 0 53.585 0 0 0 OS [OS-100% ]
0+570 10 0 5.667 0 0 0 0 56.672 0 0 0 OS [OS-100% ]
0+580 10 0 4.936 0 0 0 0 49.363 0 0 0 OS [OS-100% ]
0+590 10 0.001 3.935 0 0 0 0.006 39.345 0 0 0 OS [OS-100% ]
0+600 10 0 3.436 0 0 0 0 34.358 0 0 0 OS [OS-100% ]
0+610 10 0 5.319 0 0 0 0 53.189 0 0 0 OS [OS-100% ]
0+620 10 0 6.655 0 0 0 0 66.55 0 0 0 OS [OS-100% ]
0+630 10 0 7.83 0 0 0 0 78.301 0 0 0 OS [OS-100% ]
0+640 8.963 0 8.407 0 0 0 0 75.348 0 0 0 OS [OS-100% ]
0+647.926 5 0 9.032 0 0 0 0 45.162 0 0 0 OS [OS-100% ]
0+650 1.104 0 9.187 0 0 0 0 10.142 0 0 0 OS [OS-100% ]
0+650.134 1.171 0 9.196 0 0 0 0 10.769 0 0 0 OS [OS-100% ]
0+652.342 4.933 0 9.328 0 0 0 0 46.017 0 0 0 OS [OS-100% ]
0+660 8.829 0 9.435 0 0 0 0.002 83.304 0 0 0 OS [OS-100% ]
0+670 10 0.006 9.938 0 0 0 0.057 99.38 0 0 0 OS [OS-100% ]
0+680 10 0 11.092 0 0 0 0 110.915 0 0 0 OS [OS-100% ]
0+690 10 0 10.919 0 0 0 0 109.189 0 0 0 OS [OS-100% ]
0+700 10 0 10.684 0 0 0 0 106.836 0 0 0 OS [OS-100% ]
0+710 10 0 9.332 0 0 0 0 93.317 0 0 0 OS [OS-100% ]
0+720 10 0 8.383 0 0 0 0 83.826 0 0 0 OS [OS-100% ]
0+730 10 0 8.177 0 0 0 0 81.767 0 0 0 OS [OS-100% ]
0+740 10 0 7.994 0 0 0 0 79.945 0 0 0 OS [OS-100% ]
0+750 10 0 7.804 0 0 0 0 78.043 0 0 0 OS [OS-100% ]
0+760 10 0 6.908 0 0 0 0 69.076 0 0 0 OS [OS-100% ]
0+770 10 0.012 4.77 0 0 0 0.121 47.704 0 0 0 OS [OS-100% ]
0+780 10 1.185 3.54 0 0 0 11.852 35.399 0 0 0 OS [OS-100% ]
0+790 10 0 6.039 0 0 0 0 60.392 0 0 0 OS [OS-100% ]
0+800 10 0 5.85 0 0 0 0 58.498 0 0 0 OS [OS-100% ]
0+810 10 0 5.489 0 0 0 0 54.892 0 0 0 OS [OS-100% ]
0+820 6.881 0 4.479 0 0 0 0 30.817 0 0 0 OS [OS-100% ]
0+823.762 2.092 0 4.686 0 0 0 0 9.803 0 0 0 OS [OS-100% ]
0+824.184 0.422 0 4.741 0 0 0 0 2.001 0 0 0 OS [OS-100% ]
0+824.606 2.908 0 4.804 0 0 0 0 13.969 0 0 0 OS [OS-100% ]
0+830 7.697 0 5.887 0 0 0 0 45.311 0 0 0 OS [OS-100% ]
0+840 10 0 6.4 0 0 0 0 64.002 0 0 0 OS [OS-100% ]
0+850 10 0 6.886 0 0 0 0 68.862 0 0 0 OS [OS-100% ]
0+860 10 0 7.791 0 0 0 0 77.91 0 0 0 OS [OS-100% ]
0+870 10 0 8.564 0 0 0 0 85.642 0 0 0 OS [OS-100% ]
0+880 10 0 7.797 0 0 0 0 77.966 0 0 0 OS [OS-100% ]
0+890 5.2655 0.139 6.979 0 0 0 0.734 36.75 0 0 0 OS [OS-100% ]
0+890.531 1.7545 0.121 7.171 0 0 0 0.212 12.581 0 0 0 OS [OS-100% ]
0+893.509 2.9775 0.036 8.469 0 0 0 0.108 25.215 0 0 0 OS [OS-100% ]
0+896.486 3.2455 0.004 8.789 0 0 0 0.012 28.526 0 0 0 OS [OS-100% ]
0+900 6.757 0 8.824 0 0 0 0 59.624 0 0 0 OS [OS-100% ]
0+910 10 0 10.439 0 0 0 0 104.389 0 0 0 OS [OS-100% ]
0+920 7.056 0 10.237 0 0 0 0 72.231 0 0 0 OS [OS-100% ]
0+924.112 5 0 13.652 0 0 0 0 68.259 0 0 0 OS [OS-100% ]
0+930 7.944 0 13.226 0 0 0 0 105.07 0 0 0 OS [OS-100% ]
0+940 7.102 0 16.996 0 0 0 0 120.703 0 0 0 OS [OS-100% ]
0+944.204 5 0 15.264 0 0 0 0 76.322 0 0 0 OS [OS-100% ]
0+950 7.898 0 11.12 0 0 0 0 87.829 0 0 0 OS [OS-100% ]
0+960 7.1485 0 12.518 0 0 0 0 89.481 0 0 0 OS [OS-100% ]
0+964.297 5 0 14.059 0 0 0 0 70.293 0 0 0 OS [OS-100% ]
0+970 6.8665 0 15.465 0 0 0 0 106.19 0 0 0 OS [OS-100% ]
0+978.03 5 0 15.444 0 0 0 0 77.219 0 0 0 OS [OS-100% ]
0+980 4.997 0 15.268 0 0 0 0 76.295 0 0 0 OS [OS-100% ]
0+988.024 5 0 14.957 0 0 0 0 74.787 0 0 0 OS [OS-100% ]
0+990 4.997 0 14.747 0 0 0 0 73.689 0 0 0 OS [OS-100% ]
0+998.018 5 0 12.283 0 0 0 0 61.417 0 0 0 OS [OS-100% ]
1+000 5.991 0 11.859 0 0 0 0 71.048 0 0 0 OS [OS-100% ]
1+010 10 0 8.936 0 0.075 0 0 89.357 0 0.751 0 OS [OS-100% ]
1+020 10 0.021 7.13 0 0.251 0 0.21 71.302 0 2.507 0 OS [OS-100% ]
1+030 10 0.031 5.934 0 0.303 0 0.306 59.337 0 3.025 0 OS [OS-100% ]
1+040 10 0.046 4.769 0 0.374 0 0.465 47.688 0 3.738 0 OS [OS-100% ]
1+050 9.1135 0.077 4.016 0 0.33 0 0.698 36.596 0 3.005 0 OS [OS-100% ]
1+058.227 5 0.111 3.879 0 0.326 0 0.557 19.395 0 1.629 0 OS [OS-100% ]
1+060 5.8865 0.119 4.003 0 0.33 0 0.701 23.565 0 1.943 0 OS [OS-100% ]
1+070 10 0.129 4.422 0 0.297 0 1.286 44.22 0 2.975 0 OS [OS-100% ]
1+080 10 0.065 4.561 0 0.234 0 0.649 45.611 0 2.344 0 OS [OS-100% ]
1+090 6.4995 0.001 4.91 0 0.17 0 0.004 31.913 0 1.107 0 OS [OS-100% ]
1+092.999 5 0 4.967 0 0.154 0 0 24.834 0 0.769 0 OS [OS-100% ]
1+100 8.5005 0 5.045 0 0.121 0 0 42.884 0 1.025 0 OS [OS-100% ]
1+110 10 0 5.376 0 0.09 0 0 53.758 0 0.898 0 OS [OS-100% ]
1+120 8.8855 0 6.2 0 0.047 0 0 55.092 0 0.422 0 OS [OS-100% ]
1+127.771 5 0 6.071 0 0.129 0 0 30.356 0 0.644 0 OS [OS-100% ]
1+130 6.1145 0 5.609 0 0.142 0 0 34.296 0 0.87 0 OS [OS-100% ]
1+140 10 0 8.424 0 0.123 0 0 84.238 0 1.226 0 OS [OS-100% ]
1+150 10 0 7.02 0 0.051 0 0 70.196 0 0.51 0 OS [OS-100% ]
1+160 10 0.052 4.934 0 0.004 0 0.515 49.34 0 0.038 0 OS [OS-100% ]
1+170 10 0.156 3.512 0 0.254 0 1.561 35.12 0 2.539 0 OS [OS-100% ]
1+180 10 0.078 3.102 0 0.215 0 0.778 31.021 0 2.148 0 OS [OS-100% ]
1+190 10 0 4.062 0 0.143 0 0 40.618 0 1.432 0 OS [OS-100% ]
1+200 10 0 6.407 0 0.029 0 0 64.068 0 0.292 0 OS [OS-100% ]
1+210 10 0 7.132 0 0.006 0 0 71.318 0 0.064 0 OS [OS-100% ]
1+220 10 0 8.576 0 0.002 0 0 85.763 0 0.023 0 OS [OS-100% ]
1+230 6.742 0 8.517 0 0.018 0 0 57.423 0 0.12 0 OS [OS-100% ]
1+233.484 5 0 7.865 0 0.035 0 0 39.326 0 0.176 0 OS [OS-100% ]
1+240 8.258 0 6.475 0 0.059 0 0 53.467 0 0.485 0 OS [OS-100% ]
1+250 5.683 0 5.161 0 0.113 0 0 29.329 0 0.641 0 OS [OS-100% ]
1+251.366 5 0 5.103 0 0.134 0 0 25.517 0 0.67 0 OS [OS-100% ]
1+260 8.941 0.002 3.181 0 0.245 0 0.02 28.44 0 2.195 0 OS [OS-100% ]
1+269.248 5 0.032 4.172 0 0.211 0 0.161 20.859 0 1.055 0 OS [OS-100% ]
1+270 5.376 0.028 4.284 0 0.206 0 0.153 23.028 0 1.108 0 OS [OS-100% ]
1+280 10 0 6.097 0 0.148 0 0 60.972 0 1.478 0 OS [OS-100% ]
1+290 6.839 0 5.846 0 0.042 0 0 39.984 0 0.288 0 OS [OS-100% ]
1+293.678 5 0 4.756 0 0.063 0 0 23.778 0 0.314 0 OS [OS-100% ]
1+300 3.305 0 3.174 0 0.156 0 0 10.49 0 0.514 0 OS [OS-100% ]
1+300.288 5 0 3.128 0 0.16 0 0 15.64 0 0.798 0 OS [OS-100% ]
1+310 9.856 0 2.963 0 0.216 0 0 29.199 0 2.129 0 OS [OS-100% ]
1+320 8.497 0 2.906 0 0.227 0 0 24.69 0 1.925 0 OS [OS-100% ]
1+326.994 5 0 2.665 0 0.267 0 0 13.326 0 1.336 0 OS [OS-100% ]
1+330 6.503 0.024 2.565 0 0.289 0 0.154 16.68 0 1.876 0 OS [OS-100% ]
1+340 10 0.273 2.154 0 0.362 0 2.73 21.544 0 3.622 0 OS [OS-100% ]
1+350 6.85 0 3.126 0 0.26 0 0.003 21.414 0 1.778 0 OS [OS-100% ]
1+353.7 5 0.007 2.983 0 0.173 0 0.034 14.915 0 0.863 0 OS [OS-100% ]
1+360 8.15 0.035 2.726 0 0.131 0 0.283 22.219 0 1.071 0 OS [OS-100% ]
1+370 10 0.296 2.578 0.695 0.13 0.051 2.964 25.78 6.952 1.296 0.507 OS [OS-100% ]
1+380 6.502 0.143 3.141 0.587 0.128 0.033 0.927 20.421 3.815 0.832 0.212 OS [OS-100% ]
1+383.004 4.836 0.122 3.431 0.56 0.127 0.029 0.591 16.592 2.708 0.616 0.14 OS [OS-100% ]
1+389.672 3.498 0.092 4.468 0.506 0.124 0.022 0.322 15.63 1.77 0.435 0.078 OS [OS-100% ]
1+390 3.3335 0.091 4.501 0.504 0.124 0.022 0.303 15.004 1.679 0.414 0.074 OS [OS-100% ]
1+396.339 5 0.075 4.636 0.464 0.118 0.018 0.373 23.181 2.321 0.592 0.089 OS [OS-100% ]
1+400 6.8305 0.067 4.278 0.445 0.115 0.016 0.459 29.22 3.038 0.786 0.108 OS [OS-100% ]
1+410 10 0.049 4.339 0.392 0.109 0.011 0.487 43.385 3.917 1.087 0.111 OS [OS-100% ]
1+420 10 0.071 2.931 0.527 0.112 0.026 0.705 29.315 5.268 1.121 0.26 OS [OS-100% ]
1+430 7.04 0.172 1.659 1.379 0.02 0.057 1.213 11.68 9.712 0.138 0.405 OS [OS-100% ]
1+434.08 5 0.319 1.426 1.54 0.017 0.106 1.596 7.131 7.7 0.086 0.529 OS [OS-100% ]
1+440 7.96 0.742 1.782 1.796 0.053 0.134 5.907 14.181 14.293 0.421 1.068 OS [OS-100% ]
1+450 10 0.624 2.927 0 0.324 0 6.242 29.267 0 3.236 0 OS [OS-100% ]
1+460 10 0.655 3.836 0 0.182 0 6.553 38.357 0 1.822 0 OS [OS-100% ]
1+470 5.986 0.384 3.843 0.865 0.032 0.012 2.299 23.002 5.176 0.191 0.069 OS [OS-100% ]
1+471.972 5 1.21 4.312 4.057 0.006 0.725 6.051 21.559 20.286 0.029 3.626 OS [OS-100% ]
1+480 9.014 1.343 5.921 3.808 0 0.593 12.107 53.376 34.325 0 5.345 OS [OS-100% ]
1+490 10 1.372 7.231 3.521 0.038 0.566 13.716 72.313 35.212 0.382 5.662 OS [OS-100% ]
1+500 9.9325 1.528 8.084 2.932 0.219 0.317 15.177 80.297 29.121 2.171 3.146 OS [OS-100% ]
1+509.865 5 0 8.326 0 0 0 0 41.628 0 0 0 OS [OS-100% ]
1+510 5.0675 0 8.259 0 0 0 0 41.853 0 0 0 OS [OS-100% ]
1+520 10 0 4.801 0 0 0 0 48.007 0 0 0 OS [OS-100% ]
1+530 6.2765 0 5.141 0 0 0 0 32.267 0 0 0 OS [OS-100% ]
1+532.553 5 0 5.395 0 0 0 0 26.976 0 0 0 OS [OS-100% ]
1+540 5.564 0 5.756 0 0 0 0 32.027 0 0 0 OS [OS-100% ]
1+543.681 5 0 5.723 0 0 0 0 28.617 0 0 0 OS [OS-100% ]
1+550 5.564 1.452 3.082 4.554 0 0.726 8.078 17.15 25.336 0 4.04 OS [OS-100% ]
1+554.809 5 1.841 2.624 5.144 0 0.926 9.204 13.122 25.721 0 4.631 OS [OS-100% ]
1+560 7.5955 0.708 2.252 2.12 0 0.098 5.376 17.108 16.106 0 0.741 OS [OS-100% ]
1+570 5.2265 0.849 2.447 2.447 0 0.188 4.435 12.787 12.789 0 0.98 OS [OS-100% ]
1+570.453 5 0.857 2.464 2.454 0 0.19 4.283 12.322 12.271 0 0.948 OS [OS-100% ]
1+580 5.385 0.905 3.057 2.519 0 0.204 4.875 16.462 13.565 0 1.098 OS [OS-100% ]
1+581.223 5 0.896 3.121 2.514 0 0.202 4.481 15.606 12.569 0 1.01 OS [OS-100% ]
1+590 5.3845 0.877 2.921 2.398 0 0.184 4.721 15.726 12.909 0 0.991 OS [OS-100% ]
1+591.992 4.3425 0.292 3.292 0.673 0 0.053 1.267 14.298 2.922 0 0.231 OS [OS-100% ]
1+598.685 4.004 0 3.531 0 0 0 0 14.136 0 0 0 OS [OS-100% ]
1+600 1.7805 0 3.484 0 0 0 0 6.203 0 0 0 OS [OS-100% ]
1+602.246 2.904 0 3.396 0 0 0 0 9.863 0 0 0 OS [OS-100% ]
1+605.808 2.7775 0 3.238 0 0 0 0 8.994 0 0 0 OS [OS-100% ]
1+607.801 2.096 0 3.14 0 0 0 0 6.581 0 0 0 OS [OS-100% ]
1+610 6.0995 0 3.027 0 0 0 0 18.465 0 0 0 OS [OS-100% ]
1+620 10 0.006 3.362 0 0 0 0.061 33.618 0 0 0 OS [OS-100% ]
1+630 10 0.11 3.383 0 0 0 1.101 33.828 0 0 0 OS [OS-100% ]
1+640 10 0.313 3.91 1.33 0 0.031 3.129 39.097 13.303 0 0.312 OS [OS-100% ]
1+650 10 0.509 3.359 1.95 0 0.105 5.094 33.594 19.5 0 1.055 OS [OS-100% ]
1+660 5.9005 0.378 4.343 1.868 0 0.105 2.231 25.629 11.022 0 0.619 OS [OS-100% ]
1+661.801 5 0.373 4.02 1.829 0 0.097 1.864 20.101 9.143 0 0.485 OS [OS-100% ]
1+670 7.637 0.385 2.997 1.559 0 0.045 2.941 22.89 11.907 0 0.342 OS [OS-100% ]
1+677.075 5 1.179 5.413 4.054 0 0.824 5.893 27.065 20.27 0 4.121 OS [OS-100% ]
1+680 6.4625 0.235 8.099 2.65 0 0.256 1.517 52.338 17.127 0 1.654 OS [OS-100% ]
1+690 6.175 0.133 7.739 2.55 0 0.256 0.822 47.787 15.749 0 1.581 OS [OS-100% ]
1+692.35 5 0.159 6.126 2.752 0 0.375 0.793 30.628 13.761 0 1.876 OS [OS-100% ]
1+700 8.825 0.454 7.302 3.211 0 0.494 4.009 64.438 28.337 0 4.361 OS [OS-100% ]
1+710 10 0.725 6.178 3.9 0 0.741 7.251 61.782 38.999 0 7.415 OS [OS-100% ]
1+720 10 0.972 5.597 4.381 0 0.923 9.715 55.971 43.808 0 9.233 OS [OS-100% ]
1+730 10 1.052 5.167 4.693 0 1.045 10.519 51.668 46.926 0 10.445 OS [OS-100% ]
1+740 8.175 0.812 4.758 4.32 0 0.907 6.637 38.901 35.319 0 7.412 OS [OS-100% ]
1+746.35 3.41 0.654 5.013 4.039 0 0.806 2.23 17.093 13.773 0 2.748 OS [OS-100% ]
1+746.82 1.825 0.643 5.035 4.018 0 0.798 1.173 9.188 7.333 0 1.457 OS [OS-100% ]
1+750 6.59 0.573 5.188 3.883 0 0.75 3.775 34.192 25.59 0 4.942 OS [OS-100% ]
1+760 5.287 0.008 5.142 0.618 0 0.001 0.041 27.188 3.266 0 0.004 OS [OS-100% ]
1+760.574 5 0.011 5.123 0.646 0 0.001 0.055 25.616 3.231 0 0.005 OS [OS-100% ]
1+770 6.877 0.141 4.961 1.225 0 0.016 0.967 34.117 8.428 0 0.108 OS [OS-100% ]
1+774.328 5 0.286 5.037 1.52 0 0.062 1.431 25.186 7.601 0 0.312 OS [OS-100% ]
1+780 3.175 0.001 5.22 0.088 0 0 0.002 16.574 0.279 0 0 OS [OS-100% ]
1+780.678 5 0 5.769 0 0 0 0 28.846 0 0 0 OS [OS-100% ]
1+790 9.661 0 6.928 0 0 0 0 66.927 0 0 0 OS [OS-100% ]
1+800 10 0 7.116 0 0 0 0 71.165 0 0 0 OS [OS-100% ]
1+810 7.986 0 7.423 0 0 0 0 59.28 0 0 0 OS [OS-100% ]
1+815.972 5 0 7.755 0 0 0 0 38.776 0 0 0 OS [OS-100% ]
1+820 7.014 0 8.018 0 0 0 0 56.241 0 0 0 OS [OS-100% ]
1+830 10 0 8.547 0 0 0 0 85.466 0 0 0 OS [OS-100% ]
1+840 10 0 8.472 0 0 0 0 84.721 0 0 0 OS [OS-100% ]
1+850 5.6325 0 8.379 0 0 0 0 47.193 0 0 0 OS [OS-100% ]
1+851.265 3.87 0 8.385 0 0 0 0 32.448 0 0 0 OS [OS-100% ]
1+857.74 4.3675 0 8.699 0 0 0 0 37.992 0 0 0 OS [OS-100% ]
1+860 5.3395 0 8.733 0 0 0 0 46.632 0 0 0 OS [OS-100% ]
1+868.419 5 0 9.003 0 0 0 0 45.015 0 0 0 OS [OS-100% ]
1+870 5.34 0 9.012 0 0 0 0 48.125 0 0 0 OS [OS-100% ]
1+879.099 5 0 8.39 0 0 0 0 41.948 0 0 0 OS [OS-100% ]
1+880 5.4505 0 8.236 0 0 0 0 44.891 0 0 0 OS [OS-100% ]
1+890 6.7635 0 6.892 0 0 0 0 46.616 0 0 0 OS [OS-100% ]
1+893.527 5 0 6.738 0 0 0 0 33.69 0 0 0 OS [OS-100% ]
1+900 8.2365 0 6.55 0 0 0 0 53.951 0 0 0 OS [OS-100% ]
1+910 6.841 0 6.801 0 0 0 0 46.529 0 0 0 OS [OS-100% ]
1+913.682 5 0 6.563 0 0 0 0 32.816 0 0 0 OS [OS-100% ]
1+920 8.159 0 6.309 0 0 0 0 51.474 0 0 0 OS [OS-100% ]
1+930 6.9185 0 6.87 0 0 0 0 47.53 0 0 0 OS [OS-100% ]
1+933.837 3.757 0 6.676 0 0 0 0 25.082 0 0 0 OS [OS-100% ]
1+937.514 3.0815 0 6.256 0 0 0 0 19.277 0 0 0 OS [OS-100% ]
1+940 2.514 0 5.881 0 0 0 0 14.786 0 0 0 OS [OS-100% ]
1+942.542 3.785 0 5.799 0 0 0 0 21.951 0 0 0 OS [OS-100% ]
1+947.57 3.729 0 6.04 0 0 0 0 22.524 0 0 0 OS [OS-100% ]
1+950 6.215 0 6.051 0 0 0 0 37.604 0 0 0 OS [OS-100% ]
1+960 10 0 5.574 0 0 0 0 55.742 0 0 0 OS [OS-100% ]
1+970 10 0 6.61 0 0 0 0 66.1 0 0 0 OS [OS-100% ]
1+980 10 0 6.382 0 0 0 0 63.822 0 0 0 OS [OS-100% ]
1+990 8.367 0 6.211 0 0 0 0 51.971 0 0 0 OS [OS-100% ]
1+996.734 5 0 6.198 0 0 0 0 30.992 0 0 0 OS [OS-100% ]
2+000 6.633 0 6.265 0 0 0 0 41.554 0 0 0 OS [OS-100% ]
2+010 10 0 5.273 0 0 0 0 52.734 0 0 0 OS [OS-100% ]
2+020 10 0 5.65 0 0 0 0 56.498 0 0 0 OS [OS-100% ]
2+030 10 0 7.807 0 0 0 0 78.067 0 0 0 OS [OS-100% ]
2+040 10 0 9.613 0 0 0 0 96.13 0 0 0 OS [OS-100% ]
2+050 9.625 0 11.014 0 0 0 0 106.012 0 0 0 OS [OS-100% ]
2+059.25 5 0 11.058 0 0 0 0 55.289 0 0 0 OS [OS-100% ]
2+060 1.6235 0 10.147 0 0 0 0 16.474 0 0 0 OS [OS-100% ]
2+062.497 5 0 8.801 0 0 0 0 44.006 0 0 0 OS [OS-100% ]
2+070 8.7515 0 8.495 0 0 0 0 74.341 0 0 0 OS [OS-100% ]
2+080 10 0 7.198 0 0 0 0 71.975 0 0 0 OS [OS-100% ]
2+090 10 0 5.593 0 0 0 0 55.932 0 0 0 OS [OS-100% ]
2+100 10 0 4.46 0 0 0 0 44.596 0 0 0 OS [OS-100% ]
2+110 10 0 3.906 0 0 0 0 39.064 0 0 0 OS [OS-100% ]
2+120 5.2485 0.286 4.02 1.398 0 0.034 1.502 21.099 7.335 0 0.179 OS [OS-100% ]
2+120.497 3.5175 0.283 4.016 1.39 0 0.033 0.994 14.125 4.889 0 0.115 OS [OS-100% ]
2+127.035 4.7515 0.226 4.054 1.258 0 0.024 1.073 19.262 5.977 0 0.115 OS [OS-100% ]
2+130 3.269 0.197 4.115 1.186 0 0.021 0.645 13.452 3.876 0 0.069 OS [OS-100% ]
2+133.573 5 0.162 4.93 1.09 0 0.017 0.812 24.648 5.452 0 0.087 OS [OS-100% ]
2+140 8.2135 0.096 5.06 0.922 0 0.01 0.787 41.563 7.574 0 0.086 OS [OS-100% ]
2+150 10 0.065 5.719 0.796 0 0.007 0.645 57.192 7.955 0 0.071 OS [OS-100% ]
2+160 10 0.082 5.372 0.891 0 0.009 0.819 53.717 8.911 0 0.092 OS [OS-100% ]
2+170 10 0.092 4.577 0.939 0 0.01 0.922 45.771 9.388 0 0.103 OS [OS-100% ]
2+180 10 0.478 4.263 2.558 0 0.122 4.784 42.627 25.578 0 1.22 OS [OS-100% ]
2+190 5.7865 0.276 4.33 2.158 0 0.03 1.595 25.057 12.489 0 0.176 OS [OS-100% ]
2+191.573 5 0.261 4.99 2.09 0 0.029 1.306 24.948 10.449 0 0.143 OS [OS-100% ]
2+200 9.2135 0.338 5.043 2.129 0 0.036 3.119 46.463 19.612 0 0.331 OS [OS-100% ]
2+210 10 0.127 5.318 1.026 0 0.014 1.275 53.181 10.257 0 0.14 OS [OS-100% ]
2+220 6.272 0.074 5.922 0.787 0 0.008 0.464 37.141 4.934 0 0.047 OS [OS-100% ]
2+222.544 5 0.072 5.703 0.767 0 0.007 0.358 28.517 3.836 0 0.037 OS [OS-100% ]
2+230 8.728 0.098 6.051 0.837 0 0.01 0.852 52.816 7.304 0 0.088 OS [OS-100% ]
2+240 10 0.141 5.756 0.982 0 0.015 1.413 57.559 9.825 0 0.145 OS [OS-100% ]
2+250 10 0.202 6.08 1.153 0 0.021 2.024 60.797 11.532 0 0.208 OS [OS-100% ]
2+260 9.144 0.16 6.619 1.107 0 0.017 1.46 60.523 10.124 0 0.155 OS [OS-100% ]
2+268.288 5 0.139 5.751 0.98 0 0.014 0.695 28.755 4.9 0 0.071 OS [OS-100% ]
2+270 5.856 0.152 6.134 0.989 0 0.015 0.889 35.921 5.791 0 0.09 OS [OS-100% ]
2+280 10 0.224 4.899 1.186 0 0.023 2.243 48.992 11.861 0 0.228 OS [OS-100% ]
2+290 6.137 0.311 4.293 1.411 0 0.044 1.908 26.346 8.659 0 0.271 OS [OS-100% ]
2+292.274 5 0.327 4.231 1.465 0 0.062 1.636 21.156 7.325 0 0.312 OS [OS-100% ]
2+300 5.2715 0.21 5.25 1.401 0 0.03 1.106 27.678 7.384 0 0.156 OS [OS-100% ]
2+302.817 5 0.17 5.612 1.357 0 0.024 0.852 28.06 6.787 0 0.119 OS [OS-100% ]
2+310 5.271 0.111 6.448 1.208 0 0.016 0.583 33.987 6.367 0 0.084 OS [OS-100% ]
2+313.359 5 0.083 7.001 0.856 0 0.01 0.415 35.005 4.282 0 0.049 OS [OS-100% ]
2+320 8.3205 0.03 7.691 0.716 0 0.004 0.251 63.995 5.957 0 0.035 OS [OS-100% ]
2+330 9.225 0.035 6.849 0.608 0 0.004 0.319 63.182 5.604 0 0.033 OS [OS-100% ]
2+338.45 5 0.084 5.715 0.781 0 0.009 0.419 28.577 3.903 0 0.043 OS [OS-100% ]
2+340 1.1485 0.097 5.555 0.826 0 0.01 0.111 6.379 0.949 0 0.011 OS [OS-100% ]
2+340.747 1.5225 0.103 5.425 0.849 0 0.011 0.157 8.26 1.292 0 0.016 OS [OS-100% ]
2+343.045 4.6265 0.125 4.672 0.918 0 0.013 0.577 21.615 4.248 0 0.059 OS [OS-100% ]
2+350 8.4775 0.163 2.864 1.008 0 0.016 1.379 24.279 8.544 0 0.135 OS [OS-100% ]
2+360 10 0.425 2.524 1.068 0 0.018 4.25 25.241 10.684 0 0.183 OS [OS-100% ]
2+370 10 0.229 3.136 1.125 0 0.021 2.292 31.357 11.255 0 0.207 OS [OS-100% ]
2+380 10 0.19 4.578 1.083 0 0.019 1.903 45.782 10.829 0 0.19 OS [OS-100% ]
2+390 10 0.195 5.986 1.069 0 0.019 1.95 59.862 10.691 0 0.194 OS [OS-100% ]
2+400 10 0.154 6.455 0.955 0 0.015 1.541 64.548 9.549 0 0.153 OS [OS-100% ]
2+410 5.729 0.114 6.329 0.835 0 0.011 0.652 36.259 4.785 0 0.065 OS [OS-100% ]
2+411.458 4.727 0.109 6.207 0.819 0 0.011 0.514 29.339 3.872 0 0.051 OS [OS-100% ]
2+419.454 4.271 0 7.353 0 0 0 0 31.406 0 0 0 OS [OS-100% ]
2+420 3.998 0 7.339 0 0 0 0 29.343 0 0 0 OS [OS-100% ]
2+427.45 5 0 7.405 0 0 0 0 37.023 0 0 0 OS [OS-100% ]
2+430 6.275 0 7.238 0 0 0 0 45.418 0 0 0 OS [OS-100% ]
2+440 10 0 6.841 0 0 0 0 68.414 0 0 0 OS [OS-100% ]
2+450 10 0 7.668 0 0 0 0 76.681 0 0 0 OS [OS-100% ]
2+460 10 0 7.469 0 0 0 0 74.69 0 0 0 OS [OS-100% ]
2+470 10 0 7.254 0 0 0 0 72.541 0 0 0 OS [OS-100% ]
2+480 10 0 7.584 0 0 0 0 75.84 0 0 0 OS [OS-100% ]
2+490 10 0 6.717 0 0 0 0 67.167 0 0 0 OS [OS-100% ]
2+500 10 0 6.132 0 0 0 0 61.323 0 0 0 OS [OS-100% ]
2+510 9.437 0 7.072 0 0 0 0 66.736 0 0 0 OS [OS-100% ]
2+518.874 5 0 7.663 0 0 0 0 38.316 0 0 0 OS [OS-100% ]
2+520 3.521 0 7.734 0 0 0 0 27.231 0 0 0 OS [OS-100% ]
2+525.916 5 0 8.59 0 0 0 0 42.949 0 0 0 OS [OS-100% ]
2+530 3.521 0 9.151 0 0 0 0 32.219 0 0 0 OS [OS-100% ]
2+532.958 5 0 9.321 0 0 0 0 46.607 0 0 0 OS [OS-100% ]
2+540 8.521 0 9.677 0 0 0 0 82.458 0 0 0 OS [OS-100% ]
2+550 10 0 9.24 0 0 0 0 92.397 0 0 0 OS [OS-100% ]
2+560 10 0 8.289 0 0 0 0 82.886 0 0 0 OS [OS-100% ]
2+570 10 0 7.093 0 0 0 0 70.927 0 0 0 OS [OS-100% ]
2+580 10 0 6.57 0 0 0 0 65.699 0 0 0 OS [OS-100% ]
2+590 10 0 6.278 0 0 0 0 62.778 0 0 0 OS [OS-100% ]
2+600 10 0 7.621 0 0 0 0 76.207 0 0 0 OS [OS-100% ]
2+610 10 0 7.425 0 0 0 0 74.25 0 0 0 OS [OS-100% ]
2+620 10 0 7.247 0 0 0 0 72.465 0 0 0 OS [OS-100% ]
2+630 10 0 7.3 0 0 0 0 73.003 0 0 0 OS [OS-100% ]
2+640 8.754 0 7.836 0 0 0 0 68.595 0 0 0 OS [OS-100% ]
2+647.508 4.9925 0 8.177 0 0 0 0 40.822 0 0 0 OS [OS-100% ]
2+649.985 1.246 0 8.236 0 0 0 0 10.262 0 0 0 OS [OS-100% ]
2+650 1.2385 0 8.237 0 0 0 0 10.201 0 0 0 OS [OS-100% ]
2+652.462 5 0 8.275 0 0 0 0 41.377 0 0 0 OS [OS-100% ]
2+660 8.769 0 8.25 0 0 0 0 72.343 0 0 0 OS [OS-100% ]
2+670 10 0 8.139 0 0 0 0 81.39 0 0 0 OS [OS-100% ]
2+680 10 0 7.5 0 0 0 0 74.999 0 0 0 OS [OS-100% ]
2+690 10 0 7.104 0 0 0 0 71.039 0 0 0 OS [OS-100% ]
2+700 10 0 6.627 0 0 0 0 66.267 0 0 0 OS [OS-100% ]
2+710 10 0 6.71 0 0 0 0 67.099 0 0 0 OS [OS-100% ]
2+720 10 0 7.393 0 0 0 0 73.93 0 0 0 OS [OS-100% ]
2+730 10 0 7.612 0 0 0 0 76.119 0 0 0 OS [OS-100% ]
2+740 10 0 7.274 0 0 0 0 72.741 0 0 0 OS [OS-100% ]
2+750 7.139 0 7.65 0 0 0 0 54.615 0 0 0 OS [OS-100% ]
2+754.278 2.921 0 7.842 0 0 0 0 22.905 0 0 0 OS [OS-100% ]
2+755.842 1.5645 0 7.876 0 0 0 0 12.322 0 0 0 OS [OS-100% ]
2+757.407 2.079 0 7.892 0 0 0 0 16.407 0 0 0 OS [OS-100% ]
2+760 6.2965 0 7.888 0 0 0 0 49.668 0 0 0 OS [OS-100% ]
2+770 10 0 7.526 0 0 0 0 75.257 0 0 0 OS [OS-100% ]
2+780 10 0 7.514 0 0 0 0 75.135 0 0 0 OS [OS-100% ]
2+790 10 0 6.801 0 0 0 0 68.014 0 0 0 OS [OS-100% ]
2+800 10 0 6.431 0 0 0 0 64.312 0 0 0 OS [OS-100% ]
2+810 10 0 6.168 0 0 0 0 61.685 0 0 0 OS [OS-100% ]
2+820 10 0 5.739 0 0 0 0 57.393 0 0 0 OS [OS-100% ]
2+830 10 0 4.558 0 0 0 0 45.582 0 0 0 OS [OS-100% ]
2+840 10 0 4.544 0 0 0 0 45.445 0 0 0 OS [OS-100% ]
2+850 10 0 5.405 0 0 0 0 54.049 0 0 0 OS [OS-100% ]
2+860 10 0 7.056 0 0 0 0 70.556 0 0 0 OS [OS-100% ]
2+870 10 0 8.178 0 0 0 0 81.784 0 0 0 OS [OS-100% ]
2+880 10 0 9.094 0 0 0 0 90.937 0 0 0 OS [OS-100% ]
2+890 10 0 10.246 0 0 0 0 102.459 0 0 0 OS [OS-100% ]
2+900 10 0 10.165 0 0 0 0 101.646 0 0 0 OS [OS-100% ]
2+910 10 0 9.761 0 0 0 0 97.612 0 0 0 OS [OS-100% ]
2+920 10 0 9.237 0 0 0 0 92.367 0 0 0 OS [OS-100% ]
2+930 10 0 7.923 0 0 0 0 79.227 0 0 0 OS [OS-100% ]
2+940 10 0 7.406 0 0 0 0 74.061 0 0 0 OS [OS-100% ]
2+950 10 0 10.643 0 0 0 0 106.426 0 0 0 OS [OS-100% ]
2+960 10 0.04 7.114 0.521 0 0.004 0.399 71.138 5.215 0 0.04 OS [OS-100% ]
2+970 10 0.012 7.183 0.428 0 0.001 0.122 71.827 4.282 0 0.012 OS [OS-100% ]
2+980 10 0.001 8.138 0.446 0 0 0.015 81.376 4.462 0 0.001 OS [OS-100% ]
2+990 10 0 7.888 0.593 0 0 0 78.885 5.928 0 0 OS [OS-100% ]
3+000 10 0.001 11.308 1.069 0 0 0.013 113.083 10.694 0 0.003 OS [OS-100% ]
3+010 10 0.068 6.172 1.194 0 0.009 0.682 61.723 11.939 0 0.087 OS [OS-100% ]
3+020 10 0 6.774 0 0 0 0 67.74 0 0 0 OS [OS-100% ]
3+030 10 0 6.779 0 0 0 0 67.794 0 0 0 OS [OS-100% ]
3+040 10 0 6.812 0 0 0 0 68.121 0 0 0 OS [OS-100% ]
3+050 10 0 6.362 0 0 0 0 63.62 0 0 0 OS [OS-100% ]
3+060 10 0 5.632 0 0 0 0 56.318 0 0 0 OS [OS-100% ]
3+070 10 0 4.879 0 0 0 0 48.795 0 0 0 OS [OS-100% ]
3+080 10 0 5.592 0 0 0 0 55.92 0 0 0 OS [OS-100% ]
3+090 10 0 6.286 0 0 0 0 62.862 0 0 0 OS [OS-100% ]
3+100 10 0 6.832 0 0 0 0 68.317 0 0 0 OS [OS-100% ]
3+110 7.371 0 6.051 0 0 0 0 44.604 0 0 0 OS [OS-100% ]
3+114.742 2.371 0 8.463 0 0 0 0 20.065 0 0 0 OS [OS-100% ]
3+660 10 0.875 0.657 0 0.4 0 8.754 6.569 0 4 0 OS [OS-100% ]
3+670 10 0.747 0.853 0 0.401 0 7.47 8.533 0 4.014 0 OS [OS-100% ]
3+680 5.3995 0.982 0.583 0 0.481 0 5.301 3.149 0 2.598 0 OS [OS-100% ]
3+680.799 3.6335 1.004 0.57 0 0.486 0 3.648 2.071 0 1.767 0 OS [OS-100% ]
3+687.267 4.6005 1.118 0.484 0 0.503 0 5.144 2.228 0 2.316 0 OS [OS-100% ]
3+690 3.2345 1.207 0.516 0 0.487 0 3.904 1.67 0 1.576 0 OS [OS-100% ]
3+693.736 5 1.015 0.613 0 0.46 0 5.074 3.067 0 2.301 0 OS [OS-100% ]
3+700 8.132 0.544 0.797 0 0.42 0 4.427 6.478 0 3.417 0 OS [OS-100% ]
3+710 10 0.205 1.176 0 0.343 0 2.05 11.764 0 3.433 0 OS [OS-100% ]
3+720 10 0.124 1.582 0 0.258 0 1.239 15.816 0 2.579 0 OS [OS-100% ]
3+730 10 0.203 1.277 0 0.279 0 2.032 12.772 0 2.794 0 OS [OS-100% ]
3+740 10 0.386 1.024 0 0.337 0 3.863 10.238 0 3.37 0 OS [OS-100% ]
3+750 10 0.851 0.832 0 0.398 0 8.514 8.318 0 3.984 0 OS [OS-100% ]
3+760 10 0.822 0.807 0 0.411 0 8.217 8.069 0 4.105 0 OS [OS-100% ]
3+770 10 0.501 0.938 0 0.379 0 5.008 9.38 0 3.789 0 OS [OS-100% ]
3+780 7.374 0.19 1.038 0 0.361 0 1.397 7.657 0 2.659 0 OS [OS-100% ]
3+784.748 5 0.107 1.115 0 0.358 0 0.534 5.576 0 1.792 0 OS [OS-100% ]
3+790 4.304 0.189 1.1 0 0.353 0 0.815 4.736 0 1.519 0 OS [OS-100% ]
3+793.356 5 0.131 1.168 0 0.348 0 0.656 5.841 0 1.74 0 OS [OS-100% ]
3+800 4.3035 0.017 1.519 0 0.338 0 0.072 6.538 0 1.454 0 OS [OS-100% ]
3+801.963 5 0.009 1.584 0 0.332 0 0.044 7.921 0 1.661 0 OS [OS-100% ]
3+810 9.0185 0.006 1.746 0 0.322 0 0.05 15.75 0 2.903 0 OS [OS-100% ]
3+820 10 0.05 1.638 0 0.309 0 0.5 16.384 0 3.087 0 OS [OS-100% ]
3+830 10 0.034 1.518 0 0.312 0 0.343 15.182 0 3.12 0 OS [OS-100% ]
3+840 10 0.143 0.919 0 0.458 0 1.427 9.194 0 4.577 0 OS [OS-100% ]
3+850 10 0.295 1.199 0 0.36 0 2.949 11.986 0 3.599 0 OS [OS-100% ]
3+860 10 0.047 1.62 0 0.235 0 0.466 16.199 0 2.354 0 OS [OS-100% ]
3+870 10 0 1.988 0 0.228 0 0 19.883 0 2.284 0 OS [OS-100% ]
3+880 10 0 2.256 0 0.222 0 0 22.555 0 2.215 0 OS [OS-100% ]
3+890 10 0 2.801 0 0.171 0 0 28.009 0 1.711 0 OS [OS-100% ]
3+900 10 0.359 2.414 0.887 0.171 0.086 3.585 24.145 8.875 1.713 0.864 OS [OS-100% ]
3+910 10 0.317 2.184 0.924 0.212 0.081 3.172 21.844 9.24 2.122 0.812 OS [OS-100% ]
3+920 9.782 0.494 1.529 0.912 0.23 0.091 4.828 14.955 8.921 2.252 0.892 OS [OS-100% ]
3+929.564 4.792 0.222 1.116 0 0.386 0 1.064 5.349 0 1.85 0 OS [OS-100% ]
3+929.584 0.02 0.222 1.116 0 0.387 0 0.004 0.022 0 0.008 0 OS [OS-100% ]
3+929.604 0.208 0.222 1.115 0 0.388 0 0.046 0.232 0 0.081 0 OS [OS-100% ]
3+930 5.198 0.226 1.101 0 0.404 0 1.176 5.722 0 2.102 0 OS [OS-100% ]
3+940 10 0.492 1.112 0 0.34 0 4.921 11.117 0 3.402 0 OS [OS-100% ]
3+950 10 0.346 1.079 0 0.364 0 3.46 10.787 0 3.636 0 OS [OS-100% ]
3+960 10 0.589 1.198 0 0.319 0 5.885 11.984 0 3.186 0 OS [OS-100% ]
3+970 10 0.193 1.494 0 0.246 0 1.929 14.937 0 2.461 0 OS [OS-100% ]
3+980 10 0.493 1.581 0.971 0.178 0.1 4.934 15.805 9.712 1.782 0.998 OS [OS-100% ]
3+990 10 0.405 1.77 0.888 0.136 0.088 4.053 17.7 8.876 1.362 0.881 OS [OS-100% ]
4+000 10 0.413 1.788 0.884 0.087 0.088 4.135 17.881 8.837 0.869 0.875 OS [OS-100% ]
4+010 10 0.399 1.778 0.877 0.078 0.086 3.992 17.781 8.766 0.779 0.858 OS [OS-100% ]
4+020 8.0965 0.417 2.099 0.89 0.097 0.088 3.377 16.991 7.207 0.782 0.716 OS [OS-100% ]
4+026.193 5 0 3.098 0 0.084 0 0 15.491 0 0.421 0 OS [OS-100% ]
4+030 3.0615 0 3.473 0 0.076 0 0 10.633 0 0.232 0 OS [OS-100% ]
4+032.316 4.2195 0 3.429 0 0.07 0 0 14.469 0 0.297 0 OS [OS-100% ]
4+038.439 3.842 0 3.022 0 0.068 0 0 11.61 0 0.261 0 OS [OS-100% ]
4+040 5.7805 0 2.858 0 0.076 0 0 16.519 0 0.438 0 OS [OS-100% ]
4+050 10 0 2.802 0 0.116 0 0 28.016 0 1.157 0 OS [OS-100% ]
4+060 10 0 3.684 0 0.039 0 0 36.844 0 0.387 0 OS [OS-100% ]
4+070 10 0 2.97 0 0.064 0 0 29.699 0 0.64 0 OS [OS-100% ]
4+080 10 0.081 1.64 0 0.238 0 0.807 16.402 0 2.38 0 OS [OS-100% ]
4+090 10 0.115 1.497 0 0.369 0 1.154 14.973 0 3.688 0 OS [OS-100% ]
4+100 10 0.004 2.048 0 0.284 0 0.043 20.479 0 2.838 0 OS [OS-100% ]
4+110 10 0 3.398 0 0.127 0 0 33.978 0 1.27 0 OS [OS-100% ]
4+120 5.481 0 2.415 0 0.204 0 0 13.236 0 1.12 0 OS [OS-100% ]
4+120.962 4.5975 0 2.281 0 0.217 0 0 10.487 0 0.999 0 OS [OS-100% ]
4+129.195 4.519 0.009 2.393 0 0.275 0 0.038 10.812 0 1.242 0 OS [OS-100% ]
4+130 4.1165 0.004 2.387 0 0.278 0 0.018 9.827 0 1.143 0 OS [OS-100% ]
4+137.428 5 0.078 1.849 0 0.34 0 0.392 9.243 0 1.701 0 OS [OS-100% ]
4+140 6.286 0.085 1.534 0 0.354 0 0.534 9.645 0 2.224 0 OS [OS-100% ]
4+150 10 0.305 0.734 0 0.473 0 3.047 7.337 0 4.73 0 OS [OS-100% ]
4+160 10 0.726 0.402 0 0.555 0 7.259 4.017 0 5.554 0 OS [OS-100% ]
4+170 10 1.108 0.295 0 0.568 0 11.076 2.954 0 5.685 0 OS [OS-100% ]
4+180 9.7805 2.238 0.673 4.555 0.14 0.404 21.889 6.583 44.555 1.366 3.948 OS [OS-100% ]
4+189.561 5 1.61 1.752 4.047 0.076 0.343 8.049 8.762 20.234 0.378 1.714 OS [OS-100% ]
4+190 5.2195 1.584 1.791 4.024 0.074 0.34 8.268 9.349 21.001 0.386 1.774 OS [OS-100% ]
4+200 6.7655 1.447 2.096 3.894 0.067 0.321 9.792 14.18 26.348 0.451 2.172 OS [OS-100% ]
4+203.531 5 2.989 2.148 7.664 0.067 1.604 14.943 10.742 38.318 0.333 8.018 OS [OS-100% ]
4+210 6.9855 2.701 2.688 7.338 0.054 1.452 18.868 18.778 51.257 0.379 10.146 OS [OS-100% ]
4+217.502 5 2.153 3.087 6.908 0.021 1.342 10.764 15.433 34.541 0.104 6.712 OS [OS-100% ]
4+220 6.249 2.104 3.045 6.818 0.006 1.344 13.146 19.028 42.609 0.037 8.399 OS [OS-100% ]
4+230 10 0.586 2.279 2.891 0 0.133 5.859 22.788 28.908 0.005 1.335 OS [OS-100% ]
4+240 10 0.914 1.059 3.331 0.026 0.249 9.143 10.59 33.306 0.261 2.495 OS [OS-100% ]
4+250 10 1.35 1.051 3.216 0.046 0.182 13.499 10.512 32.159 0.46 1.816 OS [OS-100% ]
4+260 10 0 5.847 0 0 0 0 58.466 0 0 0 OS [OS-100% ]
4+270 10 2.233 2.181 9.993 0 2.512 22.326 21.808 99.929 0 25.119 OS [OS-100% ]
4+280 10 0.594 2.142 3.021 0.03 0.163 5.945 21.416 30.211 0.302 1.633 OS [OS-100% ]
4+290 10 1.189 1.422 3.608 0.056 0.25 11.888 14.216 36.081 0.562 2.503 OS [OS-100% ]
4+300 10 1.473 0.756 3.777 0.076 0.305 14.728 7.556 37.774 0.761 3.052 OS [OS-100% ]
4+310 10 1.391 0.799 3.667 0.059 0.291 13.914 7.99 36.671 0.595 2.909 OS [OS-100% ]
4+320 10 1.541 1.019 3.946 0.058 0.332 15.41 10.19 39.46 0.576 3.316 OS [OS-100% ]
4+330 7.49 0.026 1.783 0 0.225 0 0.198 13.354 0 1.683 0 OS [OS-100% ]
4+334.98 2.6095 0.174 1.55 0 0.264 0 0.454 4.045 0 0.688 0 OS [OS-100% ]
4+335.219 0.2395 0.181 1.541 0 0.265 0 0.043 0.369 0 0.064 0 OS [OS-100% ]
4+335.459 2.3905 0.188 1.532 0 0.267 0 0.451 3.662 0 0.639 0 OS [OS-100% ]
4+340 7.2705 0.307 1.384 0 0.299 0 2.233 10.066 0 2.173 0 OS [OS-100% ]
4+350 10 0.426 1.234 0 0.339 0 4.263 12.337 0 3.386 0 OS [OS-100% ]
4+360 7.1455 0.171 1.4 0 0.323 0 1.223 10.003 0 2.31 0 OS [OS-100% ]
4+364.291 5 0.129 1.462 0 0.319 0 0.647 7.31 0 1.593 0 OS [OS-100% ]
4+370 7.8545 0.092 1.446 0 0.313 0 0.719 11.359 0 2.456 0 OS [OS-100% ]
4+380 10 0.038 1.923 0 0.298 0 0.376 19.232 0 2.977 0 OS [OS-100% ]
4+390 10 0.001 2.627 0 0.221 0 0.012 26.267 0 2.205 0 OS [OS-100% ]
4+400 10 0.205 2.535 0 0.207 0 2.048 25.347 0 2.069 0 OS [OS-100% ]
4+410 9.1455 0.547 2.042 0 0.274 0 5.003 18.679 0 2.504 0 OS [OS-100% ]
4+418.291 5 0.636 1.867 0 0.308 0 3.179 9.337 0 1.541 0 OS [OS-100% ]
4+420 5.8545 0.638 1.816 0 0.312 0 3.736 10.632 0 1.829 0 OS [OS-100% ]
4+430 10 0.627 1.001 0 0.404 0 6.273 10.008 0 4.035 0 OS [OS-100% ]
4+440 9.1215 0.684 0.812 0 0.439 0 6.237 7.405 0 4.005 0 OS [OS-100% ]
4+448.243 5 0.79 0.752 0 0.448 0 3.948 3.76 0 2.241 0 OS [OS-100% ]
4+450 5.8785 0.813 0.723 0 0.451 0 4.782 4.248 0 2.652 0 OS [OS-100% ]
4+460 10 0.995 0.666 0 0.464 0 9.948 6.659 0 4.639 0 OS [OS-100% ]
4+470 9.0975 0.542 1.055 0 0.385 0 4.929 9.602 0 3.506 0 OS [OS-100% ]
4+478.195 5 0.542 1.114 0 0.381 0 2.712 5.571 0 1.907 0 OS [OS-100% ]
4+480 5.9025 0.543 1.126 0 0.373 0 3.206 6.644 0 2.203 0 OS [OS-100% ]
4+490 10 0.557 1.203 0 0.326 0 5.567 12.029 0 3.258 0 OS [OS-100% ]
4+500 10 0.528 1.201 0 0.359 0 5.284 12.006 0 3.595 0 OS [OS-100% ]
4+510 10 0.615 0.932 0 0.394 0 6.147 9.323 0 3.939 0 OS [OS-100% ]
4+520 10 0.317 1.059 0 0.366 0 3.166 10.587 0 3.656 0 OS [OS-100% ]
4+530 6.0975 0.166 1.047 0 0.386 0 1.012 6.385 0 2.351 0 OS [OS-100% ]
4+532.195 5 0.215 0.978 0 0 0 1.076 4.892 0 0 0 OS [OS-100% ]
4+540 8.404 0.318 0.902 0 0 0 2.672 7.577 0 0 0 OS [OS-100% ]
4+549.003 5 0.332 0.977 0 0 0 1.659 4.887 0 0 0 OS [OS-100% ]
4+550 1.2565 0.298 1.009 0 0 0 0.374 1.268 0 0 0 OS [OS-100% ]
4+551.516 2.0145 0.254 1.061 0 0 0 0.511 2.137 0 0 0 OS [OS-100% ]
4+554.029 4.242 0.191 1.146 0 0 0 0.81 4.86 0 0 0 OS [OS-100% ]
4+560 7.9855 0.087 1.438 0 0 0 0.695 11.486 0 0 0 OS [OS-100% ]
4+570 10 0.038 1.722 0 0 0 0.378 17.222 0 0 0 OS [OS-100% ]
4+580 10 0.045 2.064 0 0 0 0.448 20.637 0 0 0 OS [OS-100% ]
4+590 9.897 0 2.149 0 0 0 0 21.264 0 0 0 OS [OS-100% ]
4+599.794 5 0 2.458 0 0 0 0 12.29 0 0 0 OS [OS-100% ]
4+600 5.103 0 2.466 0 0 0 0 12.581 0 0 0 OS [OS-100% ]
4+610 5.7705 0 2.268 0 0 0 0 13.087 0 0 0 OS [OS-100% ]
4+611.541 5 0 2.203 0 0 0 0 11.015 0 0 0 OS [OS-100% ]
4+620 5.873 0.073 1.867 0 0 0 0.43 10.965 0 0 0 OS [OS-100% ]
4+623.287 5 0.153 1.608 0 0 0 0.765 8.041 0 0 0 OS [OS-100% ]
4+630 8.3565 0.573 1.147 0 0 0 4.79 9.587 0 0 0 OS [OS-100% ]
4+640 10 0.661 0.671 0 0 0 6.612 6.711 0 0 0 OS [OS-100% ]
4+650 10 0.242 0.774 0 0 0 2.416 7.744 0 0 0 OS [OS-100% ]
4+660 10 0.054 1.071 0 0 0 0.541 10.714 0 0 0 OS [OS-100% ]
4+670 10 1.918 0.734 0 0 0 19.181 7.343 0 0 0 OS [OS-100% ]
4+680 10 0.715 0.693 0 0 0 7.154 6.929 0 0 0 OS [OS-100% ]
4+690 10 0 2.778 0 0 0 0 27.783 0 0 0 OS [OS-100% ]
4+700 10 0.055 1.905 0 0 0 0.554 19.047 0 0 0 OS [OS-100% ]
4+710 10 0.188 1.667 0 0 0 1.878 16.667 0 0 0 OS [OS-100% ]
4+720 7.586 0.049 2.303 0 0 0 0.372 17.469 0 0 0 OS [OS-100% ]
4+725.172 5 0.067 2.844 0 0 0 0.336 14.221 0 0 0 OS [OS-100% ]
4+730 7.414 0.094 3.547 0 0 0 0.698 26.301 0 0 0 OS [OS-100% ]
4+740 5.4065 0 4.792 0 0 0 0 25.91 0 0 0 OS [OS-100% ]
4+740.813 5 0 4.882 0 0 0 0 24.409 0 0 0 OS [OS-100% ]
4+750 7.8205 0 5.57 0 0 0 0 43.56 0 0 0 OS [OS-100% ]
4+756.454 5 0 5.426 0 0 0 0 27.131 0 0 0 OS [OS-100% ]
4+760 6.773 0 5.018 0 0 0 0 33.985 0 0 0 OS [OS-100% ]
4+770 10 0 4.081 0 0 0 0 40.811 0 0 0 OS [OS-100% ]
4+780 10 0 3.242 0 0 0 0 32.423 0 0 0 OS [OS-100% ]
4+790 10 0.027 2.295 0 0 0 0.274 22.951 0 0 0 OS [OS-100% ]
4+800 10 0.085 1.41 0 0 0 0.852 14.105 0 0 0 OS [OS-100% ]
4+810 10 0.49 0.698 0 0 0 4.9 6.977 0 0 0 OS [OS-100% ]
4+820 9.1775 1.445 0.236 0 0 0 13.26 2.17 0 0 0 OS [OS-100% ]
4+828.355 5 3.013 0.046 0 0 0 15.066 0.229 0 0 0 OS [OS-100% ]
4+830 4.4555 3.33 0.03 0 0 0 14.836 0.135 0 0 0 OS [OS-100% ]
4+837.266 3.633 4.757 0 0 0 0 17.282 0.002 0 0 0 OS [OS-100% ]

6+532 4 0 3.635 0 0 0 0 14.541 0 0 0 OS [OS-100% ]


6+540 9 0 4.552 0 0 0 0 40.965 0 0 0 OS [OS-100% ]
6+550 10 0 4.296 0 0 0 0 42.963 0 0 0 OS [OS-100% ]
6+560 10 0 4.247 0 0 0 0 42.467 0 0 0 OS [OS-100% ]
6+570 10 0.311 0.993 0 0 0 3.105 9.927 0 0 0 OS [OS-100% ]
6+580 10 0.197 2.637 0 0 0 1.971 26.374 0 0 0 OS [OS-100% ]
6+590 10 0.425 3.597 0 0 0 4.255 35.969 0 0 0 OS [OS-100% ]
6+600 10 0.087 3.391 0 0 0 0.875 33.914 0 0 0 OS [OS-100% ]
6+610 10 0.016 3.695 0 0 0 0.164 36.947 0 0 0 OS [OS-100% ]
6+620 10 0.001 4.055 0 0 0 0.008 40.546 0 0 0 OS [OS-100% ]
6+630 5.3755 0 3.544 0 0 0 0 19.051 0 0 0 OS [OS-100% ]
6+630.751 5 0 3.415 0 0 0 0 17.074 0 0 0 OS [OS-100% ]
6+640 9.6245 0 3.682 0 0 0 0 35.439 0 0 0 OS [OS-100% ]
6+650 10 0 3.575 0 0 0 0 35.754 0 0 0 OS [OS-100% ]
6+660 10 0 3.45 0 0 0 0 34.503 0 0 0 OS [OS-100% ]
6+670 10 0 3.707 0 0 0 0 37.067 0 0 0 OS [OS-100% ]
6+680 10 0 3.55 0 0 0 0 35.502 0 0 0 OS [OS-100% ]
6+690 10 0 3.664 0 0 0 0 36.642 0 0 0 OS [OS-100% ]
6+700 6.579 0 3.686 0 0 0 0 24.253 0 0 0 OS [OS-100% ]
6+703.158 5 0 4.311 0 0 0 0 21.555 0 0 0 OS [OS-100% ]
6+710 8.421 0 4.13 0 0 0 0 34.782 0 0 0 OS [OS-100% ]
6+720 10 0 3.82 0 0 0 0 38.203 0 0 0 OS [OS-100% ]
6+730 10 0 4.172 0 0 0 0 41.72 0 0 0 OS [OS-100% ]
6+740 10 0 4.182 0 0 0 0 41.818 0 0 0 OS [OS-100% ]
6+750 10 0.083 2.629 1.148 0 0.013 0.828 26.293 11.479 0 0.132 OS [OS-100% ]
6+760 10 0.071 2.656 1.114 0 0.009 0.706 26.564 11.138 0 0.092 OS [OS-100% ]
6+770 10 0.075 3.672 1.122 0 0.01 0.751 36.716 11.22 0 0.101 OS [OS-100% ]
6+780 10 0.108 2.562 1.256 0 0.031 1.076 25.617 12.557 0 0.31 OS [OS-100% ]
6+790 10 0.162 2.099 1.426 0 0.08 1.623 20.991 14.26 0 0.802 OS [OS-100% ]
6+800 10 0.917 0.905 2.575 0 0.245 9.17 9.05 25.746 0 2.447 OS [OS-100% ]
6+810 10 1.28 1.37 0.985 0 0.112 12.805 13.698 9.848 0 1.119 OS [OS-100% ]
6+820 7.994 1.168 1.102 0.982 0 0.111 9.336 8.813 7.852 0 0.889 OS [OS-100% ]
6+825.988 5 1.293 1.342 0.985 0 0.112 6.465 6.712 4.927 0 0.56 OS [OS-100% ]
6+830 7.006 1.352 1.435 0.98 0 0.111 9.469 10.054 6.865 0 0.775 OS [OS-100% ]
6+840 5.152 0.431 4.799 0.778 0 0.068 2.221 24.723 4.008 0 0.348 OS [OS-100% ]
6+840.304 5 0.432 4.925 0.765 0 0.067 2.158 24.626 3.823 0 0.337 OS [OS-100% ]
6+850 9.848 1.262 5.613 4.665 0 0.692 12.432 55.275 45.945 0 6.816 OS [OS-100% ]
6+860 10 0.31 5.387 2.272 0 0.104 3.097 53.871 22.719 0 1.037 OS [OS-100% ]
6+870 10 0.498 2.772 2.201 0 0.158 4.984 27.72 22.014 0 1.583 OS [OS-100% ]
6+880 10 0 6.214 0 0 0 0 62.143 0 0 0 OS [OS-100% ]
6+890 6.652 1.842 0.91 0 0 0 12.251 6.051 0 0 0 OS [OS-100% ]
6+893.304 2.0145 1.753 1.525 0 0 0 3.531 3.073 0 0 0 OS [OS-100% ]
6+894.029 0.7245 1.657 1.409 0 0 0 1.201 1.021 0 0 0 OS [OS-100% ]
6+894.753 2.9855 1.605 1.263 0 0 0 4.791 3.771 0 0 0 OS [OS-100% ]
6+900 7.6235 0.948 0.209 0 0.704 0 7.227 1.596 0 5.369 0 OS [OS-100% ]
6+910 10 0.39 1.858 0 0.185 0 3.898 18.58 0 1.848 0 OS [OS-100% ]
6+920 10 0.13 2.256 0 0.135 0 1.3 22.557 0 1.347 0 OS [OS-100% ]
6+930 10 0.667 1.251 0 0.309 0 6.671 12.515 0 3.09 0 OS [OS-100% ]
6+940 8.8765 0.602 1.765 0 0.26 0 5.343 15.667 0 2.311 0 OS [OS-100% ]
6+947.753 5 0.656 1.751 0 0.24 0 3.278 8.756 0 1.199 0 OS [OS-100% ]
6+950 1.9845 0.713 1.7 0 0.243 0 1.415 3.374 0 0.482 0 OS [OS-100% ]
6+951.722 5 0.803 1.673 0 0.245 0 4.015 8.367 0 1.226 0 OS [OS-100% ]
6+960 5.3145 0.756 1.173 0 0.32 0 4.019 6.235 0 1.703 0 OS [OS-100% ]
6+962.351 5 0.843 0.955 0 0.384 0 4.215 4.773 0 1.921 0 OS [OS-100% ]
6+970 5.3145 0.864 0.817 0 0.429 0 4.59 4.343 0 2.282 0 OS [OS-100% ]
6+972.98 5 0.503 0.985 0 0.434 0 2.514 4.925 0 2.17 0 OS [OS-100% ]
6+980 8.51 0.382 1.475 0 0.487 0 3.253 12.551 0 4.143 0 OS [OS-100% ]
6+990 10 0.301 1.727 0 0.435 0 3.009 17.269 0 4.353 0 OS [OS-100% ]
7+000 8.2885 0.282 1.132 0 0.384 0 2.337 9.379 0 3.18 0 OS [OS-100% ]
7+006.577 3.5895 0.033 1.761 0 0 0 0.119 6.322 0 0 0 OS [OS-100% ]
7+007.179 0.602 0.032 1.781 0 0 0 0.019 1.072 0 0 0 OS [OS-100% ]
7+007.781 1.4105 0.031 1.797 0 0 0 0.044 2.535 0 0 0 OS [OS-100% ]
7+010 6.1095 0.032 1.83 0 0 0 0.195 11.18 0 0 0 OS [OS-100% ]
7+020 10 0.02 1.614 0 0 0 0.202 16.139 0 0 0 OS [OS-100% ]
7+030 10 0.019 1.761 0 0 0 0.19 17.607 0 0 0 OS [OS-100% ]
7+040 10 0 2.635 0 0 0 0 26.354 0 0 0 OS [OS-100% ]
7+050 10 0.031 1.95 0 0 0 0.308 19.497 0 0 0 OS [OS-100% ]
7+060 10 0.11 1.73 0 0 0 1.103 17.301 0 0 0 OS [OS-100% ]
7+070 8.172 0 1.952 0 0 0 0 15.95 0 0 0 OS [OS-100% ]
7+076.344 3.404 0 2.111 0 0 0 0 7.187 0 0 0 OS [OS-100% ]
7+076.808 0.4635 0 2.121 0 0 0 0 0.983 0 0 0 OS [OS-100% ]
7+077.271 1.596 0 2.13 0 0 0 0 3.4 0 0 0 OS [OS-100% ]
7+080 6.3645 0 2.185 0 0 0 0 13.905 0 0 0 OS [OS-100% ]
7+090 10 0 2.426 0 0 0 0 24.26 0 0 0 OS [OS-100% ]
7+100 9.0015 0 2.97 0 0 0 0 26.732 0 0 0 OS [OS-100% ]
7+108.003 4.09 0 3.317 0 0 0 0 13.567 0 0 0 OS [OS-100% ]
7+108.18 0.1765 0 3.331 0 0 0 0 0.588 0 0 0 OS [OS-100% ]
7+108.356 0.91 0 3.344 0 0 0 0 3.043 0 0 0 OS [OS-100% ]
7+110 5.822 0 3.392 0 0 0 0 19.747 0 0 0 OS [OS-100% ]
7+120 10 0 3.45 0 0 0 0 34.503 0 0 0 OS [OS-100% ]
7+130 10 0 2.686 0 0 0 0 26.864 0 0 0 OS [OS-100% ]
7+140 10 0 2.118 0 0 0 0 21.183 0 0 0 OS [OS-100% ]
7+150 10 0.014 1.57 0 0 0 0.136 15.699 0 0 0 OS [OS-100% ]
7+160 10 0.025 2.453 0 0 0 0.252 24.532 0 0 0 OS [OS-100% ]
7+170 10 0.002 3.018 0 0 0 0.017 30.182 0 0 0 OS [OS-100% ]
7+180 5.2815 0.011 2.726 0 0 0 0.059 14.4 0 0 0 OS [OS-100% ]
7+180.563 5 0.011 2.617 0 0 0 0.055 13.083 0 0 0 OS [OS-100% ]
7+190 6.2355 0.058 2.597 0 0 0 0.362 16.193 0 0 0 OS [OS-100% ]
7+193.034 5 0.101 2.398 0 0 0 0.503 11.988 0 0 0 OS [OS-100% ]
7+200 6.236 0.288 2.07 0 0 0 1.797 12.911 0 0 0 OS [OS-100% ]
7+205.506 5 0.26 2.524 0 0 0 1.301 12.619 0 0 0 OS [OS-100% ]
7+210 7.247 0.187 2.567 0 0 0 1.352 18.602 0 0 0 OS [OS-100% ]
7+220 10 0.073 2.758 0 0 0 0.732 27.575 0 0 0 OS [OS-100% ]
7+230 10 0.002 3.332 0 0 0 0.022 33.315 0 0 0 OS [OS-100% ]
7+240 10 0 3.885 0 0 0 0 38.851 0 0 0 OS [OS-100% ]
7+250 10 0 4.381 0 0 0 0 43.807 0 0 0 OS [OS-100% ]
7+260 10 0 4.196 0 0 0 0 41.957 0 0 0 OS [OS-100% ]
7+270 10 0 3.648 0 0 0 0 36.48 0 0 0 OS [OS-100% ]
7+280 10 0 2.94 0 0 0 0 29.398 0 0 0 OS [OS-100% ]
7+290 9.1685 0.003 2.421 0 0 0 0.025 22.198 0 0 0 OS [OS-100% ]
7+298.337 5 0.009 1.965 0 0 0 0.043 9.827 0 0 0 OS [OS-100% ]
7+300 1.74 0.007 1.968 0 0 0 0.013 3.424 0 0 0 OS [OS-100% ]
7+301.817 2.6485 0.007 1.948 0 0 0 0.02 5.158 0 0 0 OS [OS-100% ]
7+305.297 4.0915 0.014 1.802 0 0 0 0.058 7.372 0 0 0 OS [OS-100% ]
7+310 7.3515 0.132 1.491 0 0 0 0.973 10.961 0 0 0 OS [OS-100% ]
7+320 9.251 0.847 1.157 0 0 0 7.84 10.703 0 0 0 OS [OS-100% ]
7+328.502 5 0.884 1.282 0 0 0 4.422 6.41 0 0 0 OS [OS-100% ]
7+330 1.389 0.872 1.316 0 0 0 1.212 1.827 0 0 0 OS [OS-100% ]
7+331.28 2.029 0.858 1.347 0 0 0 1.74 2.733 0 0 0 OS [OS-100% ]
7+334.058 1.588 0.81 1.424 0 0 0 1.287 2.262 0 0 0 OS [OS-100% ]
7+334.456 2.971 0.802 1.437 0 0 0 2.382 4.268 0 0 0 OS [OS-100% ]
7+340 7.772 0.569 2.075 0 0 0 4.42 16.127 0 0 0 OS [OS-100% ]
7+350 10 0.244 3.303 0 0 0 2.436 33.028 0 0 0 OS [OS-100% ]
7+360 10 0.182 3.282 0 0 0 1.823 32.816 0 0 0 OS [OS-100% ]
7+370 10 0.103 3.303 0 0 0 1.027 33.029 0 0 0 OS [OS-100% ]
7+380 7.228 0.165 2.804 0 0 0 1.196 20.268 0 0 0 OS [OS-100% ]
7+384.456 5 0.143 2.657 0 0 0 0.713 13.284 0 0 0 OS [OS-100% ]
7+390 6.036 0.221 2.377 0 0 0 1.333 14.35 0 0 0 OS [OS-100% ]
7+396.528 5 0.003 2.331 0 0 0 0.013 11.653 0 0 0 OS [OS-100% ]
7+400 6.036 0 2.709 0 0 0 0 16.352 0 0 0 OS [OS-100% ]
7+408.6 5 0 4.203 0 0 0 0 21.017 0 0 0 OS [OS-100% ]
7+410 5.7 0 4.557 0 0 0 0 25.974 0 0 0 OS [OS-100% ]
7+420 10 0 6.131 0 0 0 0 61.305 0 0 0 OS [OS-100% ]
7+430 10 0 5.307 0 0 0 0 53.074 0 0 0 OS [OS-100% ]
7+440 10 0 5.724 0 0 0 0 57.242 0 0 0 OS [OS-100% ]
7+450 9.3 0 5.644 0 0 0 0 52.486 0 0 0 OS [OS-100% ]
7+458.6 5 0 5.254 0 0 0 0 26.268 0 0 0 OS [OS-100% ]
7+460 5.7 0 5.242 0 0 0 0 29.881 0 0 0 OS [OS-100% ]
7+470 6.9875 0 4.804 0 0 0 0 33.57 0 0 0 OS [OS-100% ]
7+473.975 5 0 4.453 0 0 0 0 22.264 0 0 0 OS [OS-100% ]
7+480 8.0125 0 4.526 0 0 0 0 36.266 0 0 0 OS [OS-100% ]
7+490 5.1965 0 5.222 0 0 0 0 27.135 0 0 0 OS [OS-100% ]
7+490.393 5 0 5.92 0 0 0 0 29.6 0 0 0 OS [OS-100% ]
7+500 9.8035 0 4.834 0 0 0 0 47.387 0 0 0 OS [OS-100% ]
7+510 10 0 4.159 0 0 0 0 41.592 0 0 0 OS [OS-100% ]
7+520 5.94 0 4.911 0 0 0 0 29.17 0 0 0 OS [OS-100% ]
7+521.88 5 0 5.115 0 0 0 0 25.574 0 0 0 OS [OS-100% ]
7+530 6.071 0 5.626 0 0 0 0 34.153 0 0 0 OS [OS-100% ]
7+534.022 5 0 6.354 0 0 0 0 31.771 0 0 0 OS [OS-100% ]
7+540 6.0705 0 7.523 0 0 0 0 45.67 0 0 0 OS [OS-100% ]
7+546.163 5 0.148 6.787 0.831 0 0.014 0.739 33.934 4.156 0 0.068 OS [OS-100% ]
7+550 6.9185 0.091 6.751 0.667 0 0.008 0.633 46.705 4.617 0 0.058 OS [OS-100% ]
7+560 9.1825 0.055 7.846 0.58 0 0.005 0.509 72.041 5.327 0 0.049 OS [OS-100% ]
7+568.365 5 0.046 8.029 0.537 0 0.004 0.232 40.144 2.685 0 0.022 OS [OS-100% ]
7+570 5.8175 0.046 7.902 0.54 0 0.004 0.267 45.971 3.139 0 0.026 OS [OS-100% ]
7+580 8.0175 0.076 6.257 0.449 0 0.016 0.609 50.164 3.597 0 0.129 OS [OS-100% ]
7+586.035 5 0.156 5.361 0.613 0 0.036 0.781 26.804 3.063 0 0.181 OS [OS-100% ]
7+590 6.9825 0.218 4.772 0.711 0 0.052 1.522 33.318 4.965 0 0.363 OS [OS-100% ]
7+600 6.8525 0.361 3.323 0.878 0 0.085 2.474 22.772 6.016 0 0.585 OS [OS-100% ]
7+603.705 2.739 0.406 2.794 0.928 0 0.097 1.113 7.654 2.541 0 0.266 OS [OS-100% ]
7+605.478 3.1475 0.429 2.537 0.951 0 0.103 1.35 7.986 2.994 0 0.323 OS [OS-100% ]
7+610 7.261 0.485 1.857 1.007 0 0.117 3.521 13.486 7.313 0 0.85 OS [OS-100% ]
7+620 10 0 0 0 0 0 0 0 0 0 0 OS [OS-100% ]
7+630 7.9635 1.053 0.911 1.029 0.295 0.105 8.385 7.255 8.192 2.348 0.836 OS [OS-100% ]
7+635.927 5 0.818 1.207 0.774 0.257 0.065 4.089 6.033 3.871 1.284 0.323 OS [OS-100% ]
7+640 7.0365 0.697 1.401 0.697 0.26 0.05 4.905 9.857 4.908 1.828 0.353 OS [OS-100% ]
7+650 10 1.029 0.617 1.043 0.329 0.104 10.291 6.166 10.425 3.292 1.035 OS [OS-100% ]
7+660 8.1885 0.641 1.092 0.989 0.234 0.1 5.246 8.939 8.097 1.92 0.818 OS [OS-100% ]
7+666.377 5 0.55 1.284 0.977 0.199 0.099 2.749 6.419 4.886 0.994 0.493 OS [OS-100% ]
7+670 6.8115 0.349 1.998 0.873 0.123 0.084 2.378 13.611 5.949 0.838 0.574 OS [OS-100% ]
7+680 10 0.218 2.57 0.734 0.209 0.056 2.182 25.699 7.341 2.085 0.565 OS [OS-100% ]
7+690 10 0.265 3.583 0.782 0.142 0.065 2.65 35.826 7.825 1.419 0.647 OS [OS-100% ]
7+700 10 0.382 3.664 0.894 0.1 0.089 3.824 36.644 8.939 0.996 0.887 OS [OS-100% ]
7+710 8.828 0.519 3.35 0.982 0.117 0.102 4.585 29.577 8.673 1.034 0.897 OS [OS-100% ]
7+717.656 5 0.674 1.595 1.113 0.233 0.117 3.37 7.977 5.563 1.165 0.584 OS [OS-100% ]
7+720 6.172 0.571 1.852 0.598 0.297 0.043 3.525 11.432 3.691 1.832 0.268 OS [OS-100% ]
7+730 6.905 0.283 1.231 0 0.307 0 1.954 8.503 0 2.117 0 OS [OS-100% ]
7+733.81 5 0.067 1.931 0 0.155 0 0.337 9.657 0 0.774 0 OS [OS-100% ]
7+740 6.358 0 2.327 0 0.175 0 0 14.796 0 1.113 0 OS [OS-100% ]
7+746.526 5 0 2.446 0 0.165 0 0 12.228 0 0.826 0 OS [OS-100% ]
7+750 6.737 0 2.478 0 0.187 0 0 16.691 0 1.259 0 OS [OS-100% ]
7+760 8.077 0 5.709 0 0.105 0 0 46.112 0 0.852 0 OS [OS-100% ]
7+766.154 4.5725 0.195 5.452 0.647 0.003 0.041 0.892 24.93 2.957 0.015 0.185 OS [OS-100% ]
7+769.145 1.923 0.156 5.854 0.585 0 0.032 0.299 11.257 1.125 0 0.061 OS [OS-100% ]
7+770 5.4275 0.146 5.981 0.569 0 0.03 0.794 32.464 3.086 0 0.161 OS [OS-100% ]
7+780 5.4885 0.125 6.009 0.518 0 0.023 0.686 32.98 2.841 0 0.128 OS [OS-100% ]
7+780.977 5 0.128 5.994 0.524 0 0.024 0.641 29.969 2.618 0 0.12 OS [OS-100% ]
7+790 5.9155 0.155 5.856 0.572 0 0.03 0.919 34.64 3.385 0 0.178 OS [OS-100% ]
7+792.808 5 0.162 5.362 0.584 0 0.032 0.812 26.809 2.922 0 0.159 OS [OS-100% ]
7+800 8.596 0 4.987 0 0.022 0 0 42.869 0 0.188 0 OS [OS-100% ]
7+810 10 0 3.737 0 0.03 0 0 37.371 0 0.297 0 OS [OS-100% ]
7+820 10 0 4.056 0 0.012 0 0 40.557 0 0.124 0 OS [OS-100% ]
7+830 10 0 4.254 0 0 0 0 42.537 0 0 0 OS [OS-100% ]
7+840 10 0 4.417 0 0 0 0 44.172 0 0 0 OS [OS-100% ]
7+850 6.8165 0 4.437 0 0 0 0 30.242 0 0 0 OS [OS-100% ]
7+853.633 2.375 0 4.568 0 0 0 0 10.848 0 0 0 OS [OS-100% ]
7+854.75 1.117 0 4.61 0 0 0 0 5.15 0 0 0 OS [OS-100% ]
7+855.867 2.625 0 4.652 0 0 0 0 12.21 0 0 0 OS [OS-100% ]
7+860 7.0665 0 4.794 0 0 0 0 33.877 0 0 0 OS [OS-100% ]
7+870 10 0 5.037 0 0 0 0 50.37 0 0 0 OS [OS-100% ]
7+880 5.318 0 5.505 0 0 0 0 29.278 0 0 0 OS [OS-100% ]
7+880.636 5 0 5.557 0 0 0 0 27.783 0 0 0 OS [OS-100% ]
7+890 9.5385 0.251 5.116 0.719 0 0.053 2.392 48.801 6.855 0 0.505 OS [OS-100% ]
7+899.713 5 0.219 5.274 0.675 0 0.045 1.095 26.368 3.375 0 0.227 OS [OS-100% ]
7+900 5.1435 0.218 5.276 0.674 0 0.045 1.122 27.138 3.466 0 0.233 OS [OS-100% ]
7+910 9.395 0.194 5.85 0.639 0 0.04 1.826 54.962 6.001 0 0.373 OS [OS-100% ]
7+918.79 5 0.134 5.705 0.547 0 0.027 0.67 28.526 2.735 0 0.136 OS [OS-100% ]
7+920 1.5025 0.133 5.367 0.545 0 0.027 0.199 8.064 0.818 0 0.04 OS [OS-100% ]
7+921.795 5 0.131 4.918 0.542 0 0.026 0.656 24.589 2.708 0 0.132 OS [OS-100% ]
7+930 9.1025 0.195 3.248 0.649 0 0.041 1.771 29.561 5.909 0 0.378 OS [OS-100% ]
7+940 10 0.421 1.931 0.855 0 0.08 4.209 19.313 8.546 0 0.801 OS [OS-100% ]
7+950 5.377 0.474 2.213 0.769 0 0.062 2.547 11.9 4.133 0 0.333 OS [OS-100% ]
7+950.754 5 0.475 2.24 0.762 0 0.061 2.377 11.198 3.808 0 0.303 OS [OS-100% ]
7+960 9.623 0.482 2.709 0.735 0 0.056 4.642 26.064 7.071 0 0.535 OS [OS-100% ]
7+970 9.857 0.555 2.434 0.743 0 0.057 5.47 23.989 7.321 0 0.563 OS [OS-100% ]
7+979.714 5 1.105 1.727 0.918 0 0.094 5.525 8.637 4.592 0 0.469 OS [OS-100% ]
7+980 5.143 1.101 1.708 0.927 0 0.096 5.662 8.786 4.77 0 0.493 OS [OS-100% ]
7+990 10 0.729 0.67 0.481 0 0.028 7.293 6.697 4.815 0 0.276 OS [OS-100% ]
8+000 10 1.178 0.543 0.51 0 0.031 11.783 5.429 5.097 0 0.31 OS [OS-100% ]
8+010 10 1.023 0.74 0 0 0 10.23 7.397 0 0 0 OS [OS-100% ]
8+020 10 0.977 0.939 0 0 0 9.769 9.392 0 0 0 OS [OS-100% ]
8+030 10 0.489 1.037 0 0 0 4.894 10.369 0 0 0 OS [OS-100% ]
8+040 10 0.665 1.016 0 0 0 6.653 10.156 0 0 0 OS [OS-100% ]
8+050 8.964 1.362 0.423 0 0 0 12.209 3.793 0 0 0 OS [OS-100% ]
8+057.928 3.964 2.103 0.14 0 0 0 8.335 0.556 0 0 0 OS [OS-100% ]

8+510 5 0.261 0.77 0 0.408 0 1.304 3.85 0 2.039 0 OS [OS-100% ]


8+520 10 0.948 0.701 0 0.468 0 9.48 7.006 0 4.684 0 OS [OS-100% ]
8+530 10 1.997 0.515 0 0.686 0 19.972 5.149 0 6.855 0 OS [OS-100% ]
8+540 10 0.918 0.497 0 0.547 0 9.179 4.966 0 5.474 0 OS [OS-100% ]
8+550 10 1.676 0.113 0 0.684 0 16.762 1.134 0 6.836 0 OS [OS-100% ]
8+560 10 0.873 0.339 0 0.563 0 8.733 3.391 0 5.63 0 OS [OS-100% ]
8+570 10 0.456 0.804 0 0.575 0 4.559 8.043 0 5.75 0 OS [OS-100% ]
8+580 10 0.397 0.801 0 0.537 0 3.974 8.01 0 5.37 0 OS [OS-100% ]
8+590 10 0.441 0.862 0 0.603 0 4.415 8.623 0 6.027 0 OS [OS-100% ]
8+600 10 0.383 0.787 0 0.522 0 3.827 7.869 0 5.223 0 OS [OS-100% ]
8+610 10 0.404 0.66 0 0.511 0 4.038 6.598 0 5.107 0 OS [OS-100% ]
8+620 10 0.305 0.585 0 0.519 0 3.046 5.845 0 5.192 0 OS [OS-100% ]
8+630 10 0.181 0.727 0 0.52 0 1.814 7.266 0 5.195 0 OS [OS-100% ]
8+640 10 0.17 0.703 0 0.52 0 1.703 7.034 0 5.201 0 OS [OS-100% ]
8+650 10 0.073 0.986 0 0.515 0 0.728 9.861 0 5.152 0 OS [OS-100% ]
8+660 10 0.029 1.178 0 0.483 0 0.294 11.785 0 4.827 0 OS [OS-100% ]
8+670 10 0.02 1.548 0 0.399 0 0.196 15.478 0 3.989 0 OS [OS-100% ]
8+680 10 0.007 2.238 0 0.403 0 0.075 22.377 0 4.033 0 OS [OS-100% ]
8+690 10 0 2.232 0 0.441 0 0 22.322 0 4.412 0 OS [OS-100% ]
8+700 10 0.009 1.563 0 0.461 0 0.094 15.634 0 4.61 0 OS [OS-100% ]
8+710 10 0.1 2.369 0 0.339 0 1.004 23.689 0 3.394 0 OS [OS-100% ]
8+720 10 0.47 1.625 0 0.401 0 4.699 16.251 0 4.013 0 OS [OS-100% ]
8+730 9.454 0.306 0.947 0 0.394 0 2.894 8.952 0 3.728 0 OS [OS-100% ]
8+738.908 5 0 2.118 0 0.358 0 0 10.588 0 1.79 0 OS [OS-100% ]
8+740 5.546 0 2.079 0 0.372 0 0 11.53 0 2.062 0 OS [OS-100% ]
8+750 7.964 0.057 1.512 0 0.367 0 0.453 12.04 0 2.926 0 OS [OS-100% ]
8+755.928 5 0.023 1.386 0 0.368 0 0.114 6.928 0 1.84 0 OS [OS-100% ]
8+760 7.036 0.01 1.295 0 0.37 0 0.072 9.113 0 2.604 0 OS [OS-100% ]
8+770 7.85 0.001 1.483 0 0.367 0 0.006 11.64 0 2.878 0 OS [OS-100% ]
8+775.7 5 0 1.571 0 0.346 0 0 7.854 0 1.73 0 OS [OS-100% ]
8+780 7.15 0.003 1.498 0 0.332 0 0.021 10.711 0 2.375 0 OS [OS-100% ]
8+790 7.7355 0.12 0.833 0 0.425 0 0.928 6.442 0 3.288 0 OS [OS-100% ]
8+795.471 5 0.419 0.531 0 0.491 0 2.095 2.654 0 2.453 0 OS [OS-100% ]
8+800 7.2645 0.544 0.34 0 0.555 0 3.955 2.471 0 4.029 0 OS [OS-100% ]
8+810 10 0.325 0.698 0 0.522 0 3.251 6.979 0 5.218 0 OS [OS-100% ]
8+820 10 0.446 0.304 0 0.58 0 4.456 3.044 0 5.797 0 OS [OS-100% ]
8+830 10 0.169 0.685 0 0.502 0 1.686 6.852 0 5.02 0 OS [OS-100% ]
8+840 10 0.012 0.242 0 0 0 0.124 2.417 0 0 0 OS [OS-100% ]
8+850 7.002 0.003 2.314 0 0.269 0 0.021 16.202 0 1.884 0 OS [OS-100% ]
8+854.004 5 0 2.553 0 0.225 0 0 12.765 0 1.126 0 OS [OS-100% ]
8+860 7.998 0 3.006 0 0.18 0 0 24.039 0 1.436 0 OS [OS-100% ]
8+870 8.3715 0 2.968 0 0.228 0 0 24.846 0 1.906 0 OS [OS-100% ]
8+876.743 5 0 2.487 0 0.27 0 0 12.437 0 1.351 0 OS [OS-100% ]
8+880 6.6285 0 2.44 0 0.302 0 0 16.174 0 2.002 0 OS [OS-100% ]
8+890 10 0.081 1.754 0 0.384 0 0.814 17.539 0 3.844 0 OS [OS-100% ]
8+900 8.047 0.416 0.706 0 0.657 0 3.344 5.684 0 5.283 0 OS [OS-100% ]
8+906.094 5 0.164 0.619 0 0.498 0 0.819 3.097 0 2.491 0 OS [OS-100% ]
8+910 6.953 0.173 0.641 0 0.504 0 1.204 4.455 0 3.503 0 OS [OS-100% ]
8+920 10 0.061 0.995 0 0.404 0 0.612 9.95 0 4.039 0 OS [OS-100% ]
8+930 10 0.116 0.939 0 0.415 0 1.155 9.386 0 4.154 0 OS [OS-100% ]
8+940 10 0.284 0.809 0 0.423 0 2.842 8.095 0 4.233 0 OS [OS-100% ]
8+950 10 0.291 0.787 0 0.421 0 2.91 7.874 0 4.206 0 OS [OS-100% ]
8+960 10 0.263 0.964 0 0.448 0 2.631 9.638 0 4.482 0 OS [OS-100% ]
8+970 7.266 0.159 1.206 0 0.445 0 1.156 8.762 0 3.236 0 OS [OS-100% ]
8+974.532 5 0.385 1.134 0 0.423 0 1.925 5.67 0 2.113 0 OS [OS-100% ]
8+980 7.734 0.014 1.783 0 0.399 0 0.109 13.79 0 3.088 0 OS [OS-100% ]
8+990 7.5115 0.002 1.584 0 0 0 0.016 11.901 0 0 0 OS [OS-100% ]
8+995.023 5 0 2.088 0 0 0 0 10.438 0 0 0 OS [OS-100% ]
9+000 7.4885 0 2.34 0 0 0 0 17.521 0 0 0 OS [OS-100% ]
9+010 10 0.016 1.266 0 0 0 0.158 12.661 0 0 0 OS [OS-100% ]
9+020 10 0.514 0.531 0 0 0 5.135 5.309 0 0 0 OS [OS-100% ]
9+030 8.283 0.237 0.728 0 0 0 1.963 6.029 0 0 0 OS [OS-100% ]
9+036.566 5 0 2.505 0 0 0 0 12.527 0 0 0 OS [OS-100% ]
9+040 6.717 0 3.28 0 0 0 0 22.035 0 0 0 OS [OS-100% ]
9+050 10 0 2.556 0 0 0 0 25.558 0 0 0 OS [OS-100% ]
9+060 10 0.051 1.352 0 0 0 0.505 13.52 0 0 0 OS [OS-100% ]
9+070 10 0 1.907 0 0 0 0 19.07 0 0 0 OS [OS-100% ]
9+080 10 0 1.881 0 0 0 0 18.81 0 0 0 OS [OS-100% ]
9+090 10 0.031 1.756 0 0 0 0.307 17.558 0 0 0 OS [OS-100% ]
9+100 10 0.365 1.123 0 0 0 3.647 11.234 0 0 0 OS [OS-100% ]
9+110 10 0.504 0.81 0 0 0 5.039 8.097 0 0 0 OS [OS-100% ]
9+120 6.739 0.248 1.868 0 0 0 1.669 12.585 0 0 0 OS [OS-100% ]
9+123.478 5 0 1.519 0 0 0 0.001 7.593 0 0 0 OS [OS-100% ]
9+130 8.261 1.412 1.2 4.092 0 0.521 11.668 9.912 33.802 0 4.303 OS [OS-100% ]
9+140 8.147 1.226 1.857 3.573 0 0.347 9.992 15.129 29.11 0 2.829 OS [OS-100% ]
9+146.294 5 1.004 2.057 3.244 0 0.332 5.022 10.286 16.221 0 1.659 OS [OS-100% ]
9+150 3.345 0.938 1.996 3.246 0 0.307 3.139 6.676 10.857 0 1.027 OS [OS-100% ]
9+152.984 5 0.942 2.123 3.277 0 0.291 4.709 10.617 16.384 0 1.453 OS [OS-100% ]
9+160 8.508 1.151 2.78 3.613 0 0.347 9.79 23.655 30.738 0 2.954 OS [OS-100% ]
9+170 10 1.113 4.768 3.432 0 0.249 11.133 47.677 34.319 0 2.491 OS [OS-100% ]
9+180 6.492 5.069 1.395 4.3 0 0.532 32.908 9.059 27.917 0 3.451 OS [OS-100% ]
9+182.984 2.0965 2.69 1.724 3.643 0 0.378 5.639 3.615 7.637 0 0.792 OS [OS-100% ]
9+184.193 1.209 1.832 2.064 3.424 0 0.284 2.215 2.496 4.14 0 0.343 OS [OS-100% ]
9+185.402 2.9035 1.173 2.457 3.388 0 0.28 3.405 7.134 9.837 0 0.813 OS [OS-100% ]
9+190 7.299 1.729 1.466 4.397 0 0.622 12.619 10.701 32.091 0 4.54 OS [OS-100% ]
9+200 10 0 4.927 0 0 0 0 49.267 0 0 0 OS [OS-100% ]
9+210 7.701 0 5.543 0 0 0 0 42.685 0 0 0 OS [OS-100% ]
9+215.402 5 0 4.609 0 0 0 0 23.045 0 0 0 OS [OS-100% ]
9+220 7.299 0 3.751 0 0 0 0 27.376 0 0 0 OS [OS-100% ]
9+230 10 0.015 3.225 0 0 0 0.153 32.249 0 0 0 OS [OS-100% ]
9+240 9.668 0 3.727 0 0 0 0.004 36.028 0 0 0 OS [OS-100% ]
9+249.336 5 0 3.474 0 0 0 0 17.371 0 0 0 OS [OS-100% ]
9+250 5.332 0 3.481 0 0 0 0 18.562 0 0 0 OS [OS-100% ]
9+260 10 0 3.501 0 0 0 0 35.014 0 0 0 OS [OS-100% ]
9+270 10 0 3.323 0 0 0 0 33.227 0 0 0 OS [OS-100% ]
9+280 5.334 0 3.29 0 0 0 0 17.551 0 0 0 OS [OS-100% ]
9+280.668 5 0 3.324 0 0 0 0 16.618 0 0 0 OS [OS-100% ]
9+290 9.666 0 3.233 0 0 0 0 31.247 0 0 0 OS [OS-100% ]
9+300 10 0.029 2.089 0 0 0 0.287 20.891 0 0 0 OS [OS-100% ]
9+310 6 0.125 1.523 0 0 0 0.749 9.139 0 0 0 OS [OS-100% ]
9+312 5 0.074 1.612 0 0 0 0.37 8.059 0 0 0 OS [OS-100% ]
9+320 4 0.123 1.976 0 0 0 0.492 7.903 0 0 0 OS [OS-100% ]
578.945
Summary of
Quantity
Item Code Name Quantity Unit
5354.626
12.01(A) Gravel 5308.894 M3

Structure (ExtraShoulder) Quantity


Left Right
Chainage (m) Length (m)
ExtraShoulder Gravel M3 ExtraShoulder Gravel M3
1+550 5.564 ExtraShoulder 0.35 Thick 1.5 Wdith 25 ExtraShoulder 0.35 Thick 1.5 Wdith 25
1+550 5.564 ExtraShoulder 2.921 ExtraShoulder 2.921
1+554.809 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.921 ExtraShoulder 0.35 Thick 1.5 Wdith 2.921
1+554.809 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+560 7.5955 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+560 7.5955 ExtraShoulder 3.988 ExtraShoulder 3.988
1+570 5.2265 ExtraShoulder 0.35 Thick 1.5 Wdith 3.988 ExtraShoulder 0.35 Thick 1.5 Wdith 3.988
1+570 5.2265 ExtraShoulder 2.744 ExtraShoulder 2.744
1+570.453 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.744 ExtraShoulder 0.35 Thick 1.5 Wdith 2.744
1+570.453 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+580 5.385 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+580 5.385 ExtraShoulder 2.827 ExtraShoulder 2.827
1+581.223 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.827 ExtraShoulder 0.35 Thick 1.5 Wdith 2.827
1+581.223 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+590 5.3845 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+590 5.3845 ExtraShoulder 2.827 ExtraShoulder 2.827
1+591.992 4.3425 ExtraShoulder 0.35 Thick 1.5 Wdith 2.827 ExtraShoulder 0.35 Thick 1.5 Wdith 2.827
1+591.992 4.3425 ExtraShoulder 2.28 ExtraShoulder 2.28
1+598.685 4.004 ExtraShoulder 0.35 Thick 1.5 Wdith 2.28 ExtraShoulder 0.35 Thick 1.5 Wdith 2.28
1+598.685 4.004 ExtraShoulder 2.102 ExtraShoulder 2.102
1+600 1.7805 ExtraShoulder 0.35 Thick 1.5 Wdith 2.102 ExtraShoulder 0.35 Thick 1.5 Wdith 2.102
1+600 1.7805 ExtraShoulder 0.935 ExtraShoulder 0.935
1+602.246 2.904 ExtraShoulder 0.35 Thick 1.5 Wdith 0.935 ExtraShoulder 0.35 Thick 1.5 Wdith 0.935
1+602.246 2.904 ExtraShoulder 1.525 ExtraShoulder 1.525
1+605.808 2.7775 ExtraShoulder 0.35 Thick 1.5 Wdith 1.525 ExtraShoulder 0.35 Thick 1.5 Wdith 1.525
1+605.808 2.7775 ExtraShoulder 1.458 ExtraShoulder 1.458
1+607.801 2.096 ExtraShoulder 0.35 Thick 1.5 Wdith 1.458 ExtraShoulder 0.35 Thick 1.5 Wdith 1.458
1+607.801 2.096 ExtraShoulder 1.1 ExtraShoulder 1.1
1+610 6.0995 ExtraShoulder 0.35 Thick 1.5 Wdith 1.1 ExtraShoulder 0.35 Thick 1.5 Wdith 1.1
1+610 6.0995 ExtraShoulder 3.202 ExtraShoulder 3.202
1+620 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.202 ExtraShoulder 0.35 Thick 1.5 Wdith 3.202
1+620 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+630 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+630 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+640 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+640 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+650 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+650 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+660 5.9005 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+660 5.9005 ExtraShoulder 3.098 ExtraShoulder 3.098
1+661.801 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.098 ExtraShoulder 0.35 Thick 1.5 Wdith 3.098
1+661.801 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+670 7.637 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+670 7.637 ExtraShoulder 4.009 ExtraShoulder 4.009
1+677.075 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.009 ExtraShoulder 0.35 Thick 1.5 Wdith 4.009
1+677.075 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+680 6.4625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+680 6.4625 ExtraShoulder 3.393 ExtraShoulder 3.393
1+690 6.175 ExtraShoulder 0.35 Thick 1.5 Wdith 3.393 ExtraShoulder 0.35 Thick 1.5 Wdith 3.393
1+690 6.175 ExtraShoulder 3.242 ExtraShoulder 3.242
1+692.35 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.242 ExtraShoulder 0.35 Thick 1.5 Wdith 3.242
1+692.35 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+700 8.825 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+700 8.825 ExtraShoulder 4.633 ExtraShoulder 4.633
1+710 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.633 ExtraShoulder 0.35 Thick 1.5 Wdith 4.633
1+710 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+720 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+720 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+730 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+730 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+740 8.175 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+740 8.175 ExtraShoulder 4.292 ExtraShoulder 4.292
1+746.35 3.41 ExtraShoulder 0.35 Thick 1.5 Wdith 4.292 ExtraShoulder 0.35 Thick 1.5 Wdith 4.292
1+746.35 3.41 ExtraShoulder 1.79 ExtraShoulder 1.79
1+746.82 1.825 ExtraShoulder 0.35 Thick 1.5 Wdith 1.79 ExtraShoulder 0.35 Thick 1.5 Wdith 1.79
1+746.82 1.825 ExtraShoulder 0.958 ExtraShoulder 0.958
1+750 6.59 ExtraShoulder 0.35 Thick 1.5 Wdith 0.958 ExtraShoulder 0.35 Thick 1.5 Wdith 0.958
1+750 6.59 ExtraShoulder 3.46 ExtraShoulder 3.46
1+760 5.287 ExtraShoulder 0.35 Thick 1.5 Wdith 3.46 ExtraShoulder 0.35 Thick 1.5 Wdith 3.46
1+760 5.287 ExtraShoulder 2.776 ExtraShoulder 2.776
1+760.574 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.776 ExtraShoulder 0.35 Thick 1.5 Wdith 2.776
1+760.574 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+770 6.877 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+770 6.877 ExtraShoulder 3.61 ExtraShoulder 3.61
1+774.328 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.61 ExtraShoulder 0.35 Thick 1.5 Wdith 3.61
1+774.328 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+780 3.175 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+780 3.175 ExtraShoulder 1.667 ExtraShoulder 1.667
1+780.678 5 ExtraShoulder 0.35 Thick 1.5 Wdith 1.667 ExtraShoulder 0.35 Thick 1.5 Wdith 1.667
1+780.678 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+790 9.661 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+790 9.661 ExtraShoulder 5.072 ExtraShoulder 5.072
1+800 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.072 ExtraShoulder 0.35 Thick 1.5 Wdith 5.072
1+800 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+810 7.986 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+810 7.986 ExtraShoulder 4.193 ExtraShoulder 4.193
1+815.972 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.193 ExtraShoulder 0.35 Thick 1.5 Wdith 4.193
1+815.972 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+820 7.014 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+820 7.014 ExtraShoulder 3.682 ExtraShoulder 3.682
1+830 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.682 ExtraShoulder 0.35 Thick 1.5 Wdith 3.682
1+830 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+840 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+840 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+850 5.6325 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+850 5.6325 ExtraShoulder 2.957 ExtraShoulder 2.957
1+851.265 3.87 ExtraShoulder 0.35 Thick 1.5 Wdith 2.957 ExtraShoulder 0.35 Thick 1.5 Wdith 2.957
1+851.265 3.87 ExtraShoulder 2.032 ExtraShoulder 2.032
1+857.74 4.3675 ExtraShoulder 0.35 Thick 1.5 Wdith 2.032 ExtraShoulder 0.35 Thick 1.5 Wdith 2.032
1+857.74 4.3675 ExtraShoulder 2.293 ExtraShoulder 2.293
1+860 5.3395 ExtraShoulder 0.35 Thick 1.5 Wdith 2.293 ExtraShoulder 0.35 Thick 1.5 Wdith 2.293
1+860 5.3395 ExtraShoulder 2.803 ExtraShoulder 2.803
1+868.419 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.803 ExtraShoulder 0.35 Thick 1.5 Wdith 2.803
1+868.419 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+870 5.34 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+870 5.34 ExtraShoulder 2.803 ExtraShoulder 2.803
1+879.099 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.803 ExtraShoulder 0.35 Thick 1.5 Wdith 2.803
1+879.099 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+880 5.4505 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+880 5.4505 ExtraShoulder 2.862 ExtraShoulder 2.862
1+890 6.7635 ExtraShoulder 0.35 Thick 1.5 Wdith 2.862 ExtraShoulder 0.35 Thick 1.5 Wdith 2.862
1+890 6.7635 ExtraShoulder 3.551 ExtraShoulder 3.551
1+893.527 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.551 ExtraShoulder 0.35 Thick 1.5 Wdith 3.551
1+893.527 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+900 8.2365 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+900 8.2365 ExtraShoulder 4.324 ExtraShoulder 4.324
1+910 6.841 ExtraShoulder 0.35 Thick 1.5 Wdith 4.324 ExtraShoulder 0.35 Thick 1.5 Wdith 4.324
1+910 6.841 ExtraShoulder 3.592 ExtraShoulder 3.592
1+913.682 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.592 ExtraShoulder 0.35 Thick 1.5 Wdith 3.592
1+913.682 5 ExtraShoulder 2.625 ExtraShoulder 2.625
1+920 8.159 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
1+920 8.159 ExtraShoulder 4.283 ExtraShoulder 4.283
1+930 6.9185 ExtraShoulder 0.35 Thick 1.5 Wdith 4.283 ExtraShoulder 0.35 Thick 1.5 Wdith 4.283
1+930 6.9185 ExtraShoulder 3.632 ExtraShoulder 3.632
1+933.837 3.757 ExtraShoulder 0.35 Thick 1.5 Wdith 3.632 ExtraShoulder 0.35 Thick 1.5 Wdith 3.632
1+933.837 3.757 ExtraShoulder 1.972 ExtraShoulder 1.972
1+937.514 3.0815 ExtraShoulder 0.35 Thick 1.5 Wdith 1.972 ExtraShoulder 0.35 Thick 1.5 Wdith 1.972
1+937.514 3.0815 ExtraShoulder 1.618 ExtraShoulder 1.618
1+940 2.514 ExtraShoulder 0.35 Thick 1.5 Wdith 1.618 ExtraShoulder 0.35 Thick 1.5 Wdith 1.618
1+940 2.514 ExtraShoulder 1.32 ExtraShoulder 1.32
1+942.542 3.785 ExtraShoulder 0.35 Thick 1.5 Wdith 1.32 ExtraShoulder 0.35 Thick 1.5 Wdith 1.32
1+942.542 3.785 ExtraShoulder 1.987 ExtraShoulder 1.987
1+947.57 3.729 ExtraShoulder 0.35 Thick 1.5 Wdith 1.987 ExtraShoulder 0.35 Thick 1.5 Wdith 1.987
1+947.57 3.729 ExtraShoulder 1.958 ExtraShoulder 1.958
1+950 6.215 ExtraShoulder 0.35 Thick 1.5 Wdith 1.958 ExtraShoulder 0.35 Thick 1.5 Wdith 1.958
1+950 6.215 ExtraShoulder 3.263 ExtraShoulder 3.263
1+960 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.263 ExtraShoulder 0.35 Thick 1.5 Wdith 3.263
1+960 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+970 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+970 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+980 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+980 10 ExtraShoulder 5.25 ExtraShoulder 5.25
1+990 8.367 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
1+990 8.367 ExtraShoulder 4.393 ExtraShoulder 4.393
1+996.734 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.393 ExtraShoulder 0.35 Thick 1.5 Wdith 4.393
1+996.734 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+000 6.633 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+000 6.633 ExtraShoulder 3.482 ExtraShoulder 3.482
2+010 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.482 ExtraShoulder 0.35 Thick 1.5 Wdith 3.482
2+010 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+020 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+020 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+030 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+030 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+040 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+040 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+050 9.625 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+050 9.625 ExtraShoulder 5.053 ExtraShoulder 5.053
2+059.25 5 ExtraShoulder 0.35 Thick 1.5 Wdith 5.053 ExtraShoulder 0.35 Thick 1.5 Wdith 5.053
2+059.25 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+060 1.6235 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+060 1.6235 ExtraShoulder 0.852 ExtraShoulder 0.852
2+062.497 5 ExtraShoulder 0.35 Thick 1.5 Wdith 0.852 ExtraShoulder 0.35 Thick 1.5 Wdith 0.852
2+062.497 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+070 8.7515 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+070 8.7515 ExtraShoulder 4.595 ExtraShoulder 4.595
2+080 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.595 ExtraShoulder 0.35 Thick 1.5 Wdith 4.595
2+080 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+090 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+090 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+100 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+100 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+110 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+110 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+120 5.2485 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+120 5.2485 ExtraShoulder 2.755 ExtraShoulder 2.755
2+120.497 3.5175 ExtraShoulder 0.35 Thick 1.5 Wdith 2.755 ExtraShoulder 0.35 Thick 1.5 Wdith 2.755
2+120.497 3.5175 ExtraShoulder 1.847 ExtraShoulder 1.847
2+127.035 4.7515 ExtraShoulder 0.35 Thick 1.5 Wdith 1.847 ExtraShoulder 0.35 Thick 1.5 Wdith 1.847
2+127.035 4.7515 ExtraShoulder 2.495 ExtraShoulder 2.495
2+130 3.269 ExtraShoulder 0.35 Thick 1.5 Wdith 2.495 ExtraShoulder 0.35 Thick 1.5 Wdith 2.495
2+130 3.269 ExtraShoulder 1.716 ExtraShoulder 1.716
2+133.573 5 ExtraShoulder 0.35 Thick 1.5 Wdith 1.716 ExtraShoulder 0.35 Thick 1.5 Wdith 1.716
2+133.573 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+140 8.2135 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+140 8.2135 ExtraShoulder 4.312 ExtraShoulder 4.312
2+150 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.312 ExtraShoulder 0.35 Thick 1.5 Wdith 4.312
2+150 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+160 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+160 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+170 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+170 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+180 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+180 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+190 5.7865 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+190 5.7865 ExtraShoulder 3.038 ExtraShoulder 3.038
2+191.573 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.038 ExtraShoulder 0.35 Thick 1.5 Wdith 3.038
2+191.573 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+200 9.2135 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+200 9.2135 ExtraShoulder 4.837 ExtraShoulder 4.837
2+210 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.837 ExtraShoulder 0.35 Thick 1.5 Wdith 4.837
2+210 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+220 6.272 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+220 6.272 ExtraShoulder 3.293 ExtraShoulder 3.293
2+222.544 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.293 ExtraShoulder 0.35 Thick 1.5 Wdith 3.293
2+222.544 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+230 8.728 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+230 8.728 ExtraShoulder 4.582 ExtraShoulder 4.582
2+240 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.582 ExtraShoulder 0.35 Thick 1.5 Wdith 4.582
2+240 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+250 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+250 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+260 9.144 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+260 9.144 ExtraShoulder 4.801 ExtraShoulder 4.801
2+268.288 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.801 ExtraShoulder 0.35 Thick 1.5 Wdith 4.801
2+268.288 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+270 5.856 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+270 5.856 ExtraShoulder 3.074 ExtraShoulder 3.074
2+280 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.074 ExtraShoulder 0.35 Thick 1.5 Wdith 3.074
2+280 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+290 6.137 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+290 6.137 ExtraShoulder 3.222 ExtraShoulder 3.222
2+292.274 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.222 ExtraShoulder 0.35 Thick 1.5 Wdith 3.222
2+292.274 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+300 5.2715 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+300 5.2715 ExtraShoulder 2.768 ExtraShoulder 2.768
2+302.817 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.768 ExtraShoulder 0.35 Thick 1.5 Wdith 2.768
2+302.817 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+310 5.271 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+310 5.271 ExtraShoulder 2.767 ExtraShoulder 2.767
2+313.359 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.767 ExtraShoulder 0.35 Thick 1.5 Wdith 2.767
2+313.359 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+320 8.3205 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+320 8.3205 ExtraShoulder 4.368 ExtraShoulder 4.368
2+330 9.225 ExtraShoulder 0.35 Thick 1.5 Wdith 4.368 ExtraShoulder 0.35 Thick 1.5 Wdith 4.368
2+330 9.225 ExtraShoulder 4.843 ExtraShoulder 4.843
2+338.45 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.843 ExtraShoulder 0.35 Thick 1.5 Wdith 4.843
2+338.45 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+340 1.1485 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+340 1.1485 ExtraShoulder 0.603 ExtraShoulder 0.603
2+340.747 1.5225 ExtraShoulder 0.35 Thick 1.5 Wdith 0.603 ExtraShoulder 0.35 Thick 1.5 Wdith 0.603
2+340.747 1.5225 ExtraShoulder 0.799 ExtraShoulder 0.799
2+343.045 4.6265 ExtraShoulder 0.35 Thick 1.5 Wdith 0.799 ExtraShoulder 0.35 Thick 1.5 Wdith 0.799
2+343.045 4.6265 ExtraShoulder 2.429 ExtraShoulder 2.429
2+350 8.4775 ExtraShoulder 0.35 Thick 1.5 Wdith 2.429 ExtraShoulder 0.35 Thick 1.5 Wdith 2.429
2+350 8.4775 ExtraShoulder 4.451 ExtraShoulder 4.451
2+360 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.451 ExtraShoulder 0.35 Thick 1.5 Wdith 4.451
2+360 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+370 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+370 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+380 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+380 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+390 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+390 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+400 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+400 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+410 5.729 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+410 5.729 ExtraShoulder 3.008 ExtraShoulder 3.008
2+411.458 4.727 ExtraShoulder 0.35 Thick 1.5 Wdith 3.008 ExtraShoulder 0.35 Thick 1.5 Wdith 3.008
2+411.458 4.727 ExtraShoulder 2.482 ExtraShoulder 2.482
2+419.454 4.271 ExtraShoulder 0.35 Thick 1.5 Wdith 2.482 ExtraShoulder 0.35 Thick 1.5 Wdith 2.482
2+419.454 4.271 ExtraShoulder 2.242 ExtraShoulder 2.242
2+420 3.998 ExtraShoulder 0.35 Thick 1.5 Wdith 2.242 ExtraShoulder 0.35 Thick 1.5 Wdith 2.242
2+420 3.998 ExtraShoulder 2.099 ExtraShoulder 2.099
2+427.45 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.099 ExtraShoulder 0.35 Thick 1.5 Wdith 2.099
2+427.45 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+430 6.275 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+430 6.275 ExtraShoulder 3.294 ExtraShoulder 3.294
2+440 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.294 ExtraShoulder 0.35 Thick 1.5 Wdith 3.294
2+440 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+450 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+450 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+460 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+460 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+470 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+470 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+480 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+480 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+490 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+490 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+500 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+500 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+510 9.437 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+510 9.437 ExtraShoulder 4.954 ExtraShoulder 4.954
2+518.874 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.954 ExtraShoulder 0.35 Thick 1.5 Wdith 4.954
2+518.874 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+520 3.521 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+520 3.521 ExtraShoulder 1.849 ExtraShoulder 1.849
2+525.916 5 ExtraShoulder 0.35 Thick 1.5 Wdith 1.849 ExtraShoulder 0.35 Thick 1.5 Wdith 1.849
2+525.916 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+530 3.521 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+530 3.521 ExtraShoulder 1.849 ExtraShoulder 1.849
2+532.958 5 ExtraShoulder 0.35 Thick 1.5 Wdith 1.849 ExtraShoulder 0.35 Thick 1.5 Wdith 1.849
2+532.958 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+540 8.521 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+540 8.521 ExtraShoulder 4.474 ExtraShoulder 4.474
2+550 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.474 ExtraShoulder 0.35 Thick 1.5 Wdith 4.474
2+550 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+560 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+560 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+570 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+570 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+580 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+580 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+590 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+590 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+600 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+600 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+610 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+610 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+620 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+620 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+630 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+630 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+640 8.754 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+640 8.754 ExtraShoulder 4.596 ExtraShoulder 4.596
2+647.508 4.9925 ExtraShoulder 0.35 Thick 1.5 Wdith 4.596 ExtraShoulder 0.35 Thick 1.5 Wdith 4.596
2+647.508 4.9925 ExtraShoulder 2.621 ExtraShoulder 2.621
2+649.985 1.246 ExtraShoulder 0.35 Thick 1.5 Wdith 2.621 ExtraShoulder 0.35 Thick 1.5 Wdith 2.621
2+649.985 1.246 ExtraShoulder 0.654 ExtraShoulder 0.654
2+650 1.2385 ExtraShoulder 0.35 Thick 1.5 Wdith 0.654 ExtraShoulder 0.35 Thick 1.5 Wdith 0.654
2+650 1.2385 ExtraShoulder 0.65 ExtraShoulder 0.65
2+652.462 5 ExtraShoulder 0.35 Thick 1.5 Wdith 0.65 ExtraShoulder 0.35 Thick 1.5 Wdith 0.65
2+652.462 5 ExtraShoulder 2.625 ExtraShoulder 2.625
2+660 8.769 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
2+660 8.769 ExtraShoulder 4.604 ExtraShoulder 4.604
2+670 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.604 ExtraShoulder 0.35 Thick 1.5 Wdith 4.604
2+670 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+680 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+680 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+690 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+690 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+700 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+700 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+710 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+710 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+720 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+720 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+730 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+730 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+740 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+740 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+750 7.139 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+750 7.139 ExtraShoulder 3.748 ExtraShoulder 3.748
2+754.278 2.921 ExtraShoulder 0.35 Thick 1.5 Wdith 3.748 ExtraShoulder 0.35 Thick 1.5 Wdith 3.748
2+754.278 2.921 ExtraShoulder 1.534 ExtraShoulder 1.534
2+755.842 1.5645 ExtraShoulder 0.35 Thick 1.5 Wdith 1.534 ExtraShoulder 0.35 Thick 1.5 Wdith 1.534
2+755.842 1.5645 ExtraShoulder 0.821 ExtraShoulder 0.821
2+757.407 2.079 ExtraShoulder 0.35 Thick 1.5 Wdith 0.821 ExtraShoulder 0.35 Thick 1.5 Wdith 0.821
2+757.407 2.079 ExtraShoulder 1.091 ExtraShoulder 1.091
2+760 6.2965 ExtraShoulder 0.35 Thick 1.5 Wdith 1.091 ExtraShoulder 0.35 Thick 1.5 Wdith 1.091
2+760 6.2965 ExtraShoulder 3.306 ExtraShoulder 3.306
2+770 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.306 ExtraShoulder 0.35 Thick 1.5 Wdith 3.306
2+770 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+780 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+780 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+790 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+790 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+800 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+800 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+810 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+810 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+820 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+820 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+830 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+830 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+840 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+840 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+850 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+850 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+860 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+860 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+870 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+870 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+880 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+880 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+890 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+890 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+900 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+900 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+910 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+910 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+920 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+920 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+930 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+930 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+940 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+940 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+950 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+950 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+960 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+960 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+970 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+970 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+980 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+980 10 ExtraShoulder 5.25 ExtraShoulder 5.25
2+990 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
2+990 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+000 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+000 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+010 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+010 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+020 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+020 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+030 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+030 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+040 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+040 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+050 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+050 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+060 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+060 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+070 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+070 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+080 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+080 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+090 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+090 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+100 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+100 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+110 7.371 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+110 7.371 ExtraShoulder 3.87 ExtraShoulder 3.87
3+114.742 2.371 ExtraShoulder 0.35 Thick 1.5 Wdith 3.87 ExtraShoulder 0.35 Thick 1.5 Wdith 3.87
3+114.742 2.371 ExtraShoulder 1.245 ExtraShoulder 1.245

3+660 10 ExtraShoulder 0.35 Thick 1.5 Wdith 0.457 ExtraShoulder 0.35 Thick 1.5 Wdith 0.457
3+660 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+670 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+670 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+680 5.3995 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+680 5.3995 ExtraShoulder 2.835 ExtraShoulder 2.835
3+680.799 3.6335 ExtraShoulder 0.35 Thick 1.5 Wdith 2.835 ExtraShoulder 0.35 Thick 1.5 Wdith 2.835
3+680.799 3.6335 ExtraShoulder 1.908 ExtraShoulder 1.908
3+687.267 4.6005 ExtraShoulder 0.35 Thick 1.5 Wdith 1.908 ExtraShoulder 0.35 Thick 1.5 Wdith 1.908
3+687.267 4.6005 ExtraShoulder 2.415 ExtraShoulder 2.415
3+690 3.2345 ExtraShoulder 0.35 Thick 1.5 Wdith 2.415 ExtraShoulder 0.35 Thick 1.5 Wdith 2.415
3+690 3.2345 ExtraShoulder 1.698 ExtraShoulder 1.698
3+693.736 5 ExtraShoulder 0.35 Thick 1.5 Wdith 1.698 ExtraShoulder 0.35 Thick 1.5 Wdith 1.698
3+693.736 5 ExtraShoulder 2.625 ExtraShoulder 2.625
3+700 8.132 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
3+700 8.132 ExtraShoulder 4.269 ExtraShoulder 4.269
3+710 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.269 ExtraShoulder 0.35 Thick 1.5 Wdith 4.269
3+710 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+720 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+720 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+730 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+730 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+740 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+740 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+750 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+750 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+760 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+760 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+770 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+770 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+780 7.374 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+780 7.374 ExtraShoulder 3.871 ExtraShoulder 3.871
3+784.748 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.871 ExtraShoulder 0.35 Thick 1.5 Wdith 3.871
3+784.748 5 ExtraShoulder 2.625 ExtraShoulder 2.625
3+790 4.304 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
3+790 4.304 ExtraShoulder 2.26 ExtraShoulder 2.26
3+793.356 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.26 ExtraShoulder 0.35 Thick 1.5 Wdith 2.26
3+793.356 5 ExtraShoulder 2.625 ExtraShoulder 2.625
3+800 4.3035 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
3+800 4.3035 ExtraShoulder 2.259 ExtraShoulder 2.259
3+801.963 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.259 ExtraShoulder 0.35 Thick 1.5 Wdith 2.259
3+801.963 5 ExtraShoulder 2.625 ExtraShoulder 2.625
3+810 9.0185 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
3+810 9.0185 ExtraShoulder 4.735 ExtraShoulder 4.735
3+820 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.735 ExtraShoulder 0.35 Thick 1.5 Wdith 4.735
3+820 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+830 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+830 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+840 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+840 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+850 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+850 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+860 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+860 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+870 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+870 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+880 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+880 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+890 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+890 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+900 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+900 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+910 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+910 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+920 9.782 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+920 9.782 ExtraShoulder 5.136 ExtraShoulder 5.136
3+929.564 4.792 ExtraShoulder 0.35 Thick 1.5 Wdith 5.136 ExtraShoulder 0.35 Thick 1.5 Wdith 5.136
3+929.564 4.792 ExtraShoulder 2.516 ExtraShoulder 2.516
3+929.584 0.02 ExtraShoulder 0.35 Thick 1.5 Wdith 2.516 ExtraShoulder 0.35 Thick 1.5 Wdith 2.516
3+929.584 0.02 ExtraShoulder 0.01 ExtraShoulder 0.01
3+929.604 0.208 ExtraShoulder 0.35 Thick 1.5 Wdith 0.01 ExtraShoulder 0.35 Thick 1.5 Wdith 0.01
3+929.604 0.208 ExtraShoulder 0.109 ExtraShoulder 0.109
3+930 5.198 ExtraShoulder 0.35 Thick 1.5 Wdith 0.109 ExtraShoulder 0.35 Thick 1.5 Wdith 0.109
3+930 5.198 ExtraShoulder 2.729 ExtraShoulder 2.729
3+940 10 ExtraShoulder 0.35 Thick 1.5 Wdith 2.729 ExtraShoulder 0.35 Thick 1.5 Wdith 2.729
3+940 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+950 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+950 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+960 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+960 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+970 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+970 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+980 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+980 10 ExtraShoulder 5.25 ExtraShoulder 5.25
3+990 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
3+990 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+000 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+000 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+010 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+010 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+020 8.0965 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+020 8.0965 ExtraShoulder 4.251 ExtraShoulder 4.251
4+026.193 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.251 ExtraShoulder 0.35 Thick 1.5 Wdith 4.251
4+026.193 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+030 3.0615 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+030 3.0615 ExtraShoulder 1.607 ExtraShoulder 1.607
4+032.316 4.2195 ExtraShoulder 0.35 Thick 1.5 Wdith 1.607 ExtraShoulder 0.35 Thick 1.5 Wdith 1.607
4+032.316 4.2195 ExtraShoulder 2.215 ExtraShoulder 2.215
4+038.439 3.842 ExtraShoulder 0.35 Thick 1.5 Wdith 2.215 ExtraShoulder 0.35 Thick 1.5 Wdith 2.215
4+038.439 3.842 ExtraShoulder 2.017 ExtraShoulder 2.017
4+040 5.7805 ExtraShoulder 0.35 Thick 1.5 Wdith 2.017 ExtraShoulder 0.35 Thick 1.5 Wdith 2.017
4+040 5.7805 ExtraShoulder 3.035 ExtraShoulder 3.035
4+050 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.035 ExtraShoulder 0.35 Thick 1.5 Wdith 3.035
4+050 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+060 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+060 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+070 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+070 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+080 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+080 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+090 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+090 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+100 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+100 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+110 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+110 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+120 5.481 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+120 5.481 ExtraShoulder 2.878 ExtraShoulder 2.878
4+120.962 4.5975 ExtraShoulder 0.35 Thick 1.5 Wdith 2.878 ExtraShoulder 0.35 Thick 1.5 Wdith 2.878
4+120.962 4.5975 ExtraShoulder 2.414 ExtraShoulder 2.414
4+129.195 4.519 ExtraShoulder 0.35 Thick 1.5 Wdith 2.414 ExtraShoulder 0.35 Thick 1.5 Wdith 2.414
4+129.195 4.519 ExtraShoulder 2.372 ExtraShoulder 2.372
4+130 4.1165 ExtraShoulder 0.35 Thick 1.5 Wdith 2.372 ExtraShoulder 0.35 Thick 1.5 Wdith 2.372
4+130 4.1165 ExtraShoulder 2.161 ExtraShoulder 2.161
4+137.428 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.161 ExtraShoulder 0.35 Thick 1.5 Wdith 2.161
4+137.428 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+140 6.286 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+140 6.286 ExtraShoulder 3.3 ExtraShoulder 3.3
4+150 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.3 ExtraShoulder 0.35 Thick 1.5 Wdith 3.3
4+150 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+160 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+160 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+170 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+170 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+180 9.7805 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+180 9.7805 ExtraShoulder 5.135 ExtraShoulder 5.135
4+189.561 5 ExtraShoulder 0.35 Thick 1.5 Wdith 5.135 ExtraShoulder 0.35 Thick 1.5 Wdith 5.135
4+189.561 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+190 5.2195 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+190 5.2195 ExtraShoulder 2.74 ExtraShoulder 2.74
4+200 6.7655 ExtraShoulder 0.35 Thick 1.5 Wdith 2.74 ExtraShoulder 0.35 Thick 1.5 Wdith 2.74
4+200 6.7655 ExtraShoulder 3.552 ExtraShoulder 3.552
4+203.531 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.552 ExtraShoulder 0.35 Thick 1.5 Wdith 3.552
4+203.531 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+210 6.9855 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+210 6.9855 ExtraShoulder 3.667 ExtraShoulder 3.667
4+217.502 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.667 ExtraShoulder 0.35 Thick 1.5 Wdith 3.667
4+217.502 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+220 6.249 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+220 6.249 ExtraShoulder 3.281 ExtraShoulder 3.281
4+230 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.281 ExtraShoulder 0.35 Thick 1.5 Wdith 3.281
4+230 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+240 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+240 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+250 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+250 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+270 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+270 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+280 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+280 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+290 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+290 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+300 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+300 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+310 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+310 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+320 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+320 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+330 7.49 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+330 7.49 ExtraShoulder 3.932 ExtraShoulder 3.932
4+334.98 2.6095 ExtraShoulder 0.35 Thick 1.5 Wdith 3.932 ExtraShoulder 0.35 Thick 1.5 Wdith 3.932
4+334.98 2.6095 ExtraShoulder 1.37 ExtraShoulder 1.37
4+335.219 0.2395 ExtraShoulder 0.35 Thick 1.5 Wdith 1.37 ExtraShoulder 0.35 Thick 1.5 Wdith 1.37
4+335.219 0.2395 ExtraShoulder 0.126 ExtraShoulder 0.126
4+335.459 2.3905 ExtraShoulder 0.35 Thick 1.5 Wdith 0.126 ExtraShoulder 0.35 Thick 1.5 Wdith 0.126
4+335.459 2.3905 ExtraShoulder 1.255 ExtraShoulder 1.255
4+340 7.2705 ExtraShoulder 0.35 Thick 1.5 Wdith 1.255 ExtraShoulder 0.35 Thick 1.5 Wdith 1.255
4+340 7.2705 ExtraShoulder 3.817 ExtraShoulder 3.817
4+350 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.817 ExtraShoulder 0.35 Thick 1.5 Wdith 3.817
4+350 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+360 7.1455 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+360 7.1455 ExtraShoulder 3.751 ExtraShoulder 3.751
4+364.291 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.751 ExtraShoulder 0.35 Thick 1.5 Wdith 3.751
4+364.291 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+370 7.8545 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+370 7.8545 ExtraShoulder 4.124 ExtraShoulder 4.124
4+380 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.124 ExtraShoulder 0.35 Thick 1.5 Wdith 4.124
4+380 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+390 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+390 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+400 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+400 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+410 9.1455 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+410 9.1455 ExtraShoulder 4.801 ExtraShoulder 4.801
4+418.291 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.801 ExtraShoulder 0.35 Thick 1.5 Wdith 4.801
4+418.291 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+420 5.8545 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+420 5.8545 ExtraShoulder 3.074 ExtraShoulder 3.074
4+430 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.074 ExtraShoulder 0.35 Thick 1.5 Wdith 3.074
4+430 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+440 9.1215 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+440 9.1215 ExtraShoulder 4.789 ExtraShoulder 4.789
4+448.243 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.789 ExtraShoulder 0.35 Thick 1.5 Wdith 4.789
4+448.243 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+450 5.8785 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+450 5.8785 ExtraShoulder 3.086 ExtraShoulder 3.086
4+460 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.086 ExtraShoulder 0.35 Thick 1.5 Wdith 3.086
4+460 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+470 9.0975 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+470 9.0975 ExtraShoulder 4.776 ExtraShoulder 4.776
4+478.195 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.776 ExtraShoulder 0.35 Thick 1.5 Wdith 4.776
4+478.195 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+480 5.9025 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+480 5.9025 ExtraShoulder 3.099 ExtraShoulder 3.099
4+490 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.099 ExtraShoulder 0.35 Thick 1.5 Wdith 3.099
4+490 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+500 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+500 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+510 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+510 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+520 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+520 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+530 6.0975 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+530 6.0975 ExtraShoulder 3.201 ExtraShoulder 3.201
4+532.195 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.201 ExtraShoulder 0.35 Thick 1.5 Wdith 3.201
4+532.195 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+540 8.404 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+540 8.404 ExtraShoulder 4.412 ExtraShoulder 4.412
4+549.003 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.412 ExtraShoulder 0.35 Thick 1.5 Wdith 4.412
4+549.003 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+550 1.2565 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+550 1.2565 ExtraShoulder 0.66 ExtraShoulder 0.66
4+551.516 2.0145 ExtraShoulder 0.35 Thick 1.5 Wdith 0.66 ExtraShoulder 0.35 Thick 1.5 Wdith 0.66
4+551.516 2.0145 ExtraShoulder 1.058 ExtraShoulder 1.058
4+554.029 4.242 ExtraShoulder 0.35 Thick 1.5 Wdith 1.058 ExtraShoulder 0.35 Thick 1.5 Wdith 1.058
4+554.029 4.242 ExtraShoulder 2.227 ExtraShoulder 2.227
4+560 7.9855 ExtraShoulder 0.35 Thick 1.5 Wdith 2.227 ExtraShoulder 0.35 Thick 1.5 Wdith 2.227
4+560 7.9855 ExtraShoulder 4.192 ExtraShoulder 4.192
4+570 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.192 ExtraShoulder 0.35 Thick 1.5 Wdith 4.192
4+570 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+580 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+580 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+590 9.897 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+590 9.897 ExtraShoulder 5.196 ExtraShoulder 5.196
4+599.794 5 ExtraShoulder 0.35 Thick 1.5 Wdith 5.196 ExtraShoulder 0.35 Thick 1.5 Wdith 5.196
4+599.794 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+600 5.103 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+600 5.103 ExtraShoulder 2.679 ExtraShoulder 2.679
4+610 5.7705 ExtraShoulder 0.35 Thick 1.5 Wdith 2.679 ExtraShoulder 0.35 Thick 1.5 Wdith 2.679
4+610 5.7705 ExtraShoulder 3.03 ExtraShoulder 3.03
4+611.541 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.03 ExtraShoulder 0.35 Thick 1.5 Wdith 3.03
4+611.541 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+620 5.873 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+620 5.873 ExtraShoulder 3.083 ExtraShoulder 3.083
4+623.287 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.083 ExtraShoulder 0.35 Thick 1.5 Wdith 3.083
4+623.287 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+630 8.3565 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+630 8.3565 ExtraShoulder 4.387 ExtraShoulder 4.387
4+640 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.387 ExtraShoulder 0.35 Thick 1.5 Wdith 4.387
4+640 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+650 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+650 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+660 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+660 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+670 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+670 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+680 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+680 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+690 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+690 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+700 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+700 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+710 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+710 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+720 7.586 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+720 7.586 ExtraShoulder 3.983 ExtraShoulder 3.983
4+725.172 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.983 ExtraShoulder 0.35 Thick 1.5 Wdith 3.983
4+725.172 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+730 7.414 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+730 7.414 ExtraShoulder 3.892 ExtraShoulder 3.892
4+740 5.4065 ExtraShoulder 0.35 Thick 1.5 Wdith 3.892 ExtraShoulder 0.35 Thick 1.5 Wdith 3.892
4+740 5.4065 ExtraShoulder 2.838 ExtraShoulder 2.838
4+740.813 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.838 ExtraShoulder 0.35 Thick 1.5 Wdith 2.838
4+740.813 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+750 7.8205 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+750 7.8205 ExtraShoulder 4.106 ExtraShoulder 4.106
4+756.454 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.106 ExtraShoulder 0.35 Thick 1.5 Wdith 4.106
4+756.454 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+760 6.773 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+760 6.773 ExtraShoulder 3.556 ExtraShoulder 3.556
4+770 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.556 ExtraShoulder 0.35 Thick 1.5 Wdith 3.556
4+770 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+780 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+780 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+790 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+790 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+800 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+800 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+810 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+810 10 ExtraShoulder 5.25 ExtraShoulder 5.25
4+820 9.1775 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
4+820 9.1775 ExtraShoulder 4.818 ExtraShoulder 4.818
4+828.355 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.818 ExtraShoulder 0.35 Thick 1.5 Wdith 4.818
4+828.355 5 ExtraShoulder 2.625 ExtraShoulder 2.625
4+830 4.4555 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
4+830 4.4555 ExtraShoulder 2.339 ExtraShoulder 2.339
4+837.266 3.633 ExtraShoulder 0.35 Thick 1.5 Wdith 2.339 ExtraShoulder 0.35 Thick 1.5 Wdith 2.339
4+837.266 3.633 ExtraShoulder 1.907 ExtraShoulder 1.907

6+532 4 ExtraShoulder 0.35 Thick 1.5 Wdith 4.162 ExtraShoulder 0.35 Thick 1.5 Wdith 4.162
6+532 4 ExtraShoulder 2.1 ExtraShoulder 2.1
6+540 9 ExtraShoulder 0.35 Thick 1.5 Wdith 2.1 ExtraShoulder 0.35 Thick 1.5 Wdith 2.1
6+540 9 ExtraShoulder 4.725 ExtraShoulder 4.725
6+550 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.725 ExtraShoulder 0.35 Thick 1.5 Wdith 4.725
6+550 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+560 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+560 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+570 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+570 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+580 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+580 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+590 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+590 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+600 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+600 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+610 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+610 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+620 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+620 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+630 5.3755 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+630 5.3755 ExtraShoulder 2.822 ExtraShoulder 2.822
6+630.751 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.822 ExtraShoulder 0.35 Thick 1.5 Wdith 2.822
6+630.751 5 ExtraShoulder 2.625 ExtraShoulder 2.625
6+640 9.6245 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
6+640 9.6245 ExtraShoulder 5.053 ExtraShoulder 5.053
6+650 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.053 ExtraShoulder 0.35 Thick 1.5 Wdith 5.053
6+650 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+660 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+660 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+670 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+670 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+680 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+680 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+690 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+690 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+700 6.579 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+700 6.579 ExtraShoulder 3.454 ExtraShoulder 3.454
6+703.158 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.454 ExtraShoulder 0.35 Thick 1.5 Wdith 3.454
6+703.158 5 ExtraShoulder 2.625 ExtraShoulder 2.625
6+710 8.421 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
6+710 8.421 ExtraShoulder 4.421 ExtraShoulder 4.421
6+720 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.421 ExtraShoulder 0.35 Thick 1.5 Wdith 4.421
6+720 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+730 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+730 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+740 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+740 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+750 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+750 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+760 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+760 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+770 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+770 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+780 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+780 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+790 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+790 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+800 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+800 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+810 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+810 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+820 7.994 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+820 7.994 ExtraShoulder 4.197 ExtraShoulder 4.197
6+825.988 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.197 ExtraShoulder 0.35 Thick 1.5 Wdith 4.197
6+825.988 5 ExtraShoulder 2.625 ExtraShoulder 2.625
6+830 7.006 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
6+830 7.006 ExtraShoulder 3.678 ExtraShoulder 3.678
6+840 5.152 ExtraShoulder 0.35 Thick 1.5 Wdith 3.678 ExtraShoulder 0.35 Thick 1.5 Wdith 3.678
6+840 5.152 ExtraShoulder 2.705 ExtraShoulder 2.705
6+840.304 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.705 ExtraShoulder 0.35 Thick 1.5 Wdith 2.705
6+840.304 5 ExtraShoulder 2.625 ExtraShoulder 2.625
6+850 9.848 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
6+850 9.848 ExtraShoulder 5.17 ExtraShoulder 5.17
6+860 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.17 ExtraShoulder 0.35 Thick 1.5 Wdith 5.17
6+860 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+870 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+870 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+880 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+880 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+890 6.652 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+890 6.652 ExtraShoulder 3.492 ExtraShoulder 3.492
6+893.304 2.0145 ExtraShoulder 0.35 Thick 1.5 Wdith 3.492 ExtraShoulder 0.35 Thick 1.5 Wdith 3.492
6+893.304 2.0145 ExtraShoulder 1.058 ExtraShoulder 1.058
6+894.029 0.7245 ExtraShoulder 0.35 Thick 1.5 Wdith 1.058 ExtraShoulder 0.35 Thick 1.5 Wdith 1.058
6+894.029 0.7245 ExtraShoulder 0.38 ExtraShoulder 0.38
6+894.753 2.9855 ExtraShoulder 0.35 Thick 1.5 Wdith 0.38 ExtraShoulder 0.35 Thick 1.5 Wdith 0.38
6+894.753 2.9855 ExtraShoulder 1.567 ExtraShoulder 1.567
6+900 7.6235 ExtraShoulder 0.35 Thick 1.5 Wdith 1.567 ExtraShoulder 0.35 Thick 1.5 Wdith 1.567
6+900 7.6235 ExtraShoulder 4.002 ExtraShoulder 4.002
6+910 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.002 ExtraShoulder 0.35 Thick 1.5 Wdith 4.002
6+910 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+920 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+920 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+930 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+930 10 ExtraShoulder 5.25 ExtraShoulder 5.25
6+940 8.8765 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
6+940 8.8765 ExtraShoulder 4.66 ExtraShoulder 4.66
6+947.753 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.66 ExtraShoulder 0.35 Thick 1.5 Wdith 4.66
6+947.753 5 ExtraShoulder 2.625 ExtraShoulder 2.625
6+950 1.9845 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
6+950 1.9845 ExtraShoulder 1.042 ExtraShoulder 1.042
6+951.722 5 ExtraShoulder 0.35 Thick 1.5 Wdith 1.042 ExtraShoulder 0.35 Thick 1.5 Wdith 1.042
6+951.722 5 ExtraShoulder 2.625 ExtraShoulder 2.625
6+960 5.3145 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
6+960 5.3145 ExtraShoulder 2.79 ExtraShoulder 2.79
6+962.351 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.79 ExtraShoulder 0.35 Thick 1.5 Wdith 2.79
6+962.351 5 ExtraShoulder 2.625 ExtraShoulder 2.625
6+970 5.3145 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
6+970 5.3145 ExtraShoulder 2.79 ExtraShoulder 2.79
6+972.98 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.79 ExtraShoulder 0.35 Thick 1.5 Wdith 2.79
6+972.98 5 ExtraShoulder 2.625 ExtraShoulder 2.625
6+980 8.51 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
6+980 8.51 ExtraShoulder 4.468 ExtraShoulder 4.468
6+990 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.468 ExtraShoulder 0.35 Thick 1.5 Wdith 4.468
6+990 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+000 8.2885 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+000 8.2885 ExtraShoulder 4.351 ExtraShoulder 4.351
7+006.577 3.5895 ExtraShoulder 0.35 Thick 1.5 Wdith 4.351 ExtraShoulder 0.35 Thick 1.5 Wdith 4.351
7+006.577 3.5895 ExtraShoulder 1.884 ExtraShoulder 1.884
7+007.179 0.602 ExtraShoulder 0.35 Thick 1.5 Wdith 1.884 ExtraShoulder 0.35 Thick 1.5 Wdith 1.884
7+007.179 0.602 ExtraShoulder 0.316 ExtraShoulder 0.316
7+007.781 1.4105 ExtraShoulder 0.35 Thick 1.5 Wdith 0.316 ExtraShoulder 0.35 Thick 1.5 Wdith 0.316
7+007.781 1.4105 ExtraShoulder 0.741 ExtraShoulder 0.741
7+010 6.1095 ExtraShoulder 0.35 Thick 1.5 Wdith 0.741 ExtraShoulder 0.35 Thick 1.5 Wdith 0.741
7+010 6.1095 ExtraShoulder 3.207 ExtraShoulder 3.207
7+020 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.207 ExtraShoulder 0.35 Thick 1.5 Wdith 3.207
7+020 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+030 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+030 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+040 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+040 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+050 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+050 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+060 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+060 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+070 8.172 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+070 8.172 ExtraShoulder 4.29 ExtraShoulder 4.29
7+076.344 3.404 ExtraShoulder 0.35 Thick 1.5 Wdith 4.29 ExtraShoulder 0.35 Thick 1.5 Wdith 4.29
7+076.344 3.404 ExtraShoulder 1.787 ExtraShoulder 1.787
7+076.808 0.4635 ExtraShoulder 0.35 Thick 1.5 Wdith 1.787 ExtraShoulder 0.35 Thick 1.5 Wdith 1.787
7+076.808 0.4635 ExtraShoulder 0.243 ExtraShoulder 0.243
7+077.271 1.596 ExtraShoulder 0.35 Thick 1.5 Wdith 0.243 ExtraShoulder 0.35 Thick 1.5 Wdith 0.243
7+077.271 1.596 ExtraShoulder 0.838 ExtraShoulder 0.838
7+080 6.3645 ExtraShoulder 0.35 Thick 1.5 Wdith 0.838 ExtraShoulder 0.35 Thick 1.5 Wdith 0.838
7+080 6.3645 ExtraShoulder 3.341 ExtraShoulder 3.341
7+090 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.341 ExtraShoulder 0.35 Thick 1.5 Wdith 3.341
7+090 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+100 9.0015 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+100 9.0015 ExtraShoulder 4.726 ExtraShoulder 4.726
7+108.003 4.09 ExtraShoulder 0.35 Thick 1.5 Wdith 4.726 ExtraShoulder 0.35 Thick 1.5 Wdith 4.726
7+108.003 4.09 ExtraShoulder 2.147 ExtraShoulder 2.147
7+108.18 0.1765 ExtraShoulder 0.35 Thick 1.5 Wdith 2.147 ExtraShoulder 0.35 Thick 1.5 Wdith 2.147
7+108.18 0.1765 ExtraShoulder 0.093 ExtraShoulder 0.093
7+108.356 0.91 ExtraShoulder 0.35 Thick 1.5 Wdith 0.093 ExtraShoulder 0.35 Thick 1.5 Wdith 0.093
7+108.356 0.91 ExtraShoulder 0.478 ExtraShoulder 0.478
7+110 5.822 ExtraShoulder 0.35 Thick 1.5 Wdith 0.478 ExtraShoulder 0.35 Thick 1.5 Wdith 0.478
7+110 5.822 ExtraShoulder 3.057 ExtraShoulder 3.057
7+120 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.057 ExtraShoulder 0.35 Thick 1.5 Wdith 3.057
7+120 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+130 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+130 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+140 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+140 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+150 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+150 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+160 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+160 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+170 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+170 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+180 5.2815 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+180 5.2815 ExtraShoulder 2.773 ExtraShoulder 2.773
7+180.563 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.773 ExtraShoulder 0.35 Thick 1.5 Wdith 2.773
7+180.563 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+190 6.2355 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+190 6.2355 ExtraShoulder 3.274 ExtraShoulder 3.274
7+193.034 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.274 ExtraShoulder 0.35 Thick 1.5 Wdith 3.274
7+193.034 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+200 6.236 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+200 6.236 ExtraShoulder 3.274 ExtraShoulder 3.274
7+205.506 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.274 ExtraShoulder 0.35 Thick 1.5 Wdith 3.274
7+205.506 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+210 7.247 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+210 7.247 ExtraShoulder 3.805 ExtraShoulder 3.805
7+220 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.805 ExtraShoulder 0.35 Thick 1.5 Wdith 3.805
7+220 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+230 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+230 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+240 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+240 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+250 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+250 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+260 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+260 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+270 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+270 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+280 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+280 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+290 9.1685 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+290 9.1685 ExtraShoulder 4.813 ExtraShoulder 4.813
7+298.337 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.813 ExtraShoulder 0.35 Thick 1.5 Wdith 4.813
7+298.337 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+300 1.74 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+300 1.74 ExtraShoulder 0.913 ExtraShoulder 0.913
7+301.817 2.6485 ExtraShoulder 0.35 Thick 1.5 Wdith 0.913 ExtraShoulder 0.35 Thick 1.5 Wdith 0.913
7+301.817 2.6485 ExtraShoulder 1.39 ExtraShoulder 1.39
7+305.297 4.0915 ExtraShoulder 0.35 Thick 1.5 Wdith 1.39 ExtraShoulder 0.35 Thick 1.5 Wdith 1.39
7+305.297 4.0915 ExtraShoulder 2.148 ExtraShoulder 2.148
7+310 7.3515 ExtraShoulder 0.35 Thick 1.5 Wdith 2.148 ExtraShoulder 0.35 Thick 1.5 Wdith 2.148
7+310 7.3515 ExtraShoulder 3.86 ExtraShoulder 3.86
7+320 9.251 ExtraShoulder 0.35 Thick 1.5 Wdith 3.86 ExtraShoulder 0.35 Thick 1.5 Wdith 3.86
7+320 9.251 ExtraShoulder 4.857 ExtraShoulder 4.857
7+328.502 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.857 ExtraShoulder 0.35 Thick 1.5 Wdith 4.857
7+328.502 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+330 1.389 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+330 1.389 ExtraShoulder 0.729 ExtraShoulder 0.729
7+331.28 2.029 ExtraShoulder 0.35 Thick 1.5 Wdith 0.729 ExtraShoulder 0.35 Thick 1.5 Wdith 0.729
7+331.28 2.029 ExtraShoulder 1.065 ExtraShoulder 1.065
7+334.058 1.588 ExtraShoulder 0.35 Thick 1.5 Wdith 1.065 ExtraShoulder 0.35 Thick 1.5 Wdith 1.065
7+334.058 1.588 ExtraShoulder 0.834 ExtraShoulder 0.834
7+334.456 2.971 ExtraShoulder 0.35 Thick 1.5 Wdith 0.834 ExtraShoulder 0.35 Thick 1.5 Wdith 0.834
7+334.456 2.971 ExtraShoulder 1.56 ExtraShoulder 1.56
7+340 7.772 ExtraShoulder 0.35 Thick 1.5 Wdith 1.56 ExtraShoulder 0.35 Thick 1.5 Wdith 1.56
7+340 7.772 ExtraShoulder 4.08 ExtraShoulder 4.08
7+350 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.08 ExtraShoulder 0.35 Thick 1.5 Wdith 4.08
7+350 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+360 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+360 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+370 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+370 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+380 7.228 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+380 7.228 ExtraShoulder 3.795 ExtraShoulder 3.795
7+384.456 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.795 ExtraShoulder 0.35 Thick 1.5 Wdith 3.795
7+384.456 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+390 6.036 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+390 6.036 ExtraShoulder 3.169 ExtraShoulder 3.169
7+396.528 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.169 ExtraShoulder 0.35 Thick 1.5 Wdith 3.169
7+396.528 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+400 6.036 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+400 6.036 ExtraShoulder 3.169 ExtraShoulder 3.169
7+408.6 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.169 ExtraShoulder 0.35 Thick 1.5 Wdith 3.169
7+408.6 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+410 5.7 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+410 5.7 ExtraShoulder 2.992 ExtraShoulder 2.992
7+420 10 ExtraShoulder 0.35 Thick 1.5 Wdith 2.992 ExtraShoulder 0.35 Thick 1.5 Wdith 2.992
7+420 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+430 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+430 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+440 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+440 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+450 9.3 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+450 9.3 ExtraShoulder 4.882 ExtraShoulder 4.882
7+458.6 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.882 ExtraShoulder 0.35 Thick 1.5 Wdith 4.882
7+458.6 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+460 5.7 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+460 5.7 ExtraShoulder 2.992 ExtraShoulder 2.992
7+470 6.9875 ExtraShoulder 0.35 Thick 1.5 Wdith 2.992 ExtraShoulder 0.35 Thick 1.5 Wdith 2.992
7+470 6.9875 ExtraShoulder 3.668 ExtraShoulder 3.668
7+473.975 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.668 ExtraShoulder 0.35 Thick 1.5 Wdith 3.668
7+473.975 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+480 8.0125 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+480 8.0125 ExtraShoulder 4.207 ExtraShoulder 4.207
7+490 5.1965 ExtraShoulder 0.35 Thick 1.5 Wdith 4.207 ExtraShoulder 0.35 Thick 1.5 Wdith 4.207
7+490 5.1965 ExtraShoulder 2.728 ExtraShoulder 2.728
7+490.393 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.728 ExtraShoulder 0.35 Thick 1.5 Wdith 2.728
7+490.393 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+500 9.8035 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+500 9.8035 ExtraShoulder 5.147 ExtraShoulder 5.147
7+510 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.147 ExtraShoulder 0.35 Thick 1.5 Wdith 5.147
7+510 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+520 5.94 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+520 5.94 ExtraShoulder 3.118 ExtraShoulder 3.118
7+521.88 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.118 ExtraShoulder 0.35 Thick 1.5 Wdith 3.118
7+521.88 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+530 6.071 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+530 6.071 ExtraShoulder 3.187 ExtraShoulder 3.187
7+534.022 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.187 ExtraShoulder 0.35 Thick 1.5 Wdith 3.187
7+534.022 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+540 6.0705 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+540 6.0705 ExtraShoulder 3.187 ExtraShoulder 3.187
7+546.163 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.187 ExtraShoulder 0.35 Thick 1.5 Wdith 3.187
7+546.163 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+550 6.9185 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+550 6.9185 ExtraShoulder 3.632 ExtraShoulder 3.632
7+560 9.1825 ExtraShoulder 0.35 Thick 1.5 Wdith 3.632 ExtraShoulder 0.35 Thick 1.5 Wdith 3.632
7+560 9.1825 ExtraShoulder 4.821 ExtraShoulder 4.821
7+568.365 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.821 ExtraShoulder 0.35 Thick 1.5 Wdith 4.821
7+568.365 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+570 5.8175 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+570 5.8175 ExtraShoulder 3.054 ExtraShoulder 3.054
7+580 8.0175 ExtraShoulder 0.35 Thick 1.5 Wdith 3.054 ExtraShoulder 0.35 Thick 1.5 Wdith 3.054
7+580 8.0175 ExtraShoulder 4.209 ExtraShoulder 4.209
7+586.035 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.209 ExtraShoulder 0.35 Thick 1.5 Wdith 4.209
7+586.035 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+590 6.9825 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+590 6.9825 ExtraShoulder 3.666 ExtraShoulder 3.666
7+600 6.8525 ExtraShoulder 0.35 Thick 1.5 Wdith 3.666 ExtraShoulder 0.35 Thick 1.5 Wdith 3.666
7+600 6.8525 ExtraShoulder 3.598 ExtraShoulder 3.598
7+603.705 2.739 ExtraShoulder 0.35 Thick 1.5 Wdith 3.598 ExtraShoulder 0.35 Thick 1.5 Wdith 3.598
7+603.705 2.739 ExtraShoulder 1.438 ExtraShoulder 1.438
7+605.478 3.1475 ExtraShoulder 0.35 Thick 1.5 Wdith 1.438 ExtraShoulder 0.35 Thick 1.5 Wdith 1.438
7+605.478 3.1475 ExtraShoulder 1.652 ExtraShoulder 1.652
7+610 7.261 ExtraShoulder 0.35 Thick 1.5 Wdith 1.652 ExtraShoulder 0.35 Thick 1.5 Wdith 1.652
7+610 7.261 ExtraShoulder 3.812 ExtraShoulder 3.812
7+630 7.9635 ExtraShoulder 0.35 Thick 1.5 Wdith 3.812 ExtraShoulder 0.35 Thick 1.5 Wdith 3.812
7+630 7.9635 ExtraShoulder 4.181 ExtraShoulder 4.181
7+635.927 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.181 ExtraShoulder 0.35 Thick 1.5 Wdith 4.181
7+635.927 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+640 7.0365 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+640 7.0365 ExtraShoulder 3.694 ExtraShoulder 3.694
7+650 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.694 ExtraShoulder 0.35 Thick 1.5 Wdith 3.694
7+650 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+660 8.1885 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+660 8.1885 ExtraShoulder 4.299 ExtraShoulder 4.299
7+666.377 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.299 ExtraShoulder 0.35 Thick 1.5 Wdith 4.299
7+666.377 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+670 6.8115 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+670 6.8115 ExtraShoulder 3.576 ExtraShoulder 3.576
7+680 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.576 ExtraShoulder 0.35 Thick 1.5 Wdith 3.576
7+680 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+690 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+690 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+700 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+700 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+710 8.828 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+710 8.828 ExtraShoulder 4.635 ExtraShoulder 4.635
7+717.656 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.635 ExtraShoulder 0.35 Thick 1.5 Wdith 4.635
7+717.656 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+720 6.172 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+720 6.172 ExtraShoulder 3.24 ExtraShoulder 3.24
7+730 6.905 ExtraShoulder 0.35 Thick 1.5 Wdith 3.24 ExtraShoulder 0.35 Thick 1.5 Wdith 3.24
7+730 6.905 ExtraShoulder 3.625 ExtraShoulder 3.625
7+733.81 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.625 ExtraShoulder 0.35 Thick 1.5 Wdith 3.625
7+733.81 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+740 6.358 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+740 6.358 ExtraShoulder 3.338 ExtraShoulder 3.338
7+746.526 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.338 ExtraShoulder 0.35 Thick 1.5 Wdith 3.338
7+746.526 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+750 6.737 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+750 6.737 ExtraShoulder 3.537 ExtraShoulder 3.537
7+760 8.077 ExtraShoulder 0.35 Thick 1.5 Wdith 3.537 ExtraShoulder 0.35 Thick 1.5 Wdith 3.537
7+760 8.077 ExtraShoulder 4.24 ExtraShoulder 4.24
7+766.154 4.5725 ExtraShoulder 0.35 Thick 1.5 Wdith 4.24 ExtraShoulder 0.35 Thick 1.5 Wdith 4.24
7+766.154 4.5725 ExtraShoulder 2.401 ExtraShoulder 2.401
7+769.145 1.923 ExtraShoulder 0.35 Thick 1.5 Wdith 2.401 ExtraShoulder 0.35 Thick 1.5 Wdith 2.401
7+769.145 1.923 ExtraShoulder 1.01 ExtraShoulder 1.01
7+770 5.4275 ExtraShoulder 0.35 Thick 1.5 Wdith 1.01 ExtraShoulder 0.35 Thick 1.5 Wdith 1.01
7+770 5.4275 ExtraShoulder 2.849 ExtraShoulder 2.849
7+780 5.4885 ExtraShoulder 0.35 Thick 1.5 Wdith 2.849 ExtraShoulder 0.35 Thick 1.5 Wdith 2.849
7+780 5.4885 ExtraShoulder 2.881 ExtraShoulder 2.881
7+780.977 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.881 ExtraShoulder 0.35 Thick 1.5 Wdith 2.881
7+780.977 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+790 5.9155 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+790 5.9155 ExtraShoulder 3.106 ExtraShoulder 3.106
7+792.808 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.106 ExtraShoulder 0.35 Thick 1.5 Wdith 3.106
7+792.808 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+800 8.596 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+800 8.596 ExtraShoulder 4.513 ExtraShoulder 4.513
7+810 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.513 ExtraShoulder 0.35 Thick 1.5 Wdith 4.513
7+810 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+820 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+820 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+830 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+830 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+840 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+840 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+850 6.8165 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+850 6.8165 ExtraShoulder 3.579 ExtraShoulder 3.579
7+853.633 2.375 ExtraShoulder 0.35 Thick 1.5 Wdith 3.579 ExtraShoulder 0.35 Thick 1.5 Wdith 3.579
7+853.633 2.375 ExtraShoulder 1.247 ExtraShoulder 1.247
7+854.75 1.117 ExtraShoulder 0.35 Thick 1.5 Wdith 1.247 ExtraShoulder 0.35 Thick 1.5 Wdith 1.247
7+854.75 1.117 ExtraShoulder 0.586 ExtraShoulder 0.586
7+855.867 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 0.586 ExtraShoulder 0.35 Thick 1.5 Wdith 0.586
7+855.867 2.625 ExtraShoulder 1.378 ExtraShoulder 1.378
7+860 7.0665 ExtraShoulder 0.35 Thick 1.5 Wdith 1.378 ExtraShoulder 0.35 Thick 1.5 Wdith 1.378
7+860 7.0665 ExtraShoulder 3.71 ExtraShoulder 3.71
7+870 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.71 ExtraShoulder 0.35 Thick 1.5 Wdith 3.71
7+870 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+880 5.318 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+880 5.318 ExtraShoulder 2.792 ExtraShoulder 2.792
7+880.636 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.792 ExtraShoulder 0.35 Thick 1.5 Wdith 2.792
7+880.636 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+890 9.5385 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+890 9.5385 ExtraShoulder 5.008 ExtraShoulder 5.008
7+899.713 5 ExtraShoulder 0.35 Thick 1.5 Wdith 5.008 ExtraShoulder 0.35 Thick 1.5 Wdith 5.008
7+899.713 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+900 5.1435 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+900 5.1435 ExtraShoulder 2.7 ExtraShoulder 2.7
7+910 9.395 ExtraShoulder 0.35 Thick 1.5 Wdith 2.7 ExtraShoulder 0.35 Thick 1.5 Wdith 2.7
7+910 9.395 ExtraShoulder 4.932 ExtraShoulder 4.932
7+918.79 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.932 ExtraShoulder 0.35 Thick 1.5 Wdith 4.932
7+918.79 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+920 1.5025 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+920 1.5025 ExtraShoulder 0.789 ExtraShoulder 0.789
7+921.795 5 ExtraShoulder 0.35 Thick 1.5 Wdith 0.789 ExtraShoulder 0.35 Thick 1.5 Wdith 0.789
7+921.795 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+930 9.1025 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+930 9.1025 ExtraShoulder 4.779 ExtraShoulder 4.779
7+940 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.779 ExtraShoulder 0.35 Thick 1.5 Wdith 4.779
7+940 10 ExtraShoulder 5.25 ExtraShoulder 5.25
7+950 5.377 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
7+950 5.377 ExtraShoulder 2.823 ExtraShoulder 2.823
7+950.754 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.823 ExtraShoulder 0.35 Thick 1.5 Wdith 2.823
7+950.754 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+960 9.623 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+960 9.623 ExtraShoulder 5.052 ExtraShoulder 5.052
7+970 9.857 ExtraShoulder 0.35 Thick 1.5 Wdith 5.052 ExtraShoulder 0.35 Thick 1.5 Wdith 5.052
7+970 9.857 ExtraShoulder 5.175 ExtraShoulder 5.175
7+979.714 5 ExtraShoulder 0.35 Thick 1.5 Wdith 5.175 ExtraShoulder 0.35 Thick 1.5 Wdith 5.175
7+979.714 5 ExtraShoulder 2.625 ExtraShoulder 2.625
7+980 5.143 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
7+980 5.143 ExtraShoulder 2.7 ExtraShoulder 2.7
7+990 10 ExtraShoulder 0.35 Thick 1.5 Wdith 2.7 ExtraShoulder 0.35 Thick 1.5 Wdith 2.7
7+990 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+000 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+000 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+010 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+010 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+020 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+020 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+030 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+030 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+040 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+040 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+050 8.964 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+050 8.964 ExtraShoulder 4.706 ExtraShoulder 4.706
8+057.928 3.964 ExtraShoulder 0.35 Thick 1.5 Wdith 4.706 ExtraShoulder 0.35 Thick 1.5 Wdith 4.706
8+057.928 3.964 ExtraShoulder 2.081 ExtraShoulder 2.081

8+510 5 ExtraShoulder 0.35 Thick 1.5 Wdith 0.58 ExtraShoulder 0.35 Thick 1.5 Wdith 0.58
8+510 5 ExtraShoulder 2.625 ExtraShoulder 2.625
8+520 10 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
8+520 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+530 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+530 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+540 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+540 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+550 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+550 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+560 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+560 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+570 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+570 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+580 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+580 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+590 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+590 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+600 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+600 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+610 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+610 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+620 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+620 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+630 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+630 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+640 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+640 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+650 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+650 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+660 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+660 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+670 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+670 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+680 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+680 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+690 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+690 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+700 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+700 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+710 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+710 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+720 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+720 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+730 9.454 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+730 9.454 ExtraShoulder 4.963 ExtraShoulder 4.963
8+738.908 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.963 ExtraShoulder 0.35 Thick 1.5 Wdith 4.963
8+738.908 5 ExtraShoulder 2.625 ExtraShoulder 2.625
8+740 5.546 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
8+740 5.546 ExtraShoulder 2.912 ExtraShoulder 2.912
8+750 7.964 ExtraShoulder 0.35 Thick 1.5 Wdith 2.912 ExtraShoulder 0.35 Thick 1.5 Wdith 2.912
8+750 7.964 ExtraShoulder 4.181 ExtraShoulder 4.181
8+755.928 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.181 ExtraShoulder 0.35 Thick 1.5 Wdith 4.181
8+755.928 5 ExtraShoulder 2.625 ExtraShoulder 2.625
8+760 7.036 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
8+760 7.036 ExtraShoulder 3.694 ExtraShoulder 3.694
8+770 7.85 ExtraShoulder 0.35 Thick 1.5 Wdith 3.694 ExtraShoulder 0.35 Thick 1.5 Wdith 3.694
8+770 7.85 ExtraShoulder 4.121 ExtraShoulder 4.121
8+775.7 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.121 ExtraShoulder 0.35 Thick 1.5 Wdith 4.121
8+775.7 5 ExtraShoulder 2.625 ExtraShoulder 2.625
8+780 7.15 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
8+780 7.15 ExtraShoulder 3.754 ExtraShoulder 3.754
8+790 7.7355 ExtraShoulder 0.35 Thick 1.5 Wdith 3.754 ExtraShoulder 0.35 Thick 1.5 Wdith 3.754
8+790 7.7355 ExtraShoulder 4.061 ExtraShoulder 4.061
8+795.471 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.061 ExtraShoulder 0.35 Thick 1.5 Wdith 4.061
8+795.471 5 ExtraShoulder 2.625 ExtraShoulder 2.625
8+800 7.2645 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
8+800 7.2645 ExtraShoulder 3.814 ExtraShoulder 3.814
8+810 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.814 ExtraShoulder 0.35 Thick 1.5 Wdith 3.814
8+810 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+820 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+820 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+830 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+830 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+850 7.002 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+850 7.002 ExtraShoulder 3.676 ExtraShoulder 3.676
8+854.004 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.676 ExtraShoulder 0.35 Thick 1.5 Wdith 3.676
8+854.004 5 ExtraShoulder 2.625 ExtraShoulder 2.625
8+860 7.998 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
8+860 7.998 ExtraShoulder 4.199 ExtraShoulder 4.199
8+870 8.3715 ExtraShoulder 0.35 Thick 1.5 Wdith 4.199 ExtraShoulder 0.35 Thick 1.5 Wdith 4.199
8+870 8.3715 ExtraShoulder 4.395 ExtraShoulder 4.395
8+876.743 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.395 ExtraShoulder 0.35 Thick 1.5 Wdith 4.395
8+876.743 5 ExtraShoulder 2.625 ExtraShoulder 2.625
8+880 6.6285 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
8+880 6.6285 ExtraShoulder 3.48 ExtraShoulder 3.48
8+890 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.48 ExtraShoulder 0.35 Thick 1.5 Wdith 3.48
8+890 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+900 8.047 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+900 8.047 ExtraShoulder 4.225 ExtraShoulder 4.225
8+906.094 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.225 ExtraShoulder 0.35 Thick 1.5 Wdith 4.225
8+906.094 5 ExtraShoulder 2.625 ExtraShoulder 2.625
8+910 6.953 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
8+910 6.953 ExtraShoulder 3.65 ExtraShoulder 3.65
8+920 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.65 ExtraShoulder 0.35 Thick 1.5 Wdith 3.65
8+920 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+930 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+930 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+940 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+940 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+950 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+950 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+960 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+960 10 ExtraShoulder 5.25 ExtraShoulder 5.25
8+970 7.266 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
8+970 7.266 ExtraShoulder 3.815 ExtraShoulder 3.815
8+974.532 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.815 ExtraShoulder 0.35 Thick 1.5 Wdith 3.815
8+974.532 5 ExtraShoulder 2.625 ExtraShoulder 2.625
8+980 7.734 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
8+980 7.734 ExtraShoulder 4.06 ExtraShoulder 4.06
8+990 7.5115 ExtraShoulder 0.35 Thick 1.5 Wdith 4.06 ExtraShoulder 0.35 Thick 1.5 Wdith 4.06
8+990 7.5115 ExtraShoulder 3.944 ExtraShoulder 3.944
8+995.023 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.944 ExtraShoulder 0.35 Thick 1.5 Wdith 3.944
8+995.023 5 ExtraShoulder 2.625 ExtraShoulder 2.625
9+000 7.4885 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
9+000 7.4885 ExtraShoulder 3.931 ExtraShoulder 3.931
9+010 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.931 ExtraShoulder 0.35 Thick 1.5 Wdith 3.931
9+010 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+020 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+020 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+030 8.283 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+030 8.283 ExtraShoulder 4.349 ExtraShoulder 4.349
9+036.566 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.349 ExtraShoulder 0.35 Thick 1.5 Wdith 4.349
9+036.566 5 ExtraShoulder 2.625 ExtraShoulder 2.625
9+040 6.717 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
9+040 6.717 ExtraShoulder 3.526 ExtraShoulder 3.526
9+050 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.526 ExtraShoulder 0.35 Thick 1.5 Wdith 3.526
9+050 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+060 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+060 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+070 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+070 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+080 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+080 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+090 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+090 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+100 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+100 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+110 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+110 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+120 6.739 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+120 6.739 ExtraShoulder 3.538 ExtraShoulder 3.538
9+123.478 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.538 ExtraShoulder 0.35 Thick 1.5 Wdith 3.538
9+123.478 5 ExtraShoulder 2.625 ExtraShoulder 2.625
9+130 8.261 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
9+130 8.261 ExtraShoulder 4.337 ExtraShoulder 4.337
9+140 8.147 ExtraShoulder 0.35 Thick 1.5 Wdith 4.337 ExtraShoulder 0.35 Thick 1.5 Wdith 4.337
9+140 8.147 ExtraShoulder 4.277 ExtraShoulder 4.277
9+146.294 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.277 ExtraShoulder 0.35 Thick 1.5 Wdith 4.277
9+146.294 5 ExtraShoulder 2.625 ExtraShoulder 2.625
9+150 3.345 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
9+150 3.345 ExtraShoulder 1.756 ExtraShoulder 1.756
9+152.984 5 ExtraShoulder 0.35 Thick 1.5 Wdith 1.756 ExtraShoulder 0.35 Thick 1.5 Wdith 1.756
9+152.984 5 ExtraShoulder 2.625 ExtraShoulder 2.625
9+160 8.508 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
9+160 8.508 ExtraShoulder 4.467 ExtraShoulder 4.467
9+170 10 ExtraShoulder 0.35 Thick 1.5 Wdith 4.467 ExtraShoulder 0.35 Thick 1.5 Wdith 4.467
9+170 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+180 6.492 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+180 6.492 ExtraShoulder 3.408 ExtraShoulder 3.408
9+182.984 2.0965 ExtraShoulder 0.35 Thick 1.5 Wdith 3.408 ExtraShoulder 0.35 Thick 1.5 Wdith 3.408
9+182.984 2.0965 ExtraShoulder 1.101 ExtraShoulder 1.101
9+184.193 1.209 ExtraShoulder 0.35 Thick 1.5 Wdith 1.101 ExtraShoulder 0.35 Thick 1.5 Wdith 1.101
9+184.193 1.209 ExtraShoulder 0.635 ExtraShoulder 0.635
9+185.402 2.9035 ExtraShoulder 0.35 Thick 1.5 Wdith 0.635 ExtraShoulder 0.35 Thick 1.5 Wdith 0.635
9+185.402 2.9035 ExtraShoulder 1.524 ExtraShoulder 1.524
9+190 7.299 ExtraShoulder 0.35 Thick 1.5 Wdith 1.524 ExtraShoulder 0.35 Thick 1.5 Wdith 1.524
9+190 7.299 ExtraShoulder 3.832 ExtraShoulder 3.832
9+200 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.832 ExtraShoulder 0.35 Thick 1.5 Wdith 3.832
9+200 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+210 7.701 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+210 7.701 ExtraShoulder 4.043 ExtraShoulder 4.043
9+215.402 5 ExtraShoulder 0.35 Thick 1.5 Wdith 4.043 ExtraShoulder 0.35 Thick 1.5 Wdith 4.043
9+215.402 5 ExtraShoulder 2.625 ExtraShoulder 2.625
9+220 7.299 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
9+220 7.299 ExtraShoulder 3.832 ExtraShoulder 3.832
9+230 10 ExtraShoulder 0.35 Thick 1.5 Wdith 3.832 ExtraShoulder 0.35 Thick 1.5 Wdith 3.832
9+230 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+240 9.668 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+240 9.668 ExtraShoulder 5.076 ExtraShoulder 5.076
9+249.336 5 ExtraShoulder 0.35 Thick 1.5 Wdith 5.076 ExtraShoulder 0.35 Thick 1.5 Wdith 5.076
9+249.336 5 ExtraShoulder 2.625 ExtraShoulder 2.625
9+250 5.332 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
9+250 5.332 ExtraShoulder 2.799 ExtraShoulder 2.799
9+260 10 ExtraShoulder 0.35 Thick 1.5 Wdith 2.799 ExtraShoulder 0.35 Thick 1.5 Wdith 2.799
9+260 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+270 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+270 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+280 5.334 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+280 5.334 ExtraShoulder 2.8 ExtraShoulder 2.8
9+280.668 5 ExtraShoulder 0.35 Thick 1.5 Wdith 2.8 ExtraShoulder 0.35 Thick 1.5 Wdith 2.8
9+280.668 5 ExtraShoulder 2.625 ExtraShoulder 2.625
9+290 9.666 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
9+290 9.666 ExtraShoulder 5.075 ExtraShoulder 5.075
9+300 10 ExtraShoulder 0.35 Thick 1.5 Wdith 5.075 ExtraShoulder 0.35 Thick 1.5 Wdith 5.075
9+300 10 ExtraShoulder 5.25 ExtraShoulder 5.25
9+310 6 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25 ExtraShoulder 0.35 Thick 1.5 Wdith 5.25
9+310 6 ExtraShoulder 3.15 ExtraShoulder 3.15
9+312 5 ExtraShoulder 0.35 Thick 1.5 Wdith 3.15 ExtraShoulder 0.35 Thick 1.5 Wdith 3.15
9+312 5 ExtraShoulder 2.625 ExtraShoulder 2.625
9+320 4 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625 ExtraShoulder 0.35 Thick 1.5 Wdith 2.625
9+320 4 ExtraShoulder 2.1 ExtraShoulder 2.1
Nature of the work: Asphalt pavement, drain, cross drainage and associated works Length= 6.10 km.

Name of the Road: Birtamode Muktichowk Sanischare Road ko Kaptanbari chowk, Puspalal chowk, Bihibare hat
Kharbandi Buddhachowk, Kalisthan bazar, Buddhashanti-2, Jaypur Budhabare road, jhapa
asphalt concrete -
S.No Description Unit Nos Length Breadth Height Quantity Remarks

Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth
1 up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of
serviceable Material to be used or auctioned, up to a lead of 30 meters including removal and disposal of top
organic soil not exceeding 150 mm in thickness all complete as per drawing, specification and instruction
Clearance on either side of carriageway
9+100.00 6.00 54600.00
from chainage
deductions existing pitch -1 500 6.00 -3000.00
Sqm -1 400 6.00 -2400.00
-1 1500 6.00 -9000.00
-1 400 6.00 -2400.00
Total quantity 37800.00

Scarifying Existing road Surface to a depth of 50 mm by Mechanical Means, Scarifying the existing bituminous
2 road surface to a depth of 50 mm and disposal of scarified Material with in all lifts and lead as per Drawing and
Technical Specifications.
From chainage 0+500 to 3+000 sq.m. 1 2500 6 15000
deductions
1 new and 1 old slab culvert -2 4 6 -48
bridge -1 50 6 -300
Total= 14652 3997.513 bituminous road surface only
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of
3 embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to
achieve dry density as per Drawing and Technical Specifications. [SS 1003,1005]
FROM ch-0+500 to ch-1+500 1 1000 15 15000 1000
FROM ch-1+500 to ch-9+100 1 7600.00 10.00 76000 7600
Branch Road 37 15.00 10.00 5550 1.4285714285714 It's factor taken for subgrade while assigning materials (10/7)
Deduct 0
sq.m.
3+000 to 3+400 -1 400.00 10.00 -4000 -400
4+900 to 6+400 -1 1500.00 10.00 -15000 -1500
8+300 to 8+700 -1 400.00 10.00 -4000 -400
New Slab Culvert 4m -3 2.00 10.00 -60 -6
New Slab Culvert 5m -1 4.00 10.00 -40 -4
Exiting slab sulvert -1 4.00 10.00 -40 -4
Existing Bridge -1 58.00 10.00 -580 -58
Existing Bridge -2 20.00 10.00 -400 -40 6188 Total length here
Total Quantity 10032 9932.155 -99.8450000000103
Construction of Embankment, Providing, laying, spreading and compacting embankment and compact to the
4 density not less than 15.2 KN/Cum as per Drawing and Technical Specifications. (CBR of Borrow Material shall +
not be less than 10% , For technical details and borrow pit IRC: 36-1970. RECOMMENDED PRACTICE FOR
THE CONSTRUCTION. OF EARTH EMBANKMENTS FOR ROAD WORKS shall prevail). [SS 909, 910] With consideration of extrawidening at Curves
FROM ch-0+500 to ch-1+500 #REF! from cut/fill sheet
Cum
Branch Road 37 15.00 7.00 0.15 582.75
Total Quantity #REF! with 20% excess value -2412 Total length here
#REF! 25302.932 #REF!
5 Providing and laying granular sub-base on prepared surface, mixing at OMC, and compacting to achieve the
desired density, complete as per Drawing and Technical Specifications., By Mechanical means
FROM ch-0+500 to ch-1+500 1 1000 15 0.2 3000 1000
FROM ch-1+500 to ch-9+100 1 7600.00 7.00 0.20 10640 7600
Shoulder 2 5300.00 1.50 0.35 5565 7600-2200(Drain) Shoulder as subbase material(and no shoulder in Drain portion)
Branch Road 37 15.00 5.50 0.20 610.5 5565
Deduct Cum 0 -1888.897
3+000 to 3+400 -1 400.00 7.00 0.20 -560 -400 -7453.897
4+900 to 6+400 -1 1500.00 7.00 0.20 -2100 -1500 - Since total length still varies due to deduction and proposed cross structure
8+300 to 8+700 -1 400.00 7.00 0.20 -560 -400
New Slab Culvert 4m -3 2.00 7.00 0.20 -8.4 -6 -1888.897
New Slab Culvert 5m -1 4.00 7.00 0.20 -5.6 -4 15816.897
Exiting slab sulvert -1 4.00 7.00 0.20 -5.6 -4 13928
Existing Bridge -1 58.00 7.00 0.20 -81.2 -58
Existing Bridge -2 20.00 7.00 0.20 -56 -40 6188 Total length here
Total
Providing and laying Crusher Run Macadam on a prepared surface, Quantity
spreading and mixing16438.7
, watering and 15816.897 -621.803
6 compacting to form a layer of sub-base/Base course as per Drawing and Technical Specifications., By Mix in -
Place Method Since total length still varies due to deduction and proposed cross structure
3000 1000
FROM ch-0+500 to ch-1+500 Cum 1 1000 15 0.2
FROM ch-1+500 to ch-9+100 1 7600.00 7.00 0.20 10640 7600
Branch Road Cum 37 15.00 5.50 0.15 457.87
Deduct 0
3+000 to 3+400 -1 400.00 7.00 0.20 -560 -400
4+900 to 6+400 -1 1500.00 7.00 0.20 -2100 -1500
8+300 to 8+700 -1 400.00 7.00 0.20 -560 -400
New Slab Culvert 4m -3 2.00 7.00 0.20 -8.4 -6
New Slab Culvert 5m -1 4.00 7.00 0.20 -5.6 -4
Exiting slab sulvert -1 4.00 7.00 0.20 -5.6 -4
Existing Bridge -1 58.00 7.00 0.20 -81.2 -58
Existing Bridge -2 20.00 7.00 0.20 -56 -40 6188 Total length here
Total Quantity 10721.07 10275.721 -445.349
Prime Coat, Prime Coat, with MC 30 / 70 by Mechanical Means, Providing and applying prime coat with Hot
7 Bitumen ( including cutter) on prepared surface of granular base including cleaning of road surface and spraying by - Since total length still varies due to deduction and proposed cross structure
mechanical means as per Technical Specification ., Bitumen ( cutback) MC 30 ( for stabilized soil base/ crusher run
macadam
FROM ch-0+500 to ch-1+500 1 1000 15 15000 1000
FROM ch-1+500 to ch-9+100 lit. 1 7600.00 7.00 53200 7600
Branch Road 37 15.00 5.50 3052.5
Deduct 0
3+000 to 3+400 -1 400.00 7.00 -2800 -400
4+900 to 6+400 -1 1500.00 7.00 -10500 -1500
0.9 ltr./m²
8+300 to 8+700 -1 400.00 7.00 -2800 -400
New Slab Culvert 4m -3 2.00 7.00 -42 -6
New Slab Culvert 5m -1 4.00 7.00 -28 -4
Exiting slab sulvert -1 4.00 7.00 -28 -4
Existing Bridge -1 58.00 7.00 -406 -58
Existing Bridge -2 20.00 7.00 -280 -40 6188 Total length here
Total Quantity 46184.4 46667.314 482.913999999953
+ With consideration of extrawidening at Curves

Prepared by: Checked by: Approved by:


Nature of the work: Asphalt pavement, drain, cross drainage and associated works Length= 6.10 km.

Name of the Road: Birtamode Muktichowk Sanischare Road ko Kaptanbari chowk, Puspalal chowk, Bihibare hat
Kharbandi Buddhachowk, Kalisthan bazar, Buddhashanti-2, Jaypur Budhabare road, jhapa
asphalt concrete -
S.No Description Unit Nos Length Breadth Height Quantity Remarks

8 Tack Coat, Tack coat with Bitumen By Mechanical Means, Providing and applying tack coat with hot Bitumen at
specified rate on the prepared non-bituminous surfaces including cleaning as per Technical Speciation .
FROM ch-0+500 to ch-1+500 1 1000.00 15.00 15000 1000
FROM ch-1+500 to ch-9+100 lit. 1 7600.00 7.00 53200 7600
Branch Road 37 15.00 5.50 3052.5
Deduct 0
3+000 to 3+400 -1 400.00 7.00 -2800 -400
4+900 to 6+400 -1 1500.00 7.00 -10500 -1500
0.5 ltr./m²
8+300 to 8+700 -1 400.00 7.00 -2800 -400
New Slab Culvert 4m -3 2.00 7.00 -42 -6
New Slab Culvert 5m -1 4.00 7.00 -28 -4
Exiting slab sulvert -1 4.00 7.00 -28 -4
Existing Bridge -1 58.00 7.00 -406 -58
Existing Bridge -2 20.00 7.00 -280 -40 6188 Total length here
Total Quantity 25658 25926.3 268.299999999996
Bituminous Concrete / Asphalt Concrete, Providing and laying Bituminous concrete/ Asphalt concrete using
9 crushed aggregates of specified grading, premixed with bituminous binder and filler as per Drawing and Technical
Specifications, Grading - II-13 mm (Nominal Size), In case BC is laid over freshly laid tack coat. [SS-1309] + With consideration of extrawidening at Curves
FROM ch-0+500 to ch-1+500 1 1000 15 0.04 600 1000
FROM ch-1+500 to ch-9+100 Cu.m. 1 7600.00 7.00 0.04 2128 7600
Branch Road 37 15.00 5.50 0.04 122.1
Deduct
3+000 to 3+400 -1 400.00 7.00 0.04 -112 -400
4+900 to 6+400 -1 1500.00 7.00 0.04 -420 -1500
8+300 to 8+700 -1 400.00 7.00 0.04 -112 -400
New Slab Culvert 4m -3 2.00 7.00 0.04 -1.68 -6
New Slab Culvert 5m -1 4.00 7.00 0.04 -1.12 -4
Exiting slab sulvert -1 4.00 7.00 0.04 -1.12 -4
Existing Bridge -1 58.00 7.00 0.04 -16.24 -58
Existing Bridge -2 20.00 7.00 0.04 -11.2 -40 6188 Total length here
Total Quantity 2052.64 2053.994 1.35399999999208

+ With consideration of extrawidening at Curves


Grand Total

Prepared by: Checked by: Approved by:


Summary of Quantity
Item Code Name Quantity Unit
24.01(A-ii) Gabion Works 3388.306 M3
24.05 Geotextile 3298.779 M2

Structure (GabionRetainingWall) Quantity


Chainage
(m) Length (m) Left Right
GabionRetainingWall Height M Gabion Works M3 Geotextile M2 GabionRetainingWall Height M Gabion Works M3 Geotextile M2
24.01(A-ii) 24.05 24.01(A-ii) 24.05
1+430 7.04 GabionRetainingWallB 2 17.6 17.6
1+434.08 5 GabionRetainingWallB 2 12.5 12.5
1+440 7.96 GabionRetainingWallB 2 19.9 19.9
1+470 5.986 GabionRetainingWallB 2 14.965 14.965
1+471.972 5 GabionRetainingWallB 3 25 22.5
1+480 9.014 GabionRetainingWallB 3 45.07 40.563
1+490 10 GabionRetainingWallB 3 50 45
1+500 9.9325 GabionRetainingWallB 3 49.662 44.696
1+550 5.564 GabionRetainingWallB 3 27.82 25.038
1+554.809 5 GabionRetainingWallB 3 25 22.5
1+560 7.5955 GabionRetainingWallB 2 18.989 18.989
1+570 5.2265 GabionRetainingWallB 2 13.066 13.066
1+570.453 5 GabionRetainingWallB 2 12.5 12.5
1+580 5.385 GabionRetainingWallB 2 13.462 13.462
1+581.223 5 GabionRetainingWallB 2 12.5 12.5
1+590 5.3845 GabionRetainingWallB 2 13.461 13.461
1+640 10 GabionRetainingWallB 2 25 25
1+650 10 GabionRetainingWallB 2 25 25
1+660 5.9005 GabionRetainingWallB 2 14.751 14.751
1+661.801 5 GabionRetainingWallB 2 12.5 12.5
1+670 7.637 GabionRetainingWallB 2 19.093 19.093
1+677.075 5 GabionRetainingWallB 3 25 22.5
1+680 6.4625 GabionRetainingWallB 3 32.312 29.081
1+690 6.175 GabionRetainingWallB 3 30.875 27.788
1+692.35 5 GabionRetainingWallB 3 25 22.5
1+700 8.825 GabionRetainingWallB 3 44.125 39.713
1+710 10 GabionRetainingWallB 3 50 45
1+720 10 GabionRetainingWallB 3 50 45
1+730 10 GabionRetainingWallB 3 50 45
1+740 8.175 GabionRetainingWallB 3 40.875 36.787
1+746.35 3.41 GabionRetainingWallB 3 17.05 15.345
1+746.82 1.825 GabionRetainingWallB 3 9.125 8.212
1+750 6.59 GabionRetainingWallB 3 32.95 29.655
1+760 5.287 GabionRetainingWallB 2 13.217 13.217
1+760.574 5 GabionRetainingWallB 2 12.5 12.5
1+770 6.877 GabionRetainingWallB 2 17.192 17.192
1+774.328 5 GabionRetainingWallB 2 12.5 12.5
1+780 3.175 GabionRetainingWallB 1 3.175 3.175
2+120 5.2485 GabionRetainingWallB 2 13.121 13.121
2+120.497 3.5175 GabionRetainingWallB 2 8.794 8.794
2+127.035 4.7515 GabionRetainingWallB 2 11.879 11.879
2+130 3.269 GabionRetainingWallB 2 8.172 8.172
2+133.573 5 GabionRetainingWallB 2 12.5 12.5
2+140 8.2135 GabionRetainingWallB 2 20.534 20.534
2+150 10 GabionRetainingWallB 2 25 25
2+160 10 GabionRetainingWallB 2 25 25
2+170 10 GabionRetainingWallB 2 25 25
2+180 10 GabionRetainingWallB 2 25 25 GabionRetainingWallB 2 25 25
2+190 5.7865 GabionRetainingWallB 2 14.466 14.466 GabionRetainingWallB 2 14.466 14.466
2+191.573 5 GabionRetainingWallB 2 12.5 12.5 GabionRetainingWallB 2 12.5 12.5
2+200 9.2135 GabionRetainingWallB 2 23.034 23.034 GabionRetainingWallB 2 23.034 23.034
2+210 10 GabionRetainingWallB 2 25 25
2+220 6.272 GabionRetainingWallB 2 15.68 15.68
2+222.544 5 GabionRetainingWallB 2 12.5 12.5
2+230 8.728 GabionRetainingWallB 2 21.82 21.82
2+240 10 GabionRetainingWallB 2 25 25
2+250 10 GabionRetainingWallB 2 25 25
2+260 9.144 GabionRetainingWallB 2 22.86 22.86
2+268.288 5 GabionRetainingWallB 2 12.5 12.5
2+270 5.856 GabionRetainingWallB 2 14.64 14.64
2+280 10 GabionRetainingWallB 2 25 25
2+290 6.137 GabionRetainingWallB 2 15.342 15.342
2+292.274 5 GabionRetainingWallB 2 12.5 12.5
2+300 5.2715 GabionRetainingWallB 2 13.179 13.179
2+302.817 5 GabionRetainingWallB 2 12.5 12.5
2+310 5.271 GabionRetainingWallB 2 13.177 13.177
2+313.359 5 GabionRetainingWallB 2 12.5 12.5
2+320 8.3205 GabionRetainingWallB 2 20.801 20.801
2+330 9.225 GabionRetainingWallB 2 23.062 23.062
2+338.45 5 GabionRetainingWallB 2 12.5 12.5
2+340 1.1485 GabionRetainingWallB 2 2.871 2.871
2+340.747 1.5225 GabionRetainingWallB 2 3.806 3.806
2+343.045 4.6265 GabionRetainingWallB 2 11.566 11.566
2+350 8.4775 GabionRetainingWallB 2 21.194 21.194
2+360 10 GabionRetainingWallB 2 25 25
2+370 10 GabionRetainingWallB 2 25 25
2+380 10 GabionRetainingWallB 2 25 25
2+390 10 GabionRetainingWallB 2 25 25
2+400 10 GabionRetainingWallB 2 25 25
2+410 5.729 GabionRetainingWallB 2 14.323 14.323
2+411.458 4.727 GabionRetainingWallB 2 11.818 11.818
2+960 10 GabionRetainingWallB 2 25 25
2+970 10 GabionRetainingWallB 2 25 25
2+980 10 GabionRetainingWallB 2 25 25
2+990 10 GabionRetainingWallB 2 25 25
3+000 10 GabionRetainingWallB 2 25 25
3+010 10 GabionRetainingWallB 2 25 25

4+180 9.7805 GabionRetainingWallB 2 24.451 24.451 GabionRetainingWallB 2 24.451 24.451


4+189.561 5 GabionRetainingWallB 2 12.5 12.5 GabionRetainingWallB 2 12.5 12.5
4+190 5.2195 GabionRetainingWallB 2 13.049 13.049 GabionRetainingWallB 2 13.049 13.049
4+200 6.7655 GabionRetainingWallB 2 16.914 16.914 GabionRetainingWallB 2 16.914 16.914
4+203.531 5 GabionRetainingWallB 3 25 22.5 GabionRetainingWallB 2 12.5 12.5
4+210 6.9855 GabionRetainingWallB 3 34.928 31.435 GabionRetainingWallB 2 17.464 17.464
4+217.502 5 GabionRetainingWallB 3 25 22.5 GabionRetainingWallB 2 12.5 12.5
4+220 6.249 GabionRetainingWallB 3 31.245 28.121 GabionRetainingWallB 2 15.623 15.623
4+230 10 GabionRetainingWallB 2 25 25 GabionRetainingWallB 2 25 25
4+240 10 GabionRetainingWallB 2 25 25 GabionRetainingWallB 2 25 25
4+250 10 GabionRetainingWallB 2 25 25 GabionRetainingWallB 2 25 25
4+270 10 GabionRetainingWallB 3 50 45 GabionRetainingWallB 3 50 45
4+280 10 GabionRetainingWallB 2 25 25 GabionRetainingWallB 2 25 25
4+290 10 GabionRetainingWallB 2 25 25 GabionRetainingWallB 2 25 25
4+300 10 GabionRetainingWallB 2 25 25 GabionRetainingWallB 2 25 25
4+310 10 GabionRetainingWallB 2 25 25 GabionRetainingWallB 2 25 25
4+320 10 GabionRetainingWallB 2 25 25 GabionRetainingWallB 2 25 25

6+750 10 GabionRetainingWallB 2 25 25
6+760 10 GabionRetainingWallB 2 25 25
6+770 10 GabionRetainingWallB 2 25 25
6+780 10 GabionRetainingWallB 2 25 25
6+790 10 GabionRetainingWallB 2 25 25
6+800 10 GabionRetainingWallB 2 25 25
6+850 9.848 GabionRetainingWallB 3 49.24 44.316
6+860 10 GabionRetainingWallB 2 25 25
6+870 10 GabionRetainingWallB 2 25 25
7+546.163 5 GabionRetainingWallB 2 12.5 12.5
7+550 6.9185 GabionRetainingWallB 2 17.296 17.296
7+560 9.1825 GabionRetainingWallB 2 22.956 22.956
7+568.365 5 GabionRetainingWallB 2 12.5 12.5
7+570 5.8175 GabionRetainingWallB 2 14.544 14.544

9+130 8.261 GabionRetainingWallB 2 20.653 20.653 GabionRetainingWallB 2 20.653 20.653


9+140 8.147 GabionRetainingWallB 2 20.368 20.368 GabionRetainingWallB 2 20.368 20.368
9+146.294 5 GabionRetainingWallB 2 12.5 12.5 GabionRetainingWallB 2 12.5 12.5
9+150 3.345 GabionRetainingWallB 2 8.363 8.363 GabionRetainingWallB 2 8.363 8.363
9+152.984 5 GabionRetainingWallB 2 12.5 12.5 GabionRetainingWallB 2 12.5 12.5
9+160 8.508 GabionRetainingWallB 2 21.27 21.27 GabionRetainingWallB 2 21.27 21.27
9+170 10 GabionRetainingWallB 2 25 25 GabionRetainingWallB 2 25 25
9+180 6.492 GabionRetainingWallB 2 16.23 16.23 GabionRetainingWallB 2 16.23 16.23
9+182.984 2.0965 GabionRetainingWallB 2 5.241 5.241 GabionRetainingWallB 2 5.241 5.241
9+184.193 1.209 GabionRetainingWallB 2 3.023 3.023 GabionRetainingWallB 2 3.023 3.023
9+185.402 2.9035 GabionRetainingWallB 2 7.259 7.259 GabionRetainingWallB 2 7.259 7.259
9+190 7.299 GabionRetainingWallB 2 18.247 18.247 GabionRetainingWallB 2 18.247 18.247
GABION RETAINING WALL

S.No Description Unit Nos Length Breadth Height Quantity Remarks Rate Amount

Earthwork in excavation in foundation of structures (by machine), including construction of shoring and
1 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per
Drawing and Technical specifications in ordinary soil depth upto 3m all complete as per drawing,
specification and instruction
Structure
Cum Cut
from ch-1+560 to ch-3+400 8 35 2.5 1 700 BackFill
Structure
from ch-6+500 to ch-6+600 2 100 2.5 1 500 Cut
Total Quantity 1200 0 0 BackFill
DrainCut

Supply and Transportation of Machine Made Mechanically selvedged double twisted hexagonal mesh type
Structure
2 100mm x 120 mm Gabion boxes / mattresses with diapharagms, with binding wire 2.4 mm, mesh wire 3.0
Cut
mm and selvedged wire 3.90 mm, placing in position including stretching, forming compartments; tying with
bracing wires and tie wires; tying down the lid, providing and filling stone / boulder in gabion boxes /
mattresses etc. including dressing, beding, bonding etc. all complete as per special specification and drawings.
Cum DrainCut
Structure
from ch-1+560 to ch-3+400 8 35 c/s area 7 1960 51 1909 Cut
from ch-6+500 to ch-6+600 2 100 c/s area 7 1400 -78.3 758 329 391.3
Total Quantity 3360 - 0
3
Providing and laying and fixing of Geo-membrane all complete as per specification.
from ch-1+560 to ch-3+400 8 35 5.5 1540
from ch-6+500 to ch-6+600 2 100 5.5 1100
Total Quantity 2640 0 0

Prepared by: Checked by: Approved by:


TRAFFIC SIGN, ROAD MARKINGS & OTHER ROAD APPURTENANCES

S.No Description Unit Nos Length Breadth Height Quantity Remarks Rate Amount
Retro-Reflectorized Traffic Signs, Providing and fixing of retro- reflectorized warning, Regulatory and
informatory sign as per specification clause 1501 made of high intensity grade sheeting , fixed over
aluminum sheeting, 1.5 mm thick supported on a Heavy Duty Steel Tube internal 50 mm dia. firmly fixed
1
to the ground by means of properly designed foundation with M 10/40 grade cement concrete 30 cm x 30
cm , 30 cm below ground level or as per Drawing and Technical Specifications., 80 mm * 60 mm
rectangular, Heavy Duty Steel Tube internal 50 mm dia.
Single post.
90 cm height equilateral triangle 20 20 0.00 0.00
Nos
60 cm circular 30 30 30.00
80 cm x 60 cm rectangular 15 15 15.00
Total Quantity 45.00
Road Marking with Hot Applied Thermoplastic Compound with Reflectorizing Glass Beads on Bituminous
Surface, On smooth surface (similar to Asphalt concrete and rigid pavement), Providing and laying of hot
2 applied thermoplastic compound at least 2 mm thick including reflectorizing glass beads as per DOR
Traffic sign manual/ Specifications .The finished surface to be level, uniform and free from streaks and
holes.(old norms)
From ch-0+000 to ch-9+100
for edgemarking 2 9100.00 0.15 1365
centerline marking sqm 1 9100.00 0.15 1023.75
Zebra-crossing 37 7.00 2 518
Total Quantity 2906.75 0.00 0.00

Road Delineators Post, Providing and installation of 150 mm * 150 mm 1. 5 m long delineators (road way
3 indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in
20 cm wide strips, buried or pressed into the ground and conforming to the drawings and Technical
Specifications.
From 0+000 to ch- 3+400 175 175
At 5m new slab culvert 20 20
Total Quantity 195 931.46 181,634.70

Prepared by: Checked by: Approved by:


Provincial Government
Sudurpaschim Province
Ministry of Physical Infrastructure Development
Transport Infrastructure Directorate
Infrastructure Development Office
Kailali, Nepal
.

Project Name: -Detail Engineering Survey, Design & Estimate of Khakraula Naka - Tikapur Road (0+000 - 14+690)

Quantity Estimate of Slab Culvert (Span 3m)


Assumptions:

Clear Depth (H) = 2.00 m


Span(S)= 3.00 m
Road Width 7.00 m Extra 0.5
Total Width of Slab( Road Width +
7.8 m Wing Wall
kerb Width)(W)
H1= 3.00 m D= 2.37 m
T= 0.25 m D1= 3.37 m
T1= 0.20 m BW1= 2.02 m
T2= 0.12 m LW1= 6.74 m
A= 0.65 m F1= 2.92 m
B= 1.95 m BW2= 0.96 m
L= 3.90 m ```
L1 4.30 m

Stone soiling depth= 0.15 m (dimension shown in drawing)


lean concreting depth= 0.45 m (dimension shown in drawing)
Boulder pitching grouting with MM 7.5= 0.30 m (dimension shown in drawing)
pcc - M10/40= 0.20 m (dimension shown in drawing)
length of gabion apron= 2.0429544 m

Bar Bending Schedule of kerb: Dia Bar Spacing No. L Total L


10 mm @ 100 c/c 40 1.74 69.6
10 mm 2 * 6nos 12 4.10 49.2
Bar Bending schedule of Abutment Seat Dia Bar Spacing No. L Total L
10 mm 2 * 9nos 18 8.00 144
10 mm @ 200 c/c 80 2.27 181.6
16 mm @ 250 c/c 129 0.6 77.4
Bar Bending schedule of
Culvert(Excluding kerb and Abutment Dia Bar Spacing No. L Total L
Seat):
a1 16 mm @ 140 c/c 57 4.10 233.70
a2 10 mm @ 150 c/c 27 8 216.00
a3 10 mm @ 300 c/c 57 4.1 233.70
a4 10 mm @ 300 c/c 27 8 216.00
12 mm 2 nos. 2 8 16.00

79 of 313
Length Breadth Height
SN Description of Works Nos. Quantity Units Remarks
(m) (m) (m)

Excavation in foundation for structures


(cross drainage structures) in all type of
soil (Soft soil, Hard Soil, BMS, Soft
Rock, Hard Rock all) including shoring
and shuttering and disposal at specified
1
tipping area of necessary haulage,
disposal and lift and dewatering by
mechanical means all complete, as per
specification (SS-907), drawings and
instruction of Engineer.

i) Abutment 2 7.80 2.35 1.50 54.99


ii) Wing Walls 4 6.74 1.69 1.00 45.59
iii) Aprons U/S and Down Steam 2 3.76 2.92 0.50 10.97
iv) Middle Portion 1 7.80 2.30 0.50 8.97
v) Gabion Apron 1 5.52 2.04 0.50 5.64
Total for 1 slab culvert = 126.16
Total for 5 slab culvet = 630.79 Cum

Providing and laying of Plain /


Reinforced cement concrete (M15/40)
including compaction, curing, testing
2
and lead 30m etc. all complete as per
specification (SS-2000), drawings and
instruction of Engineer.

i) Abutment 2 7.80 2.35 0.45 16.50


ii) Wing Walls 4 6.74 1.69 0.45 20.52
L=2(S-0.1H)
iii) Aprons U/S and Down Steam 2 4.06 2.92 0.20 4.74 +2F1*sin(30))/2,
B=F1
iv) Middle Portion 1 7.80 2.60 0.20 4.06
Total for 1 slab culvert = 45.81
Total for 5 slab culvet = 229.05 Cum

Providing and laying of Stone Soling /


Pitching / Packing Works for levelling
3 in line and level, all complete, as per
specification (SS-21.11), drawings and
instruction of Engineer.

i) Aprons U/S and Down Steam 2 4.06 2.92 0.30 7.11 L=(2S+2E)/2, B=F1
ii) Middle Portion 1 7.80 2.60 0.30 6.08
Total for 1 slab culvert = 13.19
Total for 5 slab culvet = 65.96 Cum

Providing and laying Random Rubble


Stone Masonry in machine mixed
cement sand mortar (1:4) including
scaffolding, curing, preparation of
4 mortar etc., pointing and installation of
required weep hole of HDPE 110 mm
dia 6 kg/sqm pressure all complete as
per specification (SS-2607), drawings
and instruction of Engineer.

i) Abutment 2 7.80 1.30 3.00 60.84


ii) Wing Walls 4 6.74 1.00 2.49 66.69
iii) U/S and D/S Cut Off 2 5.52 0.30 0.60 1.99
Total for 1 slab culvert = 129.52
Total for 5 slab culvet = 647.60 Cum

80 of 313
Length Breadth Height
SN Description of Works Nos. Quantity Units Remarks
(m) (m) (m)
Providing and placing machine mixed
Cement Concrete M20/20 for the
foundation and footing including
5 compaction, curing, testing all
complete, as per specification (SS-
2000), drawings and instruction of
Engineer
i) Slab 1 3.90 7.80 0.25 7.61 L=S+2*(A-T1)
ii) kerb 2 3.90 area 0.15 m2 1.15
Concrete Cap 2 7.80 area 0.13 m2 2.00
Total for 1 slab culvert = 10.75
Total for 5 slab culvet = 53.76 Cum

Providing and laying Reinforcement


Bar for RCC works including cutting
bending, binding, placing, fixing in
6
position all complete as per
specification. (SS-2014) and
instruction of Engineer.
i) Bar Bending Schedule of kerb:
Mark a6 40 1.74 @ 0.62kg/m 43.15
Mark a7 12 4.1 @ 0.62kg/m 30.50
ii) Bar Bending schedule of Abutment Seat:
Mark s1 18 8.00 @ 0.62kg/m 89.28
Mark s2 80 2.27 @ 0.62kg/m 112.59
Mark s3 129 0.60 @ 1.58kg/m 122.29
iii) Bar Bending schedule of Culvert(Excluding kerb and Abutment Seat):
Mark a1 57 4.10 @ 1.58kg/m 369.25
Mark a2 27 8.00 @ 0.62kg/m 133.92
Mark a3 57 4.10 @ 0.62kg/m 144.89
Mark a4 27 8.00 @ 0.62kg/m 133.92
Mark a5 2 8.00 @ 0.89kg/m 14.24
Total for 1 slab culvert = 1,194.04 Kg
Total for 5 slab culvet = 5.97 MT

Providing, preparing and installing


Formwork (All Classes) for concrete
works including necessary supports,
7 scaffolding and removing after
completion all complete as per
specification (SS-1804, 1805),
drawings and instruction of Engineer.
i) Abutment Capping 2 7.80 0.74 11.54 P=(2*T+2*T2)*W
ii) Slab side faces 1 23.40 0.25 5.85 P=2*(S+2*A1)+2*W
iii) Slab bottom face 1 3.00 7.80 23.40
iv) Foundation Slab vertical faces 2 20.30 0.45 18.27
v) Wing wall foundation vertical faces 4 16.86 0.45 30.35
Total for 1 slab culvert = 89.42
Total for 5 slab culvet = 447.08 Sqm

Supply, fabrication, assembling and


fixing in positions of gabion boxes /
mattresses, of hexagonal mesh type
100mm X 120mm, with mesh wire 10
8 swg, slevedge wire 8 swg, binding wire 1 5.52 2.04 0.50 5.64
12 swg and supply, transport and
filling stone as per specification (SS-
2401), drawings and instruction of
Engineer

Total for 1 slab culvert = 5.64


Total for 5 slab culvet = 28.19 Cum

81 of 313
Length Breadth Height
SN Description of Works Nos. Quantity Units Remarks
(m) (m) (m)

Providing and laying of Filter media


with granular Material/stone crushed
aggregates to a thickness of not less
than 600 mm with smaller size towards
the soil and bigger size towards the
9 wall and provided over the entire
surface behind abutment, wing wall
and return wall to the full height
compacted to a firm condition
complete as per drawing and Technical
Specification. (SS - 909, 910)

i) Abutment 2 7.80 0.25 2.25 8.78 H=75%of total


ii) Wing wall 4 6.74 0.25 1.86 12.56
Total for 1 slab culvert = 21.34
Total for 5 slab culvet = 106.68 Cum

Backfilling for cross drainage


structures etc. from excavated materials
including watering, compaction and
10
density test all complete. as per
specification (SS-908), drawings and
instruction of Engineer

i) Abutment 2 7.80 1.63 3.00 76.28


ii) Wing walls 4 6.74 1.12 2.49 74.72
Deduct Filter material - 21.34
Total for 1 slab culvert = 129.66
Total for 5 slab culvet = 648.32 Cum

Providing and laying two layers of


Tarfelt all complete as per drawing,
11
specification and instruction of
engineer
i) Slab Base 2.00 7.80 0.45 7.02
Total for 1 slab culvert = 7.02
Total for 5 slab culvet = 35.10 Sqm

82 of 313
#NAME?
#NAME?
#NAME?
#NAME?

RIVER TRAINING WORKS

#REF!

S.No Description Unit Nos Length Breadth Height Quantity Rate Amount
Excavation for Structures Foundation. Earthwork in excavation of foundation of structures, including constrution of shoring and
1 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per Drawing and Technical
specifications. Ordinary soil; Manual Means; Depth upto 3m.: (Section 9.4 I-A-(i))
30% of total excavation Cum 0 3100 2 1.2 0
Total Quantity 0 #REF! #REF!

Excavation for Structures Foundation. Earthwork in excavation of foundation of structures including constrution of shoring and
2 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per Drawing and Technical
specifications. Ordinary soil; Mechanical Means; depth upto 3m.: (Section 9.4-I-B-(i))
70% of total excavation Cum 0 3100 2 1.2 0
Total Quantity 0 #REF! #REF!

Providing suitable material and Back filling behind abutment, wing wall and returns wall complete as per Drawing and Technical
3 Specifications. Locally available Material including compaction by tamping rod (without watering).: (Section 9.11-C)
50% of total excavation Cum 0
Total Quantity 0 #REF! #REF!

Gabion Structure for Retaining Earth. Providing and laying Gabion structure for retaining earth with diaphragm including rolling,
cutting weaving , placing, laying sides and diaphragms with binding wire and filling boulders all complete as per Drawing and
4 Technical Specification. Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg (0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m)
Hexagonal mesh Type 100 mm X 120 mm,. Box size 2 X 1 X 1 m.: (Section 24.1-A-ii)
2mx1mx1m Cum 0 3100 2 1 0
1mx1mx1m Cum 0 3100 1 1 0
0.5mx1mx1m Cum 0 3100 0.5 1 0
Total Quantity 0 #REF! #REF!

Laying and fixing of Geo-Textile all complete as per specification. Providing and laying of a geotextile filter between pitching and
5 embankment slopes as per Drawing and Technical Specifications.: (Section 24.5)
Sqm 0 3100.00 3.9 0
Total Quantity 0.00 #REF! #REF!
Location of Pipe Culvert (90 cm dia)

S.N0 Chainage (m) Length (m) Count Depth (m) Slope Skew Angle Catchpit Side (-1:L | 0:N | 1:R) Remarks
1 1+670 12.5 1 0.5 20 10 0 RCC Hume Pipe culvert
2 2+620 12.5 1 0.5 20 10 0 RCC Hume Pipe culvert

Chainage (m) Length (m) Count Depth (m) Slope Skew Angle Catchpit Side (-1:L | 0:N | 1:R) Remarks
3 3+985 12.5 2 0.5 20 0 0 RCC Hume Pipe Culvert
4 4+102 12.5 2 0.5 20 0 0 RCC Hume Pipe Culvert
5 4+738 12.5 2 0.5 20 0 0 RCC Hume Pipe Culvert
6 4+450 12.5 2 0.5 20 0 0 RCC Hume Pipe Culvert
7 4+250 12.5 2 0.5 20 0 0 RCC Hume Pipe Culvert

Chainage (m) Length (m) Count Depth (m) Slope Skew Angle Catchpit Side (-1:L | 0:N | 1:R) Remarks
8 6+860 12.5 1 0.5 20 0 0 RCC Hume Pipe Culvert
9 7+240 12.5 1 0.5 20 0 0 RCC Hume Pipe Culvert
10 8+120 12.5 1 0.5 20 0 0 RCC Hume Pipe Culvert
11 8+460 12.5 1 0.5 20 0 0 RCC Hume Pipe Culvert

Chainage (m) Length (m) Count Depth (m) Slope Skew Angle Catchpit Side (-1:L | 0:N | 1:R) Remarks
12 8+860 12.5 1 0.5 20 0 0 RCC Hume Pipe Culvert
13 9+150 12.5 1 0.5 20 0 0 RCC Hume Pipe Culvert
14 9+187 12.5 1 0.5 20 0 0 RCC Hume Pipe Culvert
Quantity Estimate of Pipe Culvert (90 cm dia)
Assumptions:
Head Wall Height 3.00 ###
Pavement Thickness (m)= 0.35 Pipe Length (m)= 12.50 ###
Nos of hume pipe = 15.00

Description of Works Width Height


S. No. Unit Nos. Length (m) Quantity Remarks Rate Amount
(m) (m)

Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry,
1 cement concrete, wood work, steel work, including scaffolding wherever necessary, sorting the dismantled Material,
disposal of unserviceable Material and stacking the serviceable Material with all lifts and lead of 1000 meters, Stone
Masonry, Rubble Stone Masonry in cement mortar.
Slab culverts cu.m. 4 22 1 2 176.00
Total Quantity 176.00

Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of
2 stumps and other deleterious matter and backfilling with approved Material as per Drawing and Technical
Specifications., in all type of soil. [SS/SP 907]
Head wall cum 2 3.00 1.50 0.75 6.75
Pipe portion cum 1 -2.00 1.20 1.85 -4.44
Gabion works upstream and
downstream
Upstream protection cum 1 3.00 1.00 0.50 1.50
Downstream protection cum 1 3.00 3.00 0.50 4.50
Total = 8.31
Total quantity for 15.00 nos = 124.65 0.00 0.00

3 Providing, laying and levelling of dry stone soling works in the foundation all complete. (old Norms)
Below Head wall cum 2 3.00 1.50 0.15 1.35
Below Hume Pipe cum 1 -2.00 1.10 0.15 -0.33
Total = 1.02
Total quantity for 15.00 nos = 15.30 0.00 0.00

Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and Technical
4
Specifications., RCC Grade M 15 including F2 finish formwork .[SS/SP-2000]
Below Head wall cum 2 3.00 1.50 0.10 0.90
Below Hume pipe cum 1 -2.00 1.10 0.10 -0.22
Total = 0.68
Total quantity for 15 nos = 10.20 0.00 0.00

Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and Specifications, 60% M 15
5
concrete and 40% boulders/stones, using Mechanical Aids. [SS-2421]
Head wall cum 2 3.00 1.00 3.00 18.00
Deduction for pipe cum -2 1.00 0.90 -1.80
Parapet cum 2 3.00 0.50 0.50 1.50
Total = 17.70 cum
Total quantity for 15 nos = 265.50 0.00 0.00

Providing and Laying Reinforced cement concrete NP3 Flush jointed pipe for culverts including fixing with cement
6
mortar 1:2 as per Drawing and Technical Specifications., 900 mm internal dia. [SS-701]
Rm. 1 0.00 0.00 m
Total = 0.00
Total quantity for 15 nos = 0.00 0.00 0.00

Supply and Transportation of Machine Made Mechanically selvedged double twisted hexagonal mesh type 100mm
x 120 mm Gabion boxes / mattresses with diapharagms, with binding wire 2.4 mm, mesh wire 3.0 mm and
7 selvedged wire 3.90 mm, placing in position including stretching, forming compartments; tying with bracing wires
and tie wires; tying down the lid, providing and filling stone / boulder in gabion boxes / mattresses etc. including
dressing, beding, bonding etc. all complete as per special specification and drawings.
Upstream protection cum 1 3.00 1.00 1.00 3.00
Downstream protection cum 1 3.00 3.00 0.50 4.50
Downstream protection cum 2 3.00 1.00 0.50 3.00
Total = 10.50 cum
Total quantity for 15 nos = 157.50 0.00 0.00

Providing , Preparing and Installing form work including necessary supports and removing after completion for
8
foundation and footings., (Class F1 Finish), Using timber (soft wood ) [SS 1804, 1805]
Head wall sq.m 2 8.00 3.00 48.00

Prepared by: Checked by: Approved by:


Description of Works Width Height
S. No. Unit Nos. Length (m) Quantity Remarks Rate Amount
(m) (m)
Deduction for pipe sq.m -4 Area= 0.95 -3.80
Parapet sq.m 2 7.00 0.50 7.00
Total =
51.20 sqm

Total quantity for 15 nos = 768.00 0.00 0.00

9 Providing and laying and fixing of Geo-membrane all complete as per specification. [SS-2404]
Down Stream Protection sqm 2 3.00 0.50 3.00
Total = 3.00
Total quantity for 15 nos = 45.00 0.00 0.00

Prepared by: Checked by: Approved by:


#REF!
#REF!
#REF!
#REF!

Quantity Estimate of Slab Culvert (Span 2m)


Assumptions:

Clear Depth (H) = 2.00 m


Span(S)= 2.00 m
Road Width 11.00 m Extra 0.5
Total Width of Slab( Road Width +
11.8 m Wing Wall
kerb Width)(W)
H1= 3.00 m D= 2.45 m
T= 0.30 m D1= 3.45 m
T1= 0.20 m BW1= 2.07 m
T2= 0.15 m LW1= 6.9 m
A= 0.77 m F1= 2.99 m
B= 1.95 m BW2= 0.96 m
L= 3.14 m ```
L1 3.54 m

Stone soiling depth= 0.15 m (dimension shown in drawing)


lean concreting depth= 0.45 m (dimension shown in drawing)
Boulder pitching grouting with MM 7.5= 0.30 m (dimension shown in drawing)
pcc - M10/40= 0.20 m (dimension shown in drawing)
length of gabion apron= 2.09 m

Bar Bending Schedule of kerb: Dia Bar Spacing No. L Total L


10 mm @ 100 c/c 32 1.74 55.68
10 mm 2 * 6nos 12 3.34 40.08
Bar Bending schedule of Abutment Seat Dia Bar Spacing No. L Total L
10 mm 2 * 9nos 18 12.00 216
10 mm @ 200 c/c 120 2.27 272.4
16 mm @ 250 c/c 193 0.6 115.8
Bar Bending schedule of
Culvert(Excluding kerb and Abutment Dia Bar Spacing No. L Total L
Seat):
a1 12 mm @ 120 c/c 99 3.34 330.66
a2 10 mm @ 150 c/c 22 12 264.00
a3 10 mm @ 300 c/c 99 3.34 330.66
a4 10 mm @ 300 c/c 22 12 264.00
12 mm 2 nos. 2 12 24.00
Length Breadth Height
SN Description of Works Nos. Quantity Units Remarks
(m) (m) (m)

Earthwork in excavation in foundation


of structures (by Machine - 90%)
including constrution of shoring and
bracing, removal of stumps and other
deleterious matter and backfilling with
1
approved Materials as per Drawing and
Technical specifications in ordinary
soil depth upto 3m all complete as per
drawing, specification and instruction
of engineer

i) Abutment 2 11.80 2.35 1.50 83.19


ii) Wing Walls 4 6.90 1.72 1.00 47.33
iii) Aprons U/S and Down Steam 2 2.79 2.99 0.50 8.35
iv) Middle Portion 1 11.80 1.30 0.50 7.67
v) Gabion Apron 1 4.59 2.09 0.50 4.80
Total for 1 slab culvert = 151.34
Total for 1 slab culvert (For 90% excavation by machine) = 136.21 Cum

Earthwork in excavation in foundation


of structures (Manually - 10%)
including constrution of shoring and
bracing, removal of stumps and other
deleterious matter and backfilling with
approved Materials as per Drawing and
Technical specifications in ordinary
soil depth upto 3m all complete as per
drawing, specification and instruction
of engineer

10% of total excavation manually 13.62 Cum

Providing and laying of Plain Cement


Concrete in Foundation complete as
2 per drawing, technical specifications
and instruction all complete. PCC
Grade M 15
i) Abutment 2 11.80 2.35 0.45 24.96
ii) Wing Walls 4 6.90 1.72 0.45 21.30

L=2(S-0.1H)
iii) Aprons U/S and Down Steam 2 3.09 2.99 0.20 3.70 +2F1*sin(30
))/2, B=F1

iv) Middle Portion 1 11.80 1.60 0.20 3.78


Total for 1 slab culvert = 53.73 Cum

Providing and laying of hand pack


Stone soling with 150 to 200mm thick
3 stones and packing with smaller stone
on prepared surface as per Drawing
and Technical Specifications
L=(2S+2E)/
i) Aprons U/S and Down Stream 2 3.09 2.99 0.20 3.70
2, B=F1
ii) Middle Portion 1 11.80 1.60 0.20 3.78
Total for 1 slab culvert = 7.47 Cum
Length Breadth Height
SN Description of Works Nos. Quantity Units Remarks
(m) (m) (m)

Providing and laying of Stone Masonry


Work in Cement Mortar 1:4 in
4
Foundation complete as per Drawing
and Technical Specifications.

i) Abutment 2 11.80 1.36 3.00 96.29


ii) Wing Walls 4 6.90 1.01 2.53 70.21
iii) U/S and D/S Cut Off 2 4.59 0.30 0.60 1.65
Total for 1 slab culvert = 168.15 Cum

Providing and laying of Reinforced


Cement Concrete in super-structure as
5
per drawing and Technical
Specification. RCC Grade M 20
L=S+2*(A-
i) Slab 1 3.14 11.80 0.30 11.12
T1)
ii) kerb 2 3.14 area 0.15 m2 0.93
Concrete Cap 2 11.80 area 0.18 m2 4.14
Total for 1 slab culvert = 16.18 Cum

Providing and laying , fitting and


placing HYSD bar reinforcement in
6
super-structure complete as per
drawing and technical specifications
i) Bar Bending Schedule of kerb:
Mark a6 32 1.74 @ 0.62kg/m 34.52
Mark a7 12 3.34 @ 0.62kg/m 24.85
ii) Bar Bending schedule of Abutment Seat:
Mark s1 18 12.00 @ 0.62kg/m 133.92
Mark s2 120 2.27 @ 0.62kg/m 168.89
Mark s3 193 0.60 @ 1.58kg/m 182.96
iii) Bar Bending schedule of Culvert(Excluding kerb and Abutment Seat):
Mark a1 99 3.34 @ 0.89kg/m 294.29
Mark a2 22 12.00 @ 0.62kg/m 163.68
Mark a3 99 3.34 @ 0.62kg/m 205.01
Mark a4 22 12.00 @ 0.62kg/m 163.68
Mark a5 2 12.00 @ 0.89kg/m 21.36
Total for 1 slab culvert = 1,393.16 Kg

Providing, preparing and installing


Formwork (All Classes) for concrete
works including necessary supports,
7 scaffolding and removing after
completion all complete as per
specification (SS-1804, 1805),
drawings and instruction of Engineer.
P=(2*T+2*T
i) Abutment Capping 2 11.80 0.90 21.24
2)*W
P=2*(S+2*
ii) Slab side faces 1 29.88 0.30 8.96
A1)+2*W
iii) Slab bottom face 1 2.00 11.80 23.60
iv) Foundation Slab vertical faces 2 28.30 0.45 25.47
v) Wing wall foundation vertical faces 4 17.23 0.45 31.01
Total for 1 slab culvert = 110.29 Sqm
Length Breadth Height
SN Description of Works Nos. Quantity Units Remarks
(m) (m) (m)

Supply, fabrication, assembling and


fixing in positions of gabion boxes /
mattresses, of hexagonal mesh type
100mm X 120mm, with mesh wire 10
8 swg, slevedge wire 8 swg, binding wire 1 4.59 2.09 0.50 4.80
12 swg and supply, transport and
filling stone as per specification (SS-
2401), drawings and instruction of
Engineer

Total for 1 slab culvert = 4.80 Cum

Providing and laying of Filter media


with granular Material/stone crushed
aggregates to a thickness of not less
than 600 mm with smaller size towards
the soil and bigger size towards the
9 wall and provided over the entire 4.00
surface behind abutment, wing wall
and return wall to the full height
compacted to a firm condition
complete as per drawing and Technical
Specification. (SS - 909, 910)

H=75%of
i) Abutment 2 11.80 0.25 2.25 13.28
total
ii) Wing wall 4 6.90 0.25 1.89 13.07
Total for 1 slab culvert = 26.34 Cum

Backfilling for cross drainage


structures etc. from excavated materials
including watering, compaction and
10
density test all complete. as per
specification (SS-908), drawings and
instruction of Engineer

i) Abutment 2 11.80 1.51 1.50 53.45


ii) Wing walls 4 6.90 1.14 2.53 79.53
Deduct Filter material - 26.34
Total for 1 slab culvert = 106.65 Cum

Providing and laying two layers of


Tarfelt all complete as per drawing,
11
specification and instruction of
engineer
i) Slab Base 2 11.80 0.57 13.45
Total for 1 slab culvert = 13.45 Sqm
Err:509
Err:509
Err:509
Err:509
Err:509

RETAINING WALLS

#REF!

S.No Description Unit Nos Length Width Height Quantity Rate Amount
For Masonry Works
Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal of
1 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and instruction
in ordinary soil depth upto 3m
90 % of excavation by mechanical
cum 0 20 1.2 0.6 0.00
means
Total Quantity 0.00 #REF! #REF!

Earthwork in excavation in foundation of structures (by Machine- 10%) including constrution of shoring and bracing, removal of
2 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and instruction
in ordinary soil depth upto 3m

10 % of excavation by manual means cum


0.00
Total Quantity 0.00 #REF! #REF!

Backfilling in layers in foundation pits, trenches with locally available material etc. including compaction and watering etc all
3
complete as per drawing, specification and instruction
10 % of total excavation cum 0.00
Total Quantity 0.00 #REF! #REF!

Providing and laying of hand pack Stone soling with 150 to 200mm thick stones and packing with smaller stone on prepared surface all
4
complete as per drawing, specification and instruction

From Ch 0+000 to 8+631.22 cum 0 20 0.6 0.15 0.00

Total Quantity 0.00 #REF! #REF!

Providing and laying of Plain Cement Concrete M 10 ( or 1:3:6 for nominal mix) in Foundation complete all complete as per
5
drawing, specification and instruction

From Ch 0+000 to 8+631.22 cum 0 20 0.6 0.1 0.00

Total Quantity 0.00 #REF! #REF!

Stone masonry work including full compensation for all labour, materials and other incidentals required to complete the work as per
6 the specifications and drawings. It includes full compensation for using specially dressed stones on the face of wall with batter and
provisions for weep hole as necessary as mentioned in specification and directed by the Engineer
Uncoursed stone rubble masonry
cum 0.00 #REF! #REF!
works in 1:4 cement sand mortar

Providing and laying weep holes in Brick dry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm dia HDPE
7 pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face all complete as per drawing,
specification and instruction
Rm 0.00 #REF! #REF!
Grand Total #REF!

91 of 313
Err:509
Err:509
Err:509
Err:509
Err:509

#REF!

Structure(MWBRT) QUANTITY
Left Right
Chainage Length
MWBRT Height Area(m2) Volume(m3) MWBRT Height Area(m2) Volume(m3)
8340 20 MWBRTA 2 1.976 39.523

92 of 313
Quantity Estimate of Pipe Culvert (90 cm dia)

#REF!
#REF!
#REF!
#REF!
#REF!

Quantity Estimate of Pipe Culvert (45 cm dia)


Assumptions:
Abutment Height (m)= 3 Catchpit Wall Height (m)= 1 ###
Pavement Thickness (m)= 0.54 Pipe Length (m)= 13 ###
Nos of hume pipe = 0

Description of Works Width Height


S. No. Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal of
1 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
Head wall cum 1 3.00 1.80 1.50 8.10
Catchpit cum 1 2.99 2.99 1.00 8.92
Pipe portion cum 1 13.00 0.90 1.84 21.53
Stone soling portion
Catchpit cum 1 2.99 2.99 0.15 1.34
Below headwall cum 1 3.00 1.80 0.15 0.81
PCC Lining
Catchpit cum 1 2.99 2.99 0.10 0.89
Below headwall cum 1 13.00 0.90 0.10 1.17
Gabion works upstream and
downstream
Upstream protection cum 1 3.00 1.00 0.50 1.50
Downstream protection cum 1 3.00 3.00 0.30 2.70
Total = 46.95 cum
Total for 90% excavation = 42.26
Total quantity for 0 nos = 0.00 #REF! #REF!

Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal of
2 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
10 % of total excavation cum 4.70
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying Random Rubble Stone Masonry work in cement mortar 1:4 in structure complete all complete as per
3
drawing, specification and instruction
Head wall cum 1 3.00 1.15 3.15 10.87
Deduction for pipe cum -1 1.26 0.45 -0.57
Inlet wall cum 1 3.00 0.55 1.00 1.65
Deduction for pipe cum -1 0.21 0.45 -0.09
Hill side wall cum 1 3.00 0.55 1.00 1.65
Side wall cum 2 1.50 0.52 1.00 1.56
Parapet cum 2 3.00 0.40 0.40 0.96
Total = 16.03 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of hand pack Stone soling with 150 to 200mm thick stones and packing with smaller stone on prepared
4
surface all complete as per drawing, specification and instruction
Catchpit soling cum 1 2.99 2.99 0.15 1.34
Below head wall cum 1 3.00 1.80 0.15 0.81
Total = 2.15 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation all complete as per drawing, specification and instruction. PCC
5
Grade M 15 )
Catchpit cum 1 2.99 2.99 0.10 0.89
Below head wall cum 1 3.00 1.80 0.10 0.54
Below hume pipe cum 1 13.00 0.19 2.50

Page 93 of 313
Quantity Estimate of Pipe Culvert (90 cm dia)

Description of Works Width Height


S. No. Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Total = 3.93 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing suitable material and Back filling behind abutment, wing wall and return wall all complete as per drawing, specification
6
and instruction with locally available Material, with out watering and compaction by tamping rod
Carriage way cum 1 13.00 0.75 2.09 20.38
Deduction for pipe cum -1 13.00 0.45 -5.85
Hill side wall cum 1 2.99 0.10 1.00 0.30
Catchpit side walls cum 2 1.50 0.12 1.00 0.36
Total = 15.19 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying weep holes with 110 mm dia HDPE pipe, extending through the full width of the structure with slope of
7
1V :20H towards drawing face all complete as per drawing, specification and instruction
m 4 0.45 1.80 m
Total = 1.80
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and Laying Reinforced Cement Concrete NP3 Flush jointed pipe for culverts including fixing with cement mortar 1:2
8
all complete as per drawing, specification and instruction (SS 701) - 450 mm Internal Diameter.
m 1 13.00 13.00 m
Total = 13.00
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving , placing, laying sides
and diaphragms with binding wire and filling boulders all complete as per drawing, specification and instruction Mesh wire- 10
9
Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X
120 mm,. Box size 2 X 1 X 1 m
Upstream protection cum 1 3.00 1.00 1.00 3.00
Downstream protection cum 1 3.00 3.00 0.50 4.50
Downstream protection cum 2 3.00 1.00 0.50 3.00
Total = 10.50 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and
10
footings.(Class F1 Finish) Using timber (soft wood ) all complete as per drawing, specification and instruction
Below head wall sqm 1 11.60 0.10 1.16
At Catchpit sqm 1 12.37 0.10 1.24
Bedding concrete sqm 1 13.00 0.52 6.76
Total = 9.16 sqm
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of Filter media with granular Material/stone crushed aggregates to a thickness of not less than 600 mm with
11 smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall
and return wall to the full height compacted to a firm condition all complete as per drawing, specification and instruction
Head wall cum 1 3.00 0.20 3.15 1.89
Deduction for pipe cum -1 0.45 0.20 -0.09
Inlet wall cum 1 3.00 0.20 1.00 0.60
Deduction for pipe cum -1 0.45 0.20 -0.09
Hill side wall cum 1 3.00 0.20 1.00 0.60
Side walls cum 2 1.50 0.20 1.00 0.60
Total = 3.51
Total quantity for 0 nos = 0.00 #REF! #REF!

Page 94 of 313
Quantity Estimate of Pipe Culvert (90 cm dia)

#REF!
#REF!
#REF!
#REF!
#REF!

Quantity Estimate of Pipe Culvert (45 cm dia)


Assumptions:
Abutment Height (m)= 3 Catchpit Wall Height (m)= 1 ###
Pavement Thickness (m)= 0.54 Pipe Length (m)= 13 ###
Nos of hume pipe = 0

Description of Works Width Height


S. No. Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal of
1 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
Head wall cum 1 3.00 1.80 1.50 8.10
Catchpit cum 1 2.99 2.99 1.00 8.92
Pipe portion cum 1 13.00 0.90 1.84 21.53
Stone soling portion
Catchpit cum 1 2.99 2.99 0.15 1.34
Below headwall cum 1 3.00 1.80 0.15 0.81
PCC Lining
Catchpit cum 1 2.99 2.99 0.10 0.89
Below headwall cum 1 13.00 0.90 0.10 1.17
Gabion works upstream and
downstream
Upstream protection cum 1 3.00 1.00 0.50 1.50
Downstream protection cum 1 3.00 3.00 0.30 2.70
Total = 46.95 cum
Total for 90% excavation = 42.26
Total quantity for 0 nos = 0.00 #REF! #REF!

Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal of
2 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
10 % of total excavation cum 4.70
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying Random Rubble Stone Masonry work in cement mortar 1:4 in structure complete all complete as per
3
drawing, specification and instruction
Head wall cum 1 3.00 1.15 3.15 10.87
Deduction for pipe cum -1 1.26 0.45 -0.57
Inlet wall cum 1 3.00 0.55 1.00 1.65
Deduction for pipe cum -1 0.21 0.45 -0.09
Hill side wall cum 1 3.00 0.55 1.00 1.65
Side wall cum 2 1.50 0.52 1.00 1.56
Parapet cum 2 3.00 0.40 0.40 0.96
Total = 16.03 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of hand pack Stone soling with 150 to 200mm thick stones and packing with smaller stone on prepared
4
surface all complete as per drawing, specification and instruction
Catchpit soling cum 1 2.99 2.99 0.15 1.34
Below head wall cum 1 3.00 1.80 0.15 0.81
Total = 2.15 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation all complete as per drawing, specification and instruction. PCC
5
Grade M 15 )
Catchpit cum 1 2.99 2.99 0.10 0.89
Below head wall cum 1 3.00 1.80 0.10 0.54
Below hume pipe cum 1 13.00 0.19 2.50

Page 95 of 313
Quantity Estimate of Pipe Culvert (90 cm dia)

Description of Works Width Height


S. No. Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Total = 3.93 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing suitable material and Back filling behind abutment, wing wall and return wall all complete as per drawing, specification
6
and instruction with locally available Material, with out watering and compaction by tamping rod
Carriage way cum 1 13.00 0.75 2.09 20.38
Deduction for pipe cum -1 13.00 0.45 -5.85
Hill side wall cum 1 2.99 0.10 1.00 0.30
Catchpit side walls cum 2 1.50 0.12 1.00 0.36
Total = 15.19 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying weep holes with 110 mm dia HDPE pipe, extending through the full width of the structure with slope of
7
1V :20H towards drawing face all complete as per drawing, specification and instruction
m 4 0.40 1.60 m
Total = 1.60
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and Laying Reinforced Cement Concrete NP3 Flush jointed pipe for culverts including fixing with cement mortar 1:2
8
all complete as per drawing, specification and instruction (SS 701) - 450 mm Internal Diameter.
m 1 13.00 13.00 m
Total = 13.00
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving , placing, laying sides
and diaphragms with binding wire and filling boulders all complete as per drawing, specification and instruction Mesh wire- 10
9
Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X
120 mm,. Box size 2 X 1 X 1 m
Upstream protection cum 1 3.00 1.00 1.00 3.00
Downstream protection cum 1 3.00 3.00 0.50 4.50
Downstream protection cum 2 3.00 1.00 0.50 3.00
Total = 10.50 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and
10
footings.(Class F1 Finish) Using timber (soft wood ) all complete as per drawing, specification and instruction
Below head wall sqm 1 11.60 0.10 1.16
At Catchpit sqm 1 12.37 0.10 1.24
Bedding concrete sqm 1 13.00 0.52 6.76
Total = 9.16 sqm
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of Filter media with granular Material/stone crushed aggregates to a thickness of not less than 600 mm with
11 smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall
and return wall to the full height compacted to a firm condition all complete as per drawing, specification and instruction
Head wall cum 1 3.00 0.20 3.15 1.89
Deduction for pipe cum -1 0.45 0.20 -0.09
Inlet wall cum 1 3.00 0.20 1.00 0.60
Deduction for pipe cum -1 0.45 0.20 -0.09
Hill side wall cum 1 3.00 0.20 1.00 0.60
Side walls cum 2 1.50 0.20 1.00 0.60
Total = 3.51
Total quantity for 0 nos = 0.00 #REF! #REF!

Page 96 of 313
Quantity Estimate of Pipe Culvert (90 cm dia)

#REF!
#REF!
#REF!
#REF!
#REF!

Quantity Estimate of Pipe Culvert (45 cm dia)


Assumptions:
Abutment Height (m)= 3 Catchpit Wall Height (m)= 1 ###
Pavement Thickness (m)= 0.54 Pipe Length (m)= 13 ###
Nos of hume pipe = 0

Description of Works Width Height


S. No. Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal of
1 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
Head wall cum 1 3.00 1.80 1.50 8.10
Catchpit cum 1 2.99 2.99 1.00 8.92
Pipe portion cum 1 13.00 0.90 1.84 21.53
Stone soling portion
Catchpit cum 1 2.99 2.99 0.15 1.34
Below headwall cum 1 3.00 1.80 0.15 0.81
PCC Lining
Catchpit cum 1 2.99 2.99 0.10 0.89
Below headwall cum 1 13.00 0.90 0.10 1.17
Gabion works upstream and
downstream
Upstream protection cum 1 3.00 1.00 0.50 1.50
Downstream protection cum 1 3.00 3.00 0.30 2.70
Total = 46.95 cum
Total for 90% excavation = 42.26
Total quantity for 0 nos = 0.00 #REF! #REF!

Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal of
2 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
10 % of total excavation cum 4.70
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying Random Rubble Stone Masonry work in cement mortar 1:4 in structure complete all complete as per
3
drawing, specification and instruction
Head wall cum 1 3.00 1.15 3.15 10.87
Deduction for pipe cum -1 1.26 0.45 -0.57
Inlet wall cum 1 3.00 0.55 1.00 1.65
Deduction for pipe cum -1 0.21 0.45 -0.09
Hill side wall cum 1 3.00 0.55 1.00 1.65
Side wall cum 2 1.50 0.52 1.00 1.56
Parapet cum 2 3.00 0.40 0.40 0.96
Total = 16.03 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of hand pack Stone soling with 150 to 200mm thick stones and packing with smaller stone on prepared
4
surface all complete as per drawing, specification and instruction
Catchpit soling cum 1 2.99 2.99 0.15 1.34
Below head wall cum 1 3.00 1.80 0.15 0.81
Total = 2.15 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation all complete as per drawing, specification and instruction. PCC
5
Grade M 15 )
Catchpit cum 1 2.99 2.99 0.10 0.89
Below head wall cum 1 3.00 1.80 0.10 0.54
Below hume pipe cum 1 13.00 0.19 2.50

Page 97 of 313
Quantity Estimate of Pipe Culvert (90 cm dia)

Description of Works Width Height


S. No. Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Total = 3.93 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing suitable material and Back filling behind abutment, wing wall and return wall all complete as per drawing, specification
6
and instruction with locally available Material, with out watering and compaction by tamping rod
Carriage way cum 1 13.00 0.75 2.09 20.38
Deduction for pipe cum -1 13.00 0.45 -5.85
Hill side wall cum 1 2.99 0.10 1.00 0.30
Catchpit side walls cum 2 1.50 0.12 1.00 0.36
Total = 15.19 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying weep holes with 110 mm dia HDPE pipe, extending through the full width of the structure with slope of
7
1V :20H towards drawing face all complete as per drawing, specification and instruction
m 4 0.40 1.60 m
Total = 1.60
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and Laying Reinforced Cement Concrete NP3 Flush jointed pipe for culverts including fixing with cement mortar 1:2
8
all complete as per drawing, specification and instruction (SS 701) - 450 mm Internal Diameter.
m 1 13.00 13.00 m
Total = 13.00
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving , placing, laying sides
and diaphragms with binding wire and filling boulders all complete as per drawing, specification and instruction Mesh wire- 10
9
Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X
120 mm,. Box size 2 X 1 X 1 m
Upstream protection cum 1 3.00 1.00 1.00 3.00
Downstream protection cum 1 3.00 3.00 0.50 4.50
Downstream protection cum 2 3.00 1.00 0.50 3.00
Total = 10.50 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and
10
footings.(Class F1 Finish) Using timber (soft wood ) all complete as per drawing, specification and instruction
Below head wall sqm 1 11.60 0.10 1.16
At Catchpit sqm 1 12.37 0.10 1.24
Bedding concrete sqm 1 13.00 0.52 6.76
Total = 9.16 sqm
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of Filter media with granular Material/stone crushed aggregates to a thickness of not less than 600 mm with
11 smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall
and return wall to the full height compacted to a firm condition all complete as per drawing, specification and instruction
Head wall cum 1 3.00 0.20 3.15 1.89
Deduction for pipe cum -1 0.45 0.20 -0.09
Inlet wall cum 1 3.00 0.20 1.00 0.60
Deduction for pipe cum -1 0.45 0.20 -0.09
Hill side wall cum 1 3.00 0.20 1.00 0.60
Side walls cum 2 1.50 0.20 1.00 0.60
Total = 3.51
Total quantity for 0 nos = 0.00 #REF! #REF!

Page 98 of 313
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

Quantity Estimate of Pipe Culvert (45 cm dia)

Width Height
S. No. Description of Works Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal
1 of stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
Head wall cum 1 3.00 1.80 1.50 8.10
Catchpit cum 0 2.99 2.99 1.00 0.00
Pipe portion cum 1 10.00 2.99 1.84 55.02
Stone soling portion
Below headwall cum 1 2.99 2.99 0.15 1.34
PCC Lining
Below headwall cum 1 3.00 1.80 0.15 0.81
Gabion works upstream and
downstream
Upstream protection cum 1 3.00 1.00 0.50 1.50
Downstream protection cum 1 3.00 3.00 0.30 2.70
Total = 69.47 cum
Total for 90% excavation = 62.52
Total quantity for 1 nos = 62.52 #REF! #REF!

Earthwork in excavation in foundation of structures (manually- 10%) including constrution of shoring and bracing, removal of
2 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
10 % of total excavation cum 6.95
Total quantity for 1 nos = 6.95 #REF! #REF!

Providing and laying Random Rubble Stone Masonry work in cement mortar 1:4 in structure all complete as per drawing,
3
specification and instruction
Head wall cum 1 3.00 1.15 3.15 10.87
Deduction for pipe cum -1 1.26 0.45 -0.57
Inlet wall cum 1 3.00 0.55 1.00 1.65
Deduction for pipe cum -1 0.21 0.45 -0.09
Hill side wall cum 1 3.00 0.55 1.00 1.65
Side wall cum 2 1.50 0.52 1.00 1.56
Parapet cum 2 3.00 0.40 0.40 0.96
Total = 16.03 cum
Total quantity for 1 nos = 16.03 #REF! #REF!

Providing and laying of hand pack Stone soling with 150 to 200mm thick stones and packing with smaller stone on prepared
4
surface all complete as per drawing, specification and instruction
Below head wall cum 1 3.00 1.80 0.15 0.81
Total = 0.81 cum
Total quantity for 1 nos = 0.81 #REF! #REF!

5 Providing and laying of Plain Cement Concrete Grade M 15 in Foundation all complete as per drawing, specification and instruct
Below head wall cum 1 3.00 1.80 0.10 0.54
Below hume pipe cum 1 10.00 0.19 1.92
Total = 2.46 cum
Total quantity for 1 nos = 2.46 #REF! #REF!

Page 99 of 313
Width Height
S. No. Description of Works Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Providing suitable material and Back filling behind abutment, wing wall and return wall all complete as per drawing,
6
specification and instruction with locally available Material, with out watering and compaction by tamping rod
Carriage way cum 1 10.00 0.75 2.09 15.68
Deduction for pipe cum -1 10.00 0.45 -4.50
Total = 11.18 cum
Total quantity for 1 nos = 11.18 #REF! #REF!

Providing and laying weep holes with 110 mm dia HDPE pipe, extending through the full width of the structure with slope of
7
1V :20H towards drawing face all complete as per drawing, specification and instruction
m 4 0.45 1.80 m
Total = 1.80
Total quantity for 1 nos = 1.80 #REF! #REF!

Providing and Laying Reinforced Cement Concrete NP3 Flush jointed pipe for culverts including fixing with cement mortar
8
1:2 all complete as per drawing, specification and instruction (SS 701) - 600 mm Internal Diameter.
m 1 10.00 10.00 m
Total = 10.00
Total quantity for 1 nos = 10.00 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving , placing, laying
sides and diaphragms with binding wire and filling boulders all complete as per drawing, specification and instruction Mesh
9
wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type
100 mm X 120 mm,. Box size 2 X 1 X 1 m
Upstream protection cum 1 3.00 1.00 1.00 3.00
Downstream protection cum 1 3.00 3.00 0.50 4.50
Downstream protection cum 2 3.00 1.00 0.50 3.00
Total = 10.50 cum
Total quantity for 1 nos = 10.50 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and
10
footings.(Class F1 Finish) Using timber (soft wood ) all complete as per drawing, specification and instruction
Below head wall sqm 1 11.60 0.10 1.16
Bedding concrete sqm 1 10.00 0.52 5.20
Total = 6.36 sqm
Total quantity for 1 nos = 6.36 #REF! #REF!

Providing and laying of Filter media with granular Material/stone crushed aggregates to a thickness of not less than 600 mm
11 with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing
wall and return wall to the full height compacted to a firm condition all complete as per drawing, specification and instruction
Head wall cum 1 3.00 0.20 3.15 1.89
Deduction for pipe cum -1 0.60 0.20 -0.12
Inlet wall cum 1 3.00 0.20 1.00 0.60
Deduction for pipe cum -1 0.60 0.20 -0.12
Side walls cum 2 1.50 0.20 1.00 0.60
Total = 2.85
Total quantity for 1 nos = 2.85 #REF! #REF!

Providing and laying of a geotextile filter between pitching and embankment slopes all complete as per drawing, specification
12
and instruction.
Head wall sqm 1 0.20 3.15 0.63
Deduction for pipe sqm -1 0.45 0.20 -0.09
Inlet wall sqm 1 0.20 0.80 0.16
Deduction for pipe sqm -1 0.45 0.20 -0.09
Side walls sqm 2 1.50 0.20 0.60
Total = 1.21
Total quantity for 1 nos = 1.21 #REF! #REF!
Grand Total #REF!

Page 100 of 313


Location of Slab Culvert (Span 4m and 5m)

Chainage (m) Span (m) Thickness (m) Depth (m) Remarks Work Code
2+357 4 0.25 0.2 Slab Culvert 4m span SC_4m_span_10m_width
2+966 4 0.25 0.2 Slab Culvert 4m span SC_4m_span_10m_width

Chainage (m) Span (m) Thickness (m) Depth (m) Remarks Work Code
5+186 5 0.25 0.2 Slab Culvert 5m span SC_5m_span_7m_width
5+567 6 0.25 0.2 SlabCulvet 6m span SC_5m_span_7m_width

Chainage (m) Span (m) Thickness (m) Depth (m) Remarks Work Code
7+620 6 0.25 0.2 Slab Culvert 6m span SC_5m_span_7m_width

Location of Existing Bridge

Chainage (m) Span (m) Thickness (m) Depth (m) Remarks Work Code
1+540 Existing Bridge
3+560 Existing Bridge
4+280 Existing Bridge
6+518 Existing Bridge
Quantity Estimate of Slab Culvert (Span 4m)
Assumptions:

Clear Depth (H) = 4.00 m


Span(S)= 4.00 m
Road Width 10.00 m Extra 0.5
Total Width of Slab( Road
10.8 m Wing Wall
Width + kerb Width)(W)
H1= 5.00 m D= 3.00 m
T= 0.40 m D1= 4.00 m
T1= 0.20 m BW1= 2.60 m
T2= 0.15 m LW1= 8m
A= 0.77 m F1= 4.20 m
B= 2.28 m BW2= 0.96 m
L= 5.14 m ```
L1 5.54 m

Stone soiling depth= 0.15 m (dimension shown in drawing)


lean concreting depth= 0.45 m (dimension shown in drawing)
lder pitching grouting with MM 7.5= 0.30 m (dimension shown in drawing)
pcc - M15/40= 0.20 m (dimension shown in drawing)
length of gabion apron= 2.94 m

Bar Bending Schedule of kerb: Dia Bar Spacing No. L Total L


10 mm @ 100 c/c 56 1.74 97.44
10 mm 2 * 6nos 12 5.44 65.28
Bar Bending schedule of Abutment Seat Dia Bar Spacing No. L Total L
10 mm 2 * 9nos 18 11.00 198
10 mm @ 200 c/c 70 1.94 135.8
16 mm @ 250 c/c 113 0.6 67.8
Bar Bending schedule of
Culvert(Excluding kerb and Dia Bar Spacing No. L Total L
Abutment Seat):
a1 16 mm @ 110 c/c 99 5.34 528.66
a2 10 mm @ 150 c/c 35 11 385.00
a3 10 mm @ 200 c/c 99 5.34 528.66
a4 10 mm @ 200 c/c 35 11 385.00
12 mm 2 nos. 2 11 22.00

Prepared by: Checked by: Approved by:


Length Breadth Height
SN Description of Works Nos. Quantity Units Remarks
(m) (m) (m)

Earth work in excavation of foundation of structures, including construction of shoring and bracing,
1 removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing
and Technical Specifications., in all type of soil. [SS/SP 907]

i) Abutment 2 10.80 2.68 1.50 86.83


ii) Wing Walls 4 8.00 1.98 1.00 63.36
iii) Aprons U/S and Down Steam 2 5.20 4.20 0.50 21.83
iv) Middle Portion 1 10.80 3.10 0.50 16.74
v) Gabion Apron 1 7.40 2.94 0.50 10.87
Total for 3 slab culvert = 199.63 Cum

2 Providing, laying and levelling of dry stone soling works in the foundation all complete. (old Norms)
i) Aprons U/S and Down Steam 2 5.30 4.20 0.30 13.35 L=(2S+2E)/2, B=F1
ii) Middle Portion 1 10.80 3.20 0.30 10.36
Total for 3 slab culvert = 23.71 Cum

Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and
3
Technical Specifications., RCC Grade M 15 including F2 finish formwork .[SS/SP-2000]
i) Abutment 2 10.80 2.68 0.45 26.04
ii) Wing Walls 4 8.00 1.98 0.45 28.51
L=2(S-0.1H)
iii) Aprons U/S and Down Steam 2 5.30 4.20 0.20 8.90 +2F1*sin(30))/2,
B=F1
iv) Middle Portion 1 10.80 3.20 0.20 6.91
Total for 3 slab culvert = 70.36 Cum

Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and Specifications, 60%
4
M 15 concrete and 40% boulders/stones, using Mechanical Aids. [SS-2421]
i) Abutment 2 10.80 1.53 5.00 164.70
ii) Wing Walls 4 8.00 1.14 2.80 102.14
iii) U/S and D/S Cut Off 2 7.40 0.30 0.60 2.66
Total for 3 slab culvert = 808.50 Cum
Providing , Preparing and Installing form work including necessary supports and removing after
5
completion for foundation and footings., (Class F1 Finish), Using timber (soft wood ) [SS 1804, 1805]
i) Abutment 2 12.32 5.00 123.20 P=(2*T+2*T2)*W
2 12.32 5.22 128.62
ii) Wing Walls 2 9.14 2.80 51.18 P=2*(S+2*A1)+2*W
2 9.14 2.80 51.18
iii) U/S and D/S Cut Off 4 7.70 0.60 18.47
Total for 3 slab culvert = 1,117.95 Sqm

Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing and
6
Technical Specifications., RCC Grade M 25 including F2 finish formwork .(SS/SP-2000)
i) Slab 1 5.14 10.80 0.40 22.20 L=S+2*(A-T1)
ii) kerb 2 5.14 area 0.15 m2 1.51
Concrete Cap 2 10.80 area 0.20 m2 4.22
Total for 3 slab culvert = 83.79 Cum

Providing and laying , fitting and placing un-coated Mild steel / HYSD reinforcement complete in
7
foundation as per drawing and technical specification. [SS-2014]
i) Bar Bending Schedule of kerb:
Mark a6 56 1.74 @ 0.62kg/m 60.41
Mark a7 12 5.44 @ 0.62kg/m 40.47
ii) Bar Bending schedule of Abutment Seat: -
Mark s1 18 11.00 @ 0.62kg/m 122.76
Mark s2 70 1.94 @ 0.62kg/m 84.19

Prepared by: Checked by: Approved by:


Length Breadth Height
SN Description of Works Nos. Quantity Units Remarks
(m) (m) (m)
Mark s3 113 0.60 @ 1.58kg/m 107.12
iii) Bar Bending schedule of Culvert(Excluding kerb and Abutment Seat):
Mark a1 99 5.34 @ 1.58kg/m 835.28
Mark a2 35 11.00 @ 0.62kg/m 238.70
Mark a3 99 5.34 @ 0.62kg/m 327.76
Mark a4 35 11.00 @ 0.62kg/m 238.70
Mark a5 2 11.00 @ 0.89kg/m 19.58
Total for 3 slab culvert = 6.22 MT.

Supply and Transportation of


Machine Made Mechanically
selvedged double twisted
hexagonal mesh type 100mm x
120 mm Gabion boxes /
mattresses with diapharagms, with
binding wire 2.4 mm, mesh wire
3.0 mm and selvedged wire 3.90
mm, placing in position including
8 1 7.40 2.94 0.50 10.87
stretching, forming compartments;
tying with bracing wires and tie
wires; tying down the lid,
providing and filling stone /
boulder in gabion boxes /
mattresses etc. including dressing,
beding, bonding etc. all complete
as per special specification and
drawings.

Total for 3 slab culvert = 32.61 Cum

Prepared by: Checked by: Approved by:


Quantity Estimate of Slab Culvert (Span 5m)
Assumptions:

Clear Depth (H) = 4.00 m


Span(S)= 5.00 m
Road Width 10.00 m Extra 0.5
Total Width of Slab( Road Width +
10.8 m Wing Wall
kerb Width)(W)
H1= 5.00 m D= 3.00 m
T= 0.42 m D1= 4.00 m
T1= 0.20 m BW1= 2.60 m
T2= 0.20 m LW1= 8m
A= 0.77 m F1= 4.20 m
B= 2.28 m BW2= 0.96 m
L= 6.14 m ```
L1 6.54 m

Stone soiling depth= 0.15 m (dimension shown in drawing)


lean concreting depth= 0.45 m (dimension shown in drawing)
Boulder pitching grouting with MM 7.5= 0.30 m (dimension shown in drawing)
pcc - M15/40= 0.20 m (dimension shown in drawing)
length of gabion apron= 2.94 m

Bar Bending Schedule of kerb: Dia Bar Spacing No. L Total L


10 mm @ 100 c/c 56 1.74 97.44
10 mm 2 * 6nos 12 5.44 65.28
Bar Bending schedule of Abutment Seat Dia Bar Spacing No. L Total L
10 mm 2 * 9nos 18 11.00 198
10 mm @ 200 c/c 70 1.94 135.8
16 mm @ 250 c/c 113 0.6 67.8
Bar Bending schedule of
Culvert(Excluding kerb and Abutment Dia Bar Spacing No. L Total L
Seat):
a1 20 mm @ 140 c/c 78 6.34 494.52
a2 12 mm @ 170 c/c 37 11 407.00
a3 12 mm @ 300 c/c 78 6.34 494.52
a4 12 mm @ 300 c/c 37 11 407.00
12 mm 2 nos. 2 11 22.00

Prepared by: Checked by: Approved by:


Length Breadth Height
SN Description of Works Nos. Quantity Units Remarks
(m) (m) (m)

Earth work in excavation of foundation of structures, including construction of shoring and bracing,
1 removal of stumps and other deleterious matter and backfilling with approved Material as per
Drawing and Technical Specifications., in all type of soil. [SS/SP 907]

i) Abutment 2 10.80 2.68 1.50 86.83


ii) Wing Walls 4 8.00 1.98 1.00 63.36
iii) Aprons U/S and Down Steam 2 6.20 4.20 0.50 26.03
iv) Middle Portion 1 10.80 4.10 0.50 22.14
v) Gabion Apron 1 8.40 2.94 0.50 12.34
Total for 1 slab culvert = 210.70

Providing, laying and levelling of dry stone soling works in the foundation all complete. (old
2
Norms)
i) Aprons U/S and Down Steam 2 6.30 4.20 0.30 15.87 L=(2S+2E)/2, B=F1
ii) Middle Portion 1 10.80 4.20 0.30 13.60
Total for 1 slab culvert = 29.47

Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing
3
and Technical Specifications., RCC Grade M 15 including F2 finish formwork .[SS/SP-2000]
i) Abutment 2 10.80 2.68 0.45 26.04
ii) Wing Walls 4 8.00 1.98 0.45 28.51
L=2(S-0.1H)
iii) Aprons U/S and Down Steam 2 6.30 4.20 0.20 10.58 +2F1*sin(30))/2,
B=F1
iv) Middle Portion 1 10.80 4.20 0.20 9.07
Total for 1 slab culvert = 74.20

Providing and laying Plum concrete ( Boulder mixed concrete) as per Drawing and Specifications,
4
60% M 15 concrete and 40% boulders/stones, using Mechanical Aids. [SS-2421]
i) Abutment 2 10.80 1.53 5.00 164.70
ii) Wing Walls 4 8.00 1.14 2.80 102.14
iii) U/S and D/S Cut Off 2 8.40 0.30 0.60 3.02
Total for 1 slab culvert = 269.86

Providing , Preparing and Installing form work including necessary supports and removing after
5 completion for foundation and footings., (Class F1 Finish), Using timber (soft wood ) [SS 1804,
1805]
i) Abutment 2 12.32 5.00 123.20 P=(2*T+2*T2)*W
2 12.32 5.22 128.62 P=2*(S+2*A1)+2*W
ii) Wing Walls 2 8.30 2.80 46.48
2 8.30 2.80 46.48
iii) U/S and D/S Cut Off 4 8.70 0.60 20.87
Total for 1 slab culvert = 365.65

Providing and laying of Plain/Reinforced Cement Concrete in Foundation complete as per Drawing
6
and Technical Specifications., RCC Grade M 25 including F2 finish formwork .(SS/SP-2000)

i) Slab 1 6.14 10.80 0.42 27.85 L=S+2*(A-T1)


ii) kerb 2 6.14 area 0.15 m2 1.81
Concrete Cap 2 10.80 area 0.24 m2 5.14
Total for 1 slab culvert = 34.80

Providing and laying , fitting and placing un-coated Mild steel / HYSD reinforcement complete in
7
foundation as per drawing and technical specification. [SS-2014]
i) Bar Bending Schedule of kerb:
Mark a6 56 1.74 @ 0.62kg/m 60.41
Mark a7 12 5.44 @ 0.62kg/m 40.47
ii) Bar Bending schedule of Abutment Seat: -
Mark s1 18 11.00 @ 0.62kg/m 122.76
Mark s2 70 1.94 @ 0.62kg/m 84.19

Prepared by: Checked by: Approved by:


Length Breadth Height
SN Description of Works Nos. Quantity Units Remarks
(m) (m) (m)
Mark s3 113 0.60 @ 1.58kg/m 107.12
iii) Bar Bending schedule of Culvert(Excluding kerb and Abutment Seat): -
Mark a1 78 6.34 @ 2.47kg/m 1,221.46
Mark a2 37 11.00 @ 0.89kg/m 362.23
Mark a3 78 6.34 @ 0.89kg/m 440.12
Mark a4 37 11.00 @ 0.89kg/m 362.23
Mark a5 2 11.00 @ 0.89kg/m 19.58
Total for 1 slab culvert = 2.82 MT.

Supply and Transportation of Machine


Made Mechanically selvedged double
twisted hexagonal mesh type 100mm x
120 mm Gabion boxes / mattresses
with diapharagms, with binding wire
2.4 mm, mesh wire 3.0 mm and
selvedged wire 3.90 mm, placing in
8 position including stretching, forming 1 8.40 2.94 0.50 12.34
compartments; tying with bracing
wires and tie wires; tying down the lid,
providing and filling stone / boulder in
gabion boxes / mattresses etc.
including dressing, beding, bonding
etc. all complete as per special
specification and drawings.

Total for 1 slab culvert = 12.34

Prepared by: Checked by: Approved by:


Detailed Engineering Survey and Design of Rajbiraj Ring-Road, Saptari Detailed Cost Estimate

#REF!
#REF!
#REF!
#REF!

#REF!

Quantity Estimate of Pipe Culvert (60 cm dia)


Assumptions:
Abutment Height (m)= 2.5 Catchpit Wall Height (m)= 1.2 ###
Pavement Thickness (m)= 0.35 Pipe Length (m)= 11 ###
Nos of hume pipe = #REF!

#REF!

Width Height
S. No. Description of Works Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal
1 of stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
Head wall cum 1 3.00 1.80 1.50 8.10
Pipe portion cum 1 11.00 0.90 1.84 18.22
Stone soling portion
Below headwall cum 1 3.00 1.80 0.15 0.81
PCC Lining
Below headwall cum 1 11.00 0.90 0.10 0.99
Gabion works upstream and
downstream
Upstream protection cum 1 3.00 1.00 0.50 1.50
Downstream protection cum 1 3.00 3.00 0.30 2.70
Total = 32.32 cum
Total for 90% excavation = 29.08
Total quantity for #REF! nos = #REF! #REF! #REF!

Earthwork in excavation in foundation of structures (manually- 10%) including constrution of shoring and bracing, removal of
2 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
10 % of total excavation cum 3.23
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and laying Random Rubble Stone Masonry work in cement mortar 1:4 in structure all complete as per drawing,
3
specification and instruction
Head wall cum 1 3.00 1.15 3.15 10.87
Deduction for pipe cum -1 1.26 0.60 -0.76
Inlet wall cum 1 3.00 0.55 1.20 1.98
Deduction for pipe cum -1 0.21 0.60 -0.13
Hill side wall cum 1 3.00 0.55 1.20 1.98
Side wall cum 2 1.50 0.52 1.20 1.87
Parapet cum 2 3.00 0.40 0.40 0.96
Total = 16.78 cum
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and laying of hand pack Stone soling with 150 to 200mm thick stones and packing with smaller stone on prepared
4
surface all complete as per drawing, specification and instruction
Below head wall cum 1 3.00 1.80 0.15 0.81
Total = 0.81 cum
Total quantity for #REF! nos = #REF! #REF! #REF!

CIAS 108 of 313


Detailed Engineering Survey and Design of Rajbiraj Ring-Road, Saptari Detailed Cost Estimate

Width Height
S. No. Description of Works Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
5 Providing and laying of Plain Cement Concrete Grade M 15 in Foundation all complete as per drawing, specification and instruct
Below head wall cum 1 3.00 1.80 0.10 0.54
Below hume pipe cum 1 11.00 0.19 2.11
Total = 2.65 cum
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing suitable material and Back filling behind abutment, wing wall and return wall all complete as per drawing,
6
specification and instruction with locally available Material, with out watering and compaction by tamping rod
Carriage way cum 1 11.00 0.75 2.09 17.24
Deduction for pipe cum -1 11.00 0.60 -6.60
Total = 10.64 cum
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and laying weep holes with 110 mm dia HDPE pipe, extending through the full width of the structure with slope of
7
1V :20H towards drawing face all complete as per drawing, specification and instruction
m 4 0.55 2.20 m
Total = 2.20
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and Laying Reinforced Cement Concrete NP3 Flush jointed pipe for culverts including fixing with cement mortar
8
1:2 all complete as per drawing, specification and instruction (SS 701) - 600 mm Internal Diameter.
m 1 11.00 11.00 m
Total = 11.00
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving , placing, laying
sides and diaphragms with binding wire and filling boulders all complete as per drawing, specification and instruction Mesh
9
wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type
100 mm X 120 mm,. Box size 2 X 1 X 1 m
Upstream protection cum 1 3.00 1.00 1.00 3.00
Downstream protection cum 1 3.00 3.00 0.50 4.50
Downstream protection cum 2 3.00 1.00 0.50 3.00
Total = 10.50 cum
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and
10
footings.(Class F1 Finish) Using timber (soft wood ) all complete as per drawing, specification and instruction
Below head wall sqm 1 11.60 0.10 1.16
Bedding concrete sqm 1 11.00 0.52 5.72
Total = 6.88 sqm
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and laying of Filter media with granular Material/stone crushed aggregates to a thickness of not less than 600 mm
11 with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing
wall and return wall to the full height compacted to a firm condition all complete as per drawing, specification and instruction
Head wall cum 1 3.00 0.20 3.15 1.89
Deduction for pipe cum -1 0.60 0.20 -0.12
Inlet wall cum 1 3.00 0.20 1.20 0.72
Deduction for pipe cum -1 0.60 0.20 -0.12
Side walls cum 2 1.50 0.20 1.20 0.72
Total = 3.09
Total quantity for #REF! nos = #REF! #REF! #REF!

CIAS 109 of 313


Detailed Engineering Survey and Design of Rajbiraj Ring-Road, Saptari Detailed Cost Estimate

Width Height
S. No. Description of Works Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Providing and laying of a geotextile filter between pitching and embankment slopes all complete as per drawing, specification
12
and instruction.
Head wall sqm 1 0.20 3.15 0.63
Deduction for pipe sqm -1 0.90 0.20 -0.18
Inlet wall sqm 1 0.20 0.80 0.16
Deduction for pipe sqm -1 0.90 0.20 -0.18
Side walls sqm 2 1.50 0.20 0.60
Total = 1.03
Total quantity for #REF! nos = #REF! #REF! #REF!
Grand Total #REF!

CIAS 110 of 313


#REF!
#REF!
#REF!
#REF!
#REF!

Quantity Estimate of Pipe Culvert (60 cm dia)


Assumptions:
Abutment Height (m)= 3 Catchpit Wall Height (m)= 1.18 ###
Pavement Thickness (m)= 0.25 Pipe Length (m)= 13 ###
Nos of hume pipe = 0

Width Height
S. No. Description of Works Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal of
1 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
Head wall cum 1 3.00 1.80 1.50 8.10
Catchpit cum 1 2.99 2.99 1.18 10.52
Pipe portion cum 1 13.00 0.90 1.84 21.53
Stone soling portion
Catchpit cum 1 2.99 2.99 0.15 1.34
Below headwall cum 1 3.00 1.80 0.15 0.81
PCC Lining
Catchpit cum 1 2.99 2.99 0.10 0.89
Below headwall cum 1 21.03 0.90 0.10 1.89
Gabion works upstream and
downstream
Upstream protection cum 1 3.00 1.00 0.50 1.50
Downstream protection cum 1 3.00 3.00 0.30 2.70
Total = 49.28 cum
Total for 90% excavation = 44.35
Total quantity for 0 nos = 0.00 #REF! #REF!

Earthwork in excavation in foundation of structures (manually- 10%) including constrution of shoring and bracing, removal of
2 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
10 % of total excavation cum 4.93
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying Random Rubble Stone Masonry work in cement mortar 1:4 in structure all complete as per drawing,
3
specification and instruction
Head wall cum 1 3.00 1.15 3.15 10.87
Deduction for pipe cum -1 1.26 0.60 -0.76
Inlet wall cum 1 3.00 0.55 1.18 1.95
Deduction for pipe cum -1 0.21 0.60 -0.13
Hill side wall cum 1 3.00 0.55 1.18 1.95
Side wall cum 2 1.50 0.52 1.18 1.84
Parapet cum 2 3.00 0.40 0.40 0.96
Total = 16.68 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of hand pack Stone soling with 150 to 200mm thick stones and packing with smaller stone on prepared
4
surface all complete as per drawing, specification and instruction
Catchpit soling cum 1 2.99 2.99 0.15 1.34
Below head wall cum 1 3.00 1.80 0.15 0.81
Total = 2.15 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of Plain Cement Concrete Grade M 15 in Foundation all complete as per drawing, specification and
5
instruction.
Catchpit cum 1 2.99 2.99 0.10 0.89

Page 111 of 313


#REF!
#REF!
#REF!
#REF!
#REF!

Quantity Estimate of Pipe Culvert (60 cm dia)


Assumptions:
Abutment Height (m)= 3 Catchpit Wall Height (m)= 1.18 ###
Pavement Thickness (m)= 0.25 Pipe Length (m)= 13 ###
Nos of hume pipe = 0

Width Height
S. No. Description of Works Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Below head wall cum 1 3.00 1.80 0.10 0.54
Below hume pipe cum 1 13.00 0.19 2.50
Total = 3.93 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing suitable material and Back filling behind abutment, wing wall and return wall all complete as per drawing, specification
6
and instruction with locally available Material, with out watering and compaction by tamping rod
Carriage way cum 1 13.00 0.75 2.09 20.38
Deduction for pipe cum -1 13.00 0.45 -5.85
Hill side wall cum 1 2.99 0.10 1.18 0.35
Catchpit side walls cum 2 1.50 0.12 1.18 0.42
Total = 15.31 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying weep holes with 110 mm dia HDPE pipe, extending through the full width of the structure with slope of
7
1V :20H towards drawing face all complete as per drawing, specification and instruction
m 4 0.55 2.20 m
Total = 2.20
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and Laying Reinforced Cement Concrete NP3 Flush jointed pipe for culverts including fixing with cement mortar 1:2
8
all complete as per drawing, specification and instruction (SS 701) - 600 mm Internal Diameter.
m 1 13.00 13.00 m
Total = 13.00
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving , placing, laying sides
and diaphragms with binding wire and filling boulders all complete as per drawing, specification and instruction Mesh wire- 10
9
Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X
120 mm,. Box size 2 X 1 X 1 m
Upstream protection cum 1 3.00 1.00 1.00 3.00
Downstream protection cum 1 3.00 3.00 0.50 4.50
Downstream protection cum 2 3.00 1.00 0.50 3.00
Total = 10.50 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and
10
footings.(Class F1 Finish) Using timber (soft wood ) all complete as per drawing, specification and instruction
Below head wall sqm 1 11.60 0.10 1.16
At Catchpit sqm 1 12.37 0.10 1.24
Bedding concrete sqm 1 13.00 0.52 6.76
Total = 9.16 sqm
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of Filter media with granular Material/stone crushed aggregates to a thickness of not less than 600 mm with
11 smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall
and return wall to the full height compacted to a firm condition all complete as per drawing, specification and instruction

Page 112 of 313


#REF!
#REF!
#REF!
#REF!
#REF!

Quantity Estimate of Pipe Culvert (60 cm dia)


Assumptions:
Abutment Height (m)= 3 Catchpit Wall Height (m)= 1.18 ###
Pavement Thickness (m)= 0.25 Pipe Length (m)= 13 ###
Nos of hume pipe = 0

Width Height
S. No. Description of Works Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Head wall cum 1 3.00 0.20 3.15 1.89
Deduction for pipe cum -1 0.60 0.20 -0.12
Inlet wall cum 1 3.00 0.20 1.18 0.71
Deduction for pipe cum -1 0.60 0.20 -0.12
Hill side wall cum 1 3.00 0.20 1.18 0.71
Side walls cum 2 1.50 0.20 1.18 0.71
Total = 3.77
Total quantity for 0 nos = 0.00 #REF! #REF!

Page 113 of 313


Quantity Estimate of Pipe Culvert (90 cm dia)

#REF!
#REF!
#REF!
#REF!
#REF!

Quantity Estimate of Pipe Culvert (60 cm dia)


Assumptions:
Abutment Height (m)= 3 Catchpit Wall Height (m)= 1.18 ###
Pavement Thickness (m)= 0.54 Pipe Length (m)= 13 ###
Nos of hume pipe = 0

Description of Works Width Height


S. No. Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal of
1 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
Head wall cum 1 3.00 1.80 1.50 8.10
Catchpit cum 1 2.99 2.99 1.18 10.52
Pipe portion cum 1 13.00 0.90 1.84 21.53
Stone soling portion
Catchpit cum 1 2.99 2.99 0.15 1.34
Below headwall cum 1 3.00 1.80 0.15 0.81
PCC Lining
Catchpit cum 1 2.99 2.99 0.10 0.89
Below headwall cum 1 13.00 0.90 0.10 1.17
Gabion works upstream and
downstream
Upstream protection cum 1 3.00 1.00 0.50 1.50
Downstream protection cum 1 3.00 3.00 0.30 2.70
Total = 48.56 cum
Total for 90% excavation = 43.70
Total quantity for 0 nos = 0.00 #REF! #REF!

Earthwork in excavation in foundation of structures (manually- 10%) including constrution of shoring and bracing, removal of
2 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
10 % of total excavation cum 4.86
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying Random Rubble Stone Masonry work in cement mortar 1:4 in structure all complete as per drawing,
3
specification and instruction
Head wall cum 1 3.00 1.15 3.15 10.87
Deduction for pipe cum -1 1.26 0.45 -0.57
Inlet wall cum 1 3.00 0.55 1.18 1.95
Deduction for pipe cum -1 0.21 0.45 -0.09
Hill side wall cum 1 3.00 0.55 1.18 1.95
Side wall cum 2 1.50 0.52 1.18 1.84
Parapet cum 2 3.00 0.40 0.40 0.96
Total = 16.90 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of hand pack Stone soling with 150 to 200mm thick stones and packing with smaller stone on prepared
4
surface all complete as per drawing, specification and instruction
Catchpit soling cum 1 2.99 2.99 0.15 1.34
Below head wall cum 1 3.00 1.80 0.15 0.81
Total = 2.15 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of Plain Cement Concrete Grade M 15 in Foundation all complete as per drawing, specification and
5
instruction.
Catchpit cum 1 2.99 2.99 0.10 0.89
Below head wall cum 1 3.00 1.80 0.10 0.54
Below hume pipe cum 1 13.00 0.19 2.50
Total = 3.93 cum

Page 114 of 313


Quantity Estimate of Pipe Culvert (90 cm dia)

Description of Works Width Height


S. No. Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing suitable material and Back filling behind abutment, wing wall and return wall all complete as per drawing, specification
6
and instruction with locally available Material, with out watering and compaction by tamping rod
Carriage way cum 1 13.00 0.75 2.09 20.38
Deduction for pipe cum -1 13.00 0.45 -5.85
Hill side wall cum 1 2.99 0.10 1.18 0.35
Catchpit side walls cum 2 1.50 0.12 1.18 0.42
Total = 15.31 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying weep holes with 110 mm dia HDPE pipe, extending through the full width of the structure with slope of
7
1V :20H towards drawing face all complete as per drawing, specification and instruction
m 4 0.55 2.20 m
Total = 2.20
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and Laying Reinforced Cement Concrete NP3 Flush jointed pipe for culverts including fixing with cement mortar 1:2
8
all complete as per drawing, specification and instruction (SS 701) - 600 mm Internal Diameter.
m 1 13.00 13.00 m
Total = 13.00
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving , placing, laying sides
and diaphragms with binding wire and filling boulders all complete as per drawing, specification and instruction Mesh wire- 10
9
Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X
120 mm,. Box size 2 X 1 X 1 m
Upstream protection cum 1 3.00 1.00 1.00 3.00
Downstream protection cum 1 3.00 3.00 0.50 4.50
Downstream protection cum 2 3.00 1.00 0.50 3.00
Total = 10.50 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and
10
footings.(Class F1 Finish) Using timber (soft wood ) all complete as per drawing, specification and instruction
Below head wall sqm 1 11.60 0.10 1.16
At Catchpit sqm 1 12.37 0.10 1.24
Bedding concrete sqm 1 13.00 0.52 6.76
Total = 9.16 sqm
Total quantity for 0 nos = 0.00 #REF! #REF!

Providing and laying of Filter media with granular Material/stone crushed aggregates to a thickness of not less than 600 mm with
11 smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall
and return wall to the full height compacted to a firm condition all complete as per drawing, specification and instruction
Head wall cum 1 3.00 0.20 3.15 1.89
Deduction for pipe cum -1 0.60 0.20 -0.12
Inlet wall cum 1 3.00 0.20 1.18 0.71
Deduction for pipe cum -1 0.60 0.20 -0.12
Hill side wall cum 1 3.00 0.20 1.18 0.71
Side walls cum 2 1.50 0.20 1.18 0.71
Total = 3.77
Total quantity for 0 nos = 0.00 #REF! #REF!

Page 115 of 313


Quantity Estimate of Pipe Culvert (90 cm dia)

#REF!
#REF!
#REF!
#REF!
#REF!

Quantity Estimate of Pipe Culvert (90 cm dia)


Assumptions:
Abutment Height (m)= 3 Catchpit Wall Height (m)= 0.8 ###
Pavement Thickness (m)= 0.6 Pipe Length (m)= 13 ###
Nos of hume pipe = 0

Description of Works Width Height


S. No. Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
#REF!
1

Head wall cum 1 3.00 1.80 1.50 8.10


Catchpit cum 1 2.58 2.58 0.80 5.33
Pipe portion cum 1 13.00 1.20 1.65 25.74
Stone soling portion
Catchpit cum 1 2.58 2.58 0.15 1.00
Below headwall cum 1 3.00 1.80 0.15 0.81
PCC Lining
Catchpit cum 1 2.58 2.58 0.10 0.67
Below headwall cum 1 3.00 1.80 0.10 0.54
Gabion works upstream and
downstream
Upstream protection cum 1 3.00 1.00 0.50 1.50
Downstream protection cum 1 3.00 3.00 0.30 2.70
Total = 46.38 cum
Total for 90% excavation = 41.74
Total quantity for 0 nos = 0.00 #REF! #REF!

#REF!
2

10 % of total excavation cum 4.64


Total quantity for 0 nos = 0.00 #REF! #REF!

#REF!
3

Head wall cum 1 3.00 1.15 3.15 10.87


Deduction for pipe cum -1 1.17 0.90 -1.05
Inlet wall cum 1 3.00 0.45 0.80 1.08
Deduction for pipe cum -1 0.08 0.90 -0.07
Hill side wall cum 1 3.00 0.45 0.80 1.08
Side wall cum 2 1.50 0.42 0.80 1.01
Parapet cum 2 3.00 0.40 0.40 0.96
Total = 13.87 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

#REF!
4

Catchpit soling cum 1 2.58 2.58 0.15 1.00


Below head wall cum 1 3.00 1.80 0.15 0.81
Total = 1.81 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

#REF!
5

Catchpit cum 1 2.58 2.58 0.10 0.67


Below head wall cum 1 3.00 1.80 0.10 0.54
Below hume pipe cum 1 13.00 0.19 2.50

Page 116 of 313


Quantity Estimate of Pipe Culvert (90 cm dia)

Description of Works Width Height


S. No. Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Total = 3.70 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

#REF!
6

Carriage way cum 1 13.00 1.10 1.90 27.17


Deduction for pipe cum -1 13.00 0.90 -11.70
Hill side wall cum 1 2.58 0.10 0.80 0.21
Catchpit side walls cum 2 1.50 0.02 0.80 0.05
Total = 15.72 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

#REF!
7

m 4 0.90 3.60 m
Total = 3.60
Total quantity for 0 nos = 0.00 #REF! #REF!

#REF!
8

m 1 13.00 13.00 m
Total = 13.00
Total quantity for 0 nos = 0.00 #REF! #REF!

#REF!

Upstream protection cum 1 3.00 1.00 1.00 3.00


Downstream protection cum 1 3.00 3.00 0.50 4.50
Downstream protection cum 2 3.00 1.00 0.50 3.00
Total = 10.50 cum
Total quantity for 0 nos = 0.00 #REF! #REF!

#REF!
10
Below head wall sqm 1 9.60 0.10 0.96
At Catchpit sqm 1 10.72 0.10 1.07
Bedding concrete sqm 1 13.00 0.72 9.36
Total = 11.39 sqm
Total quantity for 0 nos = 0.00 #REF! #REF!

#REF!
11

Head wall sqm 1 0.20 3.15 0.63


Deduction for pipe sqm -1 0.90 0.20 -0.18
Inlet wall sqm 1 0.20 0.80 0.16
Deduction for pipe sqm -1 0.90 0.20 -0.18
Hill side wall sqm 1 0.20 0.80 0.16
Side walls sqm 2 1.50 0.20 0.60
Total = 1.19
Total quantity for 0 nos = 0.00 #REF! #REF!
Grand Total #REF!

Page 117 of 313


Detailed Engineering Survey and Design of Rajbiraj Ring-Road, Saptari Detailed Cost Estimate

#REF!
#REF!
#REF!
#REF!

#REF!

Quantity Estimate of Pipe Culvert (120 cm dia)


Assumptions:
Abutment Height (m)= 3 Catchpit Wall Height (m)= 1.2 ###
Pavement Thickness (m)= 0.35 Pipe Length (m)= 11 ###
Nos of hume pipe = #REF!

#REF!

Width Height
S. No. Description of Works Unit Nos. Length (m) Quantity Rate Amount
(m) (m)
Earthwork in excavation in foundation of structures (by Machine- 90%) including constrution of shoring and bracing, removal of
1 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
Head wall cum 1 3.00 1.80 1.50 8.10
Pipe portion cum 1 11.00 1.20 1.65 21.78
Stone soling portion
Below headwall cum 1 3.00 1.80 0.15 0.81
PCC Lining
Below headwall cum 1 3.00 1.80 0.10 0.54
Gabion works upstream and
downstream
Upstream protection cum 1 3.00 1.00 0.50 1.50
Downstream protection cum 1 3.00 3.00 0.30 2.70
Total = 35.43 cum
Total for 90% excavation = 31.89
Total quantity for #REF! nos = #REF! #REF! #REF!

Earthwork in excavation in foundation of structures (manually- 10%) including constrution of shoring and bracing, removal of
2 stumps and other deleterious matter and backfilling with approved Materials all complete as per drawing, specification and
instruction in ordinary soil depth upto 3m
10 % of total excavation cum 3.54
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and laying Random Rubble Stone Masonry work in cement mortar 1:4 in structure all complete as per drawing,
3
specification and instruction
Head wall cum 1 3.00 1.15 3.15 10.87
Deduction for pipe cum -1 1.17 1.20 -1.40
Inlet wall cum 1 3.00 0.45 1.20 1.62
Deduction for pipe cum -1 0.08 1.20 -0.10
Side wall cum 2 1.50 0.42 1.20 1.51
Parapet cum 2 3.00 0.40 0.40 0.96
Total = 13.46 cum
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and laying of hand pack Stone soling with 150 to 200mm thick stones and packing with smaller stone on prepared surface
4
all complete as per drawing, specification and instruction
Below head wall cum 1 3.00 1.80 0.15 0.81
Total = 0.81 cum
Total quantity for #REF! nos = #REF! #REF! #REF!

5 Providing and laying of Plain Cement Concrete Grade M 15 in Foundation all complete as per drawing, specification and instruction.
Below head wall cum 1 3.00 1.80 0.10 0.54
Below hume pipe cum 1 11.00 0.19 2.11
Total = 2.65 cum
Total quantity for #REF! nos = #REF! #REF! #REF!

CIAS 118 of 313


Detailed Engineering Survey and Design of Rajbiraj Ring-Road, Saptari Detailed Cost Estimate

Width Height
S. No. Description of Works Unit Nos. Length (m) Quantity Rate Amount
(m) (m)

Providing suitable material and Back filling behind abutment, wing wall and return wall all complete as per drawing, specification
6
and instruction with locally available Material, with out watering and compaction by tamping rod
Carriage way cum 1 11.00 1.10 1.90 22.99
Deduction for pipe cum -1 11.00 1.20 -13.20
Hill side wall cum 1 2.58 0.10 1.20 0.31
Catchpit side walls cum 2 1.50 0.02 1.20 0.07
Total = 10.17 cum
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and laying weep holes with 110 mm dia HDPE pipe, extending through the full width of the structure with slope of
7
1V :20H towards drawing face all complete as per drawing, specification and instruction
m 4 0.90 3.60 m
Total = 3.60
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and Laying Reinforced Cement Concrete NP3 Flush jointed pipe for culverts including fixing with cement mortar 1:2 all
8
complete as per drawing, specification and instruction (SS 701) - 900 mm Internal Diameter.
m 1 11.00 11.00 m
Total = 11.00
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving , placing, laying sides
and diaphragms with binding wire and filling boulders all complete as per drawing, specification and instruction Mesh wire- 10
9
Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X
120 mm,. Box size 2 X 1 X 1 m
Upstream protection cum 1 3.00 1.00 1.00 3.00
Downstream protection cum 1 3.00 3.00 0.50 4.50
Downstream protection cum 2 3.00 1.00 0.50 3.00
Total = 10.50 cum
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and
10
footings.(Class F1 Finish) Using timber (soft wood ) all complete as per drawing, specification and instruction
Below head wall sqm 1 9.60 0.10 0.96
Bedding concrete sqm 1 11.00 0.72 7.92
Total = 8.88 sqm
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and laying of Filter media with granular Material/stone crushed aggregates to a thickness of not less than 600 mm with
11 smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and
return wall to the full height compacted to a firm condition all complete as per drawing, specification and instruction
Head wall cum 1 3.00 0.20 3.15 1.89
Deduction for pipe cum -1 0.90 0.20 -0.18
Inlet wall cum 1 3.00 0.20 1.20 0.72
Deduction for pipe cum -1 0.90 0.20 -0.18
Side walls cum 2 1.50 0.20 1.20 0.72
Total = 2.97
Total quantity for #REF! nos = #REF! #REF! #REF!

Providing and laying of a geotextile filter between pitching and embankment slopes all complete as per drawing, specification and
12
instruction.
Head wall sqm 1 0.20 3.15 0.63
Deduction for pipe sqm -1 1.20 0.20 -0.24
Inlet wall sqm 1 0.20 0.80 0.16
Deduction for pipe sqm -1 1.20 0.20 -0.24
Side walls sqm 2 1.50 0.20 0.60
Total = 0.91
Total quantity for #REF! nos = #REF! #REF! #REF!
Grand Total #REF!

CIAS 119 of 313


Err:509
Err:509
Err:509
Err:509
Err:509

#REF!

DETAILED QUANTITY ESTIMATE OF BOX CULVERT (1M X 1M)

Breadth
S. No. Description Unit No. Length (m) Height (m) Quantity Rate Amount
(m)
A Deck slab
Earthwork in excavation in foundation of structures (by Machine) including constrution of shoring and bracing,
1 removal of stumps and other deleterious matter and backfilling with approved Materials as per Drawing and
Technical specifications in ordinary soil depth upto 3m
Base cum 1 10 2.75 1.5 37.13
For 4 nos Total 148.50 #REF! #REF!

Earthwork in excavation in foundation of structures (manually) including constrution of shoring and bracing,
2 removal of stumps and other deleterious matter and backfilling with approved Materials as per Drawing and
Technical specifications in ordinary soil depth upto 3m
10% of total
16.50
excavation
For 4 nos Total 66.00 #REF! #REF!

3 Providing and Laying flat bricks soling all complete as per drawing, specification and instruction
Base sqm 1 10 2.75 27.50
For 4 nos Total 110.00 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
4
Specifications.PCC Grade M 15
Base cum 1 10 2.75 0.15 4.13
Wing wall
Tappererd portion cum 0 0 0.2 0.15 0.00
Rectangular portion cum 0 0 0.2 0.15 0.00
Floor apron cum 0.00 0.00 0 0 0.00
Curtain wall
Type 1 curtain wall cum 1 8.6 1.85 0.15 2.39

Type 2 curtain wall cum 1 8.6 1.5 0.15 1.94


For 4 nos Total 33.79 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
5
Specifications. M20
Wing wall
Tappererd portion cum 0 0 Area= 0 0.00
Rectangular portion cum 0 0 Area= 0.00 0.00
Curtain wall
Type 1 curtain wall cum 1 8.6 AREA= 1.97 16.96

Type 2 curtain wall cum 1 8.6 AREA= 1.47 12.62


For 4 nos Total 118.34 #REF! #REF!

Providing and laying of Reinforced cement concrete in super structure RCC Grade M30/20 with Formwork and all
6
complete as per Drawing and Technical Specification

Deck slab

120 of 313
Breadth
S. No. Description Unit No. Length (m) Height (m) Quantity Rate Amount
(m)
Base Slab cum 1 10 2.6 0.38 9.88
Wall cum 2 10 0.3 1 6.00
Top Slab cum 1 10 1.6 0.35 5.60
Fillet cum 4 10 Area = 0.02 0.80

121 of 313
Breadth
S. No. Description Unit No. Length (m) Height (m) Quantity Rate Amount
(m)
Approach slab
cum 2 3.5 10 0.3 21.00
For 4 nos Total 173.12 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion for
7 walls. (Class F2 Finish), vertical plain surface.Using timber (soft wood ) all complete as per drawing, specification
and instruction
For M15 concrete sqm 1 25.5 0.15 3.83
Base Slab sqm 1 25.2 0.38 9.58
Wall sqm 2 20.6 1 41.20
Top Slab side sqm 1 23.2 0.35 8.12
Top Slab bottom sqm 1 10 1 10.00
For 4 nos Total 290.88 #REF! #REF!

Providing and laying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and
8
technical specifications
Reinforcement (@
MT 1 118.336 130 15.38
130 kg/cum) (kg)
For 4 nos Total 61.53 #REF! #REF!

Providing and laying of Stone Masonry Work in Cement Mortar 1:4 in Foundation complete as per Drawing and
9
Technical Specifications.
Floor apron
stone apron cum 0.00 0.00 0 0 0.00
For 4 nos Total 0.00 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving ,
placing, laying sides and diaphragms with binding wire and filling boulders all complete as per Drawing and
10
Technical Specification. Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12
Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,. Box size 2 X 1 X 1 m
Flexible apron
Up stream cum 1 3 8.6 0.75 19.35
down stream cum 1 6 8.6 0.75 38.70
For 4 nos Total 232.20 #REF! #REF!

Providing, fencing and erecting 50mm dia GI pipe in railing posts complete as per Drawing and Technical
11
Specifications.
m 11.2 11.20
For 4 nos Total 44.80 #REF! #REF!
Grand Total #REF!

122 of 313
Err:509
Err:509
Err:509
Err:509
Err:509

#REF!

DETAILED QUANTITY ESTIMATE OF BOX CULVERT (2MX1M)

Breadth
S. No. Description Unit No. Length (m) Height (m) Quantity Rate Amount
(m)
A Deck slab
Earthwork in excavation in foundation of structures (by Machine) including constrution of shoring and bracing,
1 removal of stumps and other deleterious matter and backfilling with approved Materials as per Drawing and
Technical specifications in ordinary soil depth upto 3m
Base cum 1 10 3.75 1.5 50.63
For 6 nos Total 303.75 #REF! #REF!

Earthwork in excavation in foundation of structures (manually) including constrution of shoring and bracing,
2 removal of stumps and other deleterious matter and backfilling with approved Materials as per Drawing and
Technical specifications in ordinary soil depth upto 3m
10% of total
33.75
excavation
For 6 nos Total 202.50 #REF! #REF!

3 Providing and Laying flat bricks soling all complete as per drawing, specification and instruction
Base sqm 1 10 3.75 37.50
For 6 nos Total 225.00 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
4
Specifications.PCC Grade M 15
Base cum 1 10 3.75 0.15 5.63
Wing wall
Tappererd portion cum 0 0 0.2 0.15 0.00
Rectangular portion cum 0 0 0.2 0.15 0.00
Floor apron cum 0.00 0.00 0 0 0.00
Curtain wall
Type 1 curtain wall cum 1 9.6 1.85 0.15 2.66

Type 2 curtain wall cum 1 9.6 1.5 0.15 2.16


For 6 nos Total 62.69 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
5
Specifications. M20
Wing wall
Tappererd portion cum 0 0 Area= 0 0.00
Rectangular portion cum 0 0 Area= 0.00 0.00
Curtain wall
Type 1 curtain wall cum 1 9.6 AREA= 1.97 18.94

Type 2 curtain wall cum 1 9.6 AREA= 1.47 14.09


For 6 nos Total 198.14 #REF! #REF!

Providing and laying of Reinforced cement concrete in super structure RCC Grade M30/20 with Formwork and
6
all complete as per Drawing and Technical Specification

Deck slab

123 of 313
Breadth
S. No. Description Unit No. Length (m) Height (m) Quantity Rate Amount
(m)
Base Slab cum 1 10 3.6 0.38 13.68
Wall cum 2 10 0.3 1 6.00
Top Slab cum 1 10 2.6 0.35 9.10
Fillet cum 4 10 Area = 0.02 0.80

124 of 313
Breadth
S. No. Description Unit No. Length (m) Height (m) Quantity Rate Amount
(m)
Approach slab
cum 2 3.5 10 0.3 21.00
For 6 nos Total 303.48 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion
7 for walls. (Class F2 Finish), vertical plain surface.Using timber (soft wood ) all complete as per drawing,
specification and instruction
For M15 concrete sqm 1 27.5 0.15 4.13
Base Slab sqm 1 27.2 0.38 10.34
Wall sqm 2 20.6 1 41.20
Top Slab side sqm 1 25.2 0.35 8.82
Top Slab bottom sqm 1 10 2 20.00
For 6 nos Total 506.89 #REF! #REF!

Providing and laying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing
8
and technical specifications
Reinforcement (@
MT 1 198.144 130 25.76
130 kg/cum) (kg)
Total 154.55 #REF! #REF!

Providing and laying of Stone Masonry Work in Cement Mortar 1:4 in Foundation complete as per Drawing
9
and Technical Specifications.
Floor apron
stone apron cum 0.00 0.00 0 0 0.00
For 6 nos Total 0.00 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving ,
placing, laying sides and diaphragms with binding wire and filling boulders all complete as per Drawing and
10
Technical Specification. Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12
Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,. Box size 2 X 1 X 1 m
Flexible apron
Up stream cum 1 3 9.6 0.75 21.60
down stream cum 1 6 9.6 0.75 43.20
For 6 nos Total 388.80 #REF! #REF!

Providing, fencing and erecting 50mm dia GI pipe in railing posts complete as per Drawing and Technical
11
Specifications.
m 13.2 13.20
For 6 nos Total 79.20 #REF! #REF!
Grand Total #REF!

125 of 313
Err:509
Err:509
Err:509
Err:509
Err:509

#REF!

DETAILED QUANTITY ESTIMATE OF BOX CULVERT (3M X 1.3M)

Length Breadth Height


S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
A Deck slab
Earthwork in excavation in foundation of structures (by Machine) including constrution of shoring and
1 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per
Drawing and Technical specifications in ordinary soil depth upto 3m
Base cum 1 10 5.55 1.5 74.93
For 3 nos Total 224.78 #REF! #REF!

Earthwork in excavation in foundation of structures (manually) including constrution of shoring and


2 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per
Drawing and Technical specifications in ordinary soil depth upto 3m
10% of total
24.98
excavation
For 3 nos Total 74.93 #REF! #REF!

3 Providing and Laying flat bricks soling all complete as per drawing, specification and instruction
Base sqm 1 10 5.55 55.50
For 3 nos Total 166.50 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
4
Specifications.PCC Grade M 15
Base cum 1 10 5.55 0.15 8.33
Wing wall
Tappererd portion cum 0 0 0.2 0.15 0.00
Rectangular
cum 0 0 0.2 0.15 0.00
portion
Floor apron cum 0.00 0.00 0 0 0.00
Curtain wall
Type 1 curtain
cum 1 10.8 1.85 0.15 3.00
wall
Type 2 curtain
cum 1 10.8 1.5 0.15 2.43
wall
For 3 nos Total 41.26 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
5
Specifications. M20
Wing wall
Tappererd portion cum 0 0 Area= 0 0.00
Rectangular
cum 0 0 Area= 0.00 0.00
portion
Curtain wall
Type 1 curtain
cum 1 10.8 AREA= 1.97 21.30
wall
Type 2 curtain
cum 1 10.8 AREA= 1.47 15.85
wall
For 3 nos Total 111.46 #REF! #REF!

Providing and laying of Reinforced cement concrete in super structure RCC Grade M30/20 with
6
Formwork and all complete as per Drawing and Technical Specification

Deck slab

126 of 313
Length Breadth Height
S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
Base Slab cum 1 10 5.4 0.45 24.30
Wall cum 2 10 0.4 1.3 10.40
Top Slab cum 1 10 3.8 0.37 14.06
Fillet cum 4 10 Area = 0.02 0.80

127 of 313
Length Breadth Height
S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
Approach slab
cum 2 3.5 10 0.3 21.00
For 3 nos Total 211.68 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after
7 completion for walls. (Class F2 Finish), vertical plain surface.Using timber (soft wood ) all complete as
per drawing, specification and instruction
For M15 concrete sqm 1 31.1 0.15 4.67
Base Slab sqm 1 30.8 0.45 13.86
Wall sqm 2 20.8 1.3 54.08
Top Slab side sqm 1 27.6 0.37 10.21
Top Slab bottom sqm 1 10 3 30.00
For 3 nos Total 338.45 #REF! #REF!

Providing and laying , fitting and placing HYSD bar reinforcement in super-structure complete as per
8
drawing and technical specifications
Reinforcement (@
MT 1 111.456 130 14.49
130 kg/cum) (kg)
For 3 nos Total 43.47 #REF! #REF!

Providing and laying of Stone Masonry Work in Cement Mortar 1:4 in Foundation complete as per
9
Drawing and Technical Specifications.
Floor apron
stone apron cum 0.00 0.00 0 0 0.00
For 3 nos Total 0.00 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting
weaving , placing, laying sides and diaphragms with binding wire and filling boulders all complete as per
10 Drawing and Technical Specification. Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057
kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,. Box size 2 X 1 X 1
m
Flexible apron
Up stream cum 1 3 10.8 0.75 24.30
down stream cum 1 6 10.8 0.75 48.60
For 3 nos Total 218.70 #REF! #REF!

Providing, fencing and erecting 50mm dia GI pipe in railing posts complete as per Drawing and
11
Technical Specifications.
m 15.6 15.60
For 3 nos Total 46.80 #REF! #REF!
Grand Total #REF!

128 of 313
Err:509
Err:509
Err:509
Err:509
Err:509

#REF!

DETAILED QUANTITY ESTIMATE OF BOX CULVERT (DOUBLE CELL 3M X 2M)

Length Breadth Height


S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
A Deck slab
Earthwork in excavation in foundation of structures (by Machine) including constrution of shoring and
1 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per
Drawing and Technical specifications in ordinary soil depth upto 3m
Base cum 1 10 7.95 1.5 107.33
Total 107.33 #REF! #REF!

Earthwork in excavation in foundation of structures (manually) including constrution of shoring and


2 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per
Drawing and Technical specifications in ordinary soil depth upto 3m
10% of total
11.93
excavation
Total 11.93 #REF! #REF!

3 Providing and Laying flat bricks soling all complete as per drawing, specification and instruction
Base sqm 1 10 7.95 79.50
Total 79.50 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
4
Specifications.PCC Grade M 15
Base cum 1 10 7.95 0.15 11.93
Wing wall
Tappererd portion cum 4 0.5 2.01 0.15 0.60
Rectangular portion cum 4 4.242 2.01 0.15 5.12
Floor apron cum 2.00 1.04 10.7 0.3 6.65
Curtain wall
Type 1 curtain wall cum 1 14.2 1.85 0.15 3.94

Type 2 curtain wall cum 1 14.2 1.5 0.15 3.20


Total 31.43 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
5
Specifications. M20
Wing wall
Tappererd portion cum 4 4.242 Area= 2.1527 36.53
Rectangular portion cum 4 0.5 Area= 1.72 3.44
Curtain wall
Type 1 curtain wall cum 1 14.2 AREA= 1.97 28.01

Type 2 curtain wall cum 1 14.2 AREA= 1.47 20.84


Total 88.82 #REF! #REF!

Providing and laying of Reinforced cement concrete in super structure RCC Grade M30/20 with
6
Formwork and all complete as per Drawing and Technical Specification

Deck slab

129 of 313
Length Breadth Height
S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
Base Slab cum 1 10 7.8 0.45 35.10
Wall cum 3 10 0.4 2 24.00
Top Slab cum 1 10 7.2 0.45 32.40
Fillet cum 8 10 Area = 0.02 1.60

130 of 313
Length Breadth Height
S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
Approach slab
cum 2 3.5 10 0.3 21.00
Total 114.10 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after
7 completion for walls. (Class F2 Finish), vertical plain surface.Using timber (soft wood ) all complete as per
drawing, specification and instruction
For M15 concrete sqm 1 35.9 0.15 5.39
Base Slab sqm 1 35.6 0.45 16.02
Wall sqm 3 20.8 2 124.80
Top Slab side sqm 1 27.6 0.45 12.42
Top Slab bottom sqm 1 10 3 30.00
Total 188.63 #REF! #REF!

Providing and laying , fitting and placing HYSD bar reinforcement in super-structure complete as per
8
drawing and technical specifications
Reinforcement (@
MT 1 88.817914 130 11.55
130 kg/cum) (kg)
Total 11.55 #REF! #REF!

Providing and laying of Stone Masonry Work in Cement Mortar 1:4 in Foundation complete as per
9
Drawing and Technical Specifications.
Floor apron
stone apron cum 2.00 1.04 10.7 0.15 3.32
Total 3.32 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting
weaving , placing, laying sides and diaphragms with binding wire and filling boulders all complete as per
10
Drawing and Technical Specification. Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057
kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,. Box size 2 X 1 X 1 m
Flexible apron
Up stream cum 1 3 14.2 0.75 31.95
down stream cum 1 6 14.2 0.75 63.90
Total 95.85 #REF! #REF!

Providing, fencing and erecting 50mm dia GI pipe in railing posts complete as per Drawing and Technical
11
Specifications.
m 22.4 22.40
Total 22.40 #REF! #REF!
Grand Total #REF!

131 of 313
Err:509
Err:509
Err:509
Err:509
Err:509

#REF!

DETAILED QUANTITY ESTIMATE OF BOX CULVERT (DOUBLE CELL 3.5M X 3M)

Breadth Height
S. No. Description Unit No. Length (m) Quantity Rate Amount
(m) (m)
A Deck slab
Earthwork in excavation in foundation of structures (by Machine) including constrution of shoring and
1 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per
Drawing and Technical specifications in ordinary soil depth upto 3m
Base cum 1 10 9.01 1.5 121.64
Total 121.64 #REF! #REF!

Earthwork in excavation in foundation of structures (manually) including constrution of shoring and bracing,
2 removal of stumps and other deleterious matter and backfilling with approved Materials as per Drawing and
Technical specifications in ordinary soil depth upto 3m
10% of total
13.52
excavation
Total 13.52 #REF! #REF!

3 Providing and Laying flat bricks soling all complete as per drawing, specification and instruction
Base sqm 1 10 9.01 90.10
Total 90.10 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
4
Specifications.PCC Grade M 15
Base cum 1 10 9.01 0.15 13.52
Wing wall
Tappererd portion cum 4 0.5 2.01 0.15 0.60
Rectangular portion cum 4 7.12656 2.01 0.15 8.59
Floor apron cum 2.00 3.09 11.76 0.3 21.82
Curtain wall
Type 1 curtain wall cum 1 15.26 1.85 0.15 4.23

Type 2 curtain wall cum 1 15.26 1.5 0.15 3.43


Total 52.20 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
5
Specifications. M20
Wing wall
Tappererd portion cum 4 7.12656 Area= 2.44595 69.72
Rectangular portion cum 4 0.5 Area= 1.72 3.44
Curtain wall
Type 1 curtain wall cum 1 15.26 AREA= 1.97 30.10

Type 2 curtain wall cum 1 15.26 AREA= 1.47 22.39


Total 125.66 #REF! #REF!

Providing and laying of Reinforced cement concrete in super structure RCC Grade M30/20 with Formwork
6
and all complete as per Drawing and Technical Specification

Deck slab

132 of 313
Breadth Height
S. No. Description Unit No. Length (m) Quantity Rate Amount
(m) (m)
Base Slab cum 1 10 8.86 0.45 39.87
Wall cum 3 10 0.42 3 37.80
Top Slab cum 1 10 8.26 0.47 38.82
Fillet cum 8 10 Area = 0.02 1.60

133 of 313
Breadth Height
S. No. Description Unit No. Length (m) Quantity Rate Amount
(m) (m)
Approach slab
cum 2 3.5 10 0.3 21.00
Total 139.09 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion
7 for walls. (Class F2 Finish), vertical plain surface.Using timber (soft wood ) all complete as per drawing,
specification and instruction
For M15 concrete sqm 1 38.02 0.15 5.70
Base Slab sqm 1 37.72 0.45 16.97
Wall sqm 3 20.84 3 187.56
Top Slab side sqm 1 28.68 0.47 13.48
Top Slab bottom sqm 1 10 3.5 35.00
Total 258.72 #REF! #REF!

Providing and laying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing
8
and technical specifications
Reinforcement (@ 130
MT 1 125.6621377 130 16.34
kg/cum) (kg)
Total 16.34 #REF! #REF!

Providing and laying of Stone Masonry Work in Cement Mortar 1:4 in Foundation complete as per Drawing
9
and Technical Specifications.
Floor apron
stone apron cum 2.00 3.09 11.76 0.15 10.91
Total 10.91 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving ,
placing, laying sides and diaphragms with binding wire and filling boulders all complete as per Drawing and
10
Technical Specification. Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire
12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,. Box size 2 X 1 X 1 m
Flexible apron
Up stream cum 1 3 15.26 0.75 34.34
down stream cum 1 6 15.26 0.75 68.67
Total 103.01 #REF! #REF!

Providing, fencing and erecting 50mm dia GI pipe in railing posts complete as per Drawing and Technical
11
Specifications.
m 24.52 24.52
Total 24.52 #REF! #REF!
Grand Total #REF!

134 of 313
Err:509
Err:509
Err:509
Err:509
Err:509

#REF!

DETAILED QUANTITY ESTIMATE OF BOX CULVERT (SINGLE CELL 4M X 1.3M)

Length Breadth Height


S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
A Deck slab
Earthwork in excavation in foundation of structures (by Machine) including constrution of shoring and
1 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per
Drawing and Technical specifications in ordinary soil depth upto 3m
Base cum 1 10 5.99 1.5 80.87
For 4 nos Total 323.46 #REF! #REF!

Earthwork in excavation in foundation of structures (manually) including constrution of shoring and


2 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per
Drawing and Technical specifications in ordinary soil depth upto 3m
10% of total
35.94
excavation
For 4 nos Total 143.76 #REF! #REF!

3 Providing and Laying flat bricks soling all complete as per drawing, specification and instruction
Base sqm 1 10 5.99 59.90
For 4 nos Total 239.60 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
4
Specifications.PCC Grade M 15
Base cum 1 10 5.99 0.15 8.99
Wing wall
Tappererd portion cum 0 0 0.2 0.15 0.00
Rectangular portion cum 0 0 0.2 0.15 0.00
Floor apron cum 0.00 0.00 0 0 0.00
Curtain wall
Type 1 curtain wall cum 1 11.84 1.85 0.15 3.29

Type 2 curtain wall cum 1 11.84 1.5 0.15 2.66


For 4 nos Total 59.74 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
5
Specifications. M20
Wing wall
Tappererd portion cum 0 0 Area= 0 0.00
Rectangular portion cum 0 0 Area= 0.00 0.00
Curtain wall
Type 1 curtain wall cum 1 11.84 AREA= 1.97 23.35

Type 2 curtain wall cum 1 11.84 AREA= 1.47 17.38


For 4 nos Total 162.92 #REF! #REF!

Providing and laying of Reinforced cement concrete in super structure RCC Grade M30/20 with Formwork
6
and all complete as per Drawing and Technical Specification

Deck slab

135 of 313
Length Breadth Height
S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
Base Slab cum 1 10 5.84 0.55 32.12
Wall cum 2 10 0.42 1.3 10.92
Top Slab cum 1 10 4.84 0.47 22.75
Fillet cum 4 10 Area = 0.02 0.80

136 of 313
Length Breadth Height
S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
Approach slab
cum 2 3.5 10 0.3 21.00
For 4 nos Total 350.35 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after
7 completion for walls. (Class F2 Finish), vertical plain surface.Using timber (soft wood ) all complete as per
drawing, specification and instruction
For M15 concrete sqm 1 31.98 0.15 4.80
Base Slab sqm 1 31.68 0.55 17.42
Wall sqm 2 20.84 1.3 54.18
Top Slab side sqm 1 29.68 0.47 13.95
Top Slab bottom sqm 1 10 4 40.00
For 4 nos Total 521.42 #REF! #REF!

Providing and laying , fitting and placing HYSD bar reinforcement in super-structure complete as per
8
drawing and technical specifications
Reinforcement (@
MT 1 162.9184 130 21.18
130 kg/cum) (kg)
For 4 nos Total 84.72 #REF! #REF!

Providing and laying of Stone Masonry Work in Cement Mortar 1:4 in Foundation complete as per
9
Drawing and Technical Specifications.
Floor apron
stone apron cum 0.00 0.00 0 0 0.00
For 4 nos Total 0.00 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting
weaving , placing, laying sides and diaphragms with binding wire and filling boulders all complete as per
10
Drawing and Technical Specification. Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057
kg/m), binding wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,. Box size 2 X 1 X 1 m
Flexible apron
Up stream cum 1 3 11.84 0.75 26.64
down stream cum 1 6 11.84 0.75 53.28
For 4 nos Total 319.68 #REF! #REF!

Providing, fencing and erecting 50mm dia GI pipe in railing posts complete as per Drawing and Technical
11
Specifications.
m 17.68 17.68
For 4 nos Total 70.72 #REF! #REF!
Grand Total #REF!

137 of 313
Err:509
Err:509
Err:509
Err:509
Err:509

#REF!

DETAILED QUANTITY ESTIMATE OF BOX CULVERT (SINGLE CELL 4M X 1M)

Length Breadth Height


S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
A Deck slab
Earthwork in excavation in foundation of structures (by Machine) including constrution of shoring and
1 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per
Drawing and Technical specifications in ordinary soil depth upto 3m
Base cum 1 10 5.99 1.5 80.87
For 2 nos Total 161.73 #REF! #REF!

Earthwork in excavation in foundation of structures (manually) including constrution of shoring and


2 bracing, removal of stumps and other deleterious matter and backfilling with approved Materials as per
Drawing and Technical specifications in ordinary soil depth upto 3m
10% of total
17.97
excavation
For 2 nos Total 35.94 #REF! #REF!

3 Providing and Laying flat bricks soling all complete as per drawing, specification and instruction
Base sqm 1 10 5.99 59.90
For 2 nos Total 119.80 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
4
Specifications.PCC Grade M 15
Base cum 1 10 5.99 0.15 8.99
Wing wall
Tappererd portion cum 0 0 0.2 0.15 0.00
Rectangular portion cum 0 0 0.2 0.15 0.00
Floor apron cum 0.00 0.00 0 0 0.00
Curtain wall
Type 1 curtain wall cum 1 11.84 1.85 0.15 3.29

Type 2 curtain wall cum 1 11.84 1.5 0.15 2.66


For 2 nos Total 29.87 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical
5
Specifications. M20
Wing wall
Tappererd portion cum 0 0 Area= 0 0.00
Rectangular portion cum 0 0 Area= 0.00 0.00
Curtain wall
Type 1 curtain wall cum 1 11.84 AREA= 1.97 23.35

Type 2 curtain wall cum 1 11.84 AREA= 1.47 17.38


For 2 nos Total 81.46 #REF! #REF!

Providing and laying of Reinforced cement concrete in super structure RCC Grade M30/20 with Formwork
6
and all complete as per Drawing and Technical Specification

Deck slab

138 of 313
Length Breadth Height
S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
Base Slab cum 1 10 5.84 0.55 32.12
Wall cum 2 10 0.42 1 8.40
Top Slab cum 1 10 4.84 0.47 22.75
Fillet cum 4 10 Area = 0.02 0.80

139 of 313
Length Breadth Height
S. No. Description Unit No. Quantity Rate Amount
(m) (m) (m)
Approach slab
cum 2 3.5 10 0.3 21.00
For 2 nos Total 170.14 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion
7 for walls. (Class F2 Finish), vertical plain surface.Using timber (soft wood ) all complete as per drawing,
specification and instruction
For M15 concrete sqm 1 31.98 0.15 4.80
Base Slab sqm 1 31.68 0.55 17.42
Wall sqm 2 20.84 1 41.68
Top Slab side sqm 1 29.68 0.47 13.95
Top Slab bottom sqm 1 10 4 40.00
For 2 nos Total 235.70 #REF! #REF!

Providing and laying , fitting and placing HYSD bar reinforcement in super-structure complete as per
8
drawing and technical specifications
Reinforcement (@ 130
MT 1 81.4592 130 10.59
kg/cum) (kg)
For 2 nos Total 21.18 #REF! #REF!

Providing and laying of Stone Masonry Work in Cement Mortar 1:4 in Foundation complete as per Drawing
9
and Technical Specifications.
Floor apron
stone apron cum 0.00 0.00 0 0 0.00
For 2 nos Total 0.00 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving
, placing, laying sides and diaphragms with binding wire and filling boulders all complete as per Drawing
10
and Technical Specification. Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding
wire 12 Swg (0.0409 kg/m) Hexagonal mesh Type 100 mm X 120 mm,. Box size 2 X 1 X 1 m
Flexible apron
Up stream cum 1 3 11.84 0.75 26.64
down stream cum 1 6 11.84 0.75 53.28
For 2 nos Total 159.84 #REF! #REF!

Providing, fencing and erecting 50mm dia GI pipe in railing posts complete as per Drawing and Technical
11
Specifications.
m 17.68 17.68
For 2 nos Total 35.36 #REF! #REF!
Grand Total #REF!

140 of 313
Err:509
Err:509
Err:509
Err:509
Err:509

DETAILED QUANTITY ESTIMATE OF BOX CULVERT (TYPE - I)

Box Culvert Details


No of cell = 2 nos
Length= X 1 m
Width= a 2 m
Clear Height= b 2 m
Extra width of base
c 0.3 m
slab
Top slab Thickness d 0.4 m
Base Slab thickness e 0.4 m
Wall thickness f 0.7 m
g 0.3 m
h 0 m
PCC Depth= = 0.15 m
Fillet= = 0.2 m
12dia 10dia 8dia
Fillet no= = 8 nos 8
Wall no = 3 nos
Top Slab width = 6.1 m
Base slab width = 6.7 m
PCC Width= = 6.85 m
Soling Width= = 6.85 m

Approach slab =
No = 2 no (Both Side)
length = 3.5 m
depth = 0.3
Width = 1 m

Wing Wall At Min Height


At Maximum height
no 1.00 1.00 nos
base width 1.81 1.81 m
height 2.15 3.60 m
length 0.50 4.10 m

Base Area 0.91 0.91 m^2


Top Area 0.27 0.27 m^2
Right Triangle portion 0.06 0.06 m^2
Left trapazoidal portion 0.49 1.32 m^2
Total Area 1.72 2.56 m^2

Floor apron No = 2.00 nos


Stone apron thickness = 0.15 m
M15 concrete thickness = 0.3 m

width at near box


= 6.1 m
culvert
width at end = 13.1 m
length = 0.84 m

Flexible apron Up stream down stream


No 1 1 nos
Length = 3 6 m
width = 13.1 13.1 m
thickness 0.75 0.75 m

Curtain wall Type I Type II


No 1 1 no
Length 13.1 13.1 m
M15 PCC base width 1.85 1.5 m
M15 PCC base
0.15 0.15 m
thickness
M20 PCC area 1.97 1.47 m^2

S. No. Description Unit No. Length (m) Breadth (m) Height (m) Quantity Rate Amount
A Deck slab
Earthwork in excavation in foundation of structures (by Machine) including constrution of shoring and bracing, removal of
1 stumps and other deleterious matter and backfilling with approved Materials as per Drawing and Technical specifications
in ordinary soil depth upto 3m
Base cum 1 1 6.85 1.5 9.25
Total 9.25 #REF! #REF!

Earthwork in excavation in foundation of structures (manually) including constrution of shoring and bracing, removal of
2 stumps and other deleterious matter and backfilling with approved Materials as per Drawing and Technical specifications
in ordinary soil depth upto 3m
10% of total
1.03
excavation
Total 1.03 #REF! #REF!

3 Providing and Laying flat bricks soling all complete as per drawing, specification and instruction
Base sqm 1 1 6.85 6.85
Total 6.85 #REF! #REF!

Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical Specifications.PCC
4
Grade M 15
Base cum 1 1 6.85 0.15 1.03
Wing wall
Tappererd portion cum 4 0.5 2.01 0.15 0.60
Rectangular portion cum 4 4.1006 2.01 0.15 4.95
Floor apron cum 2.00 0.84 9.6 0.3 4.85
Curtain wall
Type 1 curtain wall cum 1 13.1 1.85 0.15 3.64
Type 2 curtain wall cum 1 13.1 1.5 0.15 2.95
Total 18.01 #REF! #REF!

5 Providing and laying of Plain Cement Concrete in Foundation complete as per Drawing and Technical Specifications. M20

Wing wall
Tappererd portion cum 4 4.1006 Area= 2.138325 35.07
Rectangular portion cum 4 0.5 Area= 1.72 3.44
Curtain wall
Type 1 curtain wall cum 1 13.1 AREA= 1.97 25.84
Type 2 curtain wall cum 1 13.1 AREA= 1.47 19.22
Total 9.48 #REF! #REF!

Providing and laying of Reinforced cement concrete in super structure RCC Grade M30/20 with Formwork and all
6
complete as per Drawing and Technical Specification

Deck slab

Base Slab cum 1 1 6.7 0.4 2.68


Wall cum 3 1 0.7 2 4.20
Top Slab cum 1 1 6.1 0.4 2.44
Fillet cum 8 1 Area = 0.02 0.16
Approach slab
cum 2 3.5 1 0.3 2.10
Total 2.10 #REF! #REF!

Providing , Preparing and Installing form work including necessary supports and removing after completion for walls.
7
(Class F2 Finish), vertical plain surface.Using timber (soft wood ) all complete as per drawing, specification and instruction

For M15 concrete sqm 1 15.7 0.15 2.36


Base Slab sqm 1 15.4 0.4 6.16
Wall sqm 3 3.4 2 20.40
Top Slab side sqm 1 8.8 0.4 3.52
Top Slab bottom sqm 1 1 2 2.00
Total 34.44 #REF! #REF!

Providing and laying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and
8
technical specifications
Reinforcement (@ 130
MT 1 9.48 130 1.23
kg/cum) (kg)
Total 1.23 #REF! #REF!

Providing and laying of Stone Masonry Work in Cement Mortar 1:4 in Foundation complete as per Drawing and Technical
9
Specifications.
Floor apron
stone apron cum 2.00 0.84 9.6 0.15 2.43
Total 2.43 #REF! #REF!

Providing and laying Gabion structure for retaining earth with diaphragm including rolling, cutting weaving , placing,
laying sides and diaphragms with binding wire and filling boulders all complete as per Drawing and Technical
10
Specification. Mesh wire- 10 Swg(0.0615 kg/m), Selvedge Wire 8 Swg ( 0.1057 kg/m), binding wire 12 Swg (0.0409 kg/m)
Hexagonal mesh Type 100 mm X 120 mm,. Box size 2 X 1 X 1 m
Flexible apron
Up stream cum 1 3 13.1 0.75 29.48
down stream cum 1 6 13.1 0.75 58.95
Total 88.43 #REF! #REF!

11 Providing, fencing and erecting 50mm dia GI pipe in railing posts complete as per Drawing and Technical Specifications.
m 20.2 20.20
Total 20.20 #REF! #REF!
Grand Total #REF!
Err:509
Err:509
Err:509
Err:509

DISTRICT RATES

District: Jhapa FY : 2077/78


(A) District Rate: Labour / Transportaion
S.N. Particulars Unit Rate Remarks
1 Labour- Unskilled md 545.00
2 Labour- Semi-Skilled md 625.00 Assumed
3 Labour- Skilled md 790.00
4 Watchman md 545.00
5 Foreman md 790.00
6 Supervisor md 550.00
7 Length Worker md 625.00
8 Equipment Operator hrs 100.00 780/md
9 Equipment Operator Helper hrs 75.00 700/md
10 a) Transportaion by Truck/Tractor including Transportation
3.20 km
load/unload (upto 10km) Distance=
i) in Pitch road kg/km 0.01 0.019 per kg
ii) in Gravel road kg/km 0.02 0.030 per kg
iii) in earthern road kg/km 0.06 0.093 per kg
b) Transportation of concrete poles upto 5km per no 726.00
11 Local Tax for sand per cum 80.00
12 Local Tax for boulder per cum 115.00

(B) District Rate: Materials


Transportatio
Material Adopted
Unit n
Rate Rate
S.N. Particulars Rate
1 Cement-OPC bag 825.00 26.50 856.50
2 Cement-OPC mt 16,500.00 530.00 17,030.00
3 Chimney brick (Class 1) thousand 16,000.00 76.00 17,076.00
4 Chimney brick (Class 2) thousand 12,000.00 76.00 13,076.00
6 Brick nos 16.00 16.00
7 Sand cu m 770.00 - 850.00
8 Aggregates- 10 mm down cu m 1,100.00 51.07 1,151.07
9 Aggregates- 10 to 20 mm cu m 1,265.00 51.07 1,316.07
10 Aggregates- 20 to 40 mm cu m 1,100.00 51.07 1,151.07
11 River bed single (10 to 40mm) cu m 785.00 - 900.00
12 Stone Dust cu m 1,000.00 33.44 1,033.44
13 Stone Dust ton 205.34 2,790.29
14 Stone cum 785.00 1,151.07
15 Block Stone cu m 785.00 - 885.00
16 Bond Stone cu m 785.00 - 885.00
17 Crush stone chips cum 1,000.00 1,000.00
18 Soil cu m 110.00 - 185.00
19 Water Litres 0.25 - 0.25
Transportatio
Material Adopted
Unit n
Rate Rate
S.N. Particulars Rate
23 RCC Hume pipe (NP3)- m 8,000.00 8,000.00
900 mm internal diameter
25 160 mm HDP Pipe (4 kg/cm2) m 472.00 - 472.00
26 125mm HDPE Pipe (4 kg/cm²) m 450.00 450.00
27 Interlocking Block Hexagon(60 mm thick) sq m 827.00 - 827.00
28 Interlocking Block Hexagon(50 mm thick) sq m 513.48 - 513.48
29 Jute kg 85.00 - 85.00
30 Hessian Jute m2 13.50 - 13.50
31 Line String m - - -
32 Local wood (for formwork) cu m 123,602.50 - 123,602.50
33 Planks(38mm) cu m 123,602.50 - 123,602.50
34 Nails, Spikes etc. kg 117.60 - 117.60
35 Plywood 10mm thick sq m 958.00 - 958.00
36 GI Wire- Medium Coated (8, 10 SWG) kg 111.30 - 111.30
37 GI Wire- Heavy Coated (8, 10 & 12 SWG) kg 116.55 - 116.55
41 MS clamps nos 1,800.00 1,800.00
42 Steel Tube m 245.60 - 245.60
43 Angle Iron different sizes kg 99.00 - 99.00
44 Reinforcement 8mm kg 78.00 - 78.00
45 Reinforcement 10-20mm kg 78.00 - 78.00
46 Binding Wire kg 80.00 - 80.00
47 Barbed Wire kg 78.00 - 78.00
48 Geo-textiles sq m 78.00 - 78.00
49 Tarfelt Sheet sq m 76.65 - 76.65
50 Road Marking paint (water based) lit 450.00 - 450.00
51 Expansion joint sq m 6,429.77 - 6,429.77
52 Bitumen 60/70 grade Kg 76.90 1.12 78.02
53 Emulsion Kg 70.00 1.12 71.12
54 Primer lit 442.75 - 442.75
55 Enamel lit 493.00 - 493.00
56 Aluminum Paint lit 546.25 546.25
57 Seeds No 75.00 - 75.00
58 Grass Slips no 4.00 - 4.00
59 Precast kerb no 1,020.00 500.00
60 Cat Eye no 596.00 596.00
61 Solar light no 5,900.00 9,000.00
62 Solar light Pole no 1,500.00 8,000.00
63 Lettering on kilometer post cm-letter 1.00 1.00
64 Grass Slips
65 Graded filter materials cum 2,000.00 2,000.00
66 Wood kg 13.00 13.00
67 Seedling nos 145.00 145.00
68 Compost cum 100.00 100.00
69 Tree guard nos 560.00 560.00
70 Green mulch cum 100.00 100.00

(C) NOC Rate


Transportatio
Material Adopted
Unit n
Rate Rate
S.N. Particulars Rate
Ref No. Particulars Unit Rate Trasportation Remarks
1 Diesel litre 110.00 0.39 110.39
2 Petrol litre 130.00 0.39 130.39
3 Kerosene litre 110.00 0.39 110.39
3 Antistripping agent Additives litre 599.76 599.76

References:
Jhapa District Rate: FY-077/78
QUANTITY CALCULATION SHEET
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Summary for Cross Drainage Structures

S. N. Items Units Quantity Remarks


1 Excavation in foundation for structures and roadside drains in (SS/SP- 900)
a All types of soil except hard rock cu.m 14,458.000
b Hard rock. cu.m 761.000
2 Earthwork Backfilling cu.m 3,828.000
3 M10 Concrete cu.m 44.500
4 M15 Plum Concrete cu.m 152.539
5 M20 Concrete cu.m 4,261.700
6 Reinforcement Steel t 174.457
7 Stone Masonary Work MM5 type cu.m 2,372.670
8 Gabion Work
a Using new stone cu.m 3,492.600
b Using stone from dismantling of existing structures cu.m 153.300
9 Geo-textile sq.m 233.000
10 Formwork sq.m 3,328.800
11 Dry Stone Soling cu.m 3,452.380
12 Gravel Bed Material cu.m 976.330
13 Pipe Culvert
a 600mmØ NP3 m 220.500
b 900mmØ NP3 m 334.000
14 Dismantle Gabion Work cu.m 219.000
15 Dismantle Stone Masonary Work cu.m 427.653

Page 148 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Summary for Road Side Drain

S. N. Items Units Quantity Remarks


1 Earthworks Cutting cu.m 21,205.386
a All types of soil except hard rock cu.m 20,750.000
b Hard rock. cu.m 1,093.000
2 Earthwork Backfilling cu.m 601.230
3 M15 Concrete cu.m 71.757
4 M25 Precast Concrete cu.m 254.788
5 Reinforcement Steel t 5.616
6 Stone Masonary Work MM5 type cu.m 23,111.549
7 Formwork sq.m 1,207.590
8 Dismantling of existing drain cu.m 427.653

Page 149 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Summary ofStructures

S. N. Items Units Quantity Remarks


1 Earthworks Cutting cu.m
a All types of soil except hard rock cu.m 29,817.000
b Hard rock. cu.m 1,570.000
2 Earthwork Backfilling cu.m 17,959.227
3 M10 Concrete cu.m 106.470
4 Stone Masonary Work MM5 type cu.m 2,346.050
5 Gabion Work
a Using new stone cu.m Err:509
b Using stone from dismantling of existing structures cu.m Err:509
6 Formwork sq.m 211.938
7 Geo-textile sq.m Err:509
8 Backfilling behind structure - Filter material cu.m 533.194
9 Dismantle Gabion Work cu.m 599.500
10 Dismantle Dry masonary Work cu.m 3,448.700

Page 150 of 313


2.0 SITE CLEARANCE
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No. : 2.01


Description of work : Clearance of landslides, debris from culverts and side-drains including haulage
for disposal within 50 m, all complete. (SS/SP- 201)
Chainge Soil Length Height Cut Quantity
S.N. Side Wide (m) Remarks
From To Type (m) (m) (cu.m)
Slide and Boulders clearance
1 20+346 20+360 BMS L 14.00 1.50 2.90 60.900
2 20+360 20+370 BMS L 10.00 1.50 4.00 60.000
3 20+775 20+790 MR L 15.00 0.50 1.00 7.500
4 21+650 21+692 SR L 42.00 50.000
5 22+260 22+290 BMS R 50.000
6 22+580 22+605 BMS L 25.00 2.00 15.00 750.000
7 22+725 SS L 25.000
8 23+275 BMS L 50.000
9 24+275 24+287 BMS L 12.00 1.00 1.10 13.200
10 29+185 29+225 BMS R 40.00 1.00 2.50 100.000
11 30+128 MR L 12.00 12.000
12 31+340 31+353 SR R 13.00 2.00 1.50 39.000
13 31+424 31+434 OS R 10.00 1.00 2.00 20.000
14 34+540 34+550 SR R 10.00 1.50 2.00 30.000
15 34+675 34+692 OS L 17.00 3.00 2.00 102.000
16 35+300 35+302 BMS L 2.00 0.80 2.00 3.200
17 35+705 35+710 OS L 5.00 1.00 2.00 10.000
18 35+770 35+776 OS R 6.00 1.50 1.50 13.500
19 38+302 38+332 BMS R 30.00 1.00 3.00 90.000
20 38+332 38+425 BMS L 93.00 1.20 3.000
21 38+765 38+775 BMS L 10.00 1.50 2.00 30.000
22 42+429 42+436 BMS R 7.00 1.00 1.00 7.000
23 42+412 42+423 OS R 11.00 1.00 1.00 11.000
24 42+655 42+695 OS R 40.00 1.50 1.50 90.000
25 42+748 42+782 BMS R 34.00 1.00 1.00 34.000
26 43+308 43+318 BMS L 10.00 2.00 2.00 40.000
27 43+468 43+531 BMS L 63.00 1.50 3.00 283.500
28 43+645 43+690 BMS R 10.000
29 43+850 43+880 OS R 10.000
30 43+930 43+935 BMS R 10.000
31 43+950 43+990 BMS R 40.00 1.50 2.00 120.000
32 44+100 44+125 BMS L 25.00 1.00 1.00 25.000
33 44+350 BMS R 30.000
34 44+600 44+630 BMS R 30.00 1.20 4.00 144.000
35 44+700 44+760 BMS R 60.00 1.00 2.00 120.000
36 44+900 44+920 OS R 20.00 1.00 1.20 24.000
37 44+950 44+975 BMS L 25.00 1.20 1.20 36.000
38 47+925 47+958 BMS R 33.00 2.00 3.50 231.000
39 48+827 48+836 OS L 9.00 1.00 1.50 13.500
40 49+985 50+050 MR R 65.00 2.50 2.00 325.000
41 52+500 52+520 BMS L 20.00 2.00 5.00 200.000
42 53+265 53+290 BMS L 25.00 0.50 1.00 12.500
43 55+150 55+156 BMS L 6.00 1.00 3.00 18.000
44 55+220 55+235 BMS L 15.00 1.00 1.00 15.000
45 55+783 55+880 BMS L 97.00 1.20 2.00 232.800
46 55+955 56+075 BMS L 120.00 30.000
47 56+750 BMS L 20.000
48 59+540 59+555 BMS L 15.00 2.00 3.00 90.000
49 59+740 MR 15.000
50 64+465 64+650 BMS L 185.00 0.75 2.00 277.500
Total 3,994.100 cu.m

Page 152 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.2.02
Description of work:
Felling trees (the girth measured at a height of 1 m above ground level) including cuttting of
trunks and branches, removing the roots, stacking serviceable materials and disposal of
unserviceable materials to 10m distance and back filling the depressions/pits (SS/SP- 201)

S.N. Chainage Number Remarks


a) Grith size 0 mm to 600mm
2 Provisional Quantity

Total 2 nos.
b) Grith size 600mm to 900mm
1 41+152 1
2 62+625 1
Total 2 nos.

c) Grith size 900mm to 1800mm


1 31+745 1
2 34+528 1
3 41+202 1
4 45+475 1
Total 4 nos.

Page 153 of 313


3.0 EARTHWORKS
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
0+000 0+125 113.00 0.510 0.000 57.675 100.000 57.675 0.000 0.000 0.000 CW-12m
0+125 0+175 38.00 0.148 0.100 5.616 100.000 5.616 0.000 0.000 3.800 CW-12m
0+175 0+250 75.00 0.160 0.193 12.000 100.000 12.000 0.000 0.000 14.475
0+250 0+500 238.00 0.243 0.860 57.882 100.000 57.882 0.000 0.000 204.680 CW-12m
0+500 0+650 150.00 0.106 0.289 15.915 100.000 15.915 0.000 0.000 43.350
0+650 0+680 30.00 0.333 0.128 9.993 100.000 9.993 0.000 0.000 3.840
0+680 0+720 40.00 0.333 0.128 13.324 50.000 6.662 50.000 6.662 5.120
0+720 0+800 80.00 0.333 0.128 26.648 100.000 26.648 0.000 0.000 10.240
0+800 0+900 100.00 0.333 0.128 33.310 100.000 33.310 0.000 0.000 12.800
0+900 1+150 229.00 0.077 0.135 17.564 100.000 17.564 0.000 0.000 30.915 CW-12,9m
1+150 1+450 282.00 0.077 0.135 21.629 100.000 21.629 0.000 0.000 38.070 CW-12,6m
1+450 1+750 288.00 0.064 0.428 18.288 100.000 18.288 0.000 0.000 123.264 CW-12m
1+750 1+885 135.00 0.078 0.193 10.530 100.000 10.530 0.000 0.000 26.055
1+885 2+000 115.00 0.098 0.145 11.270 100.000 11.270 0.000 0.000 16.675
2+000 2+200 179.00 0.254 0.100 45.377 100.000 45.377 0.000 0.000 17.900 CW-12,9m
2+200 2+240 40.00 0.014 0.393 0.548 100.000 0.548 0.000 0.000 15.720
2+240 2+650 362.00 0.157 0.353 56.762 100.000 56.762 0.000 0.000 127.786 CW-4no.-12m
2+650 2+700 50.00 0.083 0.255 4.130 100.000 4.130 0.000 0.000 12.750
2+700 2+760 60.00 0.083 0.255 4.956 100.000 4.956 0.000 0.000 15.300
2+760 2+875 115.00 0.067 0.473 7.694 100.000 7.694 0.000 0.000 54.395
2+875 2+900 25.00 0.088 0.480 2.200 100.000 2.200 0.000 0.000 12.000
2+900 2+960 60.00 0.088 0.480 5.280 100.000 5.280 0.000 0.000 28.800
2+960 3+040 80.00 0.090 0.250 7.200 100.000 7.200 0.000 0.000 20.000
3+040 3+150 86.00 0.175 0.128 15.050 100.000 15.050 0.000 0.000 11.008 CW-2no.-12m
3+150 3+260 110.00 0.175 0.128 19.250 100.000 19.250 0.000 0.000 14.080
3+260 3+325 65.00 0.110 0.155 7.150 100.000 7.150 0.000 0.000 10.075
3+325 3+445 96.00 0.172 0.358 16.474 100.000 16.474 0.000 0.000 34.368 CW-2no.-12m
3+445 3+575 118.00 0.031 0.585 3.623 100.000 3.623 0.000 0.000 69.030 CW-12m
3+575 3+600 25.00 0.168 0.248 4.195 100.000 4.195 0.000 0.000 6.200
3+600 3+795 186.00 0.168 0.248 31.211 100.000 31.211 0.000 0.000 46.128 CW-9m
3+795 3+825 24.00 0.168 0.248 4.027 100.000 4.027 0.000 0.000 5.952 CW-6m
3+825 3+925 100.00 0.145 0.103 14.500 100.000 14.500 0.000 0.000 10.300
3+925 4+150 201.00 0.275 0.048 55.355 100.000 55.355 0.000 0.000 9.648 CW 2no.-12m
4+150 4+300 150.00 0.098 0.268 14.760 100.000 14.760 0.000 0.000 40.200
4+300 4+500 200.00 0.148 0.470 29.600 100.000 29.600 0.000 0.000 94.000
4+500 4+700 200.00 0.052 0.033 10.440 100.000 10.440 0.000 0.000 6.600
4+700 4+760 60.00 0.281 0.105 16.860 100.000 16.860 0.000 0.000 6.300
4+760 5+050 266.00 0.076 0.820 20.110 100.000 20.110 0.000 0.000 218.120 CW 2no.-12m
5+050 5+100 50.00 0.058 0.293 2.900 100.000 2.900 0.000 0.000 14.650
5+100 5+155 55.00 0.058 0.293 3.190 100.000 3.190 0.000 0.000 16.115
5+155 5+170 15.00 0.190 0.228 2.850 100.000 2.850 0.000 0.000 3.420
5+170 5+190 20.00 0.263 0.100 5.250 100.000 5.250 0.000 0.000 2.000
5+190 5+215 25.00 0.263 0.065 6.575 100.000 6.575 0.000 0.000 1.625
5+215 5+240 25.00 0.087 0.183 2.163 100.000 2.163 0.000 0.000 4.575
5+240 5+260 20.00 0.073 0.148 1.456 100.000 1.456 0.000 0.000 2.960

Page 155 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
5+260 5+300 40.00 0.124 0.240 4.948 100.000 4.948 0.000 0.000 9.600
5+300 5+475 166.50 0.296 0.100 49.234 100.000 49.234 0.000 0.000 16.650 CW-8.5m
5+475 5+570 95.00 0.236 0.115 22.411 100.000 22.411 0.000 0.000 10.925
5+570 5+630 60.00 0.142 0.168 8.508 100.000 8.508 0.000 0.000 10.080
5+630 6+050 408.00 0.307 0.153 125.093 100.000 125.093 0.000 0.000 62.424 CW-12m
6+050 6+150 88.00 0.080 0.145 7.014 100.000 7.014 0.000 0.000 12.760 CW-12m
6+150 6+350 188.00 0.080 0.145 14.984 100.000 14.984 0.000 0.000 27.260 CW-12m
6+350 6+520 170.00 0.232 0.610 39.440 100.000 39.440 0.000 0.000 103.700
6+520 6+625 105.00 0.163 0.770 17.147 100.000 17.147 0.000 0.000 80.850
6+625 6+800 175.00 0.338 0.380 59.150 100.000 59.150 0.000 0.000 66.500
6+800 6+925 125.00 0.038 1.538 4.750 100.000 4.750 0.000 0.000 192.250
6+925 7+050 125.00 0.040 0.755 5.000 100.000 5.000 0.000 0.000 94.375
7+050 7+550 500.00 0.358 0.230 178.850 100.000 178.850 0.000 0.000 115.000
7+550 7+600 50.00 0.930 0.230 46.500 100.000 46.500 0.000 0.000 11.500
7+600 7+630 30.00 0.160 0.073 4.800 100.000 4.800 0.000 0.000 2.190
7+630 7+655 25.00 0.005 0.035 0.123 100.000 0.123 0.000 0.000 0.875
7+655 7+680 17.00 0.160 0.165 2.720 100.000 2.720 0.000 0.000 2.805 CW-8m
7+680 7+700 20.00 0.193 0.250 3.860 100.000 3.860 0.000 0.000 5.000
7+700 7+725 25.00 0.178 0.420 4.450 100.000 4.450 0.000 0.000 10.500
7+725 7+745 20.00 0.160 0.083 3.200 100.000 3.200 0.000 0.000 1.660
7+745 7+760 15.00 0.119 0.083 1.788 100.000 1.788 0.000 0.000 1.245
7+760 7+785 25.00 0.168 0.108 4.210 100.000 4.210 0.000 0.000 2.700
7+785 7+800 15.00 0.292 0.170 4.374 100.000 4.374 0.000 0.000 2.550
7+800 7+820 20.00 0.326 0.275 6.528 100.000 6.528 0.000 0.000 5.500
7+820 7+835 15.00 0.483 0.338 7.244 100.000 7.244 0.000 0.000 5.070
7+835 7+860 25.00 0.356 0.520 8.903 100.000 8.903 0.000 0.000 13.000
7+860 7+890 30.00 0.299 0.058 8.964 100.000 8.964 0.000 0.000 1.740
7+890 7+900 10.00 0.075 0.135 0.746 100.000 0.746 0.000 0.000 1.350
7+900 7+925 25.00 0.137 0.308 3.418 100.000 3.418 0.000 0.000 7.700
7+925 7+940 15.00 0.118 0.225 1.770 100.000 1.770 0.000 0.000 3.375
7+940 7+960 20.00 0.374 0.040 7.476 100.000 7.476 0.000 0.000 0.800
7+960 7+990 30.00 0.170 0.228 5.106 100.000 5.106 0.000 0.000 6.840
7+990 8+100 110.00 0.108 0.373 11.847 100.000 11.847 0.000 0.000 41.030
8+100 8+130 30.00 0.896 0.143 26.886 100.000 26.886 0.000 0.000 4.290
8+130 8+160 30.00 0.062 0.278 1.863 100.000 1.863 0.000 0.000 8.340
8+160 8+190 18.00 0.211 0.735 3.796 100.000 3.796 0.000 0.000 13.230 CW-12m
8+190 8+290 90.00 0.746 0.003 67.167 100.000 67.167 0.000 0.000 0.270 CW-10m
8+290 8+320 30.00 0.204 0.008 6.120 100.000 6.120 0.000 0.000 0.240
8+320 8+340 20.00 0.455 0.018 9.102 100.000 9.102 0.000 0.000 0.360
8+340 8+360 20.00 5.556 0.058 111.126 100.000 111.126 0.000 0.000 1.160
8+360 8+400 40.00 0.725 0.135 28.988 100.000 28.988 0.000 0.000 5.400
8+400 8+575 163.00 0.099 0.385 16.186 100.000 16.186 0.000 0.000 62.755 CW-12m
8+575 8+600 25.00 0.129 0.445 3.233 100.000 3.233 0.000 0.000 11.125
8+600 8+775 175.00 0.129 0.445 22.628 100.000 22.628 0.000 0.000 77.875
8+775 9+000 213.00 0.136 0.338 29.011 100.000 29.011 0.000 0.000 71.994 CW-12m
9+000 9+350 338.00 0.126 0.785 42.487 100.000 42.487 0.000 0.000 265.330 CW-12m
9+350 9+600 238.00 0.214 0.075 50.908 100.000 50.908 0.000 0.000 17.850 CW-12m
9+600 9+950 348.00 0.160 0.583 55.784 100.000 55.784 0.000 0.000 202.884 SC-2m
9+950 10+150 200.00 0.154 0.345 30.800 100.000 30.800 0.000 0.000 69.000

Page 156 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
10+150 10+350 200.00 0.110 0.990 22.000 100.000 22.000 0.000 0.000 198.000
10+350 10+380 30.00 0.047 0.318 1.404 100.000 1.404 0.000 0.000 9.540
10+380 10+420 40.00 0.479 0.208 19.144 100.000 19.144 0.000 0.000 8.320
10+420 10+435 15.00 0.050 0.088 0.746 100.000 0.746 0.000 0.000 1.320
10+435 10+460 25.00 0.228 0.435 5.695 100.000 5.695 0.000 0.000 10.875
10+460 10+490 30.00 1.099 0.435 32.973 100.000 32.973 0.000 0.000 13.050
10+490 10+520 30.00 0.250 0.255 7.494 100.000 7.494 0.000 0.000 7.650
10+520 10+600 80.00 0.057 0.383 4.544 100.000 4.544 0.000 0.000 30.640
10+600 10+800 170.00 1.389 0.220 236.113 100.000 236.113 0.000 0.000 37.400 CW-18,12m
10+800 10+950 138.00 0.075 0.410 10.350 100.000 10.350 0.000 0.000 56.580 CW-12m
10+950 11+350 361.00 0.051 0.273 18.339 100.000 18.339 0.000 0.000 98.553 CW-15m,2*12m
11+350 11+750 352.00 0.003 0.418 1.126 100.000 1.126 0.000 0.000 147.136 CW 4no.-12m
11+750 11+850 88.00 0.000 1.758 0.000 100.000 0.000 0.000 0.000 154.704 CW-12m
11+850 11+920 70.00 0.000 1.758 0.000 100.000 0.000 0.000 0.000 123.060
11+920 12+190 243.00 0.000 1.758 0.000 100.000 0.000 0.000 0.000 427.194 CW-15,12m
12+190 12+225 26.00 0.000 1.758 0.000 98.000 0.000 2.000 0.000 45.708 CW-18/2m
12+225 12+275 41.00 0.099 0.930 4.051 98.000 3.970 2.000 0.081 38.130 CW-18/2m
12+275 12+300 13.00 0.005 0.460 0.065 98.000 0.064 2.000 0.001 5.980 CW-12m
12+300 12+325 25.00 0.005 0.460 0.125 100.000 0.125 0.000 0.000 11.500
12+325 12+500 151.00 0.041 0.588 6.146 100.000 6.146 0.000 0.000 88.788 CW 2no.-12m
12+355 12+435 56.00 2.500 140.000 100.000 140.000 0.000 0.000 0.000 Additnl cut
12+500 13+000 476.00 0.016 0.360 7.616 100.000 7.616 0.000 0.000 171.360 CW 2no.-12m
13+000 13+250 238.00 0.025 1.408 5.950 100.000 5.950 0.000 0.000 335.104 CW-12m
13+250 13+300 50.00 0.033 0.605 1.660 100.000 1.660 0.000 0.000 30.250
13+300 13+500 200.00 0.008 0.983 1.640 100.000 1.640 0.000 0.000 196.600
13+500 13+730 205.00 0.155 1.325 31.816 100.000 31.816 0.000 0.000 271.625 CW-15,10m
13+730 13+760 30.00 2.010 0.066 60.306 100.000 60.306 0.000 0.000 1.980
13+760 14+000 240.00 0.000 1.005 0.000 100.000 0.000 0.000 0.000 241.200
14+000 14+100 88.00 0.038 0.583 3.344 100.000 3.344 0.000 0.000 51.304 CW-12m
14+100 14+225 125.00 0.123 0.455 15.375 100.000 15.375 0.000 0.000 56.875
14+225 14+400 163.00 0.000 0.948 0.000 100.000 0.000 0.000 0.000 154.524 CW-12m
14+400 14+650 250.00 0.000 0.948 0.000 100.000 0.000 0.000 0.000 237.000
14+650 15+250 588.00 0.000 0.855 0.000 100.000 0.000 0.000 0.000 502.740 CW-12m
15+250 15+700 438.00 0.050 0.735 21.900 100.000 21.900 0.000 0.000 321.930 CW-12m
15+700 15+975 239.00 0.195 0.490 46.605 100.000 46.605 0.000 0.000 117.110 CW 3no.-12m
15+975 16+175 173.00 0.570 0.338 98.610 100.000 98.610 0.000 0.000 58.474 CW-15,12m
16+175 16+300 110.00 3.768 0.640 414.480 100.000 414.480 0.000 0.000 70.400 CW-15m
16+300 16+330 30.00 0.003 1.460 0.090 100.000 0.090 0.000 0.000 43.800
16+330 16+360 30.00 0.033 0.340 0.990 100.000 0.990 0.000 0.000 10.200
16+360 16+390 30.00 0.043 1.385 1.290 100.000 1.290 0.000 0.000 41.550
16+390 16+415 25.00 0.180 1.100 4.500 100.000 4.500 0.000 0.000 27.500
16+415 16+435 8.00 0.595 0.700 4.760 100.000 4.760 0.000 0.000 5.600 CW-12m
16+435 16+455 20.00 0.075 1.263 1.500 100.000 1.500 0.000 0.000 25.260
16+455 16+490 35.00 0.090 1.215 3.150 100.000 3.150 0.000 0.000 42.525
16+490 16+505 15.00 0.045 0.595 0.675 100.000 0.675 0.000 0.000 8.925
16+505 16+545 40.00 0.015 1.088 0.600 100.000 0.600 0.000 0.000 43.520
16+545 16+560 15.00 0.913 0.478 13.695 100.000 13.695 0.000 0.000 7.170
16+560 16+600 40.00 2.205 0.518 88.200 100.000 88.200 0.000 0.000 20.720
16+600 16+635 35.00 0.010 0.528 0.350 100.000 0.350 0.000 0.000 18.480
16+635 16+660 25.00 1.735 0.600 43.375 100.000 43.375 0.000 0.000 15.000

Page 157 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
16+660 16+680 20.00 0.663 0.793 13.260 100.000 13.260 0.000 0.000 15.860
16+680 16+710 30.00 0.003 1.750 0.090 100.000 0.090 0.000 0.000 52.500
16+710 16+740 30.00 0.745 0.478 22.350 100.000 22.350 0.000 0.000 14.340
16+740 16+770 30.00 1.260 0.198 37.800 100.000 37.800 0.000 0.000 5.940
16+770 16+825 55.00 0.448 0.693 24.640 100.000 24.640 0.000 0.000 38.115
16+825 17+050 213.00 0.470 0.565 100.110 100.000 100.110 0.000 0.000 120.345 CW-12m
17+050 17+150 100.00 2.178 0.158 217.800 100.000 217.800 0.000 0.000 15.800
17+150 17+300 150.00 0.283 0.525 42.450 100.000 42.450 0.000 0.000 78.750
17+300 17+425 125.00 0.123 0.293 15.375 100.000 15.375 0.000 0.000 36.625
17+425 17+650 225.00 0.335 0.168 75.375 100.000 75.375 0.000 0.000 37.800
17+650 17+850 200.00 0.278 0.455 55.600 100.000 55.600 0.000 0.000 91.000
17+850 17+950 88.00 0.143 0.775 12.584 100.000 12.584 0.000 0.000 68.200 CW-12m
17+950 18+100 150.00 0.143 0.775 21.450 60.000 12.870 40.000 8.580 116.250
18+100 18+175 75.00 0.143 0.775 10.725 100.000 10.725 0.000 0.000 58.125
18+175 18+500 313.00 0.233 0.290 72.929 100.000 72.929 0.000 0.000 90.770 CW-12m
18+500 18+575 75.00 0.233 0.290 17.475 60.000 10.485 40.000 6.990 21.750
18+575 18+700 113.00 0.153 0.488 17.289 60.000 10.373 40.000 6.916 55.144 CW-12m
18+700 18+925 201.00 0.153 0.488 30.753 100.000 30.753 0.000 0.000 98.088 CW 2no.-12m
18+925 19+200 263.00 0.273 0.515 71.799 100.000 71.799 0.000 0.000 135.445 CW12m
19+200 19+400 188.00 0.283 0.583 53.204 100.000 53.204 0.000 0.000 109.604 CW12m
19+400 19+460 48.00 0.283 0.583 13.584 70.000 9.509 30.000 4.075 27.984 CW12m
19+460 19+480 20.00 0.033 0.243 0.660 70.000 0.462 30.000 0.198 4.860
19+480 19+510 20.00 0.348 0.060 6.960 70.000 4.872 30.000 2.088 1.200 CW-10m
19+510 19+530 20.00 1.185 0.090 23.700 70.000 16.590 30.000 7.110 1.800
19+530 19+555 25.00 0.745 0.260 18.625 70.000 13.038 30.000 5.588 6.500
19+555 19+580 25.00 0.980 0.950 24.500 70.000 17.150 30.000 7.350 23.750
19+580 19+615 35.00 1.930 0.080 67.550 70.000 47.285 30.000 20.265 2.800
19+615 19+700 73.00 0.260 0.118 18.980 70.000 13.286 30.000 5.694 8.614 CW-12m
19+700 20+000 288.00 0.260 0.118 74.880 100.000 74.880 0.000 0.000 33.984 CW-12m
20+000 20+200 185.00 0.560 0.308 103.600 100.000 103.600 0.000 0.000 56.980 CW-15m
20+200 20+375 175.00 0.350 0.295 61.250 100.000 61.250 0.000 0.000 51.625
20+375 20+600 201.00 0.118 1.675 23.718 100.000 23.718 0.000 0.000 336.675 CW 2no.-12m
20+600 20+800 188.00 0.750 0.143 141.000 100.000 141.000 0.000 0.000 26.884 CW-12m
20+800 20+900 100.00 1.020 0.083 102.000 100.000 102.000 0.000 0.000 8.300
20+900 21+000 100.00 1.020 0.083 102.000 60.000 61.200 40.000 40.800 8.300
21+000 21+090 90.00 0.853 0.005 76.770 60.000 46.062 40.000 30.708 0.450
21+090 21+200 83.00 0.740 0.218 61.420 60.000 36.852 40.000 24.568 18.094 CW-15,12m
21+200 21+300 100.00 0.740 0.218 74.000 100.000 74.000 0.000 0.000 21.800
21+300 21+400 100.00 0.355 0.108 35.500 100.000 35.500 0.000 0.000 10.800
21+400 21+450 50.00 1.080 0.098 54.000 100.000 54.000 0.000 0.000 4.900
21+450 21+550 85.00 1.080 0.098 91.800 70.000 64.260 30.000 27.540 8.330 CW-15m
21+550 21+650 85.00 0.820 0.303 69.700 100.000 69.700 0.000 0.000 25.755 CW-15m
21+650 21+850 176.00 0.765 0.215 134.640 100.000 134.640 0.000 0.000 37.840 CW 2no.-12m
21+850 22+200 338.00 0.275 0.335 92.950 100.000 92.950 0.000 0.000 113.230 CW-12m
22+200 22+225 25.00 0.275 0.335 6.875 100.000 6.875 0.000 0.000 8.375
22+225 22+300 63.00 0.380 0.220 23.940 100.000 23.940 0.000 0.000 13.860 CW-12m
22+300 22+400 100.00 0.380 0.220 38.000 100.000 38.000 0.000 0.000 22.000
22+400 22+700 264.00 0.818 0.095 215.952 100.000 215.952 0.000 0.000 25.080 CW 3no.-12m
22+700 22+750 38.00 0.818 0.095 31.084 70.000 21.759 30.000 9.325 3.610 CW-12m

Page 158 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
22+750 22+800 50.00 0.255 0.040 12.750 70.000 8.925 30.000 3.825 2.000
22+800 22+875 63.00 0.255 0.040 16.065 100.000 16.065 0.000 0.000 2.520 CW-12m
22+875 23+125 226.00 0.673 0.155 152.098 100.000 152.098 0.000 0.000 35.030 CW 2no.-12m
23+125 23+250 113.00 0.150 0.123 16.950 100.000 16.950 0.000 0.000 13.899 CW-12m
23+250 23+340 78.00 0.890 0.373 69.420 100.000 69.420 0.000 0.000 29.094 CW-12m
23+340 23+360 20.00 0.680 0.150 13.600 100.000 13.600 0.000 0.000 3.000
23+360 23+380 20.00 0.283 0.143 5.660 100.000 5.660 0.000 0.000 2.860
23+380 23+415 35.00 0.215 0.070 7.525 100.000 7.525 0.000 0.000 2.450
23+415 23+430 15.00 0.215 0.398 3.225 100.000 3.225 0.000 0.000 5.970
23+430 23+460 30.00 0.100 0.200 3.000 100.000 3.000 0.000 0.000 6.000
23+460 23+485 25.00 0.300 0.218 7.500 100.000 7.500 0.000 0.000 5.450
23+485 23+510 13.00 0.000 100.000 0.000 0.000 0.000 0.000 CW-12m
23+510 23+530 20.00 0.375 0.810 7.500 100.000 7.500 0.000 0.000 16.200
23+530 23+555 25.00 0.923 0.123 23.075 100.000 23.075 0.000 0.000 3.075
23+555 23+580 13.00 0.390 0.105 5.070 100.000 5.070 0.000 0.000 1.365 CW-12m
23+580 23+610 30.00 0.268 0.053 8.040 70.000 5.628 30.000 2.412 1.590
23+610 23+635 25.00 0.280 0.335 7.000 70.000 4.900 30.000 2.100 8.375
23+635 23+665 30.00 0.313 0.250 9.390 70.000 6.573 30.000 2.817 7.500
23+665 23+680 15.00 0.350 0.403 5.250 70.000 3.675 30.000 1.575 6.045
23+680 23+720 28.00 0.440 0.245 12.320 70.000 8.624 30.000 3.696 6.860 CW-12m
23+720 23+800 80.00 0.313 0.418 25.040 70.000 17.528 30.000 7.512 33.440
23+800 23+950 150.00 0.313 0.418 46.950 90.000 42.255 10.000 4.695 62.700
23+950 24+100 150.00 0.173 0.428 25.950 90.000 23.355 10.000 2.595 64.200
24+100 24+300 176.00 0.173 0.428 30.448 70.000 21.314 30.000 9.134 75.328 CW 2no.-12m
24+300 24+340 40.00 0.233 0.128 9.320 70.000 6.524 30.000 2.796 5.120
24+340 24+360 20.00 0.208 0.223 4.160 70.000 2.912 30.000 1.248 4.460
24+360 24+390 30.00 0.120 0.240 3.600 70.000 2.520 30.000 1.080 7.200
24+390 24+420 30.00 0.443 0.195 13.290 70.000 9.303 30.000 3.987 5.850
24+420 24+445 25.00 0.095 0.203 2.375 70.000 1.663 30.000 0.713 5.075
24+445 24+460 15.00 0.833 0.475 12.495 70.000 8.747 30.000 3.749 7.125
24+460 24+485 25.00 0.358 0.040 8.950 70.000 6.265 30.000 2.685 1.000
24+485 24+550 53.00 0.210 0.138 11.130 70.000 7.791 30.000 3.339 7.314 CW-12m
24+550 24+665 115.00 1.260 0.224 144.900 70.000 101.430 30.000 43.470 25.760
24+665 24+975 283.00 1.083 0.308 306.489 70.000 214.542 30.000 91.947 87.164 CW-15,12m
24+975 25+000 25.00 1.620 0.118 40.500 70.000 28.350 30.000 12.150 2.950
25+000 25+030 30.00 1.620 0.118 48.600 97.000 47.142 3.000 1.458 3.540
25+030 25+200 170.00 1.848 0.020 314.160 97.000 304.735 3.000 9.425 3.400
25+200 25+380 168.00 0.935 0.003 157.080 97.000 152.368 3.000 4.712 0.504 CW-12m
25+380 25+550 146.00 0.733 0.125 107.018 97.000 103.807 3.000 3.211 18.250 CW 2no.-12m
25+550 25+800 238.00 0.450 0.065 107.100 97.000 103.887 3.000 3.213 15.470 CW-12m
25+800 26+300 500.00 0.595 0.303 297.500 97.000 288.575 3.000 8.925 151.500
26+300 26+370 58.00 1.213 0.128 70.354 97.000 68.243 3.000 2.111 7.424 CW-12m
26+370 26+500 103.00 1.723 0.075 177.469 97.000 172.145 3.000 5.324 7.725 CW-15,12m
26+500 26+580 80.00 0.708 0.238 56.640 100.000 56.640 0.000 0.000 19.040
26+580 26+620 40.00 1.375 0.135 55.000 100.000 55.000 0.000 0.000 5.400
26+620 26+800 168.00 1.350 0.243 226.800 100.000 226.800 0.000 0.000 40.824 CW-12m
26+800 27+010 210.00 0.585 0.050 122.850 100.000 122.850 0.000 0.000 10.500
27+010 27+200 178.00 0.855 0.075 152.190 100.000 152.190 0.000 0.000 13.350 CW-12m
27+200 27+300 88.00 0.855 0.075 75.240 70.000 52.668 30.000 22.572 6.600 CW-12m

Page 159 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
27+300 27+350 50.00 1.005 0.110 50.250 70.000 35.175 30.000 15.075 5.500
27+350 27+400 50.00 1.005 0.110 50.250 100.000 50.250 0.000 0.000 5.500
27+400 27+600 176.00 0.750 0.045 132.000 100.000 132.000 0.000 0.000 7.920 CW 2no.-12m
27+600 27+750 138.00 1.030 0.040 142.140 100.000 142.140 0.000 0.000 5.520 CW-12m
27+750 27+900 150.00 0.870 0.165 130.500 100.000 130.500 0.000 0.000 24.750
27+900 28+000 100.00 0.203 0.033 20.300 100.000 20.300 0.000 0.000 3.300
28+000 28+050 50.00 0.203 0.033 10.150 100.000 10.150 0.000 0.000 1.650
28+050 28+080 30.00 0.640 0.158 19.200 100.000 19.200 0.000 0.000 4.740
28+080 28+400 296.00 0.608 0.080 179.968 100.000 179.968 0.000 0.000 23.680 CW 2no.-12m
28+400 28+430 30.00 0.918 0.105 27.540 100.000 27.540 0.000 0.000 3.150
28+430 28+460 30.00 1.065 0.105 31.950 100.000 31.950 0.000 0.000 3.150
28+460 28+480 20.00 1.523 0.065 30.460 100.000 30.460 0.000 0.000 1.300
28+480 28+515 35.00 1.208 0.110 42.280 100.000 42.280 0.000 0.000 3.850
28+515 28+535 20.00 1.438 0.088 28.760 100.000 28.760 0.000 0.000 1.760
28+535 28+565 30.00 1.578 0.078 47.340 100.000 47.340 0.000 0.000 2.340
28+565 28+585 20.00 1.408 0.170 28.160 100.000 28.160 0.000 0.000 3.400
28+585 28+620 35.00 1.085 0.210 37.975 100.000 37.975 0.000 0.000 7.350
28+620 28+640 20.00 1.103 0.093 22.060 100.000 22.060 0.000 0.000 1.860
28+640 28+775 123.00 1.418 0.108 174.414 100.000 174.414 0.000 0.000 13.284 CW-12m
28+775 28+800 25.00 1.003 0.185 25.075 100.000 25.075 0.000 0.000 4.625
28+800 29+000 200.00 1.003 0.185 200.600 100.000 200.600 0.000 0.000 37.000
29+000 29+200 200.00 1.578 0.040 315.600 100.000 315.600 0.000 0.000 8.000
29+200 29+300 100.00 1.768 0.113 176.800 100.000 176.800 0.000 0.000 11.300
29+300 29+400 100.00 1.768 0.113 176.800 100.000 176.800 0.000 0.000 11.300
29+400 29+430 30.00 1.060 0.123 31.800 100.000 31.800 0.000 0.000 3.690
29+430 29+465 35.00 1.185 0.178 41.475 100.000 41.475 0.000 0.000 6.230
29+465 29+490 25.00 1.516 0.173 37.900 100.000 37.900 0.000 0.000 4.325
29+490 29+510 20.00 1.395 0.108 27.900 100.000 27.900 0.000 0.000 2.160
29+510 29+535 25.00 1.313 0.263 32.825 100.000 32.825 0.000 0.000 6.575
29+535 29+550 15.00 1.500 0.093 22.500 100.000 22.500 0.000 0.000 1.395
29+550 29+555 5.00 1.500 0.093 7.500 100.000 7.500 0.000 0.000 0.465
29+555 29+595 40.00 1.753 0.055 70.120 100.000 70.120 0.000 0.000 2.200
29+595 29+625 30.00 1.208 0.145 36.240 100.000 36.240 0.000 0.000 4.350
29+625 30+000 363.00 1.143 0.085 414.909 100.000 414.909 0.000 0.000 30.855 CW-12m
30+000 30+100 100.00 0.920 0.065 92.000 100.000 92.000 0.000 0.000 6.500
30+100 30+375 275.00 0.920 0.065 253.000 70.000 177.100 30.000 75.900 17.875
30+375 30+450 51.00 1.200 0.153 61.200 70.000 42.840 30.000 18.360 7.803 CW 2no.-12m
30+450 30+600 150.00 1.880 0.153 282.000 70.000 197.400 30.000 84.600 22.950
30+600 30+630 30.00 4.657 0.050 139.710 70.000 97.797 30.000 41.913 1.500
30+630 30+660 30.00 1.253 0.133 37.590 70.000 26.313 30.000 11.277 3.990
30+660 30+680 20.00 1.278 0.180 25.560 70.000 17.892 30.000 7.668 3.600
30+680 30+720 40.00 0.970 0.265 38.800 70.000 27.160 30.000 11.640 10.600
30+720 30+850 130.00 1.515 0.063 196.950 70.000 137.865 30.000 59.085 8.190
30+850 30+900 50.00 1.515 0.063 75.750 100.000 75.750 0.000 0.000 3.150
30+900 30+935 35.00 1.300 0.123 45.500 100.000 45.500 0.000 0.000 4.305
30+935 30+955 20.00 0.285 0.493 5.700 100.000 5.700 0.000 0.000 9.860
30+955 30+980 25.00 0.770 0.230 19.250 100.000 19.250 0.000 0.000 5.750
30+980 31+020 40.00 0.425 0.328 17.000 100.000 17.000 0.000 0.000 13.120
31+020 31+300 280.00 0.313 0.070 87.640 100.000 87.640 0.000 0.000 19.600

Page 160 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
31+300 31+480 168.00 0.345 0.060 57.960 100.000 57.960 0.000 0.000 10.080 CW-12m
31+480 31+670 190.00 0.278 0.110 52.820 100.000 52.820 0.000 0.000 20.900
31+670 31+900 218.00 0.705 0.000 153.690 100.000 153.690 0.000 0.000 0.000 CW-12m
31+900 32+180 268.00 0.973 0.010 260.764 100.000 260.764 0.000 0.000 2.680 CW-12m
32+180 32+300 120.00 0.900 0.090 108.000 100.000 108.000 0.000 0.000 10.800
32+300 32+600 288.00 1.400 0.133 403.200 100.000 403.200 0.000 0.000 38.304 CW-12m
32+600 32+800 188.00 0.458 0.050 86.104 100.000 86.104 0.000 0.000 9.400 CW-12m
32+800 33+020 220.00 0.063 0.055 13.860 100.000 13.860 0.000 0.000 12.100
33+020 33+200 156.00 0.760 0.045 118.560 100.000 118.560 0.000 0.000 7.020 CW 2no.-12m
33+200 33+400 200.00 0.375 0.373 75.000 100.000 75.000 0.000 0.000 74.600
33+400 33+600 176.00 0.618 0.058 108.768 100.000 108.768 0.000 0.000 10.208 CW 2no.-12m
33+600 33+850 238.00 0.720 0.030 171.360 100.000 171.360 0.000 0.000 7.140 CW-12m
33+850 34+100 250.00 1.045 0.173 261.250 100.000 261.250 0.000 0.000 43.250
34+100 34+250 120.00 0.258 0.165 30.960 100.000 30.960 0.000 0.000 19.800 CW-18,12m
34+250 34+550 273.00 0.638 0.078 174.174 100.000 174.174 0.000 0.000 21.294 CW-27m
34+550 34+700 150.00 0.638 0.078 95.700 100.000 95.700 0.000 0.000 11.700
34+700 34+800 100.00 0.793 0.055 79.300 100.000 79.300 0.000 0.000 5.500
34+800 35+000 188.00 0.735 0.005 138.180 100.000 138.180 0.000 0.000 0.940 CW-12m
35+000 35+120 120.00 1.188 0.003 142.560 100.000 142.560 0.000 0.000 0.360
35+120 35+200 80.00 1.005 0.055 80.400 100.000 80.400 0.000 0.000 4.400
35+200 35+250 50.00 1.018 0.010 50.900 100.000 50.900 0.000 0.000 0.500
35+250 35+280 30.00 1.018 0.010 30.540 100.000 30.540 0.000 0.000 0.300
35+280 35+330 50.00 0.608 0.010 30.400 100.000 30.400 0.000 0.000 0.500
35+330 35+375 45.00 0.608 0.010 27.360 100.000 27.360 0.000 0.000 0.450
35+375 35+600 213.00 0.845 0.338 179.985 100.000 179.985 0.000 0.000 71.994 CW-12m
35+600 35+630 30.00 0.893 0.028 26.790 100.000 26.790 0.000 0.000 0.840
35+630 35+640 4.00 1.175 0.073 4.700 100.000 4.700 0.000 0.000 0.292 CW-12/2m
35+640 35+660 14.00 1.175 0.073 16.450 100.000 16.450 0.000 0.000 1.022 CW-12/2m
35+660 35+680 20.00 0.728 0.053 14.560 100.000 14.560 0.000 0.000 1.060
35+680 35+700 20.00 0.953 0.080 19.060 100.000 19.060 0.000 0.000 1.600
35+700 35+710 10.00 0.953 0.080 9.530 100.000 9.530 0.000 0.000 0.800
35+710 35+735 25.00 0.683 0.085 17.075 100.000 17.075 0.000 0.000 2.125
35+735 35+765 30.00 0.805 0.085 24.150 100.000 24.150 0.000 0.000 2.550
35+765 35+875 110.00 0.603 0.108 66.330 100.000 66.330 0.000 0.000 11.880
35+875 35+925 38.00 0.460 0.258 17.480 100.000 17.480 0.000 0.000 9.804 CW-12m
35+925 36+150 225.00 1.105 0.073 248.625 100.000 248.625 0.000 0.000 16.425
36+150 36+315 153.00 0.755 0.035 115.515 100.000 115.515 0.000 0.000 5.355 CW-12m
36+315 36+350 35.00 0.983 0.010 34.405 100.000 34.405 0.000 0.000 0.350
36+350 36+380 30.00 0.665 0.043 19.950 100.000 19.950 0.000 0.000 1.290
36+380 36+500 108.00 0.665 0.043 71.820 100.000 71.820 0.000 0.000 4.644 CW-12m
36+500 36+600 100.00 0.665 0.043 66.500 100.000 66.500 0.000 0.000 4.300
36+600 36+775 175.00 0.800 0.020 140.000 100.000 140.000 0.000 0.000 3.500
36+775 36+800 25.00 0.800 0.020 20.000 100.000 20.000 0.000 0.000 0.500
36+800 36+950 150.00 0.593 0.135 88.950 100.000 88.950 0.000 0.000 20.250
36+950 37+150 176.00 1.673 0.000 294.448 100.000 294.448 0.000 0.000 0.000 CW 2no.-12m
37+150 37+225 75.00 0.593 0.255 44.475 100.000 44.475 0.000 0.000 19.125
37+225 37+260 35.00 1.050 0.000 36.750 100.000 36.750 0.000 0.000 0.000
37+260 37+460 176.00 0.575 0.555 101.200 100.000 101.200 0.000 0.000 97.680 CW 2no.-12m
37+460 37+700 228.00 0.575 0.555 131.100 100.000 131.100 0.000 0.000 126.540 CW-12m

Page 161 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
37+700 37+725 13.00 0.575 0.555 7.475 70.000 5.233 30.000 2.243 7.215 CW-12m
37+725 37+800 75.00 0.555 0.088 41.625 70.000 29.138 30.000 12.488 6.600
37+800 38+000 188.00 0.593 0.678 111.484 70.000 78.039 30.000 33.445 127.464 CW-12m
38+000 38+070 58.00 0.973 0.060 56.434 70.000 39.504 30.000 16.930 3.480 CW-12m
38+070 38+100 30.00 0.973 0.060 29.190 0.000 0.000 100.000 29.190 1.800
38+100 38+120 20.00 1.175 0.593 23.500 0.000 0.000 100.000 23.500 11.860
38+120 38+160 40.00 1.175 0.593 47.000 100.000 47.000 0.000 0.000 23.720
38+160 38+180 20.00 0.168 0.285 3.360 100.000 3.360 0.000 0.000 5.700
38+180 38+210 30.00 0.440 0.190 13.200 100.000 13.200 0.000 0.000 5.700
38+210 38+225 15.00 0.635 0.083 9.525 100.000 9.525 0.000 0.000 1.245
38+225 38+230 5.00 0.635 0.083 3.175 100.000 3.175 0.000 0.000 0.415
38+230 38+260 30.00 0.340 0.180 10.200 100.000 10.200 0.000 0.000 5.400
38+260 38+295 35.00 0.438 0.150 15.330 100.000 15.330 0.000 0.000 5.250
38+295 38+350 55.00 0.370 0.108 20.350 100.000 20.350 0.000 0.000 5.940
38+350 38+390 40.00 0.178 0.523 7.120 100.000 7.120 0.000 0.000 20.920
38+390 38+415 25.00 0.495 0.025 12.375 100.000 12.375 0.000 0.000 0.625
38+415 38+430 15.00 0.313 0.158 4.695 100.000 4.695 0.000 0.000 2.370
38+430 38+465 35.00 0.108 0.193 3.780 100.000 3.780 0.000 0.000 6.755
38+465 38+485 20.00 0.525 0.058 10.500 100.000 10.500 0.000 0.000 1.160
38+485 38+525 40.00 0.645 0.068 25.800 100.000 25.800 0.000 0.000 2.720
38+525 38+560 23.00 0.912 0.005 20.976 100.000 20.976 0.000 0.000 0.115 CW-12
38+560 38+580 20.00 0.448 0.115 8.960 100.000 8.960 0.000 0.000 2.300
38+580 38+650 70.00 0.505 0.015 35.350 100.000 35.350 0.000 0.000 1.050
38+650 38+700 38.00 0.963 0.008 36.594 100.000 36.594 0.000 0.000 0.304 CW-12m
38+700 38+750 26.00 0.503 0.023 13.078 100.000 13.078 0.000 0.000 0.598 CW 2no.-12m
38+750 38+800 50.00 0.503 0.023 25.150 70.000 17.605 30.000 7.545 1.150
38+800 38+850 38.00 1.763 0.145 66.994 70.000 46.896 30.000 20.098 5.510 CW-12m
38+850 38+920 70.00 0.478 0.049 33.460 70.000 23.422 30.000 10.038 3.430
38+920 38+940 8.00 0.478 0.049 3.824 10.000 0.382 90.000 3.442 0.392 CW-12m
38+940 38+960 20.00 2.735 0.100 54.700 10.000 5.470 90.000 49.230 2.000
38+960 39+000 40.00 6.338 0.093 253.520 10.000 25.352 90.000 228.168 3.720
39+000 39+025 25.00 7.125 0.020 178.125 10.000 17.813 90.000 160.313 0.500
39+025 39+125 88.00 1.908 0.080 167.904 10.000 16.790 90.000 151.114 7.040 CW-12m
39+125 39+200 75.00 0.755 0.093 56.625 10.000 5.663 90.000 50.963 6.975
39+200 39+250 38.00 0.733 0.035 27.854 10.000 2.785 90.000 25.069 1.330 CW-12m
39+250 39+365 91.00 0.120 0.035 10.920 10.000 1.092 90.000 9.828 3.185 CW 2no.-12m
39+365 39+450 85.00 1.663 0.000 141.355 10.000 14.136 90.000 127.220 0.000
39+450 39+570 120.00 0.343 0.243 41.160 10.000 4.116 90.000 37.044 29.160
39+570 39+575 5.00 0.343 0.243 1.715 50.000 0.858 50.000 0.858 1.215
39+575 39+700 113.00 0.705 0.225 79.665 50.000 39.833 50.000 39.833 25.425 CW-12m
39+700 39+800 76.00 0.710 0.225 53.960 50.000 26.980 50.000 26.980 17.100 CW 2no.-12m
39+800 39+900 100.00 0.710 0.225 71.000 100.000 71.000 0.000 0.000 22.500
39+900 40+175 263.00 0.595 0.115 156.485 100.000 156.485 0.000 0.000 30.245 CW-12m
40+175 40+275 100.00 0.143 0.228 14.300 100.000 14.300 0.000 0.000 22.800
40+275 40+325 50.00 0.683 0.000 34.150 100.000 34.150 0.000 0.000 0.000
40+325 40+425 94.00 1.253 0.160 117.782 100.000 117.782 0.000 0.000 15.040 CW-12/2m
40+425 40+600 169.00 0.625 0.373 105.625 100.000 105.625 0.000 0.000 63.037 CW-12/2m
40+600 40+700 100.00 0.320 0.113 32.000 100.000 32.000 0.000 0.000 11.300
40+700 40+900 188.00 0.688 0.003 129.344 100.000 129.344 0.000 0.000 0.564 CW-12m

Page 162 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
40+900 40+990 90.00 0.325 0.153 29.250 100.000 29.250 0.000 0.000 13.770
40+990 41+050 60.00 0.330 0.078 19.800 100.000 19.800 0.000 0.000 4.680
41+050 41+150 88.00 0.885 0.055 77.880 100.000 77.880 0.000 0.000 4.840 CW-12m
41+150 41+300 138.00 0.733 0.113 101.154 100.000 101.154 0.000 0.000 15.594 CW-12m
41+300 41+425 125.00 0.523 0.055 65.375 10.000 6.538 90.000 58.838 6.875
41+425 41+500 75.00 0.523 0.055 39.225 100.000 39.225 0.000 0.000 4.125
41+500 41+650 150.00 0.688 0.160 103.200 100.000 103.200 0.000 0.000 24.000
41+650 41+700 50.00 0.688 0.160 34.400 100.000 34.400 0.000 0.000 8.000
41+700 41+780 80.00 1.095 0.035 87.600 100.000 87.600 0.000 0.000 2.800
41+780 41+850 70.00 1.530 0.068 107.100 100.000 107.100 0.000 0.000 4.760
41+850 41+875 13.00 1.530 0.068 19.890 50.000 9.945 50.000 9.945 0.884 CW-12m
41+875 41+990 115.00 0.488 0.075 56.120 50.000 28.060 50.000 28.060 8.625
41+990 42+040 50.00 1.333 0.000 66.650 50.000 33.325 50.000 33.325 0.000
42+040 42+100 48.00 16.383 0.000 786.384 50.000 393.192 50.000 393.192 0.000 CW-12m
42+100 42+125 25.00 0.370 0.938 9.250 50.000 4.625 50.000 4.625 23.450
42+125 42+285 148.00 1.055 0.018 156.140 100.000 156.140 0.000 0.000 2.664 CW-12m
42+285 42+290 5.00 1.205 0.000 6.025 100.000 6.025 0.000 0.000 0.000
42+290 42+375 73.00 1.205 0.000 87.965 70.000 61.576 30.000 26.390 0.000 CW-12m
42+375 42+420 33.00 0.820 0.040 27.060 70.000 18.942 30.000 8.118 1.320 CW-12m
42+420 42+435 3.00 0.820 0.040 2.460 100.000 2.460 0.000 0.000 0.120 CW-12m
42+435 42+650 215.00 0.878 0.310 188.770 100.000 188.770 0.000 0.000 66.650
42+650 42+725 75.00 1.243 0.018 93.225 100.000 93.225 0.000 0.000 1.350
42+725 42+870 121.00 0.650 0.030 78.650 100.000 78.650 0.000 0.000 3.630 CW 2no.-12m
42+870 42+920 50.00 0.650 0.030 32.500 70.000 22.750 30.000 9.750 1.500
42+920 42+975 43.00 0.660 0.048 28.380 70.000 19.866 30.000 8.514 2.064 CW-12m
42+975 43+000 25.00 0.928 0.013 23.200 70.000 16.240 30.000 6.960 0.325
43+000 43+050 38.00 0.688 0.018 26.144 70.000 18.301 30.000 7.843 0.684 CW-12m
43+050 43+200 138.00 0.465 0.069 64.170 70.000 44.919 30.000 19.251 9.522 CW-12m
43+200 43+350 138.00 0.580 0.030 80.040 100.000 80.040 0.000 0.000 4.140 CW-12m
43+350 43+550 188.00 0.753 0.093 141.564 100.000 141.564 0.000 0.000 17.484 CW-12m
43+550 43+585 23.00 0.998 0.022 22.954 100.000 22.954 0.000 0.000 0.506 CW-12m
43+585 43+600 15.00 3.078 0.055 46.170 100.000 46.170 0.000 0.000 0.825
43+600 43+680 80.00 0.483 0.048 38.640 100.000 38.640 0.000 0.000 3.840
43+680 43+750 70.00 3.077 0.048 215.390 100.000 215.390 0.000 0.000 3.360
43+750 43+780 18.00 1.138 0.073 20.484 95.000 19.460 5.000 1.024 1.314 CW-12m
43+780 43+850 70.00 3.082 0.048 215.740 95.000 204.953 5.000 10.787 3.360
43+850 43+875 25.00 1.280 0.093 32.000 95.000 30.400 5.000 1.600 2.325
43+875 43+915 40.00 0.395 0.023 15.800 95.000 15.010 5.000 0.790 0.920
43+915 43+935 8.00 0.425 0.185 3.400 95.000 3.230 5.000 0.170 1.480 CW-12m
43+935 43+955 20.00 0.370 0.048 7.400 95.000 7.030 5.000 0.370 0.960
43+955 44+000 45.00 0.548 0.098 24.660 95.000 23.427 5.000 1.233 4.410
44+000 44+025 13.00 0.548 0.098 7.124 100.000 7.124 0.000 0.000 1.274 CW-12m
44+025 44+400 339.00 0.563 0.035 190.857 100.000 190.857 0.000 0.000 11.865 CW 3no.-12m
44+400 44+475 75.00 0.355 0.025 26.625 100.000 26.625 0.000 0.000 1.875
44+475 44+675 200.00 0.533 0.330 106.600 100.000 106.600 0.000 0.000 66.000
44+675 44+850 151.00 0.538 0.390 81.238 100.000 81.238 0.000 0.000 58.890 CW 2no.-12m
44+850 44+900 50.00 1.150 0.030 57.500 100.000 57.500 0.000 0.000 1.500
44+900 44+975 63.00 1.150 0.030 72.450 100.000 72.450 0.000 0.000 1.890 CW-12m
44+975 45+160 173.00 0.428 0.250 74.044 100.000 74.044 0.000 0.000 43.250 CW-12m

Page 163 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
45+160 45+410 226.00 1.100 0.015 248.600 100.000 248.600 0.000 0.000 3.390 CW 2no.-12m
45+410 45+435 25.00 0.643 0.330 16.075 100.000 16.075 0.000 0.000 8.250
45+435 45+600 165.00 0.693 0.410 114.345 100.000 114.345 0.000 0.000 67.650
45+600 45+825 213.00 0.935 0.120 199.155 100.000 199.155 0.000 0.000 25.560 CW-12m
45+825 45+900 75.00 0.928 0.573 69.600 100.000 69.600 0.000 0.000 42.975
45+900 46+000 100.00 0.720 0.093 72.000 100.000 72.000 0.000 0.000 9.300
46+000 46+100 100.00 0.965 0.085 96.500 100.000 96.500 0.000 0.000 8.500
46+100 46+500 400.00 0.735 0.123 294.000 100.000 294.000 0.000 0.000 49.200
46+500 46+800 300.00 1.010 0.048 303.000 100.000 303.000 0.000 0.000 14.400
46+800 47+150 350.00 0.595 0.148 208.250 100.000 208.250 0.000 0.000 51.800
47+150 47+180 30.00 0.760 0.008 22.800 100.000 22.800 0.000 0.000 0.240
47+180 47+225 45.00 0.280 0.220 12.600 100.000 12.600 0.000 0.000 9.900
47+225 47+330 93.00 0.883 0.003 82.119 100.000 82.119 0.000 0.000 0.279 CW-12m
47+330 47+430 100.00 0.883 0.003 88.300 100.000 88.300 0.000 0.000 0.300
47+430 47+575 121.00 1.130 0.043 136.730 100.000 136.730 0.000 0.000 5.203 CW 2no.-12m
47+575 47+600 25.00 0.880 0.120 22.000 100.000 22.000 0.000 0.000 3.000
47+600 47+900 288.00 1.348 0.060 388.224 100.000 388.224 0.000 0.000 17.280 CW-12m
47+900 47+975 63.00 0.528 0.117 33.264 100.000 33.264 0.000 0.000 7.371 CW-12m
47+975 48+040 53.00 0.615 0.089 32.595 100.000 32.595 0.000 0.000 4.717 CW-12m
48+040 48+260 208.00 0.975 0.003 202.800 100.000 202.800 0.000 0.000 0.624 CW-12m
48+260 48+310 50.00 1.178 0.108 58.900 100.000 58.900 0.000 0.000 5.400
48+310 48+360 38.00 0.963 0.020 36.594 100.000 36.594 0.000 0.000 0.760 CW-12m
48+360 48+410 50.00 1.083 0.048 54.150 100.000 54.150 0.000 0.000 2.400
48+410 48+450 40.00 0.833 0.118 33.320 100.000 33.320 0.000 0.000 4.720
48+450 48+550 100.00 1.053 0.088 105.300 100.000 105.300 0.000 0.000 8.800
48+550 48+570 20.00 1.053 0.088 21.060 100.000 21.060 0.000 0.000 1.760
48+570 48+630 45.00 1.010 0.010 45.450 100.000 45.450 0.000 0.000 0.450 CW-15m
48+630 48+670 28.00 1.375 0.035 38.500 100.000 38.500 0.000 0.000 0.980 CW-15m
48+670 48+685 15.00 1.375 0.035 20.625 0.000 0.000 100.000 20.625 0.525
48+685 48+740 55.00 13.455 0.153 740.025 0.000 0.000 100.000 740.025 8.415
48+740 48+760 20.00 13.022 0.118 260.440 0.000 0.000 100.000 260.440 2.360
48+760 48+800 40.00 9.023 0.118 360.920 0.000 0.000 100.000 360.920 4.720
48+800 48+805 5.00 9.023 0.118 45.115 100.000 45.115 0.000 0.000 0.590
48+805 48+860 34.00 1.392 0.103 47.328 100.000 47.328 0.000 0.000 3.502 CW-21m
48+860 49+020 160.00 1.020 0.003 163.200 100.000 163.200 0.000 0.000 0.480
49+020 49+045 13.00 1.020 0.003 13.260 100.000 13.260 0.000 0.000 0.039 CW-12m
49+045 49+070 25.00 0.878 0.060 21.950 100.000 21.950 0.000 0.000 1.500
49+070 49+215 145.00 0.970 0.138 140.650 100.000 140.650 0.000 0.000 20.010
49+215 49+310 83.00 1.130 0.126 93.790 100.000 93.790 0.000 0.000 10.458 CW-12m
49+310 49+340 30.00 1.380 0.000 41.400 100.000 41.400 0.000 0.000 0.000
49+340 49+360 20.00 0.888 0.048 17.760 100.000 17.760 0.000 0.000 0.960
49+360 49+400 40.00 1.143 0.005 45.720 100.000 45.720 0.000 0.000 0.200
49+400 49+525 104.00 0.715 0.117 74.360 100.000 74.360 0.000 0.000 12.168 CW-21m
49+525 49+560 35.00 1.135 0.000 39.725 100.000 39.725 0.000 0.000 0.000
49+560 49+600 40.00 1.013 0.088 40.520 100.000 40.520 0.000 0.000 3.520
49+600 49+650 50.00 1.730 0.018 86.500 100.000 86.500 0.000 0.000 0.900
49+650 49+680 30.00 1.730 0.018 51.900 50.000 25.950 50.000 25.950 0.540
49+680 49+720 40.00 1.045 0.148 41.800 50.000 20.900 50.000 20.900 5.920
49+720 49+775 55.00 0.800 0.220 44.000 50.000 22.000 50.000 22.000 12.100

Page 164 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
49+775 49+800 25.00 0.800 0.220 20.000 100.000 20.000 0.000 0.000 5.500
49+800 49+860 60.00 1.225 0.016 73.500 100.000 73.500 0.000 0.000 0.960
49+860 49+890 18.00 1.160 0.065 20.880 100.000 20.880 0.000 0.000 1.170 CW-12m
49+890 49+950 45.00 0.920 0.119 41.400 100.000 41.400 0.000 0.000 5.355 CW-15m
49+950 50+020 70.00 0.803 0.116 56.210 100.000 56.210 0.000 0.000 8.120
50+020 50+060 40.00 1.590 0.079 63.600 100.000 63.600 0.000 0.000 3.160
50+060 50+125 50.00 1.205 0.004 60.250 100.000 60.250 0.000 0.000 0.200 CW-15m
50+125 50+300 175.00 0.933 0.350 163.275 100.000 163.275 0.000 0.000 61.250
50+300 50+460 148.00 1.350 0.073 199.800 100.000 199.800 0.000 0.000 10.804 CW-12m
50+460 50+600 128.00 1.560 0.018 199.680 100.000 199.680 0.000 0.000 2.304 CW-12m
50+600 50+660 60.00 0.825 0.100 49.500 100.000 49.500 0.000 0.000 6.000
50+660 50+825 165.00 0.900 0.028 148.500 100.000 148.500 0.000 0.000 4.620
50+825 50+975 150.00 1.053 0.020 157.950 100.000 157.950 0.000 0.000 3.000
50+975 51+090 103.00 0.995 0.123 102.485 100.000 102.485 0.000 0.000 12.669 CW-12m
51+090 51+210 120.00 1.265 0.018 151.800 100.000 151.800 0.000 0.000 2.160
51+210 51+275 65.00 1.355 0.055 88.075 100.000 88.075 0.000 0.000 3.575
51+275 51+300 25.00 1.325 0.033 33.125 100.000 33.125 0.000 0.000 0.825
51+300 51+400 100.00 1.325 0.033 132.500 100.000 132.500 0.000 0.000 3.300
51+400 51+525 125.00 1.663 0.000 207.875 100.000 207.875 0.000 0.000 0.000
51+525 51+600 75.00 1.078 0.003 80.850 100.000 80.850 0.000 0.000 0.225
51+600 51+650 50.00 1.020 0.093 51.000 100.000 51.000 0.000 0.000 4.650
51+650 51+660 10.00 1.270 0.060 12.700 100.000 12.700 0.000 0.000 0.600
51+660 51+720 60.00 1.270 0.060 76.200 100.000 76.200 0.000 0.000 3.600
51+720 51+775 55.00 0.923 0.000 50.765 100.000 50.765 0.000 0.000 0.000
51+775 51+840 65.00 1.485 0.230 96.525 100.000 96.525 0.000 0.000 14.950
51+840 51+930 90.00 1.090 0.084 98.100 100.000 98.100 0.000 0.000 7.560
51+930 52+020 90.00 1.185 0.030 106.650 100.000 106.650 0.000 0.000 2.700
52+020 52+130 110.00 1.218 0.050 133.980 100.000 133.980 0.000 0.000 5.500
52+130 52+150 20.00 0.668 0.173 13.360 100.000 13.360 0.000 0.000 3.460
52+150 52+160 10.00 13.630 0.090 136.300 100.000 136.300 0.000 0.000 0.900
52+160 52+190 30.00 13.630 0.090 408.900 50.000 204.450 50.000 204.450 2.700
52+190 52+210 20.00 6.280 0.009 125.600 50.000 62.800 50.000 62.800 0.180
52+210 52+220 10.00 6.160 0.002 61.600 50.000 30.800 50.000 30.800 0.020
52+220 52+230 10.00 5.930 0.005 59.300 50.000 29.650 50.000 29.650 0.050
52+230 52+300 70.00 12.120 0.012 848.400 50.000 424.200 50.000 424.200 0.840
52+300 52+335 35.00 3.780 0.002 132.300 50.000 66.150 50.000 66.150 0.070
52+335 52+350 15.00 1.158 0.000 17.370 50.000 8.685 50.000 8.685 0.000
52+629 52+660 31.00 1.492 0.010 46.252 100.000 46.252 0.000 0.000 0.310
52+660 52+690 30.00 1.290 0.009 38.700 100.000 38.700 0.000 0.000 0.270
52+690 52+735 45.00 1.029 0.101 46.305 100.000 46.305 0.000 0.000 4.545
52+735 52+760 25.00 1.029 0.101 25.725 100.000 25.725 0.000 0.000 2.525
52+760 52+825 53.00 2.593 0.101 137.429 100.000 137.429 0.000 0.000 5.353 CW-12m
52+825 52+860 23.00 1.570 0.060 36.110 100.000 36.110 0.000 0.000 1.380 CW-12m
52+860 53+000 140.00 0.983 0.356 137.620 100.000 137.620 0.000 0.000 49.840
53+000 53+040 40.00 1.100 0.037 44.000 100.000 44.000 0.000 0.000 1.480
53+040 53+725 649.00 0.786 0.067 510.114 100.000 510.114 0.000 0.000 43.483 CW 3no.-12m
53+725 53+800 75.00 1.020 0.003 76.500 100.000 76.500 0.000 0.000 0.225
53+800 53+840 28.00 0.886 0.036 24.808 100.000 24.808 0.000 0.000 1.008 CW-12m
53+840 54+000 160.00 0.838 0.148 134.080 100.000 134.080 0.000 0.000 23.680

Page 165 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
54+000 54+300 276.00 1.428 0.105 394.128 100.000 394.128 0.000 0.000 28.980 CW 2no.-12m
54+300 54+440 140.00 0.602 0.120 84.280 100.000 84.280 0.000 0.000 16.800
54+440 54+475 35.00 1.169 0.052 40.915 100.000 40.915 0.000 0.000 1.820
54+475 54+510 35.00 0.782 0.035 27.370 100.000 27.370 0.000 0.000 1.225
54+510 54+540 18.00 1.297 0.090 23.346 100.000 23.346 0.000 0.000 1.620 CW-12m
54+540 54+600 60.00 0.763 0.482 45.780 100.000 45.780 0.000 0.000 28.920
54+600 54+710 86.00 1.167 0.137 100.362 100.000 100.362 0.000 0.000 11.782 CW 2no.-12m
54+710 54+740 30.00 1.030 0.034 30.900 100.000 30.900 0.000 0.000 1.020
54+740 54+850 98.00 1.030 0.100 100.940 100.000 100.940 0.000 0.000 9.800 CW-12m
54+850 54+925 63.00 0.923 0.088 58.149 100.000 58.149 0.000 0.000 5.544 CW-12m
54+925 55+025 100.00 1.107 0.061 110.700 100.000 110.700 0.000 0.000 6.100
55+025 55+130 105.00 0.914 0.088 95.970 100.000 95.970 0.000 0.000 9.240
55+130 55+275 130.00 0.846 0.024 109.980 100.000 109.980 0.000 0.000 3.120 CW-15m
55+275 55+275 0.00 1.016 0.011 0.000 100.000 0.000 0.000 0.000 0.000
55+275 55+350 75.00 1.192 0.040 89.400 100.000 89.400 0.000 0.000 3.000
55+350 55+385 23.00 1.763 0.100 40.549 100.000 40.549 0.000 0.000 2.300 CW-12m
55+385 55+500 115.00 1.763 0.100 202.745 100.000 202.745 0.000 0.000 11.500
55+500 55+575 75.00 1.204 0.080 90.300 100.000 90.300 0.000 0.000 6.000
55+575 55+600 25.00 0.888 0.075 22.200 100.000 22.200 0.000 0.000 1.875
55+600 55+620 8.00 0.888 0.075 7.104 100.000 7.104 0.000 0.000 0.600 CW-12m
55+620 55+630 10.00 0.837 0.060 8.370 100.000 8.370 0.000 0.000 0.600
55+630 55+665 35.00 1.168 0.258 40.880 100.000 40.880 0.000 0.000 9.030
55+665 55+690 25.00 1.120 0.101 28.000 100.000 28.000 0.000 0.000 2.525
55+690 55+770 80.00 1.020 0.035 81.600 100.000 81.600 0.000 0.000 2.800
55+770 55+775 5.00 1.020 0.035 5.100 100.000 5.100 0.000 0.000 0.175
55+775 55+805 15.00 1.160 0.019 17.400 100.000 17.400 0.000 0.000 0.285 CW-15m
55+805 55+820 15.00 3.070 0.075 46.050 100.000 46.050 0.000 0.000 1.125
55+820 55+840 20.00 1.770 0.070 35.400 100.000 35.400 0.000 0.000 1.400
55+840 55+880 40.00 1.082 0.021 43.280 100.000 43.280 0.000 0.000 0.840
55+880 55+910 30.00 1.082 0.021 32.460 97.000 31.486 3.000 0.974 0.630
55+910 55+920 10.00 2.960 0.293 29.600 97.000 28.712 3.000 0.888 2.930
55+920 56+010 75.00 1.080 0.000 81.000 97.000 78.570 3.000 2.430 0.000 CW-15m
56+010 56+190 180.00 0.743 0.110 133.740 97.000 129.728 3.000 4.012 19.800
56+190 56+200 10.00 1.082 0.025 10.820 97.000 10.495 3.000 0.325 0.250
56+200 56+260 33.00 1.082 0.025 35.706 100.000 35.706 0.000 0.000 0.825 CW-15,12m
56+260 56+310 50.00 1.423 0.111 71.150 100.000 71.150 0.000 0.000 5.550
56+310 56+400 66.00 1.590 0.048 104.940 100.000 104.940 0.000 0.000 3.168 CW 2no.-12m
56+400 56+525 125.00 1.449 0.210 181.125 100.000 181.125 0.000 0.000 26.250
56+525 56+560 23.00 1.030 0.037 23.690 100.000 23.690 0.000 0.000 0.851 CW-12m
56+560 56+690 130.00 1.030 0.037 133.900 100.000 133.900 0.000 0.000 4.810
56+690 56+725 35.00 0.801 0.033 28.035 100.000 28.035 0.000 0.000 1.155
56+725 56+750 13.00 0.615 0.141 7.995 100.000 7.995 0.000 0.000 1.833 CW-12m
56+750 56+870 120.00 0.615 0.141 73.800 50.000 36.900 50.000 36.900 16.920
56+870 56+900 18.00 0.615 0.141 11.070 100.000 11.070 0.000 0.000 2.538 CW-12m
56+900 57+000 100.00 1.160 0.071 116.000 100.000 116.000 0.000 0.000 7.100
57+000 57+100 100.00 0.570 0.120 57.000 100.000 57.000 0.000 0.000 12.000
57+100 57+300 188.00 0.700 0.085 131.600 100.000 131.600 0.000 0.000 15.980 CW-12m
57+300 57+600 276.00 0.792 0.483 218.592 100.000 218.592 0.000 0.000 133.308 CW 2no.-12m
57+600 57+750 138.00 0.627 0.250 86.526 100.000 86.526 0.000 0.000 34.500 CW-12m
57+750 57+900 150.00 0.733 0.430 109.950 100.000 109.950 0.000 0.000 64.500

Page 166 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
57+900 57+940 40.00 1.050 0.090 42.000 100.000 42.000 0.000 0.000 3.600
57+940 57+975 23.00 1.560 0.052 35.880 100.000 35.880 0.000 0.000 1.196 CW-12m
57+975 57+985 10.00 1.850 0.040 18.500 100.000 18.500 0.000 0.000 0.400
57+985 58+225 228.00 0.820 0.065 186.960 100.000 186.960 0.000 0.000 14.820 CW-12m
58+225 58+330 84.00 1.329 0.020 111.636 100.000 111.636 0.000 0.000 1.680 CW-21m
58+330 58+400 70.00 0.722 0.053 50.540 100.000 50.540 0.000 0.000 3.710
58+400 58+430 30.00 0.936 0.063 28.080 100.000 28.080 0.000 0.000 1.890
58+430 58+625 195.00 1.000 0.026 195.000 100.000 195.000 0.000 0.000 5.070
58+625 58+680 55.00 0.866 0.022 47.630 100.000 47.630 0.000 0.000 1.210
58+680 58+760 80.00 0.893 0.037 71.440 100.000 71.440 0.000 0.000 2.960
58+760 58+790 30.00 0.674 0.069 20.220 100.000 20.220 0.000 0.000 2.070
58+790 58+850 60.00 0.548 0.059 32.880 100.000 32.880 0.000 0.000 3.540
58+850 58+965 115.00 0.390 0.087 44.850 100.000 44.850 0.000 0.000 10.005
58+965 59+090 104.00 0.750 0.442 78.000 100.000 78.000 0.000 0.000 45.968 CW-21m
59+090 59+200 98.00 0.798 0.459 78.204 100.000 78.204 0.000 0.000 44.982 CW-12m
59+200 59+300 85.00 0.472 0.084 40.120 100.000 40.120 0.000 0.000 7.140 CW-15m
59+300 59+450 150.00 0.640 0.095 96.000 100.000 96.000 0.000 0.000 14.250
59+450 59+550 100.00 0.602 0.110 60.200 100.000 60.200 0.000 0.000 11.000
59+550 59+580 30.00 0.905 0.053 27.150 100.000 27.150 0.000 0.000 1.590
59+580 59+700 108.00 0.841 0.184 90.828 100.000 90.828 0.000 0.000 19.872 CW-12m
59+700 59+780 68.00 0.994 0.202 67.592 100.000 67.592 0.000 0.000 13.736 CW-12m
59+780 59+900 96.00 0.581 0.108 55.776 100.000 55.776 0.000 0.000 10.368 CW 2no.-12m
59+900 60+100 173.00 0.892 0.080 154.316 100.000 154.316 0.000 0.000 13.840 CW-15,12m
60+100 60+260 148.00 0.683 0.076 101.084 100.000 101.084 0.000 0.000 11.248 CW-12m
60+260 60+300 40.00 0.670 0.052 26.800 100.000 26.800 0.000 0.000 2.080
60+300 60+410 110.00 0.847 0.043 93.170 100.000 93.170 0.000 0.000 4.730
60+410 60+525 103.00 1.290 0.132 132.870 100.000 132.870 0.000 0.000 13.596 CW-12m
60+525 60+675 150.00 0.801 0.205 120.150 100.000 120.150 0.000 0.000 30.750
60+675 60+742 55.00 1.125 0.103 61.875 100.000 61.875 0.000 0.000 5.665 CW-12m
60+742 60+750 8.00 1.125 0.103 9.000 100.000 9.000 0.000 0.000 0.824
60+750 61+250 500.00 0.790 0.069 395.000 100.000 395.000 0.000 0.000 34.500
61+250 61+300 35.00 1.047 0.033 36.645 100.000 36.645 0.000 0.000 1.141 CW-15m
61+300 61+550 250.00 0.714 0.066 178.500 100.000 178.500 0.000 0.000 16.500
61+550 61+850 285.00 1.180 0.141 336.300 100.000 336.300 0.000 0.000 40.185 CW-15m
61+850 62+050 200.00 0.955 0.034 191.000 100.000 191.000 0.000 0.000 6.800
62+050 62+250 200.00 1.025 0.181 205.000 100.000 205.000 0.000 0.000 36.200
62+250 62+550 288.00 0.134 0.040 38.592 100.000 38.592 0.000 0.000 11.520 CW-12m
62+550 62+685 135.00 0.000 0.675 0.000 100.000 0.000 0.000 0.000 91.125
62+685 62+755 70.00 0.131 0.070 9.170 100.000 9.170 0.000 0.000 4.900
62+755 62+815 60.00 1.010 0.061 60.600 100.000 60.600 0.000 0.000 3.660
62+815 62+830 15.00 0.560 0.013 8.400 100.000 8.400 0.000 0.000 0.195
62+830 62+845 15.00 0.105 0.043 1.575 100.000 1.575 0.000 0.000 0.645
62+845 62+860 15.00 0.105 0.041 1.575 100.000 1.575 0.000 0.000 0.615
62+860 63+000 128.00 0.310 0.078 39.680 100.000 39.680 0.000 0.000 9.984 CW-12m
63+000 63+100 100.00 1.133 0.325 113.300 100.000 113.300 0.000 0.000 32.500
63+100 63+150 50.00 0.153 0.040 7.650 100.000 7.650 0.000 0.000 2.005
63+150 63+170 20.00 0.113 0.351 2.260 100.000 2.260 0.000 0.000 7.020
63+170 63+200 30.00 1.420 0.000 42.600 100.000 42.600 0.000 0.000 0.000
63+200 63+310 110.00 0.224 0.110 24.640 100.000 24.640 0.000 0.000 12.100
63+310 63+485 163.00 0.610 0.510 99.430 100.000 99.430 0.000 0.000 83.130 CW-12m

Page 167 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.02


Description of work : 3.01 Road-way excavation including haulage and disposal upto 10 m distance, all complete. (SS/SP- 900)
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)

Total Cutting Quantity Breakdown Total


Sectional Area Quantity Quantity
Chainage (Sq.m) (Cum.) Common Material Hard Rock (Cum.)
Length
From To (m) Cut Fill Cut % Qty. (Cum) % Qty. (Cum) Fill Remarks
63+485 63+615 130.00 0.185 0.270 24.050 100.000 24.050 0.000 0.000 35.100
63+615 63+770 143.00 0.071 0.037 10.153 100.000 10.153 0.000 0.000 5.291 CW-12m
63+770 63+900 130.00 0.005 0.055 0.650 100.000 0.650 0.000 0.000 7.150
63+900 63+960 60.00 0.098 0.038 5.880 100.000 5.880 0.000 0.000 2.280
63+960 64+075 115.00 0.490 0.942 56.350 100.000 56.350 0.000 0.000 108.330
64+075 64+195 120.00 0.035 0.228 4.200 100.000 4.200 0.000 0.000 27.360
64+195 64+325 118.00 0.025 0.301 2.950 100.000 2.950 0.000 0.000 35.518 CW-12m
64+325 64+360 35.00 0.350 0.372 12.250 100.000 12.250 0.000 0.000 13.020
64+360 64+530 170.00 0.314 0.093 53.380 100.000 53.380 0.000 0.000 15.810
64+530 64+560 30.00 0.298 0.238 8.940 100.000 8.940 0.000 0.000 7.140
64+560 64+775 215.00 0.298 0.238 64.070 65.000 41.646 35.000 22.425 51.170
64+775 64+950 175.00 0.305 0.068 53.375 100.000 53.375 0.000 0.000 11.900
64+950 65+100 150.00 0.051 0.318 7.650 100.000 7.650 0.000 0.000 47.700
Quantity for extra widenings and curves @ 7% 3025.957 2686.429 339.528 1072.135
61510.50 46253.913 41063.987 5189.927 16388.355

Page 168 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No. : 3.01,3.04


Description of work Earthwork (Cut and fill) in roadside drains (SS/SP- 900)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length
S.N. Side Sectional Quantity Sectional Quantity Remarks
From To Shape (m)
Area (sq.m) (cu.m) Area(sq.m) (cu.m)
Road Side Drain
1 0+012 0+131 SM/T2 R 119.00 0.500 59.500
2 0+131 0+137 SM/T2 L 6.00 0.500 3.000
3 0+149 0+207 SM/T2 L 58.00 0.500 29.000
4 0+250 0+350 SM/T2 L 100.00 0.500 50.000
5 0+512 0+824 SM/T2 L 312.00 0.500 156.000
6 0+826 0+920 SM/T2 L 94.00 0.500 47.000
7 0+826 0+920 SM/T2 R 94.00 0.500 47.000
8 0+950 0+975 SM/T2 L 25.00 0.500 12.500
9 0+995 1+052 SM/T2 L 57.00 0.500 28.500
10 1+054 1+148 SM/T2 L 94.00 0.500 47.000
11 1+155 1+231 SM/T2 L 76.00 0.500 38.000
12 1+325 1+362 SM/T2 L 37.00 0.500 18.500
13 1+374 1+654 SM/T2 L 280.00 0.500 140.000
14 1+420 1+475 SM/T2 R 55.00 0.500 27.500
15 1+890 2+044 SM/T2 L 154.00 0.500 77.000
16 SM/T2 R 2.00 0.500 1.000
17 SM/t2 R 15.00 0.500 7.500
18 2+610 2+635 SM/T2 R 25.00 0.500 12.500
19 2+865 2+942 SM/T2 R 77.00 0.500 38.500
20 2+952 3+050 SM/T2 L 98.00 0.500 49.000
21 3+152 3+255 SM/T2 L 103.00 0.500 51.500
22 3+255 3+340 SM/T2 L 85.00 0.500 42.500
23 3+325 3+340 SM/T2 R 15.00 0.500 7.500
24 3+340 3+346 SM/T2 R 6.00 0.500 3.000
25 3+358 3+398 SM/T2 L 40.00 0.500 20.000
26 3+410 3+497 SM/T2 L 87.00 0.500 43.500
27 3+509 3+637 SM/T2 L 128.00 0.500 64.000
28 3+647 3+780 SM/T2 L 133.00 0.500 66.500
29 3+944 SM/T9 R 60.00 0.700 42.000
30 3+888 3+944 SM/T2 R 56.00 0.500 28.000
31 3+956 4+088 SM/T2 R 132.00 0.500 66.000
32 4+160 4+300 SM/T2 R 140.00 0.500 70.000
33 4+330 4+403 SM/T1 L 73.00 0.400 29.200
34 4+495 4+652 SM/T1 L 157.00 0.400 62.800
35 4+720 4+846 SM/T1 R 126.00 0.400 50.400
36 4+859 4+910 SM/T1 R 51.00 0.400 20.400
37 5+560 5+576 SM/T1 R 16.00 0.400 6.400
38 5+710 5+765 SM/T1 R 55.00 0.400 22.000
39 5+777 6+050 SM/T1 R 273.00 0.400 109.200
40 6+090 SM/T1 20.00 0.400 8.000
41 6+090 6+132 SM/T1 L 42.00 0.400 16.800
42 6+150 6+253 SM/T1 L 103.00 0.400 41.200
43 6+400 6+580 SM/T1 R 180.00 0.400 72.000
44 6+625 6+815 SM/T1 L 190.00 0.400 76.000
45 SM/T1 R 20.00 0.400 8.000
46 6+675 6+815 SM/T1 R 140.00 0.400 56.000
47 6+925 7+050 SM/T3 R 125.00 0.630 78.750
48 6+925 7+050 SM/T3 L 125.00 0.630 78.750
49 7+050 7+270 SM/T3 R 220.00 0.630 138.600
50 7+182 7+410 SM/T3 L 228.00 0.630 143.640
51 7+270 7+325 SM/T1 R 55.00 0.400 22.000
52 7+410 7+430 SM/T3 L 20.00 0.630 12.600
53 7+955 7+975 SM/T1 L 20.00 0.400 8.000
54 7+975 7+985 SM/T1 L 10.00 0.400 4.000
55 7+985 8+075 SM/T1 L 90.00 0.400 36.000
56 8+075 8+160 SM/T7 L 85.00 0.090 7.650
57 8+173 8+240 SM/T1 L 67.00 0.400 26.800
58 8+260 8+494 SM/T1 L 234.00 0.400 93.600

Page 169 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.04


Description of work Earthwork (Cut and fill) in roadside drains (SS/SP- 900)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length
S.N. Side Sectional Quantity Sectional Quantity Remarks
From To Shape (m)
Area (sq.m) (cu.m) Area(sq.m) (cu.m)
59 8+506 8+700 SM/T2 L 194.00 0.500 97.000
60 8+702 8+831 SM/T2 L 129.00 0.500 64.500
61 8+701 15.00 1.050 15.750
62 8+836 8+886 SM/T1 L 50.00 0.400 20.000
63 8+898 9+000 SM/T1 L 102.00 0.400 40.800
64 9+044 9+056 SM/T3 L 12.00 0.630 7.560
65 9+068 9+370 SM/T3 L 302.00 0.630 190.260
66 9+270 9+335 SM/T1 R 65.00 0.400 26.000
67 9+382 9+758 SM/T2 L 376.00 0.500 188.000
68 9+763 9+992 SM/T2 L 229.00 0.500 114.500
69 10+007 10+150 SM/T2 L 143.00 0.500 71.500
70 10+007 SM/T2 R 10.00 0.500 5.000
71 10+007 10+150 SM/T2 R 143.00 0.500 71.500
72 10+288 SM/T3 L 25.00 0.630 15.750
73 10+290 10+395 SM/T3 R 105.00 0.630 66.150
74 10+395 10+505 SM/T3 R 110.00 0.630 69.300
75 10+420 SM/T1 L 15.00 0.400 6.000
76 10+515 10+600 SM/T1 L 85.00 0.400 34.000
77 10+612 10+704 SM/T3 L 92.00 0.630 57.960
78 10+716 10+815 SM/T3 L 99.00 0.630 62.370
79 10+831 10+900 SM/T3 L 69.00 0.630 43.470
80 10+900 11+020 SM/T3 L 120.00 0.000 0.330 39.600
81 11+032 11+057 SM/T1 L 25.00 0.400 10.000
82 11+057 11+240 SM/T3 L 183.00 0.630 115.290
83 11+254 11+328 SM/T1 L 74.00 0.400 29.600
84 11+352 11+400 SM/T1 L 48.00 0.400 19.200
85 11+412 11+423 SM/T1 L 11.00 0.400 4.400
86 11+430 11+504 SM/T3 L 74.00 0.630 46.620
87 11+516 11+690 SM/T1 L 174.00 0.400 69.600
88 11+705 11+739 SM/T2 L 34.00 0.500 17.000
89 11+751 11+844 SM/T2 L 93.00 0.500 46.500
90 11+856 11+877 SM/T2 L 21.00 0.500 10.500
91 11+960 SM/T3 R 15.00 0.630 9.450
92 11+960 12+047 SM/T3 R 87.00 0.630 54.810
93 12+059 12+156 SM/T3 R 97.00 0.630 61.110
94 12+178 12+216 SM/T1 R 38.00 0.400 15.200
95 12+234 12+269 SM/T1 R 35.00 0.400 14.000
96 12+281 12+344 SM/T1 R 63.00 0.400 25.200
97 12+356 12+481 SM/T3 R 125.00 0.630 78.750
98 12+493 12+542 SM/T3 R 49.00 0.630 30.870
99 12+554 12+743 SM/T3 R 189.00 0.630 119.070
100 12+755 12+925 SM/T3 R 170.00 0.630 107.100
101 13+050 13+323 SM/T3 R 273.00 0.000 0.180 49.140
102 13+325 13+500 SM/T3 R 175.00 0.000 0.180 31.500
103 13+515 13+715 SM/T3 R 200.00 0.000 0.870 174.000
104 13+731 13+854 SM/T3 R 123.00 0.000 1.440 177.120
105 13+856 14+024 168.00 0.000
106 14+036 14+225 SM/T3 R 189.00 0.000 0.210 39.690
107 14+237 14+501 SM/T3 R 264.00 0.630 166.320

Page 170 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.04


Description of work Earthwork (Cut and fill) in roadside drains (SS/SP- 900)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length
S.N. Side Sectional Quantity Sectional Quantity Remarks
From To Shape (m)
Area (sq.m) (cu.m) Area(sq.m) (cu.m)
108 14+503 14+606 SM/T3 R 103.00 0.630 64.890
109 14+622 14+695 SM/T3 R 73.00 0.630 45.990
110 14+700 14+950 SM/T3 R 250.00 0.630 157.500
111 14+950 SM/T3 L 10.00 0.630 6.300
112 14+950 15+120 SM/T3 L 170.00 0.000 0.290 49.300
113 14+950 15+100 SM/T2 L 150.00 0.500 75.000
114 15+132 15+224 SM/T8 L 92.00 0.000 0.140 12.880
115 15+230 15+600 SM/T8 L 370.00 0.910 336.700
116 15+600 15+630 SM/T1 L 30.00 0.400 12.000
117 15+642 15+780 SM/T1 L 138.00 0.400 55.200
118 15+806 15+833 SM/T1 L 27.00 0.400 10.800
119 15+850 15+944 SM/T1 L 94.00 0.400 37.600
120 15+956 16+023 SM/T3 L 67.00 0.630 42.210
121 16+040 16+080 SM/T4 L 40.00 0.375 15.000
122 16+105 16+271 SM/T3 L 166.00 0.630 104.580
123 16+300 16+361 SM/T3 L 61.00 0.630 38.430
124 16+361 16+364 SM/T3 R 3.00 0.630 1.890
125 16+366 16+414 SM/T3 R 48.00 0.630 30.240
126 16+426 16+550 SM/T8 R 124.00 0.910 112.840
127 16+550 16+637 SM/T8 R 87.00 0.910 79.170
128 16+637 16+775 SM/T8 R 138.00 0.910 125.580
129 16+775 16+982 SM/T2 R 207.00 0.500 103.500
130 16+994 17+085 SM/T3 R 91.00 0.630 57.330
131 17+110 SM/T3 L 9.00 0.630 5.670
132 17+110 17+142 SM/T8 L 32.00 0.910 29.120
133 17+142 17+224 SM/T8 L 82.00 0.910 74.620
134 17+226 17+255 SM/T8 L 29.00 0.910 26.390
Turn out
135 R 15.00
17+225 1.050 15.750 drain
136 17+255 17+375 SM/T3 L 120.00 0.630 75.600
137 17+375 17+455 SM/T4 L 80.00 0.375 30.000
138 17+455 17+559 SM/T2 L 104.00 0.500 52.000
139 17+560 R 15.00 1.050 15.750
140 17+561 17+800 SM/T3 L 239.00 0.630 150.570
141 17+800 17+942 SM/T2 L 142.00 0.500 71.000
142 17+945 SM/T2 L 30.00 0.500 15.000
143 17+954 18+316 SM/T2 L 362.00 0.500 181.000
144 18+328 18+448 SM/T2 L 120.00 0.500 60.000
145 18+453 18+620 SM/T2 L 167.00 0.500 83.500
146 18+632 18+800 SM/T2 L 168.00 0.500 84.000
147 18+814 18+844 SM/T2 L 30.00 0.500 15.000
148 18+856 18+975 SM/T2 L 119.00 0.500 59.500
149 18+987 19+219 SM/T2 L 232.00 0.500 116.000
150 19+231 19+420 SM/T2 L 189.00 0.500 94.500
151 19+432 19+475 SM/T2 L 43.00 0.500 21.500
152 19+475 19+490 SM/T2 L 15.00 0.500 7.500
153 19+548 19+692 SM/T2 L 144.00 0.500 72.000
154 19+704 19+722 SM/T2 L 18.00 0.500 9.000
155 19+734 19+915 SM/T3 L 181.00 0.630 114.030
156 19+915 20+010 SM/T2 L 95.00 0.500 47.500
157 20+025 20+325 SM/T2 L 300.00 0.500 150.000
158 20+340 20+432 SM/T2 L 92.00 0.500 46.000
159 20+444 20+546 SM/T2 L 102.00 0.500 51.000
160 20+558 20+750 SM/T2 L 192.00 0.500 96.000
161 20+777 21+120 SM/T2 L 343.00 0.500 171.500
162 21+135 21+183 SM/T2 L 48.00 0.500 24.000

Page 171 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.04


Description of work Earthwork (Cut and fill) in roadside drains (SS/SP- 900)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length
S.N. Side Sectional Quantity Sectional Quantity Remarks
From To Shape (m)
Area (sq.m) (cu.m) Area(sq.m) (cu.m)
163 21+539 21+562 SM/T2 L 23.00 0.500 11.500
164 21+577 21+669 SM/T2 L 92.00 0.500 46.000
165 21+681 21+817 SM/T2 L 136.00 0.500 68.000
166 22+110 22+235 SM/T2 L 125.00 0.500 62.500
167 22+250 22+443 SM/T2 L 193.00 0.500 96.500
Turn out
168 R 30.00
22+345 1.050 31.500 drain
169 22+456 22+575 SM/T2 L 119.00 0.500 59.500
170 22+587 22+644 SM/T2 L 57.00 0.500 28.500
171 22+656 22+725 SM/T2 L 69.00 0.500 34.500
172 22+735 22+835 SM/T2 L 100.00 0.500 50.000
173 22+847 22+938 SM/T2 L 91.00 0.500 45.500
174 22+950 23+067 SM/T2 L 117.00 0.500 58.500
175 23+079 23+230 SM/T2 L 151.00 0.500 75.500
176 23+242 23+319 SM/T2 L 77.00 0.500 38.500
177 23+331 23+490 SM/T2 L 159.00 0.500 79.500
178 23+502 23+563 SM/T2 L 61.00 0.500 30.500
179 23+575 23+694 SM/T2 L 119.00 0.500 59.500
180 23+706 23+760 SM/T2 L 54.00 0.500 27.000
181 23+955 24+100 SM/T2 L 145.00 0.500 72.500
182 24+112 24+177 SM/T2 L 65.00 0.500 32.500
183 24+189 24+217 SM/T2 L 28.00 0.500 14.000
184 24+229 24+519 SM/T2 L 290.00 0.500 145.000
185 24+658 24+800 SM/T2 L 142.00 0.500 71.000
186 24+812 24+838 SM/T2 L 26.00 0.500 13.000
187 24+853 25+017 SM/T2 L 164.00 0.500 82.000
188 25+033 25+260 SM/T2 L 227.00 0.500 113.500
189 25+274 25+340 SM/T2 L 66.00 0.500 33.000
190 25+352 25+494 SM/T2 L 142.00 0.500 71.000
191 25+506 25+752 SM/T2 L 246.00 0.500 123.000 filling is to
192 25+775 26+320 SM/T2 L 545.00 0.500 132.500 0.100 28.000 be done for
193 26+332 26+472 SM/T2 L 140.00 0.500 70.000 280m
194 26+490 26+700 SM/T2 L 210.00 0.500 105.000
195 26+715 27+175 SM/T2 L 460.00 0.500 230.000
196 27+187 27+250 SM/T2 L 63.00 0.500 31.500
197 27+262 27+417 SM/T1 L 155.00 0.400 62.000
198 27+432 27+553 SM/T1 L 121.00 0.400 48.400
199 27+567 27+619 SM/T2 L 52.00 0.500 26.000
200 27+631 27+985 SM/T2 L 354.00 0.500 177.000
201 27+997 28+111 SM/T2 L 114.00 0.500 57.000
202 28+123 28+380 SM/T2 L 257.00 0.500 128.500
203 28+392 28+647 SM/T2 L 255.00 0.500 127.500
204 28+659 29+095 SM/T2 L 436.00 0.500 218.000
205 29+095 29+275 SM/T2 L 180.00 0.500 90.000
206 29+160 SM/T10 25.00 0.500 12.500
207 29+275 29+295 SM/T2 L 20.00 0.500 10.000
208 29+520 29+550 SM/T2 R 30.00 0.500 15.000
209 29+525 SM/T2 L 15.00 0.500 7.500
210 29+525 29+550 SM/T2 L 25.00 0.500 12.500
211 29+550 29+669 SM/T7 R 119.00 0.090 10.710
212 29+681 29+725 SM/T2 R 44.00 0.500 22.000
213 29+725 30+375 SM/T1 R 650.00 0.400 260.000
214 30+388 30+419 SM/T2 R 31.00 0.500 15.500
215 30+589 30+677 SM/T2 R 88.00 0.500 44.000
216 30+810 30+875 SM/T2 R 65.00 0.500 32.500
217 30+875 30+890 SM/T2 R 15.00 0.500 7.500
218 30+890 30+950 SM/T1 R 60.00 0.400 24.000
219 30+950 31+000 SM/T1 R 50.00 0.400 20.000
220 31+000 31+301 SM/T2 R 301.00 0.500 150.500
221 31+313 31+700 SM/T2 R 387.00 0.500 193.500
222 31+712 31+945 SM/T2 R 233.00 0.500 116.500
223 31+957 32+265 SM/T2 R 308.00 0.500 154.000
224 32+265 32+386 SM/T2 R 121.00 0.500 60.500

Page 172 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.04


Description of work Earthwork (Cut and fill) in roadside drains (SS/SP- 900)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length
S.N. Side Sectional Quantity Sectional Quantity Remarks
From To Shape (m)
Area (sq.m) (cu.m) Area(sq.m) (cu.m)
225 32+400 32+435 SM/T2 R 35.00 0.500 17.500
226 32+435 32+582 SM/T2 R 147.00 0.500 73.500
227 32+594 32+645 SM/T2 R 51.00 0.500 25.500
228 32+645 32+655 SM/T2 R 10.00 0.500 5.000
229 32+667 32+880 SM/T2 R 213.00 0.500 106.500
230 32+892 32+950 SM/T4 R 58.00 0.375 21.750
231 32+950 33+016 SM/T4 R 66.00 0.375 24.750
232 33+028 33+070 SM/T4 R 42.00 0.375 15.750
233 33+070 33+110 SM/T4 R 40.00 0.375 15.000
234 33+110 33+130 SM/T2 R 20.00 0.500 10.000
235 33+142 33+200 SM/T4 R 58.00 0.375 21.750
236 33+200 33+350 SM/T4 R 150.00 0.375 56.250
237 33+350 33+397 SM/T2 R 47.00 0.500 23.500
238 33+409 33+445 SM/T2 R 36.00 0.500 18.000
239 33+445 33+556 SM/T2 R 111.00 0.500 55.500
240 33+568 33+625 SM/T4 R 57.00 0.375 21.375
241 33+625 33+690 SM/T2 R 65.00 0.500 32.500
242 33+690 33+790 SM/T4 R 100.00 0.375 37.500
243 33+790 33+825 SM/T4 R 35.00 0.375 13.125
244 33+837 33+900 SM/T4 R 63.00 0.375 23.625
245 33+900 34+075 SM/T2 R 175.00 0.500 87.500
246 34+075 34+125 SM/T2 R 50.00 0.500 25.000
247 34+143 34+216 SM/T4 R 73.00 0.375 27.375
248 34+228 34+350 SM/T2 R 122.00 0.500 61.000
249 34+377 34+450 SM/T4 R 73.00 0.375 27.375
250 34+450 34+550 SM/T4 R 100.00 0.375 37.500
251 34+577 34+765 SM/T4 R 188.00 0.375 70.500
252 34+765 34+877 SM/T2 R 112.00 0.500 56.000
253 34+889 35+000 SM/T4 R 111.00 0.375 41.625
254 35+000 35+050 SM/T1 R 50.00 0.400 20.000
255 35+050 35+175 SM/T2 R 125.00 0.500 62.500
256 35+115 35+175 SM/T1 L 60.00 0.400 24.000
257 SM/t2 R 15.00 0.500 7.500
258 35+175 35+250 SM/T2 L 75.00 0.500 37.500
259 35+250 35+324 SM/T4 L 74.00 0.375 27.750
260 35+325 35+530 SM/T4 L 205.00 0.375 76.875
261 35+542 35+634 SM/T4 L 92.00 0.375 34.500
262 35+646 35+680 SM/T2 L 34.00 0.500 17.000
263 35+690 35+868 SM/T4 R 178.00 0.375 66.750
264 35+690 SM/T4 25.00 0.375 9.375
265 35+868 35+888 SM/T4 R 20.00 0.375 7.500
266 35+900 36+265 SM/T4 R 365.00 0.375 136.875
267 36+281 36+375 SM/T4 R 94.00 0.375 35.250
268 36+375 36+455 SM/T2 R 80.00 0.500 40.000
269 36+455 36+485 SM/T2 R 30.00 0.500 15.000
270 36+497 36+600 SM/T4 R 103.00 0.375 38.625
271 36+600 36+760 SM/T2 R 160.00 0.500 80.000
272 36+775 36+986 SM/T2 R 211.00 0.500 105.500
273 37+000 37+070 SM/T2 R 70.00 0.500 35.000
274 37+070 37+096 SM/T2 R 26.00 0.500 13.000
275 37+108 37+250 SM/T2 R 142.00 0.500 71.000
276 37+250 37+314 SM/T2 R 64.00 0.500 32.000
277 37+326 37+385 SM/T2 R 59.00 0.500 29.500
278 37+385 37+455 SM/T2 R 70.00 0.500 35.000
279 37+467 37+634 SM/T2 R 167.00 0.500 83.500
280 37+646 37+700 SM/T2 R 54.00 0.500 27.000
281 37+712 37+920 SM/T2 R 208.00 0.500 104.000
282 37+932 38+050 SM/T2 R 118.00 0.500 59.000
283 38+050 38+060 SM/T2 R 10.00 0.500 5.000
284 38+078 38+120 SM/T2 R 42.00 0.500 21.000
285 38+120 38+225 SM/T2 R 105.00 0.500 52.500
286 38+225 38+415 SM/T4 R 190.00 0.375 71.250
287 38+415 38+530 SM/T5 R 115.00 0.600 69.000

Page 173 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.04


Description of work Earthwork (Cut and fill) in roadside drains (SS/SP- 900)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length
S.N. Side Sectional Quantity Sectional Quantity Remarks
From To Shape (m)
Area (sq.m) (cu.m) Area(sq.m) (cu.m)
288 38+542 38+549 SM/T5 R 7.00 0.600 4.200
289 38+549 38+574 SM/T4 R 25.00 0.375 9.375
290 38+574 38+648 SM/T5 R 74.00 0.600 44.400
291 38+660 38+713 SM/T2 R 53.00 0.500 26.500
292 38+725 38+750 SM/T2 R 25.00 0.500 12.500
293 38+750 38+815 SM/T2 R 65.00 0.500 32.500
294 38+827 38+920 SM/T2 R 93.00 0.500 46.500
295 38+932 39+030 SM/T7 R 98.00 0.090 8.820
296 39+042 39+185 SM/T5 R 143.00 0.600 85.800
297 39+185 39+200 SM/T5 R 15.00 0.600 9.000
298 39+212 39+300 SM/T5 R 88.00 0.600 52.800
299 39+300 39+342 SM/T7 R 42.00 0.090 3.780
300 39+354 39+568 SM/T7 R 214.00 0.090 19.260
301 39+580 39+675 SM/T7 R 95.00 0.090 8.550
302 39+675 39+694 SM/T2 R 19.00 0.500 9.500
303 39+706 39+762 SM/T7 R 56.00 0.090 5.040
304 39+762 39+792 SM/T2 R 30.00 0.500 15.000
305 39+804 40+075 SM/T7 R 271.00 0.090 24.390
306 40+075 40+109 SM/T2 R 34.00 0.500 17.000
307 40+121 40+330 SM/T2 R 209.00 0.500 104.500
308 40+330 40+419 SM/T2 R 89.00 0.500 44.500
309 40+431 40+440 SM/T2 R 9.00 0.500 4.500
310 40+440 40+460 SM/T7 R 20.00 0.090 1.800
311 40+460 40+790 SM/T2 R 330.00 0.500 165.000
312 40+802 41+047 SM/T2 R 245.00 0.500 122.500
313 41+059 41+078 SM/T2 R 19.00 0.500 9.500
314 41+090 41+150 SM/T2 R 60.00 0.500 30.000
315 41+150 41+220 SM/T7 R 70.00 0.090 6.300
316 41+220 41+275 SM/T2 R 55.00 0.500 27.500
317 41+287 41+300 SM/T2 R 13.00 0.500 6.500
318 41+300 41+350 SM/T7 R 50.00 0.090 4.500
319 41+350 41+410 SM/T2 R 60.00 0.500 30.000
320 41+410 41+425 SM/T7 R 15.00 0.090 1.350
321 41+425 41+650 SM/T2 R 225.00 0.500 112.500
322 at Hile SM/T2 R 40.00 0.500 20.000
323 at Hile SM/T8 R 60.00 0.910 54.600
324 41+650 41+854 SM/T2 R 204.00 0.500 102.000
325 41+866 42+020 SM/T2 R 154.00 0.500 77.000
326 42+020 42+038 SM/T2 R 18.00 0.500 9.000
327 42+050 42+125 SM/T4 R 75.00 0.375 28.125
328 42+125 42+202 SM/T2 R 77.00 0.500 38.500
329 42+214 42+225 SM/T4 R 11.00 0.375 4.125
330 42+225 42+276 SM/T2 R 51.00 0.500 25.500
331 42+276 42+286 SM/T2 R 10.00 0.500 5.000
332 42+298 42+380 SM/T2 R 82.00 0.500 41.000
333 42+392 42+417 SM/T2 R 25.00 0.500 12.500
334 42+429 42+625 SM/T2 R 196.00 0.500 98.000
335 SM/T2 L 10.00 0.500 5.000
336 42+630 42+820 SM/T2 L 190.00 0.500 95.000
337 42+832 42+866 SM/T2 L 34.00 0.500 17.000
338 42+878 42+920 SM/T2 L 42.00 0.500 21.000
339 42+932 42+966 SM/T2 L 34.00 0.500 17.000
340 42+978 43+012 SM/T2 L 34.00 0.500 17.000
341 43+024 43+070 SM/T2 L 46.00 0.500 23.000
342 43+070 43+131 SM/T2 L 61.00 0.500 30.500
343 43+143 43+231 SM/T2 L 88.00 0.500 44.000
344 43+243 43+275 SM/T2 L 32.00 0.500 16.000
345 43+275 43+417 SM/T2 R 142.00 0.500 71.000
346 SM/T2 R 20.00 0.500 10.000
347 43+429 43+520 SM/T2 R 91.00 0.500 45.500
348 43+520 43+549 SM/T2 R 29.00 0.500 14.500
349 43+561 43+610 SM/T7 R 49.00 0.090 4.410
350 43+610 43+710 SM/T2 R 100.00 0.500 50.000

Page 174 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.04


Description of work Earthwork (Cut and fill) in roadside drains (SS/SP- 900)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length
S.N. Side Sectional Quantity Sectional Quantity Remarks
From To Shape (m)
Area (sq.m) (cu.m) Area(sq.m) (cu.m)
351 43+710 43+750 SM/T4 R 40.00 0.375 15.000
352 43+762 43+781 SM/T2 R 19.00 0.500 9.500
353 43+781 43+825 SM/T4 R 44.00 0.375 16.500
354 43+825 43+926 SM/T2 R 101.00 0.500 50.500
355 43+938 44+000 SM/T2 R 62.00 0.500 31.000
356 44+012 44+155 SM/T5 R 143.00 0.600 85.800
357 44+167 44+246 SM/T5 R 79.00 0.600 47.400
358 44+258 44+385 SM/T5 R 127.00 0.600 76.200
359 44+397 44+575 SM/T5 R 178.00 0.600 106.800
360 44+585 44+714 SM/T5 R 129.00 0.600 77.400
361 44+726 44+788 SM/T5 R 62.00 0.600 37.200
362 44+800 44+890 SM/T2 R 90.00 0.500 45.000
363 44+912 44+925 SM/T5 R 13.00 0.600 7.800
364 44+925 45+002 SM/T5 R 77.00 0.600 46.200
365 45+014 45+110 SM/T2 R 96.00 0.500 48.000
366 45+110 45+247 SM/T2 R 137.00 0.500 68.500
367 45+259 45+371 SM/T2 R 112.00 0.500 56.000
368 45+393 45+440 SM/T2 R 47.00 0.500 23.500
369 45+440 45+455 SM/T2 R 15.00 0.500 7.500
370 45+455 45+705 SM/T2 R 250.00 0.500 125.000
371 45+717 46+000 SM/T2 R 283.00 0.500 141.500
372 46+000 46+135 SM/T3 R 135.00 0.630 85.050
373 SM/T2 R 12.00 0.500 6.000
374 46+135 46+475 SM/T2 R 340.00 0.500 170.000
375 46+487 46+615 SM/T2 R 128.00 0.500 64.000
376 46+615 46+875 SM/T2 R 260.00 0.500 130.000
377 46+876 47+175 SM/T4 R 299.00 0.375 112.125
378 47+175 47+317 SM/T4 R 142.00 0.375 53.250
379 47+329 47+454 SM/T4 R 125.00 0.375 46.875
380 47+466 47+568 SM/T7 R 102.00 0.090 9.180
381 47+580 47+792 SM/T7 R 212.00 0.090 19.080
382 47+804 47+906 SM/T7 R 102.00 0.090 9.180
383 47+918 47+974 SM/T4 R 56.00 0.375 21.000
384 47+986 48+113 SM/T4 R 127.00 0.375 47.625
385 48+125 48+170 SM/T2 R 45.00 0.500 22.500
386 48+170 48+320 SM/T4 R 150.00 0.375 56.250
387 48+320 48+332 SM/T3 R 12.00 0.630 7.560
388 48+344 48+568 SM/T2 R 224.00 0.500 112.000
389 48+583 48+662 SM/T2 R 79.00 0.500 39.500
390 48+674 48+760 SM/T7 R 86.00 0.090 7.740
391 48+760 48+794 SM/T7 R 34.00 0.090 3.060
392 48+815 49+017 SM/T2 R 202.00 0.500 101.000
393 49+029 49+225 SM/T2 R 196.00 0.500 98.000
394 49+237 49+260 SM/T2 R 23.00 0.500 11.500
395 49+260 49+492 SM/T4 R 232.00 0.375 87.000
396 49+513 49+530 SM/T2 R 17.00 0.500 8.500
397 49+530 49+650 SM/T2 R 120.00 0.500 60.000
398 49+650 49+680 SM/T4 R 30.00 0.375 11.250
399 49+685 49+775 SM/T7 R 90.00 0.090 8.100
400 49+775 49+863 SM/T2 R 88.00 0.500 44.000
401 49+875 49+913 SM/T2 R 38.00 0.500 19.000
402 49+928 49+955 SM/T5 R 27.00 0.600 16.200
403 49+955 50+055 SM/T5 R 100.00 0.600 60.000
404 50+075 50+346 SM/T2 R 271.00 0.500 135.500
405 50+358 50+586 SM/T2 R 228.00 0.500 114.000
406 50+598 50+850 SM/T2 R 252.00 0.500 126.000
407 SM/T2 L 10.00 0.500 5.000
408 50+790 51+055 SM/T2 L 265.00 0.500 132.500
409 51+067 51+200 SM/T2 L 133.00 0.500 66.500
410 51+220 51+250 SM/T2 L 30.00 0.500 15.000
411 51+250 51+297 SM/T2 L 47.00 0.500 23.500
412 51+307 51+335 SM/T5 L 28.00 0.600 16.800
413 51+337 51+545 SM/T5 L 208.00 0.600 124.800

Page 175 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.04


Description of work Earthwork (Cut and fill) in roadside drains (SS/SP- 900)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length
S.N. Side Sectional Quantity Sectional Quantity Remarks
From To Shape (m)
Area (sq.m) (cu.m) Area(sq.m) (cu.m)
414 51+660 51+685 SM/T3 L 25.00 0.630 15.750
415 SM/T2 R 25.00 0.500 12.500
416 51+625 51+660 SM/T2 R 35.00 0.500 17.500
417 51+950 52+050 SM/T3 R 100.00 0.630 63.000
418 52+120 52+157 SM/T3 R 37.00 0.630 23.310
419 52+192 52+207 SM/T4 R 15.00 0.375 5.625
420 52+207 52+350 SM/T4 R 143.00 0.375 53.625
421 52+629 52+735 SM/T5 R 106.00 0.600 63.600
422 52+735 52+775 SM/T5 R 40.00 0.600 24.000
423 52+787 52+844 SM/T5 R 57.00 0.600 34.200
424 52+856 53+154 SM/T5 R 298.00 0.600 178.800
425 53+166 53+388 SM/T2 R 222.00 0.500 111.000
426 53+400 53+556 SM/T2 R 156.00 0.500 78.000
427 53+568 53+825 SM/T2 R 257.00 0.500 128.500
428 53+837 54+020 SM/T2 R 183.00 0.500 91.500
429 54+020 54+040 SM/T2 R 20.00 0.500 10.000
430 54+052 54+220 SM/T2 R 168.00 0.500 84.000
431 54+232 54+320 SM/T2 R 88.00 0.500 44.000
432 54+320 54+520 SM/T2 R 200.00 0.500 100.000
433 54+532 54+540 SM/T2 R 8.00 0.500 4.000
434 54+540 54+594 SM/T2 R 54.00 0.500 27.000
435 54+606 54+700 SM/T2 R 94.00 0.500 47.000
436 54+712 54+772 SM/T2 R 60.00 0.500 30.000
437 54+784 54+799 SM/T2 R 15.00 0.500 7.500
438 54+799 54+855 SM/T2 R 56.00 0.500 28.000
439 54+867 55+025 SM/T2 R 158.00 0.500 79.000
440 SM/T2 L 5.00 0.500 2.500
441 54+925 55+220 SM/T2 L 295.00 0.500 147.500
442 55+235 55+300 SM/T2 L 65.00 0.500 32.500
443 SM/T2 R 5.00 0.500 2.500
444 55+235 55+365 SM/T2 R 130.00 0.500 65.000
445 55+385 55+600 SM/T2 R 215.00 0.500 107.500
446 55+612 55+740 SM/T2 R 128.00 0.500 64.000
447 55+742 55+768 SM/T2 R 26.00 0.500 13.000
448 55+783 55+880 SM/T5 R 97.00 0.600 58.200
449 55+908 55+994 SM/T2 R 86.00 0.500 43.000
450 56+006 56+198 SM/T2 R 192.00 0.500 96.000
451 56+210 56+244 SM/T2 R 34.00 0.500 17.000
452 56+256 56+313 SM/T2 R 57.00 0.500 28.500
453 56+325 56+372 SM/T2 R 47.00 0.500 23.500
454 56+386 56+550 SM/T2 R 164.00 0.500 82.000
455 56+562 56+700 SM/T2 R 138.00 0.500 69.000
456 56+700 56+742 SM/T2 R 42.00 0.500 21.000
457 56+754 56+867 SM/T2 R 113.00 0.500 56.500
458 56+867 56+894 SM/T2 R 27.00 0.500 13.500
459 56+906 57+194 SM/T2 R 288.00 0.500 144.000
460 57+206 57+300 SM/T2 R 94.00 0.500 47.000
461 57+300 57+375 SM/T5 R 75.00 0.600 45.000
462 57+375 57+438 SM/T5 R 63.00 0.600 37.800
463 57+450 57+555 SM/T2 R 105.00 0.500 52.500
464 57+567 57+615 SM/T2 R 48.00 0.500 24.000
465 57+615 57+675 SM/T2 R 60.00 0.500 30.000
466 57+687 57+851 SM/T5 R 164.00 0.600 98.400
467 57+851 57+946 SM/T5 R 95.00 0.600 57.000
468 57+958 58+083 SM/T2 R 125.00 0.500 62.500
469 58+095 58+175 SM/T2 R 80.00 0.500 40.000
470 58+175 58+235 SM/T2 R 60.00 0.500 30.000
471 58+256 58+310 SM/T2 R 54.00 0.500 27.000
472 58+310 58+565 SM/T2 R 255.00 0.500 127.500
473 58+565 58+825 SM/T6 R 260.00 0.750 195.000
474 58+825 58+975 SM/T6 R 150.00 0.750 112.500
475 58+996 59+092 SM/T2 R 96.00 0.500 48.000
476 59+104 59+200 SM/T2 R 96.00 0.500 48.000

Page 176 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.04


Description of work Earthwork (Cut and fill) in roadside drains (SS/SP- 900)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length
S.N. Side Sectional Quantity Sectional Quantity Remarks
From To Shape (m)
Area (sq.m) (cu.m) Area(sq.m) (cu.m)
477 59+200 59+292 SM/T2 R 92.00 0.500 46.000
478 59+307 59+594 SM/T5 R 287.00 0.600 172.200
479 59+606 59+685 SM/T5 R 79.00 0.600 47.400
480 59+685 59+722 SM/T2 R 37.00 0.500 18.500
481 59+734 59+784 SM/T2 R 50.00 0.500 25.000
482 59+796 59+810 SM/T2 R 14.00 0.500 7.000
483 59+822 59+890 SM/T2 R 68.00 0.500 34.000
484 59+890 59+920 SM/T2 R 30.00 0.500 15.000
485 59+932 59+950 SM/T2 R 18.00 0.500 9.000
486 59+950 59+992 SM/T5 R 42.00 0.600 25.200
487 60+007 60+119 SM/T2 R 112.00 0.500 56.000
488 60+131 60+280 SM/T2 R 149.00 0.500 74.500
489 60+280 60+405 SM/T2 R 125.00 0.500 62.500
490 60+417 60+450 SM/T2 R 33.00 0.500 16.500
491 60+450 60+742 SM/T2 R 292.00 0.500 146.000
492 60+754 61+000 SM/T2 R 246.00 0.500 123.000
493 61+000 61+288 SM/T3 R 288.00 0.630 181.440
494 61+303 61+560 SM/T2 R 257.00 0.500 128.500
495 61+575 61+850 SM/T2 R 275.00 0.500 137.500
496 61+850 61+975 SM/T3 R 125.00 0.630 78.750
497 61+977 62+025 SM/T2 R 48.00 0.500 24.000

Page 177 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01,3.04


Description of work Earthwork (Cut and fill) in roadside drains (SS/SP- 900)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length
S.N. Side Sectional Quantity Sectional Quantity Remarks
From To Shape (m)
Area (sq.m) (cu.m) Area(sq.m) (cu.m)
498 62+025 62+460 SM/T3 R 435.00 0.630 274.050
499 62+472 62+775 SM/T2 R 303.00 0.500 151.500
500 62+830 62+868 SM/T3 R 38.00 0.630 23.940
501 62+880 63+200 SM/T2 R 320.00 0.500 160.000
502 SM/T2 L 25.00 0.500 12.500
503 63+250 63+372 SM/T2 L 122.00 0.500 61.000
504 63+384 63+620 SM/T2 L 236.00 0.500 118.000
505 63+632 63+920 SM/T2 L 288.00 0.500 144.000
506 64+185 64+192 SM/T2 L 7.00 0.500 3.500
507 64+204 64+220 SM/T2 L 16.00 0.500 8.000
508 64+300 64+465 SM/T2 L 165.00 0.500 82.500
509 64+561 64+775 SM/T2 L 214.00 0.500 107.000
510 64+775 64+820 SM/T2 L 45.00 0.500 22.500
511 64+910 64+964 SM/T2 L 54.00 0.500 27.000
Total 27,150.450 m3 601.230 m3
Deduction for existing drain E/W in E/W Excavation 5,945.064 m3
Total E/W Excavation for Drain 21,205.386 m3
Provisional Quantity @ 3% 636.162 m3
Total 21,841.548 m3 601.230 cum

General excavation in common material (95 % ) 20,750.000 cum


General excavation in hard rock ( 5 % ) 1,093.000 cum

Page 178 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No. : 3.01


Description of work :Extra earthwork (Cut and Fill)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)
Chainge Soil Length E/W Quantity (cu.m)
S.N. Wide (m) Height (m) Remarks
From To Type (m) Cut Fill
For widening of road and profile correction
1 6+230 6+270 BMS 200.000 filling works
2 7+575 7+610 BMS 35.00 2.00 1.50 105.000 hill side cuting
filling works fo
3 70.00
9+600 9+670 OS 6.00 0.45 189.000 Profile correction
4 11+590 11+610 R 25.000 Rock cutting
5 18+175 18+205 HR 30.00 2.00 3.00 180.000
Filling works for
6 90.00
20+685 20+775 MR 6.00 0.40 216.000 profile correction
7 20+895 20+925 HR 30.00 1.50 2.70 121.500
8 20+900 21+025 MR 125.00 0.50 9.00 562.500
Filling works for
9 BMS 50.00
21+750 21+800 6.00 1.00 300.000 profile correction
10 22+215 22+240 SR 25.00 2.00 3.00 150.000 Rock cutting
11 22+740 22+755 MR 15.00 2.00 3.00 90.000
Cutting works fo
12 50.00
22+750 22+800 MR 7.00 1.50 525.000 Profile correction
13 23+600 23+650 MR 50.00 2.00 5.50 550.000 nose cutting
14 23+670 23+673 MR 3.00 2.00 1.50 9.000 nose cutting
15 24+195 25+005 MR 10.00 1.00 5.00 50.000
16 24+300 24+310 HR 10.00 1.50 5.00 75.000 Rock cutting
17 24+360 24+500 HR 40.00 2.00 6.00 480.000
18 24+580 HR 3.000 stone cutting
19 24+690 24+710 SR 20.00 2.00 6.00 240.000 nose cutting
Filling works for
20 15.00
25+025 25+040 OS 3.00 3.00 135.000 profile correction
cutting works for
21 BMS 35.00
25+885 25+920 6.00 1.00 210.000 profile correction
22 26+450 26+465 MR 15.00 1.50 1.50 33.750
23 26+940 HR 10.000
24 27+238 27+248 BMS 10.00 2.50 4.00 100.000
25 28+600 28+620 SR 20.00 6.00 2.00 240.000
26 28+660 SR 5.000
27 31+825 31+840 MR 5.000
28 33+438 33+450 HR 12.00 2.00 4.00 96.000
29 33+800 33+825 HR 25.00 1.00 3.50 87.500
30 33+840 3+860 MR 20.00 2.50 3.00 150.000
cutting works for
31 95.00
33+980 34+075 OS 6.00 0.80 456.000 profile correction
32 35+002 35+475 OS 473.00 6.00 0.50 1,419.000
filling works for
33 50.00
38+325 38+375 BMS 6.00 0.50 150.000 profile correction
34 38+796 38+802 BMS 6.00 1.80 3.00 32.400
35 39+050 39+062 HR 12.00 1.50 2.00 36.000
36 39+414 39+424 HR 10.00 1.00 1.50 15.000
37 39+665 39+697 MR 32.00 1.00 2.80 89.600 nose cutting
38 39+772 39+778 MR 6.00 1.00 2.80 16.800
39 40+275 40+325 BMS 50.00 1.80 2.50 225.000
40 40+474 40+510 BMS 36.00 1.00 2.00 72.000
41 40+905 40+915 HR 10.00 1.00 1.50 15.000
filling works for
42 50.00
41+000 41+050 BMS 6.00 0.80 240.000 240.000 profile correction
43 41+327 41+338 HR 11.00 1.20 3.00 39.600 39.600
(P2) HPB
44 25.00
42+625 42+650 BMS 9.00 8.00 1,800.000 improvement
45 42+840 42+849 HR 9.00 1.00 2.00 18.000
46 42+895 42+907 BMS 12.00 1.00 2.50 30.000
47 43+014 HR 10.000
48 43+040 43+047 HR 7.00 1.50 3.00 31.500
49 43+070 43+075 HR 5.00 2.00 3.00 30.000
50 43+166 43+200 BMS 34.00 1.00 3.00 102.000

Page 179 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.01


Description of work :Extra earthwork (Cut and Fill)
3.01 a) All types of soil except hard rock 3.01 b) Hard rock
3.02 Formation of embankment including excavation, compaction in layers and watering, all complete. (SS/SP- 900)
Chainge Soil Length E/W Quantity (cu.m)
S.N. Wide (m) Height (m) Remarks
From To Type (m) Cut Fill

51 20.00 HPB improvement


43+275 43+295 HR 3.00 5.00 300.000
52 43+340 43+480 BMS 140.00 1.50 4.00 840.000
53 43+560 43+590 HR 30.00 1.00 1.00 30.000
54 43+590 43+605 HR 15.00 2.00 3.00 90.000
55 43+625 43+645 BMS 20.00 2.00 1.00 40.000
56 43+750 MR 5.000
57 43+762 43+825 BMS 63.00 2.00 3.00 378.000
58 43+850 HR 5.000
59 43+880 43+915 HR 35.00 1.50 3.00 157.500
BMS Cutting works for
60 20.00
44+035 44+055 6.00 1.00 120.000 profile correction
61 44+310 HR 5.000
62 44+475 HR 5.000
BMS Cutting works for
63 50.00
44+650 44+700 6.00 1.00 300.000 profile correction
BMS Cutting works for
64 20.00
44+760 44+780 6.00 0.60 72.000 profile correction
65 44+775 MR 10.000
OS filling works for
66 30.00
45+270 45+300 6.00 1.00 180.000 profile correction
OS filling works for
67 35.00
45+400 45+435 6.00 0.80 168.000 profile correction
cuting works for
68 45+435.0 45+460.0 OS 0.50
25.00 6.00 75.000 profile correction
cuting works for
69 49+875.0 49+903.0 MR 28.00
6.00 1.00 168.000 profile correction
70 49+923.0 49+955.0 BMS 32.00 1.00 5.00 160.000
71 49+975.0 49+978.0 B 3.00 1.50 3.00 13.500
72 50+025.0 50+050.0 BMS 25.00 6.00 1.25 187.500
73 50+277.0 50+287.0 HR 10.00 2.00 1.20 24.000
74 50+280.0 50+285.0 HR 5.00 0.70 0.75 2.625
75 50+300.0 50+303.0 B 3.00 1.00 3.00 9.000
76 52+200.0 MR 8.000
77 52+529.0 52+860.0 BMS 331.00 0.90 2.00 595.800
78 53+750.0 53+765.0 BMS 15.00 1.50 2.00 45.000 nose cutting
filling works for
79 54+100.0 54+150.0 50.00
6.00 0.50 150.000 profile correction
80 55+600.0 55+615.0 BMS 15.00 3.20 7.00 336.000
81 55+615.0 55+650.0 BMS 35.00 2.00 7.00 490.000
82 55+665.0 55+680.0 HR 15.00 10.000 stone cutting
83 55+908.0 55+955.0 25.000
84 56+760.0 HR 2.000
Cutting works for
85 57+710.0 57+740.0 OS 30.00 6.00 0.75 135.000 profile correction
86 59+125.0 59+150.0 OS 25.00 7.00 0.50 87.500
87 59+565.0 59+575.0 MR 10.00 0.90 2.00 18.000
88 59+780.0 59+790.0 HR 10.00 1.50 3.00 45.000
89 60+423.0 60+428.0 SR 5.00 0.50 4.00 10.000
90 60+775.0 60+782.0 SR 7.00 2.00 2.00 28.000 dry stone packing
91 63+310.0 63+316.0 S 6.00 1.50 3.20 28.800 nose cutting
92 63+488.0 63+500.0 OS 12.00 1.50 2.00 36.000 stone cutting
filling works for
93 63+530.0 63+575.0 OS 45.00
6.00 1.00 270.000 profile correction
94 64+180.0 R 5.000
95 64+980.0 65+050.0 OS 70.00 1.50 1.50 157.500
Total 13,707.875 m3
3.03 a) All types of soil except hard rock 12,872.650 m3
3.03 b) Hard rock 835.225 m3
3.02) Embankment filling 2,370.600 m3

Page 180 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No. : 3.01


Road-way excavation including haulage and disposal upto 10 m distance, all
Description of work :
complete. (SS/SP- 900)
3.01 a) All types of soil except hard rock
Chainage Cutting
Length
S.N. Side Wide (m) Height (m) Sectional Quantity Remarks
From (m)
Area (sq.m) (cu.m)
Passing Zones
1 4+800 R 36.00 2.00 2.00 4.00 144.000
2 12+325 R 36.00 2.00 2.00 4.00 144.000
3 12+925 R 36.00 2.00 2.00 4.00 144.000
4 16+525 R 36.00 3.00 3.00 9.00 324.000
5 21+350 L 36.00 3.00 3.00 9.00 324.000
6 23+425 L 36.00 3.00 3.00 9.00 324.000
7 24+875 L 36.00 3.00 3.00 9.00 324.000
8 26+275 L 36.00 3.00 3.00 9.00 324.000
9 26+525 L 36.00 3.00 3.00 9.00 324.000
10 26+875 L 36.00 3.00 3.00 9.00 324.000
11 28+025 R 36.00 1.00 1.00 1.00 36.000
12 29+325 L 36.00 3.00 3.00 9.00 324.000
13 30+025 R 36.00 2.00 2.00 4.00 144.000
14 30+325 R 36.00 2.00 2.00 4.00 144.000
15 31+850 R 36.00 3.00 3.00 9.00 324.000
16 32+075 R 36.00 3.00 3.00 9.00 324.000
17 32+450 R 36.00 3.00 3.00 9.00 324.000
18 33+275 R 36.00 3.00 3.00 9.00 324.000
19 33+625 R 36.00 3.00 3.00 9.00 324.000
20 34+075 R 36.00 3.00 3.00 9.00 324.000
21 34+800 R 36.00 1.00 1.00 1.00 36.000
22 35+400 L 36.00 1.00 1.00 1.00 36.000
23 36+100 L 36.00 1.00 1.00 1.00 36.000
24 36+850 R 36.00 2.00 2.00 4.00 144.000
25 37+600 R 36.00 3.00 3.00 9.00 324.000
26 38+050 R 36.00 3.00 3.00 9.00 324.000
27 38+400 L 36.00 2.00 2.00 4.00 144.000
28 39+250 R 36.00 3.00 3.00 9.00 324.000
29 39+475 L 36.00 3.00 3.00 9.00 324.000
30 39+750 L 36.00 2.00 2.00 4.00 144.000
31 40+000 R 36.00 3.00 3.00 9.00 324.000
32 40+175 L 36.00 2.00 2.00 4.00 144.000
33 41+000 R 36.00 2.00 2.00 4.00 144.000
34 41+400 L 36.00 2.00 2.00 4.00 144.000
35 42+150 L 36.00 2.00 2.00 4.00 144.000
36 42+875 R 36.00 2.00 2.00 4.00 144.000
37 43+075 R 36.00 2.00 2.00 4.00 144.000
38 44+050 R 36.00 2.00 2.00 4.00 144.000
39 44+700 R 36.00 3.00 3.00 9.00 324.000
40 46+800 L 36.00 1.00 1.00 1.00 36.000
41 49+550 L 36.00 3.00 3.00 9.00 324.000
42 49+730 L 36.00 1.00 1.00 1.00 36.000
Total 9,180.000 cu.m

Page 181 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)
Gabion Works
1 0+012 0+022 GRW L 10 3 3.825 38.250 1.990 19.900
2 0+113 0+119 GRW L 6 3 3.825 22.950 1.990 11.940
3 1+220 1+226 GRW R 6 3 3.825 22.950 1.990 11.940
4 1+710 1+724 GRW R 14 2 1.950 27.300 0.885 12.390
DW repalce
5 R 0.675 3.375 0.221 1.105
1+995 2+000 GRW 5 1 GRW
6 2+225 2+229 GRW R 4 1 0.675 2.700 0.221 0.884

7 R 1.950 23.400 0.885 10.620 extension


2+320 2+332 GRW 12 2 Road Width.
8 2+377 2+390 GRW R 13 4 6.300 81.900 3.538 45.994
9 2+572 2+576 GRW L 4 3 3.825 15.300 1.990 7.960
10 2+766 2+774 GRW L 8 3 3.825 30.600 1.990 15.920
11 3+640 3+652 GRW L 12 2.5 2.813 33.750 1.382 16.584
12 4+408 4+418 GRW L 10 3 3.825 38.250 1.990 19.900
13 4+725 4+732 GRW L 7 3 3.825 26.775 1.990 13.930
14 4+925 4+939 GRW L 14 1.5 1.238 17.325 0.498 6.972
15 5+300 5+315 GRW L 15 3 3.825 57.375 1.990 29.850
16 5+708 5+800 GRW R 92 1.5 1.238 113.850 0.498 45.816
17 5+790 5+800 GRW L 10 2 1.950 19.500 0.885 8.850
18 5+875 5+890 GRW L 15 2 1.950 29.250 0.885 13.275
19 5+910 5+930 GRW L 20 4 6.300 126.000 3.538 70.760
20 5+940 5+970 GRW L 30 3 3.825 114.750 1.990 59.700
21 6+400 6+415 GRW L 15 3 3.825 57.375 1.990 29.850
22 6+615 6+650 GRW L 35 3 3.825 133.875 1.990 69.650

23 R 3.825 95.625 1.990 49.750 extension


7+815 7+840 GRW 25 3 Road Width.
24 7+880 7+900 GRW R 20 3 3.825 76.500 1.990 39.800
25 7+930 7+942 GRW R 12 3 3.825 45.900 1.990 23.880 Protection
26 8+075 8+090 GRW R 15 5 9.375 140.625 5.529 82.935
27 8+400 8+430 GRW R 30 2 1.950 58.500 0.885 26.550
28 8+945 9+000 GRW R 30 3 3.825 114.750 1.990 59.700
29 9+410 9+435 GRW R 25 3 3.825 95.625 1.990 49.750
near Simtar
30 R 1.950 68.250 0.885 30.975
9+720 9+750 GRW 35 2 Village
31 10+002 10+010 GRW R 8 3 3.825 30.600 1.990 15.920
32 10+690 10+700 GRW R 10 3 3.825 38.250 1.990 19.900
33 10+900 10+960 GRW R 60 5 9.375 562.500 5.529 331.740

34 R 2.813 75.938 1.382 37.314 DW repalce


GRW(80%st
11+118 11+145 GRW 27 2.5 one recover)
35 11+175 11+180 GRW R 15 3 3.825 57.375 1.990 29.850
36 11+275 11+285 GRW R 3 4 6.300 18.900 3.538 10.614
37 11+540 11+565 GRW R 25 4 6.300 157.500 3.538 88.450
38 11+610 11+625 GRW R 15 5 9.375 140.625 5.529 82.935
39 11+710 11+720 GRW R 10 6 13.050 130.500 7.962 79.620

Page 182 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)
40 11+880 11+975 GRW R 95 1.5 1.238 117.563 0.498 47.310
41 12+072 12+100 GRW L 28 4 6.300 176.400 3.538 99.064
42 12+120 12+128 GRW L 8 3 3.825 30.600 1.990 15.920
43 12+142 12+158 GRW L 16 3 3.825 61.200 1.990 31.840
44 12+315 12+325 GRW L 10 3 3.825 38.250 1.990 19.900
45 12+455 12+465 GRW L 10 3 3.825 38.250 1.990 19.900
46 12+620 12+633 GRW L 13 3 3.825 49.725 1.990 25.870
47 12+825 12+840 GRW L 15 3.5 4.988 74.813 2.709 40.635
48 12+900 12+915 GRW L 15 3 3.825 57.375 1.990 29.850
49 13+185 13+205 GRW L 20 3 3.825 76.500 1.990 39.800
50 13+230 13+245 GRW L 15 3 3.825 57.375 1.990 29.850
51 13+585 13+640 GRW L 55 4 6.300 346.500 3.538 194.590
52 13+655 13+675 GRW L 20 4 6.300 126.000 3.538 70.760
53 13+975 14+000 GRW L 25 2 1.950 48.750 0.885 22.125
54 14+783 14+800 GTW L 17 1.5 1.238 21.038 0.498 8.466
55 15+866 15+925 GTW L 59 3 3.825 225.675 1.990 117.410
56 15+880 15+910 GBW R 30 3 3.825 114.750 1.990 59.700
57 16+037 16+041 GRW R 4 3 3.825 15.300 1.990 7.960
58 16+070 16+081 GRW R 11 4 6.300 69.300 3.538 38.918
59 16+100 16+112 GTW R 12 4 6.300 75.600 3.538 42.456
60 16+125 16+150 GRW R 25 3 3.825 95.625 1.990 49.750
61 16+175 16+185 GRW R 10 5 9.375 93.750 5.529 55.290
62 16+175 16+265 GBW L 90 3 3.825 344.250 1.990 179.100
63 16+310 16+320 GRW R 10 4 6.300 63.000 3.538 35.380
64 16+428 16+440 GBW R 12 3 3.825 45.900 1.990 23.880 loop
65 16+580 16+590 GRW L 10 4 6.300 63.000 3.538 35.380
66 16+565 16+590 GTW L 3 3.825 0.000 1.990 0.000
67 16+600 16+625 GRW L 25 4 6.300 157.500 3.538 88.450
68 16+637 16+643 GRW L 6 1 0.675 4.050 0.221 1.326
69 16+643 16+725 GRW L 82 4 6.300 516.600 3.538 290.116
70 16+742 16+775 GRW L 33 4 6.300 207.900 3.538 116.754
71 16+865 16+885 GRW L 20 4 6.300 126.000 3.538 70.760
72 16+920 16+930 GRW L 10 3 3.825 38.250 1.990 19.900
73 16+930 16+950 GRW L 20 3 3.825 76.500 1.990 39.800
74 17+070 17+090 GRW L 20 2 1.950 39.000 0.885 17.700
75 17+100 17+135 GRW R 35 2.5 2.813 98.438 1.382 48.370
76 17+250 17+262 GRW R 12 3 3.825 45.900 1.990 23.880
77 17+340 17+352 GRW R 12 1 0.675 8.100 0.221 2.652
78 17+400 17+408 GRW R 8 3 3.825 30.600 1.990 15.920
79 17+493 17+505 GRW R 12 4 6.300 75.600 3.538 42.456
80 17+546 17+572 GRW R 26 3 3.825 99.450 1.990 51.740
81 18+005 18+070 GRW R 65 3 3.825 248.625 1.990 129.350
82 18+090 18+122 GRW R 32 3 3.825 122.400 1.990 63.680
83 18+155 18+175 GRW R 20 3 3.825 76.500 1.990 39.800
84 18+270 18+310 GRW R 40 2 1.950 78.000 0.885 35.400
85 18+330 18+340 GRW R 10 3 3.825 38.250 1.990 19.900
86 18+500 18+565 GRW R 65 3 3.825 248.625 1.990 129.350
87 18+580 18+600 GRW R 20 2 1.950 39.000 0.885 17.700
88 18+668 18+693 GRW R 25 3 3.825 95.625 1.990 49.750
89 18+740 18+780 GRW R 40 2 1.950 78.000 0.885 35.400
90 18+668 18+675 GRW R 7 2 1.950 13.650 0.885 6.195
91 18+986 19+018 GBW L 32 2.5 2.813 90.000 1.382 44.224
92 19+025 19+100 GRW R 75 4 6.300 472.500 3.538 265.350

93 3.825 38.250 1.990 19.900 extension


19+325 19+335 GRW R 10 3 Road Width.

Page 183 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)
94 19+408 19+424 GRW R 16 2.5 2.813 45.000 1.382 22.112
95 19+448 19+460 GRW R 12 2.5 2.813 33.750 1.382 16.584
96 19+632 19+655 GRW R 23 2.5 2.813 64.688 1.382 31.786
97 19+775 19+785 GRW R 10 2.5 2.813 28.125 1.382 13.820
98 19+970 19+995 GRW R 25 3 3.825 95.625 1.990 49.750
99 20+060 20+080 GRW R 20 3 3.825 76.500 1.990 39.800
100 20+255 20+300 GBW L 45 2 1.950 87.750 0.885 39.825
101 20+250 20+300 GRW R 50 2.5 2.813 140.625 1.382 69.100
102 20+346 20+470 GBW L 124 2 1.950 241.800 0.885 109.740
103 20+395 20+425 GRW R 30 3 3.825 114.750 1.990 59.700
104 20+495 20+505 GRW R 10 5 9.375 93.750 5.529 55.290
105 20+750 20+768 GRW R 18 2.5 2.813 50.625 1.382 24.876
addtion 1m
106 0.675 6.750 0.221 2.210 ht for Gard
20+920 20+930 GRW R 10 1 rail
107 20+970 21+000 GRW R 30 3 3.825 114.750 1.990 59.700
108 21+030 21+045 GRW R 15 2 1.950 29.250 0.885 13.275
109 21+055 21+062 GRW R 7 2 1.950 13.650 0.885 6.195
110 21+200 21+207 GRW R 7 1.5 1.238 8.663 0.498 3.486 P2
111 21+324 21+344 GRW R 20 2.5 2.813 56.250 1.382 27.640
112 21+407 21+410 GRW R 3 3 3.825 11.475 1.990 5.970
113 21+440 21+450 GRW R 10 2.5 2.813 28.125 1.382 13.820
114 21+640 21+650 GRW R 10 3 3.825 38.250 1.990 19.900
115 21+698 21+702 GRW R 4 2.5 2.813 11.250 1.382 5.528
116 21+722 21+735 GRW R 13 3 3.825 49.725 1.990 25.870
117 21+748 21+752 GRW R 4 4 6.300 25.200 3.538 14.152
118 21+872 21+882 GRW R 10 3.5 4.988 49.875 2.709 27.090
119 21+968 21+990 GRW R 22 4 6.300 138.600 3.538 77.836
120 22+115 22+152 GRW R 37 3.5 4.988 184.538 2.709 100.233
121 22+218 22+228 GRW R 10 5 9.375 93.750 5.529 55.290
122 22+275 22+305 GRW R 30 4 6.300 189.000 3.538 106.140
123 22+322 22+327 GRW R 5 3 3.825 19.125 1.990 9.950
124 22+355 22+377 GRW R 22 3 3.825 84.150 1.990 43.780
125 22+473 22+500 GRW R 37 4 6.300 233.100 3.538 130.906
126 22+548 22+557 GRW R 9 3 3.825 34.425 1.990 17.910
127 22+600 22+608 GRW R 8 3 3.825 30.600 1.990 15.920
128 22+675 22+677 GRW R 12 3 3.825 45.900 1.990 23.880
DW
129 2.813 22.500 1.382 11.056 changed in
22+740 22+748 GRW R 8 2.5 GRW
130 22+748 22+758 GRW R 10 2.5 2.813 28.125 1.382 13.820
131 22+910 22+927 GRW R 17 2 1.950 33.150 0.885 15.045
132 22+975 23+000 GRW R 25 2.5 2.813 70.313 1.382 34.550
133 23+122 23+140 GRW R 8 2.5 2.813 22.500 1.382 11.056
134 23+178 23+225 GRW R 47 2.5 2.813 132.188 1.382 64.954
135 23+340 23+348 GRW R 8 3 3.825 30.600 1.990 15.920
136 23+375 23+400 GRW R 25 3 3.825 95.625 1.990 49.750
137 23+502 23+552 GRW R 50 4 6.300 315.000 3.538 176.900

138 3.825 19.125 1.990 9.950 Dw changed


23+570 23+575 GRW R 5 3 in GRW

139 1.950 11.700 0.885 5.310 Dw changed


23+598 23+604 GRW R 6 2 in GRW

Page 184 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)

140 1.238 23.513 0.498 9.462 Dw changed


23+706 23+725 GRW R 19 1.5 in GRW

141 1.950 64.350 0.885 29.205 Dw changed


23+912 23+945 GRW R 33 2 in GRW
142 23+995 24+015 GRW R 10 3 3.825 38.250 1.990 19.900
143 24+150 24+166 GRW R 16 3 3.825 61.200 1.990 31.840
144 24+293 24+300 GRW R 7 2 1.950 13.650 0.885 6.195
145 24+345 24+353 GRW R 8 3 3.825 30.600 1.990 15.920
146 24+442 24+454 GRW R 12 2.5 2.813 33.750 1.382 16.584
147 24+575 24+580 GRW R 5 2 1.950 9.750 0.885 4.425

148 1.950 42.900 0.885 19.470 Dw changed


24+758 24+770 GRW R 22 2 in GRW
149 24+897 24+907 GRW R 10 2.5 2.813 28.125 1.382 13.820
150 24+925 24+958 GRW R 23 4 6.300 144.900 3.538 81.374
151 24+998 25+006 GRW R 8 2.5 2.813 22.500 1.382 11.056
152 25+025 25+040 GTW R 15 3 3.825 57.375 1.990 29.850
153 25+050 25+095 GRW R 45 4 6.300 283.500 3.538 159.210
154 25+130 25+150 GRW R 20 3.5 4.988 99.750 2.709 54.180
155 25+168 25+178 GRW R 10 3 3.825 38.250 1.990 19.900
156 25+203 25+225 GRW R 22 2.5 2.813 61.875 1.382 30.404
DW
157 3.825 19.125 1.990 9.950 changed in
25+255 25+260 GRW R 5 3 GRW
158 25+327 25+340 GRW R 12 2.5 2.813 33.750 1.382 16.584
159 25+388 25+396 GRW R 8 2.5 2.813 22.500 1.382 11.056
DW
160 1.950 11.700 0.885 5.310 changed in
25+494 25+500 GRW R 6 2 GRW
161 25+631 25+652 GRW R 21 3 3.825 80.325 1.990 41.790
162 26+248 26+275 GRW R 27 3 3.825 103.275 1.990 53.730
163 26+475 26+487 GRW R 12 1.5 1.238 14.850 0.498 5.976
164 26+545 26+554 GRW R 9 2 1.950 17.550 0.885 7.965
165 26+620 26+630 GRW R 10 2.5 2.813 28.125 1.382 13.820
166 26+640 26+649 GRW R 9 2.5 2.813 25.313 1.382 12.438
167 26+930 26+955 GRW R 20 3.5 4.988 99.750 2.709 54.180
168 27+105 27+112 GRW R 7 3 3.825 26.775 1.990 13.930
169 27+141 27+150 GRW R 9 3 3.825 34.425 1.990 17.910
170 27+282 27+288 GRW R 6 2.5 2.813 16.875 1.382 8.292
171 27+525 27+545 GRW R 20 3 3.825 76.500 1.990 39.800
172 27+832 27+842 GRW R 38 4 6.300 239.400 3.538 134.444
173 27+812 27+825 GRW R 13 4 6.300 81.900 3.538 45.994
174 28+120 28+125 GRW R 13 4 6.300 81.900 3.538 45.994
175 28+600 28+613 GRW R 13 3.5 4.988 64.838 2.709 35.217
176 28+647 28+659 GRW R 12 3 3.825 45.900 1.990 23.880
177 28+800 28+810 GRW R 10 2.5 2.813 28.125 1.382 13.820
178 29+120 29+133 GRW R 13 2.5 2.813 36.563 1.382 17.966
179 29+190 29+212 GRW R 22 6 13.050 287.100 7.962 175.164
180 29+294 29+315 GRW R 21 2 1.950 40.950 0.885 18.585

181 3.825 355.725 1.990 185.070 Dw changed


29+407 29+500 GRW L 93 3 in GRW (p2)
182 29+642 29+660 GRW L 18 6 13.050 234.900 7.962 143.316
183 29+692 29+700 GRW L 8 5 9.375 75.000 5.529 44.232

Page 185 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)
184 29+850 29+875 GRW L 25 3.5 4.988 124.688 2.709 67.725
185 29+930 29+935 GRW L 5 3 3.825 19.125 1.990 9.950
186 30+350 30+362 GRW L 12 3 3.825 45.900 1.990 23.880
187 30+476 30+526 GRW R 50 3 3.825 191.250 1.990 99.500
188 30+550 30+620 GRW L 70 3 3.825 267.750 1.990 139.300 RW 3.9
189 30+775 30+785 GRW L 10 3 3.825 38.250 1.990 19.900 RW 4.7m
190 30+825 30+844 GRW L 19 3 3.825 72.675 1.990 37.810 RW 4.8
191 30+933 30+955 GRW L 22 4 6.300 138.600 3.538 77.836 Rw6.2
192 31+065 31+098 GRW L 33 3 3.825 126.225 1.990 65.670 RW4.3
193 31+275 31+300 GRW L 25 3 3.825 95.625 1.990 49.750
194 31+850 31+865 GRW L 15 2.5 2.813 42.188 1.382 20.730 RW6
195 32+325 32+338 GRW L 13 3 3.825 49.725 1.990 25.870
196 32+350 32+355 GRW L 5 2 1.950 9.750 0.885 4.425
197 32+540 32+547 GBW R 7 2 1.950 13.650 0.885 6.195 RW5.2
198 32+532 32+548 GRW L 16 2.5 2.813 45.000 1.382 22.112 RW5.5
199 32+649 32+674 GRW L 23 4 6.300 144.900 3.538 81.374 RW5.2
200 32+674 32+680 GRW L 6 2 1.950 11.700 0.885 5.310
201 32+869 32+875 GRW L 3 2 1.950 5.850 0.885 2.655 RW5.3
GW
202 3.825 87.975 1.990 45.770 replaced
32+977 33+000 GRW L 23 3 GRW
203 33+124 33+126 GRW L 2 1 0.675 1.350 0.221 0.442 RW 4.4
204 33+226 33+250 GRW L 24 3.5 4.988 119.700 2.709 65.016
205 33+370 33+385 GRW L 24 1 0.675 16.200 0.221 5.304
206 33+450 33+475 GRW L 25 2.5 2.813 70.313 1.382 34.550 RW4
207 33+475 33+485 GRW L 10 3 3.825 38.250 1.990 19.900
208 33+475 33+485 GRW L 10 3 3.825 38.250 1.990 19.900 RW 4
209 33+520 33+527 GRW L 7 2 1.950 13.650 0.885 6.195 RW 4.8m
210 33+625 33+644 GRW L 19 3 3.825 72.675 1.990 37.810 RW 4.8m
211 33+782 33+800 GRW L 18 2 1.950 35.100 0.885 15.930
212 33+870 33+877 GRW L 7 2.5 2.813 19.688 1.382 9.674 RW 4
213 33+150 33+168 GRW L 18 1.5 1.238 22.275 0.498 8.964 RW 4.6
214 34+005 34+025 GRW L 20 3 3.825 76.500 1.990 39.800 RW 4.6
215 34+075 34+110 GRW L 35 2.5 2.813 98.438 1.382 48.370 RW 4.8
216 34+250 34+272 GRW L 22 2.5 2.813 61.875 1.382 30.404 RW 4.7
217 34+508 34+520 GRW L 12 3 3.825 45.900 1.990 23.880
218 34+638 34+650 GRW L 12 2.5 2.813 33.750 1.382 16.584
219 34+708 34+725 GRW L 17 3.5 4.988 84.788 2.709 46.053
220 34+868 34+880 GBW R 12 2 1.950 23.400 0.885 10.620
221 34+980 34+985 GRW L 5 2 1.950 9.750 0.885 4.425 RW 4.4
222 35+022 35+030 GRW L 8 2 1.950 15.600 0.885 7.080
223 35+304 35+325 GRW R 21 2 1.950 40.950 0.885 18.585 RW 4.2
224 35+500 35+525 GRW R 25 2.5 2.813 70.313 1.382 34.550
225 35+820 35+840 GRW L 30 2.5 2.813 84.375 1.382 41.460
226 36+020 36+032 GRW L 12 2.5 2.813 33.750 1.382 16.584
227 36+215 36+222 GRW L 7 2.5 2.813 19.688 1.382 9.674
228 36+297 36+206 GRW L 9 3 3.825 34.425 1.990 17.910
229 36+525 36+548 GRW L 23 2.5 2.813 64.688 1.382 31.786
230 36+807 36+819 GRW L 11 2.5 2.813 30.938 1.382 15.202
231 37+033 37+039 GRW L 6 2 1.950 11.700 0.885 5.310
Dw chaged
232 3.825 15.300 1.990 7.960
37+098 37+102 GRW L 4 3 GRW
233 37+122 37+128 GRW L 6 2 1.950 11.700 0.885 5.310
234 37+140 37+153 GRW L 6 3 3.825 22.950 1.990 11.940
235 37+248 37+276 GRW L 28 3 3.825 107.100 1.990 55.720
236 37+372 37+405 GRW L 32 3 3.825 122.400 1.990 63.680

Page 186 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)
237 37+500 37+528 GRW L 28 3.5 4.988 139.650 2.709 75.852 P2
238 37+752 37+773 GRW L 21 3 3.825 80.325 1.990 41.790
239 37+822 37+841 GRW L 19 2.5 2.813 53.438 1.382 26.258
240 37+952 37+977 GRW L 25 2.5 2.813 70.313 1.382 34.550
241 38+090 38+109 GRW L 29 3 3.825 110.925 1.990 57.710
242 38+260 38+325 GRW L 65 2 1.950 126.750 0.885 57.525
243 38+431 38+476 GRW L 45 3 3.825 172.125 1.990 89.550
244 38+503 38+511 GRW L 8 3 3.825 30.600 1.990 15.920
245 38+834 38+849 GRW L 15 2 1.950 29.250 0.885 13.275
246 39+012 39+025 GRW L 13 2.5 2.813 36.563 1.382 17.966
247 39+072 39+092 GRW L 20 3 3.825 76.500 1.990 39.800
248 39+275 39+289 GRW L 14 4 6.300 88.200 3.538 49.532
249 39+318 39+326 GRW L 8 3 3.825 30.600 1.990 15.920
250 39+444 39+451 GRW L 7 2.5 2.813 19.688 1.382 9.674
251 39+522 39+533 GRW L 11 2.5 2.813 30.938 1.382 15.202
DW
252 3.825 103.275 1.990 53.730 changed
GRw
39+533 39+560 GRW L 27 3 (15%SR)
253 39+944 39+952 GRW L 8 2 1.950 15.600 0.885 7.080
254 40+202 40+212 GRW L 10 2.5 2.813 28.125 1.382 13.820
255 40+222 40+226 GRW L 4 3 3.825 15.300 1.990 7.960
256 40+350 4+361 GRW L 11 2 1.950 21.450 0.885 9.735
257 40+448 40+455 GRW L 7 2 1.950 13.650 0.885 6.195
258 40+551 40+574 GRW L 23 2 1.950 44.850 0.885 20.355
259 40+935 40+946 GRW L 10 3 3.825 38.250 1.990 19.900
260 41+100 41+120 GRW L 20 2.5 2.813 56.250 1.382 27.640
261 41+295 41+300 GRW L 5 2 1.950 9.750 0.885 4.425
262 41+350 41+396 GRW L 46 2.5 2.813 129.375 1.382 63.572
263 41+884 41+900 GRW L 15 4 6.300 94.500 3.538 53.070
Gully
264 2.813 14.063 1.382 6.910 errosion
(bluster
41+902 41+907 GRW L 5 2.5 damage)
265 41+952 41+974 GRW L 22 3 3.825 84.150 1.990 43.780

266 1.950 21.450 0.885 9.735 Dw changed


GRW(25%
42+124 42+135 GRW L 11 2 SR)
267 42+269 42+276 GRW L 7 1 0.675 4.725 0.221 1.547
268 42+377 43+385 GRW L 8 2 1.950 15.600 0.885 7.080
269 42+519 42+531 GRW L 12 3 3.825 45.900 1.990 23.880
270 42+561 42+572 GRW L 11 2 1.950 21.450 0.885 9.735
271 42+748 42+825 GBW L 77 2 1.950 150.150 0.885 68.145
272 42+751 42+770 GRW R 19 3 3.825 72.675 1.990 37.810
273 43+112 43+119 GRW R 7 0.5 0.263 1.838 0.055 0.385
274 43+155 43+160 GRW R 5 2 1.950 9.750 0.885 4.425
275 43+166 43+178 GRW R 12 2 1.950 23.400 0.885 10.620
276 43+427 43+443 GRW L 7 2 1.950 13.650 0.885 6.195
DW
277 1.238 8.663 0.498 3.486 changed
GRW
43+578 43+585 GRW L 7 1.5 (25%SR)
278 43+600 43+606 GRW L 6 0.5 0.263 1.575 0.055 0.330
279 43+687 43+700 GRW L 13 3 3.825 49.725 1.990 25.870
280 44+046 44+050 GRW L 4 2 1.950 7.800 0.885 3.540

Page 187 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)
281 44+089 44+094 GRW L 5 1.5 1.238 6.188 0.498 2.490
DW
282 6.300 277.200 3.538 155.672 changed
GRW(30%
44+181 44+425 GRW L 44 4 SR)
283 44+369 44+380 GRW L 11 2 1.950 21.450 0.885 9.735
284 44+750 44+774 GRW L 24 1 0.675 16.200 0.221 5.304
285 44+855 44+876 GRW L 21 2.5 2.813 59.063 1.382 29.022
286 47+738 47+750 GRW L 12 3 3.825 45.900 1.990 23.880
287 47+768 47+778 GRW L 10 2.5 2.813 28.125 1.382 13.820
288 47+768 47+778 GRW L 10 2.5 2.813 28.125 1.382 13.820
289 48+045 48+070 GRW L 20 3 3.825 76.500 1.990 39.800
290 48+190 48+222 GRW L 32 3 3.825 122.400 1.990 63.680
DW
291 1.950 54.600 0.885 24.780 changed
GRW (25%
48+302 48+330 GRW L 28 2 SR)
292 48+526 48+535 GRW L 9 3 3.825 34.425 1.990 17.910
293 48+547 48+552 GRW L 5 3 3.825 19.125 1.990 9.950
DW
294 2.813 16.875 1.382 8.292 changed
49+063 49+069 GRW L 6 2.5 GRW
295 49+348 49+365 GRW L 17 3 3.825 65.025 1.990 33.830
296 49+412 49+419 GRW L 7 4 6.300 44.100 3.538 24.766
297 49+926 49+941 GRW L 15 4 6.300 94.500 3.538 53.070
298 49+994 50+002 GRW L 8 3 3.825 30.600 1.990 15.920

299 1.238 29.700 0.498 11.952 Dw changed


GRW(25%
50+228 50+252 GRW L 24 1.5 SR)
300 50+749 50+755 GRW L 6 2 1.950 11.700 0.885 5.310
301 51+840 51+846 GRW L 6 2.5 2.813 16.875 1.382 8.292
302 51+878 51+884 GRW L 8 3 3.825 30.600 1.990 15.920
303 51+919 51+924 GRW L 5 3 3.825 19.125 1.990 9.950
304 52+629 52+657 GRW L 28 1 0.675 18.900 0.221 6.188
305 52+657 52+727 GRW L 70 1.5 1.238 86.625 0.498 34.860
306 52+927 52+940 GRW L 13 2.5 2.813 36.563 1.382 17.966
307 52+970 52+978 GRW L 8 3 3.825 30.600 1.990 15.920
308 52+980 52+990 GRW L 10 2.5 2.813 28.125 1.382 13.820
309 53+000 53+026 GRW L 26 1.5 1.238 32.175 0.498 12.948
310 53+044 53+090 GRW L 46 1.5 1.238 56.925 0.498 22.908
311 53+148 53+152 GRW L 4 2 1.950 7.800 0.885 3.540
312 53+375 53+382 GRW L 7 1 0.675 4.725 0.221 1.547
313 53+437 53+445 GRW L 8 1.5 1.238 9.900 0.498 3.984
314 53+710 53+725 GRW L 15 3 3.825 57.375 1.990 29.850
315 54+825 54+830 GRW L 12 2.5 2.813 33.750 1.382 16.584
316 55+198 55+222 GRW R 24 3 3.825 91.800 1.990 47.760
adding
317 0.263 3.150 0.055 0.660 GRW on
55+382 55+393 GRW L 12 0.5 existing
318 55+712 55+724 GRW L 12 2 1.950 23.400 0.885 10.620
319 55+785 55+805 GRW L 20 3 3.825 76.500 1.990 39.800
320 55+810 55+818 GRW L 8 2.5 2.813 22.500 1.382 11.056
321 56+088 56+102 GRW L 14 3 3.825 53.550 1.990 27.860
322 57+250 57+256 GRW L 6 2 1.950 11.700 0.885 5.310
323 57+626 57+642 GRW L 16 3 3.825 61.200 1.990 31.840

Page 188 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)
324 57+765 57+775 GRW L 10 2 1.950 19.500 0.885 8.850
325 58+301 58+317 GRW L 16 3 3.825 61.200 1.990 31.840
326 58+568 58+576 GRW L 8 3 3.825 30.600 1.990 15.920
327 58+600 58+615 GRW L 15 1.5 1.238 18.563 0.498 7.470
328 58+724 58+740 GRW L 16 2 1.950 31.200 0.885 14.160
329 58+774 58+788 GRW L 14 4 6.300 88.200 3.538 49.532
330 58+950 58+965 GRW L 15 2 1.950 29.250 0.885 13.275
331 59+525 59+537 GRW L 12 3 3.825 45.900 1.990 23.880
332 59+694 59+700 GRW L 6 3 3.825 22.950 1.990 11.940
333 59+750 59+763 GRW L 13 2 1.950 25.350 0.885 11.505
334 59+827 59+850 GRW L 23 2 1.950 44.850 0.885 20.355
335 59+905 59+912 GBW R 7 1.5 1.238 8.663 0.498 3.486
336 60+681 60+697 GRW L 16 2 1.950 31.200 0.885 14.160
337 60+700 60+715 GRW L 15 3 3.825 57.375 1.990 29.850
338 61+275 61+280 GRW L 5 2 1.950 9.750 0.885 4.425
339 61+330 61+346 GRW L 16 2.5 2.813 45.000 1.382 22.112
340 62+396 62+403 GRW L 7 2.5 2.813 19.688 1.382 9.674
341 62+630 62+650 GRW L 20 2.5 2.813 56.250 1.382 27.640
342 62+674 62+690 GRW L 16 2 1.950 31.200 0.885 14.160
343 63+043 63+093 GRW L 50 2 1.950 97.500 0.885 44.250
344 63+400 63+405 GRW R 5 2 1.950 9.750 0.885 4.425
345 63+500 63+525 GRW R 25 1 0.675 16.875 0.221 5.525
346 63+995 64+055 GRW L 60 3 3.825 229.500 1.990 119.400
347 64+125 64+180 GRW L 55 1 0.675 37.125 0.221 12.155
348 64+325 64+357 GRW R 32 3.5 4.988 159.600 2.709 86.688
349 64+615 64+630 GRW R 15 2 1.950 29.250 0.885 13.275
350 64+415 64+675 GRW R 130 2.5 2.813 365.625 1.382 179.660
351 64+783 64+791 GRW R 8 2 1.950 15.600 0.885 7.080
352 20+255 20+300 GBW L 45 2 1.950 87.750 0.885 39.825
353 20+346 20+470 GBW L 124 2 1.950 241.800 0.885 109.740
354 20+672 20+707 GBW L 35 2 1.950 68.250 0.885 30.975
355 20+845 20+895 GBW L 60 2 1.950 117.000 0.885 53.100
356 21+145 21+155 GBW L 10 1.5 1.238 12.375 0.498 4.980
357 21+276 21+280 GBW L 4 1.5 1.238 4.950 0.498 1.992
358 21+298 21+302 GBW L 4 1 0.675 2.700 0.221 0.884
359 21+298 21+302 GBW L 4 1.5 1.238 4.950 0.498 1.992
360 21+450 21+475 GBW L 25 1 0.675 16.875 0.221 5.525
361 21+698 21+752 GBW L 50 1.5 1.238 61.875 0.498 24.900
362 21+830 21+832 GRW L 12 2 1.950 23.400 0.885 10.620
363 21+908 22+008 GBW L 40 2 1.950 78.000 0.885 35.400
364 22+325 22+337 GBW L 21 1.5 1.238 25.988 0.498 10.458
365 22+425 22+446 GBW L 21 1.5 1.238 25.988 0.498 10.458
366 22+410 22+417 GBW L 7 1 0.675 4.725 0.221 1.547
367 22+588 22+600 GBW L 12 1.5 1.238 14.850 0.498 5.976
368 22+800 22+820 GBW L 20 1.5 1.238 24.750 0.498 9.960
369 23+040 23+052 GBW L 12 1.5 1.238 14.850 0.498 5.976
370 23+100 23+122 GBW L 2 2 1.950 3.900 0.885 1.770
371 24+328 24+340 GBW L 12 3 3.825 45.900 1.990 23.880
372 26+643 26+685 GBW L 43 3 3.825 164.475 1.990 85.570
373 26+920 26+930 GBW L 10 2 1.950 19.500 0.885 8.850
374 27+000 27+050 GBW L 50 2 1.950 97.500 0.885 44.250
375 31+680 31+700 GBW R 20 2 1.950 39.000 0.885 17.700
376 32+540 32+547 GBW R 7 2 1.950 13.650 0.885 6.195 RW5.2
377 34+868 34+880 GBW R 12 2 1.950 23.400 0.885 10.620
378 35+300 35+303 GBW L 3 1.5 1.238 3.713 0.498 1.494
379 38+010 38+036 GBW R 16 2 1.950 31.200 0.885 14.160

Page 189 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)
380 38+627 38+636 GBW R 9 2.5 2.813 25.313 1.382 12.438
381 38+853 38+870 GBW R 17 1.5 1.238 21.038 0.498 8.466
382 39+182 39+204 GBW R 22 2 1.950 42.900 0.885 19.470
SR= stone
383 0.675 2.700 0.221 0.884
39+832 39+836 GBW R 4 1 recover
384 40+275 40+308 GBW R 33 2 1.950 64.350 0.885 29.205
385 40+355 40+420 GBW R 65 1.5 1.238 80.438 0.498 32.370
386 41+996 42+013 GBW R 17 1.5 1.238 21.038 0.498 8.466
DW
387 0.675 4.050 0.221 1.326 changed
GRW(15%
42+333 42+339 GBW R 6 1 SR)
388 43+000 43+014 GBW L 14 2 1.950 27.300 0.885 12.390
389 43+031 43+033 GBW L 2 4 6.300 12.600 3.538 7.076 P2
390 43+042 43+050 GBW L 8 4 6.300 50.400 3.538 28.304 P2
391 43+486 43+543 GBW R 57 2 1.950 111.150 0.885 50.445
392 43+427 43+445 GBW R 18 2 1.950 35.100 0.885 15.930
393 43+934 43+951 GBW R 17 3 3.825 65.025 1.990 33.830 P2
394 43+951 43+980 GBW R 31 2.5 2.813 87.188 1.382 42.842
395 44+261 44+267 GBW R 6 1.5 1.238 7.425 0.498 2.988
396 44+600 44+621 GBW R 21 2 1.950 40.950 0.885 18.585
397 44+733 44+752 GBW R 19 3 3.825 72.675 1.990 37.810
398 44+922 44+974 GBW R 52 2 1.950 101.400 0.885 46.020
399 44+982 45+002 GBW R 20 2 1.950 39.000 0.885 17.700
400 49+923 49+947 GBW R 24 3 3.825 91.800 1.990 47.760
401 50+028 50+056 GBW R 22 2.5 2.813 61.875 1.382 30.404
402 50+075 50+084 GBW R 9 2 1.950 17.550 0.885 7.965
403 51+520 51+528 GBW L 8 2.5 2.813 22.500 1.382 11.056
404 51+600 51+612 GBW L 12 2 1.950 23.400 0.885 10.620
405 51+840 51+846 GBW R 6 2 1.950 11.700 0.885 5.310
406 52+983 53+120 GBW R 137 2 1.950 267.150 0.885 121.245
407 53+792 53+807 GBW R 15 2 1.950 29.250 0.885 13.275
408 54+050 54+072 GBW R 22 2 1.950 42.900 0.885 19.470
409 54+524 54+539 GBW R 15 2 1.950 29.250 0.885 13.275
410 55+250 55+275 GBW L 25 3 3.825 95.625 1.990 49.750
411 55+581 55+602 GBW R 21 2 1.950 40.950 0.885 18.585
412 55+795 55+880 GBW R 22 3 3.825 84.150 1.990 43.780
GRW
413 2.813 25.313 1.382 12.438 changed
56+522 56+531 GBW R 9 2.5 SRW
414 56+555 56+567 GBW R 12 2 1.950 23.400 0.885 10.620
415 57+053 57+062 GBW R 9 2 1.950 17.550 0.885 7.965
416 57+303 57+311 GBW R 8 1 0.675 5.400 0.221 1.768
417 57+890 57+902 GBW R 12 2.5 2.813 33.750 1.382 16.584
418 57+940 57+951 GBW R 11 2 1.950 21.450 0.885 9.735
419 58+788 58+824 GBW R 36 3 3.825 137.700 1.990 71.640
420 59+200 59+205 GBW R 5 2.5 2.813 14.063 1.382 6.910
421 59+890 59+905 GBW R 15 2.5 2.813 42.188 1.382 20.730
422 59+905 59+912 GBW R 7 1.5 1.238 8.663 0.498 3.486
423 61+298 61+305 GBW R 7 2 1.950 13.650 0.885 6.195
424 61+505 61+520 GBW R 15 2 1.950 29.250 0.885 13.275
425 62+726 62+747 GBW R 21 2 1.950 40.950 0.885 18.585
Sub-Total 27,483.450 cu.m 14,167.442 cu.m

Page 190 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)
Stone Masonary Works
1 0+759 0+786 SBW L 27.00 2.5 2.813 75.938 2.031 54.844
2 2+390 0+410 SBW R 20.00 1.5 1.238 24.750 0.731 14.625
3 2+766 2+744 SBW L 8.00 3 3.825 30.600 2.925 23.400
4 25.00 1.950 1.300 32.500 Rock cutting
11+580 11+605 SRW R 2 48.750
5 13+728 13+752 SRW L 24.00 2 1.950 46.800 1.300 31.200
6 14+662 14+628 SRW L 6.00 3 3.825 22.950 2.925 17.550
7 15+800 15+840 SBW L 40.00 2 1.950 78.000 1.300 52.000
8 15+850 15+875 SBW L 25.00 2 1.950 48.750 1.300 32.500 P2
9 29+130 29+160 SBW L 30 1.5 1.238 37.125 0.731 21.938
10 38+289 38+325 SBW R 36 2 1.950 70.200 1.300 46.800
11 38+325 38+530 SBW R 25 1.5 1.238 30.938 0.731 18.281
12 38+549 38+574 SBW R 25 1.5 1.238 30.938 0.731 18.281
13 43+781 43+825 SBW R 43 1.5 1.238 53.213 0.731 31.444
14 52+126 52+146 SBW R 20 3 3.825 76.500 2.925 58.500
15 52+629 62+657 SBW R 28 1.5 1.238 34.650 0.731 20.475
16 58+067 58+082 SBW R 15 3 3.825 57.375 2.925 43.875
17 28+628 28+640 SRW R 12 3 3.825 45.900 2.925 35.100
18 29+078 29+120 SRW R 32 2.3 2.450 78.384 1.719 55.016
19 29+150 29+275 SRW R 25 4.5 7.763 194.063 6.581 164.531
20 34+901 34+913 SRW L 12 3 3.825 45.900 2.925 35.100
21 36+577 36+586 SRW L 23 2.8 3.402 78.246 2.548 58.604
22 37+172 37+176 SRW L 4 2.5 2.813 11.250 2.031 8.125
23 38+232 38+247 SRW L 15 2.5 2.813 42.188 2.031 30.469
24 38+415 38+425 SRW L 10 2.2 2.277 22.770 1.573 15.730
25 38+932 38+965 SRW L 33 2.4 2.628 86.724 1.872 61.776
26 38+983 39+012 SRW L 19 2.4 2.628 49.932 1.872 35.568
27 42+075 42+081 SRW L 6 3.8 5.757 34.542 4.693 28.158
28 42+083 42+094 SRW L 11 4 6.300 69.300 5.200 57.200
29 43+722 43+745 SRW L 23 2.5 2.813 64.688 2.031 46.719
30 44+747 44+734 SRW L 7 3 3.825 26.775 2.925 20.475
31 44+825 44+835 SRW L 10 3 3.825 38.250 2.925 29.250
32 47+134 47+149 SRW L 15 1.5 1.238 18.563 0.731 10.969
33 48+244 48+252 SRW L 8 3.2 4.272 34.176 3.328 26.624
34 49+623 49+632 SRW L 15 2 1.950 29.250 1.300 19.500
35 49+814 49+816 SRW L 3 2.8 3.402 10.206 2.548 7.644
36 49+877 49+893 SRW L 16 4 6.300 100.800 5.200 83.200
37 50+011 50+021 SRW L 10 3.5 4.988 49.875 3.981 39.813
38 52+199 52+217 SRW L 18 2.8 3.402 61.236 2.548 45.864
39 52+248 52+254 SRW L 6 4 6.300 37.800 5.200 31.200
40 52+256 52+260 SRW L 4 5 9.375 37.500 8.125 32.500
41 52+274 52+292 SRW L 18 4.5 7.763 139.725 6.581 118.463
42 52+199 52+325 SRW L 6 2.8 3.402 20.412 2.548 15.288
43 55+612 55+620 SRW L 8 2.8 3.402 27.216 2.548 20.384
44 55+652 55+665 SRW L 13 4 6.300 81.900 5.200 67.600
45 55+972 55+981 SRW L 12 3 3.825 45.900 2.925 35.100
Sub-Total 2,350.944 cu.m 1,754.181 cu.m
Gabion Works Replacing Existing Dry Wall
1 1+525 1+550 GRW R 25 1.50 1.238 30.938 0.498 12.450
2 1+992 1+997 GRW L 5 1.50 1.238 6.188 0.498 2.490
3 3+380 3+390 GRW R 10 3.00 3.825 38.250 1.990 19.900
4 3+545 3+563 GRW R 18 3.00 3.825 68.850 1.990 35.820
5 5+075 5+140 GRW R 65 2.00 1.950 126.750 0.885 57.525
6 5+280 5+290 GRW L 10 2.00 1.950 19.500 0.885 8.850
7 6+275 6+315 GRW L 40 2.00 1.950 78.000 0.885 35.400

Page 191 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)
8 7+605 7+630 GRW R 25 2.00 1.950 48.750 0.885 22.125
9 8+615 8+675 GRW R 60 2.00 1.950 117.000 0.885 53.100
10 8+704 8+722 GRW R 18 2.00 1.950 35.100 0.885 15.930
11 8+836 8+856 GRW R 20 2.00 1.950 39.000 0.885 17.700
12 8+905 8+930 GRW R 25 3.00 3.825 95.625 1.990 49.750
13 9+531 9+600 GRW L 69 2.00 1.950 134.550 0.885 61.065
14 9+765 9+825 GRW L 60 2.00 1.950 117.000 0.885 53.100
15 10+235 10+290 GRW L 55 1.00 0.675 37.125 0.221 12.155
16 11+032 11+060 GRW R 28 2.00 1.950 54.600 0.885 24.780
17 11+100 11+148 GRW R 48 2.50 2.813 135.000 1.382 66.336
18 11+815 11+826 GRW R 11 2.00 1.950 21.450 0.885 9.735
19 11+875 11+955 GRW R 80 2.00 1.950 156.000 0.885 70.800
20 11+895 11+975 GRW L 80 2.00 1.950 156.000 0.885 70.800
21 14+558 14+582 GRW L 24 3.00 3.825 91.800 1.990 47.760
22 14+668 14+690 GRW L 22 2.00 1.950 42.900 0.885 19.470
23 14+754 14+825 GRW L 71 2.00 1.950 138.450 0.885 62.835
24 14+830 14+860 GRW L 30 1.50 1.238 37.125 0.498 14.940
25 15+160 15+172 GRW L 12 2.00 1.950 23.400 0.885 10.620
26 15+600 15+632 GRW R 32 2.00 1.950 62.400 0.885 28.320
27 15+960 15+966 GRW R 6 1.00 0.675 4.050 0.221 1.326
28 15+978 16+012 GRW R 34 2.00 1.950 66.300 0.885 30.090
29 16+560 16+593 GRW L 33 4.00 6.300 207.900 3.538 116.754
30 17+850 17+950 GRW R 100 2.00 1.950 195.000 0.885 88.500
31 18+090 18+120 GRW R 30 1.00 0.675 20.250 0.221 6.630
32 18+165 18+315 GRW R 150 2.00 1.950 292.500 0.885 132.750
33 18+342 18+352 GRW R 10 2.00 1.950 19.500 0.885 8.850
34 18+370 18+375 GRW R 5 2.00 1.950 9.750 0.885 4.425
35 18+375 18+410 GRW R 35 1.00 0.675 23.625 0.221 7.735
36 18+540 18+570 GRW R 30 2.00 1.950 58.500 0.885 26.550
37 18+839 18+844 GRW R 5 2.00 1.950 9.750 0.885 4.425
38 18+990 19+025 GRW R 35 1.50 1.238 43.313 0.498 17.430
39 19+178 19+188 GRW R 10 1.00 0.675 6.750 0.221 2.210
40 19+317 19+322 GRW R 5 2.00 1.950 9.750 0.885 4.425
41 20+570 20+580 GRW R 10 2.00 1.950 19.500 0.885 8.850
42 20+685 20+690 GRW R 5 2.00 1.950 9.750 0.885 4.425
43 20+790 20+795 GRW R 5 1.50 1.238 6.188 0.498 2.490
44 20+900 20+906 GRW R 6 2.00 1.950 11.700 0.885 5.310
45 20+905 20+915 GRW R 10 0.50 0.263 2.625 0.055 0.550
46 20+905 20+930 GRW R 25 2.00 1.950 48.750 0.885 22.125
47 21+463 21+471 GRW R 8 3.00 3.825 30.600 1.990 15.920
48 21+490 21+496 GRW R 6 3.00 3.825 22.950 1.990 11.940
49 21+780 21+790 GRW R 10 3.00 3.825 38.250 1.990 19.900
50 22+005 22+015 GRW 10 2.00 1.950 19.500 0.885 8.850
51 22+025 22+050 GRW 25 2.00 1.950 48.750 0.885 22.125
52 22+638 22+742 GRW 104 2.00 1.950 202.800 0.885 92.040
53 23+583 23+593 GRW 10 2.00 1.950 19.500 0.885 8.850
54 23+915 23+925 GRW R 10 2.00 1.950 19.500 0.885 8.850
55 24+310 24+335 GRW 25 3.00 3.825 95.625 1.990 49.750
56 24+608 24+620 GRW R 12 2.00 1.950 23.400 0.885 10.620
57 24+713 24+725 GRW R 12 2.00 1.950 23.400 0.885 10.620
58 24+742 24+764 GRW R 22 2.00 1.950 42.900 0.885 19.470
59 24+785 24+795 GRW R 10 2.00 1.950 19.500 0.885 8.850
60 32+997 33+002 GRW L 5 3.00 3.825 19.125 1.990 9.950
61 33+303 33+325 GRW L 22 2.00 1.950 42.900 0.885 19.470
62 33+955 33+968 GRW L 13 2.00 1.950 25.350 0.885 11.505
63 38+425 38+565 GRW L 140 2.00 1.950 273.000 0.885 123.900
64 43+578 43+585 GRW L 7 2.00 1.950 13.650 0.885 6.195
65 43+600 43+606 GRW L 6 1.00 0.675 4.050 0.221 1.326
66 44+181 44+231 GRW L 50 2.00 1.950 97.500 0.885 44.250
67 44+294 44+325 GRW L 31 2.00 1.950 60.450 0.885 27.435
68 47+994 48+000 GRW L 6 1.00 0.675 4.050 0.221 1.326
69 48+725 48+775 GRW L 50 2.00 1.950 97.500 0.885 44.250
70 52+855 52+876 GRW L 21 2.00 1.950 40.950 0.885 18.585

Page 192 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04 Back Filling to structures
Chainage Cutting Back Filling
Type / Length Height Sectional Sectional
S.N. Side Quantity Quantity Remarks
From To Shape (m) (m) Area Area
(cu.m) (cu.m)
(sqm) (sq.m)
71 56+213 56+218 GRW L 5 2.00 1.950 9.750 0.885 4.425
72 56+256 56+263 GRW L 7 1.00 0.675 4.725 0.221 1.547
73 62+522 62+533 GRW L 11 2.00 1.950 21.450 0.885 9.735
74 63+215 63+308 GRW R 93 1.50 1.238 115.088 0.498 46.314
Sub-Total 1,551.225 cu.m 2,037.604 cu.m
Total 31,385.619 cu.m 17,959.227 cu.m
General excavation in common material (95 % ) 29,817.000 cu.m
General excavation in hard rock ( 5 % ) 1,570.000 cu.m

Page 193 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
Crossing Structures
1 0+002 0+014 CW 12.00 6.00 0.35 2.10 25.200 CW slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off Wall at US
2 0+137 0+149 CW 12.00 6.00 0.35 2.10 25.200 CW slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off Wall at US
3 0+350 0+362 CW 12.00 6.00 0.35 2.10 25.200 CW slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off Wall at US
GW 6.00 2.00 1.95 11.700 0.89 5.310 US check dam
4 0+500 0+512 GW 6.00 2.00 1.95 11.700 0.89 5.310 US check dam
5 0+825 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
6 0+980 0+995 CW 15.00 6.00 0.35 2.10 31.500 CW slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
7 1+053 PC 7.50 1.50 2.20 16.500 PC bed
8 1+362 1+374 CW 12.00 6.00 0.35 2.10 25.200 CW slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
Stone soling at US
SS 15.00
4.00 0.15 0.60 9.000 and DS
9 1+654 1+666 CW 12.00 6.00 0.35 2.10 25.200 CW slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
10 2+044 2+056 CW 12.00 6.00 0.35 2.10 25.200 CW slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 6.00 3.00 0.50 1.50 9.000 Gabion matress
11 2+363 2+375 CW 12.00 6.00 0.35 2.10 25.200 CW slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 7.00 3.00 0.50 1.50 10.500 Gabion matress
12 2+440 2+452 CW 12.00 6.00 0.35 2.10 25.200 CW slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
13 2+502 2+514 CW 12.00 6.00 0.35 2.10 25.200 CW slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SM 2.00 1.50 1.24 2.475 0.73 1.463 Breast wall
14 2+606 CW 3.00 7.00 0.35 2.45 7.350 CW slab extension
SM 3.00 0.6-0.35 1.00 0.48 1.425 0.33 0.975 Cut-off wall at US
GW 10.00 3.00 3.83 38.250 1.99 19.900 US check dam
GW 10.00 4.00 0.50 2.00 20.000 US gabion matress
GW 20.00 6.50 0.50 3.25 65.000 DS gabion matress
15 2+950 PC 3.00 2.00 1.00 2.00 6.000 0.33 0.975 DS of PC
16 3+116 3+128 CW 12.00 6.00 0.35 2.10 25.200 CW slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 2.50 0.15 0.38 1.875 Stone soling at US
17 3+138 3+150 CW 15.00 6.00 0.35 2.10 31.500 CW slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
SS 6.00 2.50 0.15 0.38 2.250 Stone soling at DS
GW 4.00 6.00 0.50 3.00 12.000 US gabion matress
18 3+346 3+358 CW 12.00 6.00 0.35 2.10 25.200 CW slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
19 3+398 3+410 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 10.00 2.00 1.95 19.500 0.89 8.850 US check dam
20 3+497 3+509 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 3.00 3.00 3.83 11.475 1.99 5.970 US check dam
GW 12.00 1.00 0.50 0.50 6.000 US gabion matress
21 3+944 3+956 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US

Page 194 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
22 4+088 4+100 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
23 4+658 PC 13.00 1.80 4.50 58.500 Pipe beds
4.80 2.30 3.15 15.120 1.17 5.616 US HW 2nos
4.80 4.50 13.50 64.800 4.48 21.494 US & DS catch pit
GW 5.00 1.50 4.50 22.500 Gabion Casecade
24 4+847 4+859 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
25 4+910 4+922 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
26 5+765 5+767 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 10.00 2.00 1.95 19.500 0.89 8.850 US check dam
DS check dam
GW 8.00 6.30 50.400 3.54 28.304
4.00 extension
SS 6.00 2.00 0.15 0.30 1.800 Stone soling at US
SS 8.00 1.00 0.15 0.15 1.200 Stone soling at DS
27 6+134 6+146 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 6.00 1.00 0.15 0.15 0.900 Stone soling at DS
28 6+260 6+272 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 3.00 1.50 6.00 18.000 Gabion Casecade
29 7+655 7+673 CW 8.00 7.00 0.35 2.45 19.600 CW slab extension
SM 8.00 0.6-0.35 1.00 0.48 3.800 0.33 2.600 Cut-off wall at US
GW 5.00 1.95 9.750 0.89 4.425 US check dam on S1
2.00
GW 8.00 1.95 15.600 0.89 7.080 US check dam on S2
2.00
GW 15.00 1.00 0.68 10.125 0.22 3.315 DS check dam
GW 6.00 2.00 1.95 11.700 0.89 5.310 DS check dam
GW 6.00 2.00 1.95 11.700 0.89 5.310 DS check dam
30 8+161 8+173 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
31 8+243 8+253 GW 10.00 2.00 1.95 19.500 0.89 8.850 US check dam
32 8+494 8+506 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 4.00 2.00 1.95 7.800 0.89 3.540 US check dam
GW 6.00 3.00 3.83 22.950 1.99 11.940 DS check dam
33 8+701 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
34 8+886 8+898 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 6.00 2.00 1.95 11.700 0.89 5.310 US check dam
35 9+056 9+068 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
36 9+370 9+382 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 12.00 2.00 0.15 0.30 3.600 Stone soling
37 10+000 PC 5.00 4.00 0.50 2.00 10.000 Gabion matress
6.00 2.30 4.50 27.000 Pipe bed (P2)
38 10+604 10+614 GW 8.00 4.00 6.30 50.400 3.54 28.304 Extension of GW
39 10+704 10+716 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 10.00 3.00 3.83 38.250 1.99 19.900 US check dam
40 10+819 10+831 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 6.00 2.00 1.95 11.700 0.89 5.310 US check dam
SS 6.00 1.50 0.15 0.23 1.350 Stone soling at US
SS 8.00 1.00 0.15 0.15 1.200 Stone soling at DS

Page 195 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
41 11+020 11+032 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 6.00 2.00 1.95 11.700 0.89 5.310 US check dam
SS 6.00 1.50 0.15 0.23 1.350 Stone soling at US
SS 8.00 1.50 0.15 0.23 1.800 Stone soling at DS
42 11+242 11+254 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 8.00 4.00 6.30 50.400 3.54 28.304 US check dam
43 11+333 11+348 CW 15.00 7.00 0.35 2.45 36.750 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
SS 10.00 7.00 0.15 1.05 10.500 Stone soling at US
44 11+400 11+412 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 6.00 2.00 0.15 0.30 1.800 Stone soling at US
45 11+504 11+516 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 6.00 2.00 0.15 0.30 1.800 Stone soling at US
46 11+692 11+704 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 4.00 2.00 1.95 7.800 0.89 3.540 US check dam
SS 5.00 1.50 0.15 0.23 1.125 Stone soling at US
SS 7.00 1.00 0.15 0.15 1.050 Stone soling at DS
47 11+739 11+751 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 6.00 1.00 0.15 0.15 0.900 Stone soling at US
48 11+844 11+856 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
49 12+047 12+059 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 8.00 1.00 0.15 0.15 1.200 Stone soling at US
50 12+163 12+178 CW 15.00 6.00 0.35 2.10 31.500 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
51 12+216 12+234 CW 18.00 7.00 0.35 2.45 44.100 CW Slab
SM 18.00 0.6-0.35 1.00 0.48 8.550 0.33 5.850 Cut-off wall at US
SS 12.00 1.00 0.15 0.15 1.800
SS 10.00 1.00 0.15 0.15 1.500
52 12+269 12+281 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
53 12+344 12+356 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 1.00 0.15 0.15 0.750
SS 5.00 1.00 0.15 0.15 0.750
54 12+481 12+493 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 4.00 1.00 0.15 0.15 0.600
55 12+542 12+554 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
56 12+743 12+755 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
57 13+036 13+048 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 6.00 1.00 0.15 0.15 0.900 DS
58 13+324 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
59 13+716 13+731 CW 15.00 7.00 0.35 2.45 36.750 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
GW 12.00 2.00 1.95 23.400 0.89 10.620 US check dam
60 13+855 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW

Page 196 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
61 14+024 14+036 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 12.00 2.00 1.95 23.400 0.89 10.620 US check dam
62 14+225 14+234 CW 3.00 7.00 0.35 2.45 7.350 CW Slab (P2)
SM 3.00 0.6-0.35 1.00 0.48 1.425 0.33 0.975 Cut-off wall at US
63 14+502 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
GW 5.00 1.50 4.50 22.500 Gabion Casecade
64 14+695 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
GW 5.00 1.50 4.50 22.500 Gabion Casecade
65 15+120 15+132 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
66 15+225 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
67 15+630 15+642 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
68 15+794 15+806 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 1.00 0.15 0.15 0.750
69 15+833 15+845 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 3.00 1.50 0.15 0.23 0.675
GW 4.00 2.00 1.95 7.800 0.89 3.540 US check dam
70 15+944 15+956 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 1.00 0.15 0.15 0.750
GW 6.00 2.00 1.95 11.700 0.89 5.310 US check dam
71 16+023 16+035 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 8.00 1.00 0.15 0.15 1.200
GW 3.00 3.00 3.83 11.475 1.99 5.970 DS extension
Gabion Casecade
GW 20.00
1.50 6.00 120.000 (P2)
72 16+090 16+112 CW 15.00 6.00 0.35 2.10 31.500 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
SS 10.00 2.00 0.15 0.30 3.000
GW 20.00 1.50 6.00 120.000 Gabion Casecade
73 16+271 16+286 CW 15.00 7.00 0.35 2.45 36.750 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
SS 12.00 6.00 0.15 0.90 10.800
SS 8.00 2.00 0.15 0.30 2.400
GW 20.00 1.50 6.00 120.000 Gabion matress
74 16+365 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
75 16+414 16+426 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
76 16+982 16+994 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US

Page 197 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
GW 3.00 2.00 1.95 5.850 0.89 2.655 US check dam
77 17+255 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
78 17+560 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
79 17+942 17+954 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 20.00 3.00 3.83 76.500 1.99 39.800 DS check dam
80 18+316 18+328 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 4.00 1.00 0.15 0.15 0.600
81 18+620 18+632 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 2.00 0.15 0.30 1.500
82 18+800 18+812 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 7.00 2.00 0.15 0.30 2.100
83 18+844 18+856 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 2.50 0.15 0.38 1.875
84 18+975 18+987 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 7.00 2.50 0.15 0.38 2.625
85 19+219 19+231 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 2.00 0.15 0.30 1.500 US
SS 6.00 2.00 0.15 0.30 1.800 DS
GW 4.00 2.00 1.95 7.800 0.89 3.540 US check dam
86 19+420 19+432 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 12.00 1.00 0.15 0.15 1.800 US
87 19+692 19+704 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 8.00 1.00 0.15 0.15 1.200
88 19+722 19+734 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 7.00 2.00 0.15 0.30 2.100
89 20+010 20+025 CW 15.00 7.00 0.35 2.45 36.750 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
SS 8.50 3.00 0.15 0.45 3.825
90 20+432 20+444 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 10.00 3.00 0.15 0.45 4.500
GW 10.00 2.00 1.95 19.500 0.89 8.850 US check dam
91 20+546 20+558 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 8.00 1.00 0.15 0.15 1.200
92 20+765 20+777 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 7.00 1.00 0.15 0.15 1.050
93 21+120 21+135 CW 15.00 7.00 0.35 2.45 36.750 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
SS 7.50 7.00 0.15 1.05 7.875
94 21+183 21+195 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 2.00 0.15 0.30 1.500
95 21+272 PC 7.50 1.30 1.60 12.000 Irrigation Crossing

Page 198 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
96 21+524 21+539 CW 15.00 7.00 0.35 2.45 36.750 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
GW 12.00 3.00 3.83 45.900 1.99 23.880 US check dam
12.00 7.00 2.00 14.00 168.000 Ponding fill work
97 21+562 21+577 CW 15.00 7.00 0.35 2.45 36.750 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
GW 12.00 2.00 1.95 23.400 0.89 10.620 US check dam
15.00 7.00 2.00 14.00 210.000 Ponding fill work
98 21+669 21+681 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
99 21+817 21+829 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
100 22+008 22+020 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
101 22+235 22+247 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
102 22+345 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit (P2)
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
103 22+444 22+456 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 1.50 0.15 0.23 1.125
104 22+572 22+584 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 1.50 0.15 0.23 1.125
105 22+644 22+656 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
106 22+723 22+735 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
107 22+835 22+847 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
108 22+938 22+950 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
109 23+067 23+079 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
110 23+230 23+242 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
111 23+319 23+331 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
112 23+490 23+502 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 10.00 3.50 0.15 0.53 5.250
113 23+563 23+575 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 1.00 0.15 0.15 0.750
114 23+694 23+706 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 35.00 2.00 1.95 68.250 0.89 30.975 US check dam
115 24+100 24+112 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 10.00 5.00 0.15 0.75 7.500
116 24+217 24+229 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 6.00 2.00 0.15 0.30 1.800
117 24+414 PC 7.50 1.50 2.15 16.125 Irrigation Crossing
118 24+519 24+531 CW 12.00 7.00 0.35 2.45 29.400 Gufa khola
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 10.00 1.20 0.15 0.18 1.800
GW 10.00 2.00 2.50 25.000 0.89 8.850 US check dam
119 24+620 PC 7.50 1.50 2.15 16.125 Irrigation Crossing
120 24+800 24+812 CW 12.00 7.00 0.35 2.45 29.400 Gufa khola

Page 199 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 8.50 7.00 0.15 1.05 8.925
GW 3.00 2.00 2.50 7.500 0.89 2.655 US check dam
121 24+838 24+853 CW 15.00 7.00 0.35 2.45 36.750 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
SS 10.00 3.50 0.15 0.53 5.250
122 25+025 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
123 25+260 25+272 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 8.00 5.00 0.15 0.75 6.000
124 25+340 25+352 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 6.00 1.00 0.15 0.15 0.900
SS 6.00 1.00 0.15 0.15 0.900
GW 3.00 1.00 3.000 0.22 0.663 Replace existing DW
1.00
125 25+494 25+506 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 6.00 2.00 0.15 0.30 1.800
SS 7.00 2.00 0.15 0.30 2.100
126 25+763 25+775 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 8.00 1.00 0.15 0.15 1.200
SS 6.00 1.00 0.15 0.15 0.900
127 26+330 26+342 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 5.00 1.50 0.15 0.23 1.125
SS 5.00 1.00 0.15 0.15 0.750
GW 3.00 2.50 7.500 0.89 2.655 Replace existing DW
2.00
128 26+475 26+490 CW 15.00 7.00 0.35 2.45 36.750 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
GW 12.00 1.95 23.400 0.89 10.620 Replace existing DW
2.00
129 26+475 26+490 CW 15.00 7.00 0.35 2.45 36.750 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875
GW 12.00 2.00 1.95 23.400 0.89 10.620
130 26+700 26+712 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
131 27+175 27+187 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
132 27+250 27+262 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 5.00 2.00 1.95 9.750 0.89 4.425
133 27+417 27+429 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 6.00 1.00 0.15 0.45 2.700 U/S stone soling
SS 5.00 1.00 0.15 0.15 0.750 D/S Stone Sloing.
134 27+555 27+567 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 10.00 2.00 1.95 19.500 0.89 8.850
135 27+619 27+631 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 10.00 2.00 1.95 19.500 0.89 8.850
136 27+950 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 4.00 3.30 7.920 3.54 8.491 DS HW
137 28+111 28+123 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 10.00 1.00 0.15 0.15 1.500 D/S stone soling

Page 200 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
138 28+380 28+392 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
139 28+587 PC 2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.40 1.20 1.50 3.600 0.32 0.763 DS protection work
140 28+647 28+659 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 12.00 5.00 9.38 112.500 5.53 66.348
141 29+160 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
4.90 2.30 4.50 22.050 Pipe bed except HW
0.00 160.000 20m drop cascade
142 29+275 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
143 29+670 29+682 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 5.00 3.00 3.83 19.125 1.99 9.950
SS 10.00 2.00 0.15 0.30 3.000
144 30+029 PC 2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
7.40 2.30 4.50 33.300 Pipe bed except HW
145 30+061 PC 2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
7.40 2.30 4.50 33.300 Pipe bed except HW
146 30+376 30+388 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 6.00 1.00 0.15 0.15 0.900 lengh(8 to 6m)
147 30+419 30+431 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 12.00 3.00 3.83 45.900 1.99 23.880 U/S gbion work
148 30+895 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
20.00 0.00 160.000 gabion cascade dro
149 31+301 31+313 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 5.00 2.00 1.95 9.750 0.89 4.425 u/s Check Dam
SS 6.00 5.00 0.15 0.75 4.500 lengh(8 to 6m)
150 31+700 31+712 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
151 31+945 31+957 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 12.00 3.00 3.83 45.900 1.99 23.880 D/S GW
152 32+388 PC 2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
153 32+582 32+594 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
154 32+655 32+667 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 12.00 4.00 6.30 75.600 3.54 42.456 D/S GW
155 32+886 32+894 PC 2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
156 33+016 33+028 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 10.00 2.00 1.95 19.500 0.89 8.850 D/S GW
157 33+130 33+142 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 10.00 5.00 0.15 0.75 7.500 U/S dry stone soling
SS 10.00 D/S dry stone soling
5.00 0.15 0.75 7.500
158 33+397 33+409 CW 12.00 7.00 0.35 2.45 29.400 CW Slab

Page 201 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 30.00 3.00 3.83 114.750 1.99 59.700 U/S gabion work
159 33+556 33+568 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 12.00 2.00 0.15 0.30 3.600 dry stone soling
160 33+825 33+837 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
ss 8.00 2.00 0.15 0.30 2.400
161 34+125 34+143 CW 18.00 7.00 0.35 2.45 44.100 CW Slab
SM 18.00 0.6-0.35 1.00 0.48 8.550 0.33 5.850 Cut-off wall at US
SS 9.00 7.00 0.15 1.05 9.450
162 34+216 34+228 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 14.00 2.00 1.95 27.300 0.89 12.390
163 34+350 34+377 CW 27.00 7.00 0.35 2.45 66.150 CW Slab
SM 27.00 0.6-0.35 1.00 0.48 12.825 0.33 8.775 Cut-off wall at US
GW 3.00 3.00 3.83 11.475 1.99 5.970
7.50 1.50 2.15 16.125 Irrigation Crossing
164 34+877 34+889 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
165 35+175 35+183 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.82 2.60 0.30 0.78 2.200 mattrace
2.60 0.60 1.15 0.69 1.794 SM D/S Tail
166 35+325 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
2.82 2.60 0.30 0.78 2.200 mattrace
2.60 0.60 1.15 0.69 1.794 SM D/S Tail
167 35+530 35+542 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 8.00 2.00 1.95 15.600 0.89 7.080
168 35+643 35+646 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
169 35+888 35+900 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
0.00
170 36+269 36+281 CW 12.00 7.00 0.35 2.45 29.400 CW Slab (P2)
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 20.00 2.00 1.95 39.000 0.89 17.700 U/s gabion work
171 36+485 36+497 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
172 36+660 PC 2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
5.00 1.20 2.00 2.40 12.000 SM work
173 36+988 37+000 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 10.00 2.00 1.95 19.500 0.89 8.850 U/s gabion work
174 37+096 37+108 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
175 37+314 37+326 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 10.00 3.00 0.15 0.45 4.500
176 37+455 37+467 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
177 37+634 37+646 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
178 37+700 37+712 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US

Page 202 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
179 37+920 37+932 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
180 38+066 38+078 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
181 38+530 38+542 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
182 38+648 38+660 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
183 38+713 38+723 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
184 38+815 38+827 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
185 38+920 38+932 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.36 1.80 0.48 5.700 1.05 12.636 Cut-off wall at US
186 39+030 39+042 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
187 39+200 39+212 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
GW 10.00 5.00 9.38 93.750 5.53 55.290 DS GW
188 39+342 39+354 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
189 39+568 39+580 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
190 39+694 39+706 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
191 39+792 39+804 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
192 40+109 40+121 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
193 40+330 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
194 40+419 40+431 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
195 40+790 40+802 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
196 41+047 41+059 CW 12.00 6.00 0.35 2.10 25.200 CW Slab
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
197 41+275 41+287 CW 12.00 7.00 0.35 2.45 29.400 CW Slab
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
198 41+854 41+886 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
199 42+038 42+050 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
200 42+202 42+214 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
201 42+286 42+298 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
SS 10.00 2.00 0.15 0.30 3.000
GW 7.00 2.00 1.95 13.650 0.89 6.195 DS GW
202 42+380 42+392 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
203 42+417 42+429 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
204 42+820 42+832 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
205 42+866 42+878 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
206 42+966 42+978 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
207 43+012 43+024 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US

Page 203 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
208 43+131 43+143 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
209 43+231 43+243 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
210 43+417 43+429 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
211 43+549 43+561 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
212 43+750 43+762 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
213 43+926 43+938 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.37 2.60 0.48 5.700 2.20 26.364 Cut-off wall at US
GW 6.00 3.00 3.83 45.900 1.99 11.940 DS GW (2 step)
214 44+000 44+012 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
215 44+155 44+167 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
216 44+246 44+258 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
217 44+385 44+397 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
218 44+714 44+726 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 6.00 3.00 3.83 22.950 1.99 11.940 US check dam
219 44+788 44+800 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
220 44+900 44+912 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
221 45+002 45+014 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
222 45+247 45+259 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
223 45+371 45+383 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
224 45+705 45+717 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
225 46+475 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
SM 2.73 2.40 0.30 1.966 RRM
SM 2.40 0.60 0.60 0.864 Protection wall
226 46+876 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
227 47+317 47+329 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
228 47+454 47+466 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
229 47+568 47+580 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
230 47+792 47+804 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
231 47+906 47+918 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
232 47+974 47+986 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
233 48+113 48+125 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
234 48+332 48+344 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
235 48+568 48+583 CW 15.00 7.00 0.35 2.45 36.750

Page 204 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
236 48+662 48+674 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
237 48+795 48+816 CW 21.00 7.00 0.35 2.45 51.450
SM 21.00 0.6-0.35 1.00 0.48 9.975 0.33 6.825 Cut-off wall at US
238 49+017 49+029 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
239 49+225 49+237 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
240 49+492 49+513 CW 21.00 7.00 0.35 2.45 51.450
SM 21.00 0.6-0.35 1.00 0.48 9.975 0.33 6.825 Cut-off wall at US
241 49+680 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
7.40 2.30 4.50 33.300 Pipe bed except HW
GW 6.00 1.00 0.60 0.60 3.600 US guide wall
242 49+863 49+875 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
243 49+913 49+928 CW 15.00 7.00 0.35 2.45 36.750
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
GW 5.00 3.00 3.83 19.125 1.99 9.950 US check dam
GW 12.00 3.00 3.83 45.900 1.99 23.880 US check dam
244 50+055 50+070 CW 15.00 7.00 0.35 2.45 36.750 CW Slab
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
245 50+346 50+358 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
246 50+586 50+598 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 4.00 3.00 0.50 1.50 6.000 Gabbin matress
247 51+055 51+067 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 2.00 3.00 3.83 7.650 1.99 3.980 US check dam
248 51+336 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
GW 3.00 3.50 0.50 1.75 5.250 for casecade
249 52+190 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
250 52+450 52+462 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
251 52+775 52+787 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
252 52+844 52+856 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
Pipe bed (irragation
253 52+987 PC 7.50 1.43 1.50 2.14 16.031
purpose)
254 53+154 53+166 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 6.00 3.00 3.83 22.980 1.99 11.940 US check dam
255 53+388 53+400 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 8.00 1.00 0.15 0.15 1.200 US stone soling
256 53+556 53+568 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
257 53+825 53+837 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 6.00 3.00 3.83 22.950 1.99 11.940
258 54+040 54+052 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 9.00 1.00 0.15 0.15 1.350 US soling
259 54+220 54+232 CW 12.00 6.00 0.35 2.10 25.200

Page 205 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
300mm crossing for
260 54+260 PC 10.00 1.18 1.35 1.59 15.863
irrigation
261 54+520 54+532 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
262 54+596 54+608 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 20.00 2.00 1.95 39.000 0.89 17.700
263 54+700 54+712 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
264 54+774 54+784 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
265 54+855 54+867 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
266 55+220 55+235 CW 15.00 7.00 0.35 2.45 36.750
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
GW 6.00 3.00 3.83 22.950 1.99 11.940
GW 3.00 2.00 1.95 5.850 0.89 2.655
267 55+372 55+384 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 32.00 2.00 1.95 62.400 0.89 28.320
268 55+525 PC 7.50 1.95 3.20 24.000 for irrigation
269 55+600 55+612 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SM 10.00 5.00 9.38 93.750 8.13 81.250
270 55+742 PC 2.30 2.00 2.00 4.00 9.200 0.89 2.036 catch pit
2.30 2.00 1.30 2.990 0.89 2.036 US HW
2.30 2.00 1.30 2.990 0.89 2.036 DS HW
4.90 1.95 3.20 15.680 Pipe bed except HW
271 55+768 55+783 CW 8.00 7.00 0.35 2.45 19.600
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
SS 15.00 1.50 0.15 0.23 3.375 PCC on u/s
272 55+994 56+009 CW 15.00 7.00 0.35 2.45 36.750
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
SS 15.00 5.00 0.15 0.75 11.250 U/S soling
273 56+198 56+210 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 6.00 2.00 1.95 11.700 0.89 5.310 U/S check dam
274 56+244 56+256 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 10.00 2.00 1.95 19.500 0.89 8.850 U/S check dam
275 56+313 56+325 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 10.00 2.00 0.15 0.30 3.000
276 56+372 56+384 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
277 56+503 PC 2.30 2.00 1.30 2.990 0.89 2.036 US HW
2.30 2.00 1.30 2.990 0.89 2.036 DS HW
4.90 1.95 3.20 15.680 Pipe bed except HW
278 56+550 56+562 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
RC 0.00 30.000 RC- rock cutting
279 56+610 PC 2.30 2.00 1.30 2.990 0.89 2.036 US HW
2.30 2.00 1.30 2.990 0.89 2.036 DS HW
4.90 1.95 3.20 15.680 Pipe bed except HW
280 56+742 56+754 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 5.00 3.00 3.83 19.125 1.99 9.950 U/S check dam(P2)
281 56+894 56+906 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
0.00 15.000 site clerance
282 57+194 57+206 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US

Page 206 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
GW 12.00 3.00 3.83 45.900 1.99 23.880 D/S protection wall
283 57+330 PC 2.30 2.00 1.30 2.990 0.89 2.036 US HW
2.30 2.00 1.30 2.990 0.89 2.036 DS HW
4.90 1.95 3.20 15.680 Pipe bed except HW
284 57+438 57+450 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
285 57+555 57+567 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 8.00 2.00 1.95 15.600 0.89 7.080 D/S protection wall
286 57+675 57+687 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 8.00 3.00 3.83 30.600 1.99 15.920 D/S protection wall
287 57+852 PC 2.30 2.00 1.30 2.990 0.89 2.036 US HW
2.30 2.00 1.30 2.990 0.89 2.036 DS HW
4.90 1.95 3.20 15.680 Pipe bed except HW
GW 2.00 3.00 0.50 1.50 3.000 fos 2m casecade
288 57+946 57+958 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
289 58+083 58+095 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
290 58+235 58+256 CW 21.00 7.00 0.35 2.45 51.450
SM 21.00 0.6-0.35 1.00 0.48 9.975 0.33 6.825 Cut-off wall at US
SS 0.15 110.00 16.500
GW 6.00 2.00 1.95 11.700 0.89 5.310 D/S protection wall
291 58+565 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
292 58+750 PC 2.30 2.00 1.30 2.990 0.89 2.036 US HW
2.30 2.00 1.30 2.990 0.89 2.036 DS HW
4.90 1.95 3.20 15.680 Pipe bed except HW
SM 2.05 2.00 0.30 0.60 1.230 RRM
SM 2.00 0.60 0.60 0.36 0.720
293 58+975 58+996 CW 21.00 7.00 0.35 2.45 51.450
SM 21.00 0.6-0.35 1.00 0.48 9.975 0.33 6.825 Cut-off wall at US
SS 10.00 0.15 43.30 6.495 US of CW
294 59+092 59+104 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
295 59+230 PC 2.30 2.00 1.30 2.990 0.89 2.036 US HW
2.30 2.00 1.30 2.990 0.89 2.036 DS HW
4.90 1.95 3.20 15.680 Pipe bed except HW
296 59+292 59+307 CW 15.00 6.00 0.35 2.10 31.500
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
297 59+594 59+606 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
298 59+722 59+734 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
299 59+784 59+796 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 12.00 4.00 6.30 75.600 3.54 42.456 U/S protection wall
300 59+810 59+822 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
301 59+920 59+932 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 12.00 0.60 1.80 21.600 12m casecade
302 59+992 60+007 CW 15.00 7.00 0.35 2.45 36.750
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
303 60+119 60+131 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 8.00 1.00 0.68 5.400 0.22 1.768 U/S protection wall
304 60+405 60+417 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US

Page 207 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 3.03,3.04


Description of work : Excavation in foundation for structures (SS/SP- 900)
3.03 a) All types of soil except hard rock 3.03 b) Hard rock 3.04) Back Filling to structures
Chainage Cutting Back Filling
Type/ Length Width Height Sectional
S.N. Sectional Quantity Quantity Remarks
From To Shape (m) (m) (m) Area
Area (sq.m) (cu.m) (cu.m)
(sq.m)
305 60+742 60+754 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
SS 10.00 2.00 0.15 0.30 3.000 US stone soling
306 61+070 PC 2.30 2.00 1.30 2.990 0.89 2.036 US HW
2.30 2.00 1.30 2.990 0.89 2.036 DS HW
3.90 1.95 3.20 12.480 Pipe bed except HW
307 61+288 61+303 CW 15.00 7.00 0.35 2.45 36.750
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
308 61+560 61+575 CW 15.00 7.00 0.35 2.45 36.750
SM 15.00 0.6-0.35 1.00 0.48 7.125 0.33 4.875 Cut-off wall at US
309 61+976 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
SM 2.73 2.40 0.30 1.966 RRM
SM 2.40 0.60 0.60 0.864 Protection wall
310 62+460 62+472 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
GW 6.00 2.00 1.95 11.700 0.89 5.310 U/S protection wall
311 62+868 62+880 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
312 63+372 63+384 CW 12.00 7.00 0.35 2.45 29.400
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
313 63+620 63+632 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
314 64+192 64+204 CW 12.00 6.00 0.35 2.10 25.200
SM 12.00 0.6-0.35 1.00 0.48 5.700 0.33 3.900 Cut-off wall at US
315 64+560 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
316 64+965 PC 2.40 4.50 13.50 32.400 4.48 10.747 US catch pit
2.40 2.30 3.15 7.560 1.17 2.808 US HW
2.40 2.20 3.30 7.920 1.07 2.568 DS HW
4.90 2.30 4.50 22.050 Pipe bed except HW
Extra Structures
317 10+300 10+340 GW 40.00 2.00 1.95 78.000 0.89 35.400 Passing bay
318 16+450 SM 10.00 1.50 0.80 1.20 12.000 Chute
319 16+550 SM 7.00 1.10 0.60 0.66 4.620 Chute
Total 15,218.000 cu.m 3,828.000 cu.m
General excavation in common material (95 % ) 14,458.000 cu.m
General excavation in hard rock ( 5 % ) 761.000 cu.m

Page 208 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 3.05


Description of work: Backfilling behind structures with graded filter materials [3110]
Chainage Length (m) Width (m) Height (m) Quantity
S.N. Remarks
From To (cu.m)
Road Side Strucutre
1 0+759 0+786 27 0.30 2.50 14.520
2 2+390 0+410 20 0.30 1.50 4.293
6 11+580 11+605 25 0.30 2.00 9.405
7 13+728 13+752 24 0.30 2.00 9.029
9 14+662 14+628 6 0.30 3.00 4.196
10 15+800 15+840 40 0.30 2.00 15.049
11 15+850 15+875 25 0.30 2.00 9.405
13 29+130 29+160 30 0.30 1.50 6.440
14 38+289 38+325 36 0.30 2.00 13.544
15 38+325 38+530 25 0.30 1.50 5.367
16 38+549 38+574 25 0.30 1.50 5.367
19 43+781 43+825 43 0.30 1.50 9.231
20 52+126 52+146 20 0.30 3.00 13.987
21 52+629 62+657 28 0.30 1.50 6.011
22 52+685 52+880 8 0.30 3.00 5.595
23 55+795 55+880 85 0.30 3.00 59.443
24 58+067 58+082 15 0.30 3.00 10.490
25 28+628 28+640 12 0.30 3.00 8.392
26 29+078 29+120 32 0.30 2.30 15.141
27 29+150 29+275 25 0.30 4.50 29.600
28 34+901 34+913 12 0.30 3.00 8.392
29 36+577 36+586 23 0.30 2.80 14.598
30 37+172 37+176 4 0.30 2.50 2.151
31 38+232 38+247 15 0.30 2.50 8.067
32 38+415 38+425 10 0.30 2.20 4.408
33 38+932 38+965 33 0.30 2.40 16.680
34 38+983 39+012 19 0.30 2.40 9.604
35 42+075 42+081 6 0.30 3.80 5.747
36 42+083 42+094 11 0.30 4.00 11.247
37 43+722 43+745 23 0.30 2.50 12.369
38 44+747 44+734 7 0.30 3.00 4.895
39 44+825 44+835 10 0.30 3.00 6.993
40 47+134 47+149 15 0.30 1.50 3.220
41 48+244 48+252 8 0.30 3.20 6.112
42 49+623 49+632 15 0.30 2.00 5.643
43 49+814 49+816 4 0.30 2.80 2.539
44 49+877 49+893 16 0.30 4.00 16.359
45 50+011 50+021 10 0.30 3.50 8.609
46 52+199 52+217 18 0.30 2.80 11.425
47 52+248 52+254 6 0.30 4.00 6.135
48 52+256 52+260 4 0.30 5.00 5.382
49 52+274 52+292 18 0.30 4.50 21.312
50 52+199 52+325 6 0.30 2.80 3.808
51 55+612 55+620 8 0.30 2.80 5.078
52 55+652 55+665 13 0.30 4.00 13.292
53 55+815 55+870 55 0.30 4.00 56.234
54 55+972 55+981 12 0.30 3.00 8.392
Total Quantity 533.194 cu.m

Page 209 of 313


4,5,6 PAVEMENT QUANTITY CALCULATION SHEET
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
Carriage Way
1 0+000 6+900 6900.00 4.25 29,325.000 0.150 4,398.750 0.175 5,131.875
2 6+900 7+500 600.00 5.00 3,000.000 0.150 450.000 0.175 525.000
3 7+500 10+375 2875.00 4.25 12,218.750 0.150 1,832.813 0.175 2,138.281
4 10+375 17+000 6625.00 4.25 28,156.250 0.150 4,223.438 0.175 4,927.344
5 17+000 17+200 200.00 4.25 850.000 0.150 127.500 0.250 212.500
6 17+200 17+375 175.00 4.25 743.750 0.150 111.563 0.250 185.938
7 17+375 17+525 150.00 4.25 637.500 0.150 95.625 0.250 159.375
8 17+525 21+400 3875.00 4.25 16,468.750 0.150 2,470.313 0.175 2,882.031
9 21+400 21+500 100.00 4.25 425.000 0.150 63.750 0.200 85.000 0.2 85.000
10 21+500 24+520 3020.00 4.25 12,835.000 0.150 1,925.250 0.175 2,246.125
11 24+520 24+575 55.00 4.25 233.750 0.150 35.063 0.100 23.375
12 24+575 24+825 250.00 4.25 1,062.500 0.150 159.375 0.250 265.625
13 24+825 25+100 275.00 4.25 1,168.750 0.150 175.313 0.200 233.750 0.2 233.750
14 25+100 25+500 400.00 4.25 1,700.000 0.150 255.000 0.250 425.000
15 25+500 26+700 1200.00 4.25 5,100.000 0.150 765.000 0.200 1,020.000 0.2 1020.000
16 26+700 28+400 1700.00 4.25 7,225.000 0.150 1,083.750 0.250 1,806.250
17 28+400 29+000 600.00 4.25 2,550.000 0.150 382.500 0.200 510.000 0.2 510.000
18 29+000 29+400 400.00 6.00 2,400.000 0.150 360.000 0.200 480.000
19 29+400 29+675 275.00 4.25 1,168.750 0.150 175.313 0.200 233.750
20 29+675 29+725 50.00 4.25 212.500 0.150 31.875 0.100 21.250
21 29+725 29+800 75.00 4.25 318.750 0.150 47.813 0.200 63.750 0.2 63.750
22 29+800 30+200 400.00 4.25 1,700.000 0.150 255.000 0.250 425.000
23 30+200 30+800 600.00 4.25 2,550.000 0.150 382.500 0.200 510.000 0.2 510.000
24 30+800 30+925 125.00 4.25 531.250 0.150 79.688 0.200 106.250 0.2 106.250
25 30+925 31+700 775.00 4.25 3,293.750 0.150 494.063 0.175 576.406
26 31+700 32+450 750.00 4.25 3,187.500 0.150 478.125 0.250 796.875
27 32+450 32+600 150.00 4.25 637.500 0.150 95.625 0.200 127.500 0.2 127.500
28 32+600 33+000 400.00 4.25 1,700.000 0.150 255.000 0.175 297.500
29 33+000 33+950 950.00 4.25 4,037.500 0.150 605.625 0.250 1,009.375

Page 211 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
30 33+950 34+000 50.00 4.25 212.500 0.150 31.875 0.200 42.500 0.2 42.500
31 34+000 34+200 200.00 4.25 850.000 0.150 127.500 0.175 148.750
32 34+200 34+500 300.00 4.25 1,275.000 0.150 191.250 0.250 318.750
33 34+500 34+600 100.00 4.25 425.000 0.150 63.750 0.200 85.000 0.2 85.000
34 34+600 36+050 1450.00 4.25 6,162.500 0.150 924.375 0.250 1,540.625
35 36+050 36+150 100.00 4.25 425.000 0.150 63.750 0.200 85.000 0.2 85.000
36 36+150 37+575 1425.00 4.25 6,056.250 0.150 908.438 0.250 1,514.063
37 37+575 37+675 100.00 6.00 600.000 0.150 90.000 0.250 150.000
38 37+675 38+125 450.00 4.25 1,912.500 0.150 286.875 0.250 478.125
39 38+125 38+150 25.00 4.25 106.250 0.150 15.938 0.200 21.250 0.2 21.250
40 38+150 38+935 785.00 4.25 3,336.250 0.150 500.438 0.175 583.844
41 38+935 39+000 65.00 4.25 276.250 0.150 41.438 0.100 27.625
42 39+000 39+400 400.00 4.25 1,700.000 0.150 255.000 0.175 297.500
43 39+400 39+900 500.00 4.25 2,125.000 0.150 318.750 0.250 531.250
44 39+900 40+200 300.00 4.25 1,275.000 0.150 191.250 0.175 223.125
45 40+200 40+400 200.00 4.25 850.000 0.150 127.500 0.250 212.500
46 40+400 41+000 600.00 4.25 2,550.000 0.150 382.500 0.175 446.250
47 41+000 41+025 25.00 4.25 106.250 0.150 15.938 0.200 21.250 0.2 21.250
48 41+025 41+500 475.00 4.25 2,018.750 0.150 302.813 0.175 353.281
49 41+500 41+700 200.00 7.00 1,400.000 0.150 210.000 0.175 245.000
50 41+700 42+550 850.00 4.25 3,612.500 0.150 541.875 0.175 632.188
51 42+550 42+650 100.00 4.25 425.000 0.150 63.750 0.250 106.250
52 42+650 44+700 2050.00 4.25 8,712.500 0.150 1,306.875 0.175 1,524.688
53 44+700 46+450 1750.00 4.25 7,437.500 0.150 1,115.625 0.250 1,859.375
54 46+450 46+550 100.00 4.25 425.000 0.150 63.750 0.200 85.000 0.2 85.000
55 46+550 46+800 250.00 4.25 1,062.500 0.150 159.375 0.250 265.625 0.1 106.250
56 46+800 46+900 100.00 4.25 425.000 0.150 63.750 0.200 85.000 0.2 85.000
57 46+900 48+000 1100.00 4.25 4,675.000 0.150 701.250 0.175 818.125
58 48+000 48+600 600.00 4.25 2,550.000 0.150 382.500 0.250 637.500
59 48+600 48+700 100.00 4.25 425.000 0.150 63.750 0.200 85.000 0.2 85.000
60 48+700 48+900 200.00 4.25 850.000 0.150 127.500 0.250 212.500
61 48+900 49+000 100.00 4.25 425.000 0.150 63.750 0.200 85.000 0.2 85.000
62 49+000 50+400 1400.00 4.25 5,950.000 0.150 892.500 0.250 1,487.500
63 50+400 50+600 200.00 4.25 850.000 0.150 127.500 0.200 170.000 0.2 170.000
64 50+600 51+200 600.00 4.25 2,550.000 0.150 382.500 0.250 637.500

Page 212 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
65 51+200 51+450 250.00 4.25 1,062.500 0.150 159.375 0.200 212.500 0.2 212.500
66 51+450 52+200 750.00 4.25 3,187.500 0.150 478.125 0.250 796.875
67 52+200 52+350 150.00 4.25 637.500 0.150 95.625 0.175 111.563
68 52+350 52+629 279.00 4.25 1,185.750 0.150 177.863 0.250 296.438
69 52+629 53+050 421.00 4.25 1,789.250 0.150 268.388 0.250 447.313
70 53+050 53+175 125.00 4.25 531.250 0.150 79.688 0.200 106.250 0.2 106.250
71 53+175 53+350 175.00 4.25 743.750 0.150 111.563 0.250 185.938
72 53+350 53+400 50.00 4.25 212.500 0.150 31.875 0.200 42.500 0.2 42.500
73 53+400 54+100 700.00 4.25 2,975.000 0.150 446.250 0.250 743.750
74 54+100 54+200 100.00 4.25 425.000 0.150 63.750 0.200 85.000 0.2 85.000
75 54+200 54+350 150.00 4.25 637.500 0.150 95.625 0.250 159.375
76 54+350 54+400 50.00 4.25 212.500 0.150 31.875 0.200 42.500 0.2 42.500
77 54+400 55+350 950.00 4.25 4,037.500 0.150 605.625 0.250 1,009.375
78 55+350 55+400 50.00 4.25 212.500 0.150 31.875 0.200 42.500 0.2 42.500
79 55+400 56+250 850.00 4.25 3,612.500 0.150 541.875 0.250 903.125
80 56+250 56+300 50.00 4.25 212.500 0.150 31.875 0.200 42.500 0.2 42.500
81 56+300 56+550 250.00 4.25 1,062.500 0.150 159.375 0.200 212.500 0.2 212.500
82 56+550 56+900 350.00 4.25 1,487.500 0.150 223.125 0.250 371.875
83 56+900 57+000 100.00 4.25 425.000 0.150 63.750 0.200 85.000 0.2 85.000
84 57+000 57+550 550.00 4.25 2,337.500 0.150 350.625 0.250 584.375
85 57+550 57+600 50.00 4.25 212.500 0.150 31.875 0.200 42.500 0.2 42.500
86 57+600 57+850 250.00 4.25 1,062.500 0.150 159.375 0.250 265.625
87 57+850 58+000 150.00 4.25 637.500 0.150 95.625 0.200 127.500 0.2 127.500
88 58+000 58+250 250.00 4.25 1,062.500 0.150 159.375 0.250 265.625
89 58+250 58+300 50.00 4.25 212.500 0.150 31.875 0.200 42.500 0.2 42.500
90 58+300 59+240 940.00 4.25 3,995.000 0.150 599.250 0.250 998.750
91 59+240 59+260 20.00 4.25 85.000 0.150 12.750 0.200 17.000 0.2 17.000
92 59+260 59+425 165.00 4.25 701.250 0.150 105.188 0.250 175.313
93 59+425 59+475 50.00 4.25 212.500 0.150 31.875 0.200 42.500 0.2 42.500
94 59+475 59+625 150.00 4.25 637.500 0.150 95.625 0.250 159.375
95 59+625 59+650 25.00 4.25 106.250 0.150 15.938 0.200 21.250 0.2 21.250
96 59+650 59+825 175.00 4.25 743.750 0.150 111.563 0.250 185.938
97 59+825 59+900 75.00 4.25 318.750 0.150 47.813 0.200 63.750 0.2 63.750
98 59+900 60+425 525.00 4.25 2,231.250 0.150 334.688 0.250 557.813
99 60+425 60+475 50.00 4.25 212.500 0.150 31.875 0.200 42.500 0.2 42.500

Page 213 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
100 60+475 61+000 525.00 4.25 2,231.250 0.150 334.688 0.250 557.813
101 61+000 61+050 50.00 4.25 212.500 0.150 31.875 0.200 42.500 0.2 42.500
102 61+050 61+400 350.00 4.25 1,487.500 0.150 223.125 0.250 371.875
103 61+400 61+450 50.00 6.00 300.000 0.150 45.000 0.250 75.000
104 61+450 61+480 30.00 6.00 180.000 0.150 27.000 0.200 36.000 0.2 36.000
105 61+480 61+900 420.00 6.00 2,520.000 0.150 378.000 0.250 630.000
106 61+900 62+125 225.00 4.25 956.250 0.150 143.438 0.250 239.063
107 62+125 62+150 25.00 4.25 106.250 0.150 15.938 0.200 21.250 0.2 21.250
108 62+150 62+900 750.00 4.25 3,187.500 0.100 318.750 0.150 478.125
109 62+900 63+600 700.00 6.00 4,200.000 0.100 420.000 0.150 630.000
110 63+600 64+000 400.00 4.25 1,700.000 0.100 170.000 0.150 255.000
111 64+000 64+300 300.00 6.00 1,800.000 0.100 180.000 0.150 270.000
112 64+300 65+000 700.00 4.25 2,975.000 0.100 297.500 0.150 446.250
113 65+000 65+100 100.00 5.50 550.000 0.150 82.500 0.200 110.000
Buspark
1 65+000 65+075 75.00 20.00 1,500.000 0.150 225.000 0.250 375.000
Valley Side Shoulders
1 0+000 65+100 65100.00 0.75 0.200 9,765.000

Passing Zones
1 0+200 36.00 2.00 72.000 0.150 10.800 0.175 12.600
2 0+875 36.00 2.00 72.000 0.150 10.800 0.175 12.600
3 1+000 36.00 2.00 72.000 0.150 10.800 0.175 12.600
4 1+375 36.00 2.00 72.000 0.150 10.800 0.175 12.600
5 1+750 36.00 2.00 72.000 0.150 10.800 0.175 12.600
6 1+950 36.00 2.00 72.000 0.150 10.800 0.175 12.600
7 2+100 36.00 2.00 72.000 0.150 10.800 0.175 12.600
8 2+473 36.00 2.00 72.000 0.150 10.800 0.175 12.600
9 2+860 36.00 2.00 72.000 0.150 10.800 0.175 12.600
10 3+410 36.00 2.00 72.000 0.150 10.800 0.175 12.600
11 3+746 36.00 2.00 72.000 0.150 10.800 0.175 12.600
12 4+000 36.00 2.00 72.000 0.150 10.800 0.175 12.600
13 4+375 36.00 2.00 72.000 0.150 10.800 0.175 12.600
14 4+618 36.00 2.00 72.000 0.150 10.800 0.175 12.600
15 4+800 36.00 2.00 72.000 0.150 10.800 0.175 12.600

Page 214 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
16 5+220 36.00 2.00 72.000 0.150 10.800 0.175 12.600
17 5+410 36.00 2.00 72.000 0.150 10.800 0.175 12.600
18 5+780 36.00 2.00 72.000 0.150 10.800 0.175 12.600
19 6+003 36.00 2.00 72.000 0.150 10.800 0.175 12.600
20 6+250 36.00 2.00 72.000 0.150 10.800 0.175 12.600
21 6+578 36.00 2.00 72.000 0.150 10.800 0.175 12.600
22 6+750 36.00 2.00 72.000 0.150 10.800 0.175 12.600
23 7+050 36.00 2.00 72.000 0.150 10.800 0.175 12.600
24 7+545 36.00 2.00 72.000 0.150 10.800 0.175 12.600
25 7+705 36.00 2.00 72.000 0.150 10.800 0.175 12.600
26 8+068 36.00 2.00 72.000 0.150 10.800 0.175 12.600
27 8+470 36.00 2.00 72.000 0.150 10.800 0.175 12.600
28 8+768 36.00 2.00 72.000 0.150 10.800 0.175 12.600
29 9+325 36.00 2.00 72.000 0.150 10.800 0.175 12.600
30 9+653 36.00 2.00 72.000 0.150 10.800 0.175 12.600
31 9+880 36.00 2.00 72.000 0.150 10.800 0.175 12.600
32 10+075 36.00 2.00 72.000 0.150 10.800 0.175 12.600
33 10+320 36.00 2.00 72.000 0.150 10.800 0.175 12.600
34 10+993 36.00 2.00 72.000 0.150 10.800 0.175 12.600
35 11+180 36.00 2.00 72.000 0.150 10.800 0.175 12.600
36 11+450 36.00 2.00 72.000 0.150 10.800 0.175 12.600
37 11+900 36.00 2.00 72.000 0.150 10.800 0.175 12.600
38 12+325 36.00 2.00 72.000 0.150 10.800 0.175 12.600
39 12+643 36.00 2.00 72.000 0.150 10.800 0.175 12.600
40 12+925 36.00 2.00 72.000 0.150 10.800 0.175 12.600
41 13+190 36.00 2.00 72.000 0.150 10.800 0.175 12.600
42 13+425 36.00 2.00 72.000 0.150 10.800 0.175 12.600
43 13+810 36.00 2.00 72.000 0.150 10.800 0.175 12.600
44 14+220 36.00 2.00 72.000 0.150 10.800 0.175 12.600
45 14+400 36.00 2.00 72.000 0.150 10.800 0.175 12.600
46 14+868 36.00 2.00 72.000 0.150 10.800 0.175 12.600
47 15+265 36.00 2.00 72.000 0.150 10.800 0.175 12.600
48 15+500 36.00 2.00 72.000 0.150 10.800 0.175 12.600
49 15+738 36.00 2.00 72.000 0.150 10.800 0.175 12.600
50 16+118 36.00 2.00 72.000 0.150 10.800 0.175 12.600

Page 215 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
51 16+525 36.00 2.00 72.000 0.150 10.800 0.175 12.600
52 16+950 36.00 2.00 72.000 0.150 10.800 0.175 12.600
53 17+333 36.00 2.00 72.000 0.150 10.800 0.250 18.000
54 17+650 36.00 2.00 72.000 0.150 10.800 0.175 12.600
55 18+493 36.00 2.00 72.000 0.150 10.800 0.175 12.600
56 18+831 36.00 2.00 72.000 0.150 10.800 0.175 12.600
57 18+925 36.00 2.00 72.000 0.150 10.800 0.175 12.600
58 20+058 36.00 2.00 72.000 0.150 10.800 0.175 12.600
59 20+601 36.00 2.00 72.000 0.150 10.800 0.175 12.600
60 20+870 36.00 2.00 72.000 0.150 10.800 0.175 12.600
61 21+050 36.00 2.00 72.000 0.150 10.800 0.175 12.600
62 21+350 36.00 2.00 72.000 0.150 10.800 0.175 12.600
63 21+618 36.00 2.00 72.000 0.150 10.800 0.175 12.600
64 22+075 36.00 2.00 72.000 0.150 10.800 0.175 12.600
65 22+420 36.00 2.00 72.000 0.150 10.800 0.175 12.600
66 23+425 36.00 2.00 72.000 0.150 10.800 0.175 12.600
67 23+800 36.00 2.00 72.000 0.150 10.800 0.175 12.600
68 24+100 36.00 2.00 72.000 0.150 10.800 0.175 12.600
69 24+643 36.00 2.00 72.000 0.150 10.800 0.250 18.000
70 24+875 36.00 2.00 72.000 0.150 10.800 0.200 14.400
71 25+298 36.00 2.00 72.000 0.150 10.800 0.250 18.000
72 25+475 36.00 2.00 72.000 0.150 10.800 0.250 18.000
73 25+798 36.00 2.00 72.000 0.150 10.800 0.200 14.400
74 26+020 36.00 2.00 72.000 0.150 10.800 0.200 14.400
75 26+275 36.00 2.00 72.000 0.150 10.800 0.200 14.400
76 26+525 36.00 2.00 72.000 0.150 10.800 0.200 14.400
77 26+875 36.00 2.00 72.000 0.150 10.800 0.250 18.000
78 27+080 36.00 2.00 72.000 0.150 10.800 0.250 18.000
79 27+475 36.00 2.00 72.000 0.150 10.800 0.250 18.000
80 27+708 36.00 2.00 72.000 0.150 10.800 0.250 18.000
81 27+890 36.00 2.00 72.000 0.150 10.800 0.250 18.000
82 28+025 36.00 2.00 72.000 0.150 10.800 0.250 18.000
83 28+360 36.00 2.00 72.000 0.150 10.800 0.250 18.000
84 28+708 36.00 2.00 72.000 0.150 10.800 0.200 14.400
85 29+020 36.00 2.00 72.000 0.150 10.800 0.200 14.400

Page 216 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
86 29+325 36.00 2.00 72.000 0.150 10.800 0.200 14.400
87 29+600 36.00 2.00 72.000 0.150 10.800 0.200 14.400
88 29+870 36.00 2.00 72.000 0.150 10.800 0.250 18.000
89 30+025 36.00 2.00 72.000 0.150 10.800 0.250 18.000
90 30+325 36.00 2.00 72.000 0.150 10.800 0.200 14.400
91 30+760 36.00 2.00 72.000 0.150 10.800 0.200 14.400
92 31+000 36.00 2.00 72.000 0.150 10.800 0.175 12.600
93 31+455 36.00 2.00 72.000 0.150 10.800 0.175 12.600
94 31+850 36.00 2.00 72.000 0.150 10.800 0.250 18.000
95 32+075 36.00 2.00 72.000 0.150 10.800 0.250 18.000
96 32+450 36.00 2.00 72.000 0.150 10.800 0.250 18.000
97 32+730 36.00 2.00 72.000 0.150 10.800 0.175 12.600
98 33+050 36.00 2.00 72.000 0.150 10.800 0.250 18.000
99 33+275 36.00 2.00 72.000 0.150 10.800 0.250 18.000
100 33+625 36.00 2.00 72.000 0.150 10.800 0.250 18.000
101 34+075 36.00 2.00 72.000 0.150 10.800 0.175 12.600
102 34+320 36.00 2.00 72.000 0.150 10.800 0.250 18.000
103 34+800 36.00 2.00 72.000 0.150 10.800 0.250 18.000
104 35+218 36.00 2.00 72.000 0.150 10.800 0.250 18.000
105 35+400 36.00 2.00 72.000 0.150 10.800 0.250 18.000
106 35+720 36.00 2.00 72.000 0.150 10.800 0.250 18.000
107 36+100 36.00 2.00 72.000 0.150 10.800 0.200 14.400
108 36+440 36.00 2.00 72.000 0.150 10.800 0.250 18.000
109 36+850 36.00 2.00 72.000 0.150 10.800 0.250 18.000
110 37+367 36.00 2.00 72.000 0.150 10.800 0.250 18.000
111 37+600 36.00 2.00 72.000 0.150 10.800 0.250 18.000
112 38+050 36.00 2.00 72.000 0.150 10.800 0.250 18.000
113 38+400 36.00 2.00 72.000 0.150 10.800 0.175 12.600
114 38+625 36.00 2.00 72.000 0.150 10.800 0.175 12.600
115 39+250 36.00 2.00 72.000 0.150 10.800 0.175 12.600
116 39+475 36.00 2.00 72.000 0.150 10.800 0.250 18.000
117 39+750 36.00 2.00 72.000 0.150 10.800 0.250 18.000
118 40+000 36.00 2.00 72.000 0.150 10.800 0.175 12.600
119 40+175 36.00 2.00 72.000 0.150 10.800 0.175 12.600
120 40+630 36.00 2.00 72.000 0.150 10.800 0.175 12.600

Page 217 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
121 41+000 36.00 2.00 72.000 0.150 10.800 0.175 12.600
122 41+170 36.00 2.00 72.000 0.150 10.800 0.175 12.600
123 41+400 36.00 2.00 72.000 0.150 10.800 0.175 12.600
124 41+703 36.00 2.00 72.000 0.150 10.800 0.175 12.600
125 42+150 36.00 2.00 72.000 0.150 10.800 0.175 12.600
126 42+538 36.00 2.00 72.000 0.150 10.800 0.175 12.600
127 42+875 36.00 2.00 72.000 0.150 10.800 0.175 12.600
128 43+075 36.00 2.00 72.000 0.150 10.800 0.175 12.600
129 43+350 36.00 2.00 72.000 0.150 10.800 0.175 12.600
130 43+663 36.00 2.00 72.000 0.150 10.800 0.175 12.600
131 44+050 36.00 2.00 72.000 0.150 10.800 0.175 12.600
132 44+435 36.00 2.00 72.000 0.150 10.800 0.175 12.600
133 44+700 36.00 2.00 72.000 0.150 10.800 0.250 18.000
134 45+125 36.00 2.00 72.000 0.150 10.800 0.250 18.000
135 45+425 36.00 2.00 72.000 0.150 10.800 0.250 18.000
136 45+468 36.00 2.00 72.000 0.150 10.800 0.250 18.000
137 45+775 36.00 2.00 72.000 0.150 10.800 0.250 18.000
138 46+018 36.00 2.00 72.000 0.150 10.800 0.250 18.000
139 46+520 36.00 2.00 72.000 0.150 10.800 0.200 14.400
140 46+800 36.00 2.00 72.000 0.150 10.800 0.250 18.000
141 47+010 36.00 2.00 72.000 0.150 10.800 0.175 12.600
142 47+370 36.00 2.00 72.000 0.150 10.800 0.175 12.600
143 47+675 36.00 2.00 72.000 0.150 10.800 0.175 12.600
144 48+065 36.00 2.00 72.000 0.150 10.800 0.250 18.000
145 48+365 36.00 2.00 72.000 0.150 10.800 0.250 18.000
146 48+625 36.00 2.00 72.000 0.150 10.800 0.200 14.400
147 48+950 36.00 2.00 72.000 0.150 10.800 0.200 14.400
148 49+350 36.00 2.00 72.000 0.150 10.800 0.250 18.000
149 49+550 36.00 2.00 72.000 0.150 10.800 0.250 18.000
150 49+730 36.00 2.00 72.000 0.150 10.800 0.250 18.000
151 50+153 36.00 2.00 72.000 0.150 10.800 0.250 18.000
152 50+245 36.00 2.00 72.000 0.150 10.800 0.250 18.000
153 52+948 36.00 2.00 72.000 0.150 10.800 0.250 18.000
154 53+205 36.00 2.00 72.000 0.150 10.800 0.250 18.000
155 53+498 36.00 2.00 72.000 0.150 10.800 0.250 18.000

Page 218 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
156 53+825 36.00 2.00 72.000 0.150 10.800 0.250 18.000
157 55+513 36.00 2.00 72.000 0.150 10.800 0.250 18.000
158 55+738 36.00 2.00 72.000 0.150 10.800 0.250 18.000
159 56+463 36.00 2.00 72.000 0.150 10.800 0.200 14.400
160 57+090 36.00 2.00 72.000 0.150 10.800 0.250 18.000
161 57+230 36.00 2.00 72.000 0.150 10.800 0.250 18.000
162 57+533 36.00 2.00 72.000 0.150 10.800 0.250 18.000
163 57+910 36.00 2.00 72.000 0.150 10.800 0.200 14.400
164 58+370 36.00 2.00 72.000 0.150 10.800 0.250 18.000
165 58+730 36.00 2.00 72.000 0.150 10.800 0.250 18.000
166 59+140 36.00 2.00 72.000 0.150 10.800 0.250 18.000
167 59+400 36.00 2.00 72.000 0.150 10.800 0.250 18.000
168 59+628 36.00 2.00 72.000 0.150 10.800 0.200 14.400
169 60+210 36.00 2.00 72.000 0.150 10.800 0.250 18.000
170 60+612 36.00 2.00 72.000 0.150 10.800 0.250 18.000
171 60+928 36.00 2.00 72.000 0.150 10.800 0.250 18.000
172 61+225 36.00 2.00 72.000 0.150 10.800 0.250 18.000
173 61+608 36.00 2.00 72.000 0.150 10.800 0.250 18.000
174 62+080 36.00 2.00 72.000 0.150 10.800 0.250 18.000
175 62+400 36.00 2.00 72.000 0.100 7.200 0.150 10.800
176 62+930 36.00 2.00 72.000 0.100 7.200 0.150 10.800
177 63+250 36.00 2.00 72.000 0.100 7.200 0.150 10.800
178 63+740 36.00 2.00 72.000 0.100 7.200 0.150 10.800
179 64+230 36.00 2.00 72.000 0.100 7.200 0.150 10.800
180 64+700 36.00 2.00 72.000 0.100 7.200 0.150 10.800

Link Roads
1 4+820 15.00 5.75 86.250 0.150 12.938 0.175 15.094
2 7+975 15.00 5.50 82.500 0.150 12.375 0.175 14.438
3 11+910 15.00 5.50 82.500 0.150 12.375 0.175 14.438
4 14+270 15.00 5.50 82.500 0.150 12.375 0.175 14.438
5 14+807 15.00 5.50 82.500 0.150 12.375 0.175 14.438
6 14+950 15.00 5.50 82.500 0.150 12.375 0.175 14.438
7 17+250 15.00 5.25 78.750 0.150 11.813 0.250 19.688
8 24+325 15.00 9.00 135.000 0.150 20.250 0.175 23.625

Page 219 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
9 28+860 15.00 6.50 97.500 0.150 14.625 0.200 19.500
10 29+190 15.00 6.25 93.750 0.150 14.063 0.200 18.750
11 29+285 15.00 6.50 97.500 0.150 14.625 0.200 19.500
12 29+407 15.00 6.00 90.000 0.150 13.500 0.200 18.000
13 31+250 15.00 6.75 101.250 0.150 15.188 0.175 17.719
14 35+125 15.00 5.25 78.750 0.150 11.813 0.250 19.688
15 37+152 15.00 4.70 70.500 0.150 10.575 0.250 17.625
16 38+425 15.00 5.15 77.250 0.150 11.588 0.175 13.519
17 47+149 15.00 6.00 90.000 0.150 13.500 0.175 15.750
18 50+225 15.00 5.00 75.000 0.150 11.250 0.250 18.750
19 50+980 15.00 4.50 67.500 0.150 10.125 0.250 16.875
20 57+125 15.00 5.60 84.000 0.150 12.600 0.250 21.000
21 58+415 15.00 6.00 90.000 0.150 13.500 0.250 22.500
22 63+925 15.00 6.75 101.250 0.100 10.125 0.150 15.188
23 64+065 15.00 7.50 112.500 0.100 11.250 0.150 16.875
24 64+365 15.00 9.50 142.500 0.100 14.250 0.150 21.375
Sub-total 297,941.750 Sqm 43,958.725 Cum 70,292.531 Cum 4,898.000 Cum
Deductions
Deductions for Cross drainage Structures
1 0+002 0+014 12.00 4.25 51.000 0.150 7.650 0.175 8.925
2 0+137 0+149 12.00 4.25 51.000 0.150 7.650 0.175 8.925
3 0+350 0+362 12.00 4.25 51.000 0.150 7.650 0.175 8.925
4 0+980 0+995 12.00 4.25 51.000 0.150 7.650 0.175 8.925
5 1+107 9.00 4.25 38.250 0.150 5.738 0.175 6.694
6 1+235 1+231 6.00 4.25 25.500 0.150 3.825 0.175 4.463
7 1+362 1+374 12.00 4.25 51.000 0.150 7.650 0.175 8.925
8 1+654 1+666 12.00 4.25 51.000 0.150 7.650 0.175 8.925
9 2+044 2+056 12.00 4.25 51.000 0.150 7.650 0.175 8.925
10 2+151 9.00 4.25 38.250 0.150 5.738 0.175 6.694
11 2+363 2+375 12.00 4.25 51.000 0.150 7.650 0.175 8.925
12 2+440 2+452 12.00 4.25 51.000 0.150 7.650 0.175 8.925
13 2+502 2+514 12.00 4.25 51.000 0.150 7.650 0.175 8.925
14 2+606 12.00 4.25 51.000 0.150 7.650 0.175 8.925
15 3+116 3+128 12.00 4.25 51.000 0.150 7.650 0.175 8.925
16 3+138 3+150 12.00 4.25 51.000 0.150 7.650 0.175 8.925

Page 220 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
17 3+346 3+358 12.00 4.25 51.000 0.150 7.650 0.175 8.925
18 3+398 3+410 12.00 4.25 51.000 0.150 7.650 0.175 8.925
19 3+497 3+509 12.00 4.25 51.000 0.150 7.650 0.175 8.925
20 3+637 3+647 9.00 4.25 38.250 0.150 5.738 0.175 6.694
21 3+799 3+805 6.00 4.25 25.500 0.150 3.825 0.175 4.463
22 3+944 3+956 12.00 4.25 51.000 0.150 7.650 0.175 8.925
23 4+088 4+100 12.00 4.25 51.000 0.150 7.650 0.175 8.925
24 4+847 4+859 12.00 4.25 51.000 0.150 7.650 0.175 8.925
25 4+910 4+922 12.00 4.25 51.000 0.150 7.650 0.175 8.925
26 5+375 5+384 8.50 4.25 36.125 0.150 5.419 0.175 6.322
27 5+765 5+767 12.00 4.25 51.000 0.150 7.650 0.175 8.925
28 6+134 6+146 12.00 4.25 51.000 0.150 7.650 0.175 8.925
29 6+260 6+272 12.00 4.25 51.000 0.150 7.650 0.175 8.925
30 7+655 7+673 8.00 4.25 34.000 0.150 5.100 0.175 5.950
31 8+161 8+173 12.00 4.25 51.000 0.150 7.650 0.175 8.925
32 8+243 8+253 10.00 4.25 42.500 0.150 6.375 0.175 7.438
33 8+494 8+506 12.00 4.25 51.000 0.150 7.650 0.175 8.925
34 8+886 8+898 12.00 4.25 51.000 0.150 7.650 0.175 8.925
35 9+056 9+068 12.00 4.25 51.000 0.150 7.650 0.175 8.925
36 9+370 9+382 12.00 4.25 51.000 0.150 7.650 0.175 8.925
37 9+760 9+763 2.00 4.25 8.500 0.150 1.275 0.175 1.488
38 10+604 10+614 8.00 4.25 34.000 0.150 5.100 0.175 5.950
39 10+704 10+716 12.00 4.25 51.000 0.150 7.650 0.175 8.925
40 10+819 10+831 12.00 4.25 51.000 0.150 7.650 0.175 8.925
41 11+020 11+032 12.00 4.25 51.000 0.150 7.650 0.175 8.925
42 11+242 11+254 12.00 4.25 51.000 0.150 7.650 0.175 8.925
43 11+333 11+348 15.00 4.25 63.750 0.150 9.563 0.175 11.156
44 11+400 11+412 12.00 4.25 51.000 0.150 7.650 0.175 8.925
45 11+504 11+516 12.00 4.25 51.000 0.150 7.650 0.175 8.925
46 11+692 11+704 12.00 4.25 51.000 0.150 7.650 0.175 8.925
47 11+739 11+751 12.00 4.25 51.000 0.150 7.650 0.175 8.925
48 11+844 11+856 12.00 4.25 51.000 0.150 7.650 0.175 8.925
49 12+047 12+059 12.00 4.25 51.000 0.150 7.650 0.175 8.925
50 12+163 12+178 15.00 4.25 63.750 0.150 9.563 0.175 11.156
51 12+216 12+234 18.00 4.25 76.500 0.150 11.475 0.175 13.388

Page 221 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
52 12+269 12+281 12.00 4.25 51.000 0.150 7.650 0.175 8.925
53 12+344 12+356 12.00 4.25 51.000 0.150 7.650 0.175 8.925
54 12+481 12+493 12.00 4.25 51.000 0.150 7.650 0.175 8.925
55 12+542 12+554 12.00 4.25 51.000 0.150 7.650 0.175 8.925
56 12+743 12+755 12.00 4.25 51.000 0.150 7.650 0.175 8.925
57 13+036 13+048 12.00 4.25 51.000 0.150 7.650 0.175 8.925
58 13+500 13+731 10.00 4.25 42.500 0.150 6.375 0.175 7.438
59 13+716 13+731 15.00 4.25 63.750 0.150 9.563 0.175 11.156
60 14+024 14+036 12.00 4.25 51.000 0.150 7.650 0.175 8.925
61 14+225 14+234 3.00 4.25 12.750 0.150 1.913 0.175 2.231
62 15+120 15+132 12.00 4.25 51.000 0.150 7.650 0.175 8.925
63 15+630 15+642 12.00 4.25 51.000 0.150 7.650 0.175 8.925
64 15+794 15+806 12.00 4.25 51.000 0.150 7.650 0.175 8.925
65 15+833 15+845 12.00 4.25 51.000 0.150 7.650 0.175 8.925
66 15+944 15+956 12.00 4.25 51.000 0.150 7.650 0.175 8.925
67 16+023 16+035 12.00 4.25 51.000 0.150 7.650 0.175 8.925
68 16+090 16+112 15.00 4.25 63.750 0.150 9.563 0.175 11.156
69 16+271 16+286 15.00 4.25 63.750 0.150 9.563 0.175 11.156
70 16+414 16+426 12.00 4.25 51.000 0.150 7.650 0.175 8.925
71 16+982 16+994 12.00 4.25 51.000 0.150 7.650 0.175 8.925
72 17+942 17+954 12.00 4.25 51.000 0.150 7.650 0.175 8.925
73 18+316 18+328 12.00 4.25 51.000 0.150 7.650 0.175 8.925
74 18+620 18+632 12.00 4.25 51.000 0.150 7.650 0.175 8.925
75 18+800 18+812 12.00 4.25 51.000 0.150 7.650 0.175 8.925
76 18+844 18+856 12.00 4.25 51.000 0.150 7.650 0.175 8.925
77 18+975 18+987 12.00 4.25 51.000 0.150 7.650 0.175 8.925
78 19+219 19+231 12.00 4.25 51.000 0.150 7.650 0.175 8.925
79 19+420 19+432 12.00 4.25 51.000 0.150 7.650 0.175 8.925
80 19+692 19+704 12.00 4.25 51.000 0.150 7.650 0.175 8.925
81 19+495 19+510 10.00 4.25 42.500 0.150 6.375 0.175 7.438
82 19+722 19+734 12.00 4.25 51.000 0.150 7.650 0.175 8.925
83 20+010 20+025 15.00 4.25 63.750 0.150 9.563 0.175 11.156
84 20+432 20+444 12.00 4.25 51.000 0.150 7.650 0.175 8.925
85 20+546 20+558 12.00 4.25 51.000 0.150 7.650 0.175 8.925
86 20+765 20+777 12.00 4.25 51.000 0.150 7.650 0.175 8.925

Page 222 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
87 21+120 21+135 15.00 4.25 63.750 0.150 9.563 0.175 11.156
88 21+183 21+195 12.00 4.25 51.000 0.150 7.650 0.175 8.925
89 21+524 21+539 15.00 4.25 63.750 0.150 9.563 0.175 11.156
90 21+562 21+577 15.00 4.25 63.750 0.150 9.563 0.175 11.156
91 21+669 21+681 12.00 4.25 51.000 0.150 7.650 0.175 8.925
92 21+817 21+829 12.00 4.25 51.000 0.150 7.650 0.175 8.925
93 22+008 22+020 12.00 4.25 51.000 0.150 7.650 0.175 8.925
94 22+235 22+247 12.00 4.25 51.000 0.150 7.650 0.175 8.925
95 22+444 22+456 12.00 4.25 51.000 0.150 7.650 0.175 8.925
96 22+572 22+584 12.00 4.25 51.000 0.150 7.650 0.175 8.925
97 22+644 22+656 12.00 4.25 51.000 0.150 7.650 0.175 8.925
98 22+723 22+735 12.00 4.25 51.000 0.150 7.650 0.175 8.925
99 22+835 22+847 12.00 4.25 51.000 0.150 7.650 0.175 8.925
100 22+938 22+950 12.00 4.25 51.000 0.150 7.650 0.175 8.925
101 23+067 23+079 12.00 4.25 51.000 0.150 7.650 0.175 8.925
102 23+230 23+242 12.00 4.25 51.000 0.150 7.650 0.175 8.925
103 23+319 23+331 12.00 4.25 51.000 0.150 7.650 0.175 8.925
104 23+490 23+502 12.00 4.25 51.000 0.150 7.650 0.175 8.925
105 23+563 23+575 12.00 4.25 51.000 0.150 7.650 0.175 8.925
106 23+694 23+706 12.00 4.25 51.000 0.150 7.650 0.175 8.925
107 24+100 24+112 12.00 4.25 51.000 0.150 7.650 0.175 8.925
108 24+217 24+229 12.00 4.25 51.000 0.150 7.650 0.175 8.925
109 24+519 24+531 12.00 4.25 51.000 0.150 7.650 0.100 5.100
110 24+800 24+812 12.00 4.25 51.000 0.150 7.650 0.250 12.750
111 24+838 24+853 15.00 4.25 63.750 0.150 9.563 0.200 12.750
112 25+260 25+272 12.00 4.25 51.000 0.150 7.650 0.250 12.750
113 25+340 25+352 12.00 4.25 51.000 0.150 7.650 0.250 12.750
114 25+494 25+506 12.00 4.25 51.000 0.150 7.650 0.250 12.750
115 25+763 25+775 12.00 4.25 51.000 0.150 7.650 0.250 12.750
116 26+330 26+342 12.00 4.25 51.000 0.150 7.650 0.250 12.750
117 26+475 26+490 15.00 4.25 63.750 0.150 9.563 0.250 15.938
118 26+700 26+712 12.00 4.25 51.000 0.150 7.650 0.250 12.750
119 27+175 27+187 12.00 4.25 51.000 0.150 7.650 0.250 12.750
120 27+250 27+262 12.00 4.25 51.000 0.150 7.650 0.250 12.750
121 27+417 27+429 12.00 4.25 51.000 0.150 7.650 0.250 12.750

Page 223 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
122 27+555 27+567 12.00 4.25 51.000 0.150 7.650 0.250 12.750
123 27+619 27+631 12.00 4.25 51.000 0.150 7.650 0.250 12.750
124 28+111 28+123 12.00 4.25 51.000 0.150 7.650 0.250 12.750
125 28+380 28+392 12.00 4.25 51.000 0.150 7.650 0.250 12.750
126 28+647 28+659 12.00 4.25 51.000 0.150 7.650 0.200 10.200
127 29+670 29+682 12.00 4.25 51.000 0.150 7.650 0.200 10.200
128 30+376 30+388 12.00 4.25 51.000 0.150 7.650 0.200 10.200
129 30+419 30+431 12.00 4.25 51.000 0.150 7.650 0.200 10.200
130 31+301 31+313 12.00 4.25 51.000 0.150 7.650 0.175 8.925
131 31+700 31+712 12.00 4.25 51.000 0.150 7.650 0.250 12.750
132 31+945 3+957 12.00 4.25 51.000 0.150 7.650 0.250 12.750
133 32+582 32+594 12.00 4.25 51.000 0.150 7.650 0.200 10.200
134 32+655 32+667 12.00 4.25 51.000 0.150 7.650 0.175 8.925
135 33+016 33+028 12.00 4.25 51.000 0.150 7.650 0.250 12.750
136 33+130 33+142 12.00 4.25 51.000 0.150 7.650 0.250 12.750
137 33+397 33+409 12.00 4.25 51.000 0.150 7.650 0.250 12.750
138 33+556 33+568 12.00 4.25 51.000 0.150 7.650 0.250 12.750
139 33+825 33+837 12.00 4.25 51.000 0.150 7.650 0.250 12.750
140 34+125 34+143 18.00 4.25 76.500 0.150 11.475 0.175 13.388
141 34+216 34+228 12.00 4.25 51.000 0.150 7.650 0.250 12.750
142 34+350 34+377 27.00 4.25 114.750 0.150 17.213 0.250 28.688
143 34+877 34+889 12.00 4.25 51.000 0.150 7.650 0.250 12.750
144 35+530 35+542 12.00 4.25 51.000 0.150 7.650 0.250 12.750
145 35+634 35+646 12.00 4.25 51.000 0.150 7.650 0.250 12.750
146 35+888 35+900 12.00 4.25 51.000 0.150 7.650 0.250 12.750
147 36+269 36+281 12.00 4.25 51.000 0.150 7.650 0.250 12.750
148 36+485 36+497 12.00 4.25 51.000 0.150 7.650 0.250 12.750
149 36+988 37+000 12.00 4.25 51.000 0.150 7.650 0.250 12.750
150 37+096 37+108 12.00 4.25 51.000 0.150 7.650 0.250 12.750
151 37+314 37+326 12.00 4.25 51.000 0.150 7.650 0.250 12.750
152 37+455 37+467 12.00 4.25 51.000 0.150 7.650 0.250 12.750
153 37+634 37+646 12.00 4.25 51.000 0.150 7.650 0.250 12.750
154 37+700 37+712 12.00 4.25 51.000 0.150 7.650 0.250 12.750
155 37+920 37+932 12.00 4.25 51.000 0.150 7.650 0.250 12.750
156 38+066 38+078 12.00 4.25 51.000 0.150 7.650 0.250 12.750

Page 224 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
157 38+530 38+542 12.00 4.25 51.000 0.150 7.650 0.175 8.925
158 38+648 38+660 12.00 4.25 51.000 0.150 7.650 0.175 8.925
159 38+713 38+723 12.00 4.25 51.000 0.150 7.650 0.175 8.925
160 38+815 38+827 12.00 4.25 51.000 0.150 7.650 0.175 8.925
161 38+920 38+932 12.00 4.25 51.000 0.150 7.650 0.175 8.925
162 39+030 39+042 12.00 4.25 51.000 0.150 7.650 0.175 8.925
163 39+200 39+212 12.00 4.25 51.000 0.150 7.650 0.175 8.925
164 39+342 39+354 12.00 4.25 51.000 0.150 7.650 0.175 8.925
165 39+568 39+580 12.00 4.25 51.000 0.150 7.650 0.250 12.750
166 39+694 39+706 12.00 4.25 51.000 0.150 7.650 0.250 12.750
167 39+792 39+804 12.00 4.25 51.000 0.150 7.650 0.250 12.750
168 40+109 40+121 12.00 4.25 51.000 0.150 7.650 0.175 8.925
169 40+419 40+431 12.00 4.25 51.000 0.150 7.650 0.175 8.925
170 40+790 40+802 12.00 4.25 51.000 0.150 7.650 0.175 8.925
171 41+047 41+059 12.00 4.25 51.000 0.150 7.650 0.200 10.200
172 41+275 41+287 12.00 4.25 51.000 0.150 7.650 0.175 8.925
173 41+854 41+886 12.00 4.25 51.000 0.150 7.650 0.175 8.925
174 42+038 42+050 12.00 4.25 51.000 0.150 7.650 0.175 8.925
175 42+202 42+214 12.00 4.25 51.000 0.150 7.650 0.175 8.925
176 42+286 42+298 12.00 4.25 51.000 0.150 7.650 0.175 8.925
177 42+380 42+392 12.00 4.25 51.000 0.150 7.650 0.175 8.925
178 42+417 42+429 12.00 4.25 51.000 0.150 7.650 0.175 8.925
179 42+820 42+832 12.00 4.25 51.000 0.150 7.650 0.175 8.925
180 42+866 42+878 12.00 4.25 51.000 0.150 7.650 0.175 8.925
181 42+966 42+978 12.00 4.25 51.000 0.150 7.650 0.175 8.925
182 43+102 43+024 12.00 4.25 51.000 0.150 7.650 0.175 8.925
183 43+131 43+143 12.00 4.25 51.000 0.150 7.650 0.175 8.925
184 43+231 43+243 12.00 4.25 51.000 0.150 7.650 0.175 8.925
185 43+417 43+429 12.00 4.25 51.000 0.150 7.650 0.175 8.925
186 43+549 43+561 12.00 4.25 51.000 0.150 7.650 0.175 8.925
187 43+750 43+762 12.00 4.25 51.000 0.150 7.650 0.175 8.925
188 43+926 43+938 12.00 4.25 51.000 0.150 7.650 0.175 8.925
189 44+000 44+012 12.00 4.25 51.000 0.150 7.650 0.175 8.925
190 44+155 44+167 12.00 4.25 51.000 0.150 7.650 0.175 8.925
191 44+246 44+258 12.00 4.25 51.000 0.150 7.650 0.175 8.925

Page 225 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
192 44+385 44+397 12.00 4.25 51.000 0.150 7.650 0.175 8.925
193 44+714 44+726 12.00 4.25 51.000 0.150 7.650 0.250 12.750
194 44+788 44+800 12.00 4.25 51.000 0.150 7.650 0.250 12.750
195 44+900 44+912 12.00 4.25 51.000 0.150 7.650 0.250 12.750
196 45+002 45+014 12.00 4.25 51.000 0.150 7.650 0.250 12.750
197 45+247 45+259 12.00 4.25 51.000 0.150 7.650 0.250 12.750
198 45+371 45+383 12.00 4.25 51.000 0.150 7.650 0.250 12.750
199 45+705 45+717 12.00 4.25 51.000 0.150 7.650 0.250 12.750
200 47+317 47+329 12.00 4.25 51.000 0.150 7.650 0.175 8.925
201 47+454 47+466 12.00 4.25 51.000 0.150 7.650 0.175 8.925
202 47+568 47+580 12.00 4.25 51.000 0.150 7.650 0.175 8.925
203 47+792 47+804 12.00 4.25 51.000 0.150 7.650 0.175 8.925
204 47+906 47+918 12.00 4.25 51.000 0.150 7.650 0.175 8.925
205 47+974 47+986 12.00 4.25 51.000 0.150 7.650 0.175 8.925
206 48+113 48+125 12.00 4.25 51.000 0.150 7.650 0.250 12.750
207 48+332 48+344 12.00 4.25 51.000 0.150 7.650 0.250 12.750
208 48+568 48+583 15.00 4.25 63.750 0.150 9.563 0.250 15.938
209 48+662 48+674 12.00 4.25 51.000 0.150 7.650 0.200 10.200
210 48+795 48+816 21.00 4.25 89.250 0.150 13.388 0.250 22.313
211 49+017 49+029 12.00 4.25 51.000 0.150 7.650 0.200 10.200
212 49+225 49+237 12.00 4.25 51.000 0.150 7.650 0.250 12.750
213 49+492 49+513 21.00 4.25 89.250 0.150 13.388 0.250 22.313
214 49+863 49+875 12.00 4.25 51.000 0.150 7.650 0.250 12.750
215 49+913 49+928 15.00 4.25 63.750 0.150 9.563 0.250 15.938
216 50+055 50+070 15.00 4.25 63.750 0.150 9.563 0.250 15.938
217 50+346 50+358 12.00 4.25 51.000 0.150 7.650 0.250 12.750
218 50+586 50+598 12.00 4.25 51.000 0.150 7.650 0.200 10.200
219 51+055 50+067 12.00 4.25 51.000 0.150 7.650 0.250 12.750
220 52+350 52+629 25.00 4.25 106.250 0.150 15.938 0.250 26.563 Bridge Approach road
221 52+775 52+787 12.00 4.25 51.000 0.150 7.650 0.250 12.750
222 52+844 52+856 12.00 4.25 51.000 0.150 7.650 0.250 12.750
223 53+154 53+166 12.00 4.25 51.000 0.150 7.650 0.250 12.750
224 53+388 53+400 12.00 4.25 51.000 0.150 7.650 0.200 10.200
225 53+556 53+568 12.00 4.25 51.000 0.150 7.650 0.250 12.750
226 53+825 53+837 12.00 4.25 51.000 0.150 7.650 0.250 12.750

Page 226 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
227 54+040 54+052 12.00 4.25 51.000 0.150 7.650 0.250 12.750
228 54+220 54+232 12.00 4.25 51.000 0.150 7.650 0.250 12.750
229 54+520 54+532 12.00 4.25 51.000 0.150 7.650 0.250 12.750
230 54+596 54+608 12.00 4.25 51.000 0.150 7.650 0.250 12.750
231 54+700 54+712 12.00 4.25 51.000 0.150 7.650 0.250 12.750
232 54+772 54+784 12.00 4.25 51.000 0.150 7.650 0.250 12.750
233 54+855 54+867 12.00 4.25 51.000 0.150 7.650 0.250 12.750
234 55+220 55+235 15.00 4.25 63.750 0.150 9.563 0.250 15.938
235 55+372 55+384 12.00 4.25 51.000 0.150 7.650 0.200 10.200
236 55+600 55+612 12.00 4.25 51.000 0.150 7.650 0.250 12.750
237 55+768 55+783 8.00 4.25 34.000 0.150 5.100 0.250 8.500
238 55+994 56+009 15.00 4.25 63.750 0.150 9.563 0.250 15.938
239 56+198 56+210 15.00 4.25 63.750 0.150 9.563 0.250 15.938
240 56+244 56+256 12.00 4.25 51.000 0.150 7.650 0.200 10.200
241 56+313 56+325 12.00 4.25 51.000 0.150 7.650 0.200 10.200
242 56+372 56+384 12.00 4.25 51.000 0.150 7.650 0.200 10.200
243 56+550 56+562 12.00 4.25 51.000 0.150 7.650 0.250 12.750
244 56+742 56+754 12.00 4.25 51.000 0.150 7.650 0.250 12.750
245 56+894 56+906 12.00 4.25 51.000 0.150 7.650 0.250 12.750
246 57+194 57+206 12.00 4.25 51.000 0.150 7.650 0.250 12.750
247 57+438 57+450 12.00 4.25 51.000 0.150 7.650 0.250 12.750
248 57+555 57+567 12.00 4.25 51.000 0.150 7.650 0.200 10.200
249 57+675 57+687 12.00 4.25 51.000 0.150 7.650 0.250 12.750
250 57+946 57+958 12.00 4.25 51.000 0.150 7.650 0.200 10.200
251 58+083 58+095 12.00 4.25 51.000 0.150 7.650 0.250 12.750
252 58+235 58+256 21.00 4.25 89.250 0.150 13.388 0.250 22.313
253 58+975 58+996 21.00 4.25 89.250 0.150 13.388 0.250 22.313
254 59+092 59+104 12.00 4.25 51.000 0.150 7.650 0.250 12.750
255 59+292 59+307 15.00 4.25 63.750 0.150 9.563 0.250 15.938
256 59+594 59+606 12.00 4.25 51.000 0.150 7.650 0.250 12.750
257 59+722 59+734 12.00 4.25 51.000 0.150 7.650 0.250 12.750
258 59+784 59+796 12.00 4.25 51.000 0.150 7.650 0.250 12.750
259 59+810 59+822 12.00 4.25 51.000 0.150 7.650 0.250 12.750
260 59+920 59+932 12.00 4.25 51.000 0.150 7.650 0.250 12.750
261 59+992 60+007 15.00 4.25 63.750 0.150 9.563 0.250 15.938

Page 227 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item no: 4.0,5.0,6.0


Description of work : Pavement Related Quantity (Subgrade, Subbase, Base and Bituminous Work)
Chainage DBST 5.02) Crushed Sub Base 5.01) Sub-Base 4.02) Capping Layer
Length Width
SN Surface Area Thickness Quantity Thickness Quantity Height Quantity Remarks
From To
(m) (m) (sq.m) (m) (cu.m) (m) (cu.m) (m) (cu.m)
262 60+119 60+131 12.00 4.25 51.000 0.150 7.650 0.250 12.750
263 60+405 60+417 12.00 4.25 51.000 0.150 7.650 0.250 12.750
264 60+742 60+754 12.00 4.25 51.000 0.150 7.650 0.250 12.750
265 61+288 61+303 15.00 4.25 63.750 0.150 9.563 0.250 15.938
266 61+560 61+575 15.00 4.25 63.750 0.150 9.563 0.250 15.938
267 62+460 62+472 12.00 4.25 51.000 0.100 5.100 0.150 7.650
268 62+868 62+880 12.00 4.25 51.000 0.100 5.100 0.150 7.650
269 63+372 63+384 12.00 4.25 51.000 0.100 5.100 0.150 7.650
270 63+620 63+632 12.00 4.25 51.000 0.100 5.100 0.150 7.650
271 64+192 64+204 12.00 4.25 51.000 0.100 5.100 0.150 7.650
3329.50
Valley Side Shoulder at Crossing Structure and Full Wide Pavement
1 0+000 65+100 3329.50 0.75 0.200 499.425 For x-drain str.
2 6+900 7+500 600.00 0.75 0.200 90.000
3 29+000 29+400 400.00 0.75 0.200 60.000
4 37+575 37+675 100.00 0.75 0.200 15.000
5 41+500 41+700 200.00 0.75 0.200 30.000
6 61+400 61+900 500.00 0.75 0.200 75.000
7 62+900 63+600 700.00 0.75 0.200 105.000
8 64+000 64+300 300.00 0.75 0.200 45.000
9 65+000 65+100 100.00 0.75 0.200 15.000
Deduction 14,150.375 sq.m 2,109.806 cu.m 3,830.853 cu.m 0.000 cu.m
Total 283,791.375 sq.m 41,848.919 cu.m 66,461.678 cu.m 4,898.000
Add qty. for widening on curve @ 5.0% of total 14,189.569 sq.m 2,092.446 cu.m 3,323.084 cu.m 244.900
Grand Total 297,980.944 sq.m 43,941.365 cu.m 69,784.762 cu.m 5,142.900 cu.m
Preparation of Sub grade: 344,308.82 sq.m
Total DBST binder (20 mm aggregate @ 1.25 ltr/sqm and 1.05 ltr/sqm) 685,356.17 ltr
80/100 Bitumen for surface dressing (@ 96 parts 658,997.00 ltr
Cutter for bitumen grade 80/100 (@ 4 parts) 26,360.00 ltr
20 mm 1st coat aggregate (Spray Rate @ 23 kg/sqm) 6,556.00 t
10 mm 2nd coat aggregate (Spray Rate @ 12 kg/sqm) 3,576.00 t
Priming 297,980.94 ltr
Antistripping agent @ 1% for 15% quantity of total binder 1,029.00 kg

Page 228 of 313


7.0 CROSS DRAINAGE AND SIDE DRAINAGE WORKS
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.:7.01
Description of work: Supply and place dry stone soling , all complete.(SS/SP- 2406)
Chainage Type / Length Width Height Quantity
S.N. Remarks
From To Shape (m) (m) (m) (cu.m)
Crossing Structures
1 0+002 0+014 CW 12.00 6.00 0.15 10.80 Below CW slab
2 0+137 0+149 CW 12.00 6.00 0.15 10.80 Below CW slab
3 0+137 0+149 CW 12.00 6.00 0.15 10.80 Below CW slab
4 0+980 0+995 CW 15.00 6.00 0.15 13.50 Below CW slab
5 1+362 1+374 CW 12.00 6.00 0.15 10.80 Below CW slab
12.00 4.00 0.15 7.20 Before & After slab
6 1+654 1+666 CW 12.00 6.00 0.15 10.80 Below CW slab
7 2+044 2+056 CW 12.00 6.00 0.15 10.80 Below CW slab
8 2+363 2+375 CW 12.00 6.00 0.15 10.80 Below CW slab
9 2+440 2+452 CW 12.00 6.00 0.15 10.80 Below CW slab
10 2+502 2+514 CW 12.00 6.00 0.15 10.80 Below CW slab
11 2+606 CW 3.00 7.00 0.15 3.15 Extended CW slab
12 3+116 3+128 CW 12.00 6.00 0.15 10.80 Below CW slab
5.00 2.50 0.15 1.88 US CW slab
13 3+138 3+150 CW 15.00 6.00 0.15 13.50 Below CW slab
6.00 2.50 0.15 2.25 DS CW slab
14 3+346 3+358 CW 12.00 6.00 0.15 10.80 Below CW slab
15 3+398 3+410 CW 12.00 6.00 0.15 10.80 Below CW slab
16 3+497 3+509 CW 12.00 6.00 0.15 10.80 Below CW slab
17 3+944 3+956 CW 12.00 6.00 0.15 10.80 Below CW slab
18 4+088 4+100 CW 12.00 6.00 0.15 10.80 Below CW slab
19 4+847 4+859 CW 12.00 6.00 0.15 10.80 Below CW slab
20 4+910 4+922 CW 12.00 6.00 0.15 10.80 Below CW slab
21 5+765 5+767 CW 12.00 6.00 0.15 10.80 Below CW slab
6.00 2.00 0.15 1.80 US CW slab
8.00 1.00 0.15 1.20 DS CW slab
22 6+134 6+146 CW 12.00 6.00 0.15 10.80 Below CW slab
6.00 1.00 0.15 0.90 US CW slab
23 6+260 6+272 CW 12.00 6.00 0.15 10.80 Below CW slab
24 7+655 7+673 CW 8.00 7.00 0.15 8.40 Below CW slab
25 8+161 8+173 CW 12.00 6.00 0.15 10.80 Below CW slab
26 8+494 8+506 CW 12.00 7.00 0.15 12.60 Below CW slab
27 8+886 8+898 CW 12.00 6.00 0.15 10.80 Below CW slab
28 9+056 9+068 CW 12.00 6.00 0.15 10.80 Below CW slab
29 9+370 9+382 CW 12.00 6.00 0.15 10.80 Below CW slab
12.00 2.00 0.15 3.60 Soling
30 10+704 10+716 CW 12.00 6.00 0.15 10.80 Below CW slab
31 10+819 10+831 CW 12.00 6.00 0.15 10.80 Below CW slab
6.00 1.50 0.15 1.35 US CW slab
8.00 1.00 0.15 1.20 DS CW slab
32 11+020 11+032 CW 12.00 6.00 0.15 10.80 Below CW slab
6.00 1.50 0.15 1.35 US CW slab
8.00 1.50 0.15 1.80 DS CW slab
33 11+242 11+254 CW 12.00 6.00 0.15 10.80 Below CW slab
34 11+333 11+348 CW 15.00 7.00 0.15 15.75 Below CW slab
10.00 7.00 0.15 10.50 US CW slab
35 11+400 11+412 CW 12.00 6.00 0.15 10.80 Below CW slab
6.00 2.00 0.15 1.80 US CW slab
36 11+504 11+516 CW 12.00 7.00 0.15 12.60 Below CW slab
6.00 2.00 0.15 1.80 US CW slab
37 11+692 11+704 CW 12.00 7.00 0.15 12.60 Below CW slab
5.00 1.50 0.15 1.13 US CW slab
7.00 1.00 0.15 1.05 DS CW slab
38 11+739 11+751 CW 12.00 7.00 0.15 12.60 Below CW slab

Page 230 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.01
Description of work: Supply and place dry stone soling , all complete.(SS/SP- 2406)
Chainage Type / Length Width Height Quantity
S.N. Remarks
From To Shape (m) (m) (m) (cu.m)
6.00 1.00 0.15 0.90 US CW slab
39 11+844 11+856 CW 12.00 7.00 0.15 12.60 Below CW slab
40 12+047 12+059 CW 12.00 6.00 0.15 10.80 Below CW slab
8.00 1.00 0.15 1.20
41 12+163 12+178 CW 12.00 6.00 0.15 10.80 Below CW slab
42 12+216 12+234 CW 18.00 7.00 0.15 18.90 Below CW slab
12.00 1.00 0.15 1.80 US
10.00 1.00 0.15 1.50 DS
43 12+269 12+281 CW 12.00 6.00 0.15 10.80 Below CW slab
44 12+344 12+356 CW 12.00 7.00 0.15 12.60 Below CW slab
5.00 1.00 0.15 0.75 US
5.00 1.00 0.15 0.75 DS
45 12+481 12+493 CW 12.00 6.00 0.15 10.80 Below CW slab
4.00 1.00 0.15 0.60 US
46 12+542 12+554 CW 12.00 6.00 0.15 10.80 Below CW slab
47 12+743 12+755 CW 12.00 6.00 0.15 10.80 Below CW slab
48 13+036 13+048 CW 12.00 7.00 0.15 12.60 Below CW slab
6.00 1.00 0.15 0.90 DS
49 13+716 13+731 CW 15.00 7.00 0.15 15.75 Below CW slab
50 14+024 14+036 CW 12.00 6.00 0.15 10.80 Below CW slab
51 14+225 14+234 CW 3.00 7.00 0.15 3.15 Below CW slab (P2)
52 15+120 15+132 CW 12.00 6.00 0.15 10.80 Below CW slab
53 15+630 15+642 CW 12.00 6.00 0.15 10.80 Below CW slab
54 15+794 15+806 CW 12.00 7.00 0.15 12.60 Below CW slab
8.00 3.00 0.15 3.60 US
55 15+833 15+845 CW 12.00 6.00 0.15 10.80 Below CW slab
3.00 1.50 0.15 0.68 US
56 15+944 15+956 CW 12.00 6.00 0.15 10.80 Below CW slab
5.00 1.00 0.15 0.75 US
57 16+023 16+035 CW 12.00 6.00 0.15 10.80 Below CW slab
8.00 1.00 0.15 1.20 US
58 16+090 16+112 CW 15.00 6.00 0.15 13.50 Below CW slab
10.00 2.00 0.15 3.00 US
59 16+271 16+286 CW 15.00 7.00 0.15 15.75 Below CW slab
12.00 6.00 0.15 10.80 US
8.00 2.00 0.15 2.40 DS
60 16+414 16+426 CW 12.00 6.00 0.15 10.80 Below CW slab
61 16+982 16+994 CW 12.00 6.00 0.15 10.80 Below CW slab
62 17+942 17+954 CW 12.00 6.00 0.15 10.80 Below CW slab
63 18+316 18+328 CW 12.00 6.00 0.15 10.80 Below CW slab
4.00 1.00 0.15 0.60 US
64 18+620 18+632 CW 12.00 6.00 0.15 10.80 Below CW slab
5.00 2.00 0.15 1.50 US
65 18+800 18+812 CW 12.00 6.00 0.15 10.80 Below CW slab
7.00 2.00 0.15 2.10 US
66 18+844 18+856 CW 12.00 6.00 0.15 10.80 Below CW slab
5.00 2.50 0.15 1.88 US
67 18+975 18+987 CW 12.00 6.00 0.15 10.80 Below CW slab
7.00 2.00 0.15 2.10 US
68 19+219 19+231 CW 12.00 7.00 0.15 12.60 Below CW slab
5.00 2.00 0.15 1.51 US
6.00 2.00 0.15 1.80 US
69 19+420 19+432 CW 12.00 7.00 0.15 12.60 Below CW slab
12.00 1.00 0.15 1.80 US
70 19+692 19+704 CW 12.00 6.00 0.15 10.80 Below CW slab
8.00 1.00 0.15 1.20 US
71 19+722 19+734 CW 12.00 6.00 0.15 10.80 Below CW slab
7.00 2.00 0.15 2.10 US

Page 231 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.01
Description of work: Supply and place dry stone soling , all complete.(SS/SP- 2406)
Chainage Type / Length Width Height Quantity
S.N. Remarks
From To Shape (m) (m) (m) (cu.m)
72 20+010 20+025 CW 15.00 7.00 0.15 15.75 Below CW slab
8.50 3.00 0.15 3.83 US
73 20+432 20+444 CW 12.00 7.00 0.15 12.60 Below CW slab
10.00 3.00 0.15 4.50 US
74 20+546 20+558 CW 12.00 6.00 0.15 10.80 Below CW slab
8.00 1.00 0.15 1.20 US
75 20+765 20+777 CW 12.00 6.00 0.15 10.80 Below CW slab
7.00 1.00 0.15 1.05 US
76 21+120 21+135 CW 15.00 7.00 0.15 15.75 Below CW slab
7.50 7.00 0.15 7.88 US
77 21+183 21+195 CW 12.00 6.00 0.15 10.80 Below CW slab
5.00 2.00 0.15 1.50 US
78 21+524 21+539 CW 15.00 7.00 0.15 15.75 Below CW slab
79 21+562 21+577 CW 15.00 7.00 0.15 15.75 Below CW slab
80 21+669 21+681 CW 12.00 7.00 0.15 12.60 Below CW slab
81 21+817 21+829 CW 12.00 7.00 0.15 12.60 Below CW slab
82 22+008 22+020 CW 12.00 7.00 0.15 12.60 Below CW slab
83 22+235 22+247 CW 12.00 7.00 0.15 12.60 Below CW slab
84 22+444 22+456 CW 12.00 7.00 0.15 12.60 Below CW slab
5.00 1.50 0.15 1.13 US
85 22+572 22+584 CW 12.00 7.00 0.15 12.60 Below CW slab
5.00 1.50 0.15 1.13 US
86 22+644 22+656 CW 12.00 7.00 0.15 12.60 Below CW slab
87 22+723 22+735 CW 12.00 7.00 0.15 12.60 Below CW slab
88 22+835 22+847 CW 12.00 7.00 0.15 12.60 Below CW slab
89 22+938 22+950 CW 12.00 7.00 0.15 12.60 Below CW slab
90 23+067 23+079 CW 12.00 7.00 0.15 12.60 Below CW slab
91 23+230 23+242 CW 12.00 7.00 0.15 12.60 Below CW slab
92 23+319 23+331 CW 12.00 6.00 0.15 10.80 Below CW slab
93 23+490 23+502 CW 12.00 7.00 0.15 12.60 Below CW slab
94 23+563 23+575 CW 12.00 7.00 0.15 12.60 Below CW slab
5.00 1.00 0.15 0.75 US
95 23+694 23+706 CW 12.00 6.00 0.15 10.80 Below CW slab
96 24+100 24+112 CW 12.00 6.00 0.15 10.80 Below CW slab
10.00 5.00 0.15 7.50 US
97 24+217 24+229 CW 12.00 7.00 0.15 12.60 Below CW slab
6.00 2.00 0.15 1.80 US
98 24+519 24+531 CW 12.00 7.00 0.15 12.60 Below CW slab
10.00 1.20 0.15 1.80 US
99 24+800 24+812 CW 12.00 7.00 0.15 12.60 Below CW slab
8.50 7.00 0.15 8.93 US
100 24+838 24+853 CW 15.00 7.00 0.15 15.75 Below CW slab
10.00 3.50 0.15 5.25 US
101 25+260 25+272 CW 12.00 7.00 0.15 12.60 Below CW slab
8.00 5.00 0.15 6.00 US
102 25+340 25+506 CW 12.00 7.00 0.15 12.60 Below CW slab
6.00 1.00 0.15 0.90 US
6.00 1.00 0.15 0.90 US
103 25+494 25+506 CW 12.00 7.00 0.15 12.60 Below CW slab
6.00 2.00 0.15 1.80 US
7.00 2.00 0.15 2.10 US
104 25+763 25+775 CW 12.00 7.00 0.15 12.60 Below CW slab
8.00 1.00 0.15 1.20 US
6.00 1.00 0.15 0.90 US
105 26+330 26+342 CW 12.00 6.00 0.15 10.80 Below CW slab
5.00 1.50 0.15 1.13 US
5.00 1.00 0.15 0.75 US
106 26+475 26+490 CW 15.00 7.00 0.15 15.75 Below CW slab

Page 232 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.01
Description of work: Supply and place dry stone soling , all complete.(SS/SP- 2406)
Chainage Type / Length Width Height Quantity
S.N. Remarks
From To Shape (m) (m) (m) (cu.m)
107 26+700 26+712 CW 12.00 7.00 0.15 12.60 Below CW Slab
108 27+175 27+187 CW 12.00 6.00 0.15 10.80 Below CW Slab
2.00 1.00 0.15 0.30 DS
109 27+250 27+262 CW 12.00 7.00 0.15 12.60 Below CW Slab
110 27+417 27+429 CW 12.00 7.00 0.15 12.60 Below CW Slab
6.00 1.00 0.15 0.90 US
5.00 1.00 0.15 0.75 DS
111 27+555 27+567 CW 12.00 7.00 0.15 12.60 Below CW Slab
112 27+619 27+631 CW 12.00 7.00 0.15 12.60 Below CW Slab
10.00 2.00 0.15 3.00 US
113 28+111 28+123 CW 12.00 7.00 0.15 12.60 Below CW Slab
10.00 8.00 0.15 12.00 DS
114 28+380 28+392 CW 12.00 7.00 0.15 12.60 Below CW Slab
115 28+647 28+659 CW 12.00 7.00 0.15 12.60
116 29+670 29+682 CW 12.00 7.00 0.15 12.60
10.00 2.00 0.15 3.00 Us
117 30+376 30+388 CW 12.00 7.00 0.15 12.60 Below CW Slab
10.00 6.00 0.15 9.00 U/s
6.00 1.00 0.15 0.90 DS
118 30+429 30+431 CW 12.00 7.00 0.15 12.60
119 31+301 31+313 CW 12.00 7.00 0.15 12.60 Below CW Slab
6.00 5.00 0.15 4.50 U/S dry stone soling
120 31+700 31+712 CW 12.00 7.00 0.15 12.60 Below CW Slab
121 31+945 31+957 CW 12.00 7.00 0.15 12.60 Below CW Slab
122 32+582 32+594 CW 12.00 7.00 0.15 12.60 Below CW Slab
123 32+555 32+657 CW 12.00 7.00 0.15 12.60 Below CW Slab
124 33+016 33+028 CW 12.00 7.00 0.15 12.60 Below CW Slab
125 33+130 33+142 CW 12.00 7.00 0.15 12.60 Below CW Slab
10.00 5.00 0.15 15.00 U/S and D/S both side SS
126 33+397 33+409 CW 12.00 7.00 0.15 12.60 Below CW Slab
127 33+556 33+568 CW 12.00 7.00 0.15 12.60 Below CW Slab
12.00 2.00 0.15 3.60 dry stone soling U/S
128 33+825 33+837 CW 12.00 7.00 0.15 12.60 Below CW Slab
8.00 2.00 0.15 2.40 dry stone soling U/S
129 34+125 34+143 CW 18.00 7.00 0.15 18.90 Below CW Slab
9.00 7.00 0.15 9.45
130 34+216 34+228 CW 12.00 7.00 0.15 12.60 Below CW Slab
131 34+350 34+377 CW 27.00 7.00 0.15 28.35 Below CW Slab
132 34+877 34+889 CW 12.00 7.00 0.15 12.60 Below CW Slab
133 35+530 35+542 CW 12.00 7.00 0.15 12.60 Below CW Slab
134 35+634 35+646 CW 12.00 7.00 0.15 12.60 Below CW Slab
135 35+888 35+900 CW 12.00 7.00 0.15 12.60 Below CW Slab
136 36+269 36+281 CW 12.00 7.00 0.15 12.60 Below CW Slab
137 36+485 36+497 CW 12.00 7.00 0.15 12.60 Below CW Slab
138 36+988 37+000 CW 12.00 7.00 0.15 12.60 Below CW Slab
139 37+096 37+108 CW 12.00 7.00 0.15 12.60 Below CW Slab
140 37+314 37+326 CW 12.00 7.00 0.15 12.60 Below CW Slab
10.00 3.00 0.15 4.50 dry stone soling
141 37+455 37+467 CW 12.00 7.00 0.15 12.60 Below CW Slab
142 37+634 37+664 CW 12.00 7.00 0.15 12.60 Below CW Slab
143 37+700 37+712 CW 12.00 7.00 0.15 12.60 Below CW Slab
144 37+920 37+932 CW 12.00 7.00 0.15 12.60 Below CW Slab
145 38+066 38+078 CW 12.00 7.00 0.15 12.60 Below CW Slab
146 38+530 38+542 CW 12.00 7.00 0.15 12.60 Below CW Slab
147 38+648 38+660 CW 12.00 7.00 0.15 12.60 Below CW Slab
148 38+713 38+725 CW 12.00 7.00 0.15 12.60 Below CW Slab
149 38+815 38+827 CW 12.00 7.00 0.15 12.60 Below CW Slab
150 38+920 38+932 CW 12.00 7.00 0.15 12.60 Below CW Slab

Page 233 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.01
Description of work: Supply and place dry stone soling , all complete.(SS/SP- 2406)
Chainage Type / Length Width Height Quantity
S.N. Remarks
From To Shape (m) (m) (m) (cu.m)
151 39+030 39+042 CW 12.00 7.00 0.15 12.60 Below CW Slab
152 39+200 39+212 CW 12.00 7.00 0.15 12.60 Below CW Slab
153 39+342 39+354 CW 12.00 7.00 0.15 12.60 Below CW Slab
154 39+568 39+580 CW 12.00 7.00 0.15 12.60 Below CW Slab
155 39+694 39+706 CW 12.00 7.00 0.15 12.60 Below CW Slab
156 39+792 39+804 CW 12.00 7.00 0.15 12.60 Below CW Slab
157 40+109 40+212 CW 12.00 7.00 0.15 12.60 Below CW Slab
158 40+419 40+431 CW 12.00 7.00 0.15 12.60 Below CW Slab
159 40+790 40+802 CW 12.00 7.00 0.15 12.60 Below CW Slab
160 41+047 41+059 CW 12.00 6.00 0.15 10.80 Below CW Slab
161 41+275 41+287 CW 12.00 7.00 0.15 12.60 Below CW Slab
162 41+854 41+886 CW 12.00 7.00 0.15 12.60 Below CW Slab
163 42+038 42+050 CW 12.00 7.00 0.15 12.60 Below CW Slab
164 42+202 42+214 CW 12.00 6.00 0.15 10.80 Below CW Slab
165 42+286 42+298 CW 12.00 7.00 0.15 12.60 Below CW Slab
166 42+380 42+392 CW 12.00 6.00 0.15 10.80 Below CW Slab
167 42+417 42+429 CW 12.00 6.00 0.15 10.80 Below CW Slab
168 42+820 42+832 CW 12.00 7.00 0.15 12.60 Below CW Slab
169 42+866 42+878 CW 12.00 7.00 0.15 12.60 Below CW Slab
170 42+966 42+978 CW 12.00 7.00 0.15 12.60 Below CW Slab
171 43+102 43+024 CW 12.00 7.00 0.15 12.60 Below CW Slab
172 43+131 43+143 CW 12.00 7.00 0.15 12.60 Below CW Slab
173 43+231 43+243 CW 12.00 6.00 0.15 10.80 Below CW Slab
174 43+417 43+561 CW 12.00 6.00 0.15 10.80 Below CW Slab
175 43+549 43+762 CW 12.00 7.00 0.15 12.60 Below CW Slab
176 43+750 43+938 CW 12.00 7.00 0.15 12.60 Below CW Slab
177 43+926 43+938 CW 12.00 6.00 0.15 10.80 Below CW Slab
178 44+000 44+012 CW 12.00 6.00 0.15 10.80 Below CW slab
179 44+155 44+167 CW 12.00 6.00 0.15 10.80 Below CW slab
180 44+246 44+258 CW 12.00 6.00 0.15 10.80 Below CW slab
181 44+385 44+397 CW 12.00 6.00 0.15 10.80 Below CW slab
182 44+714 44+726 CW 12.00 7.00 0.15 12.60 Below CW slab
183 44+788 44+800 CW 12.00 6.00 0.15 10.80 Below CW slab
184 44+900 44+912 CW 12.00 7.00 0.15 12.60 Below CW slab
185 45+002 45+014 CW 12.00 6.00 0.15 10.80 Below CW slab
186 45+247 45+259 CW 12.00 6.00 0.15 10.80 Below CW slab
187 45+371 45+383 CW 12.00 6.00 0.15 10.80 Below CW slab
188 45+705 45+717 CW 12.00 7.00 0.15 12.60 Below CW slab
189 47+317 47+329 CW 12.00 7.00 0.15 12.60 Below CW slab
190 47+454 47+466 CW 12.00 7.00 0.15 12.60 Below CW slab
191 47+568 47+580 CW 12.00 7.00 0.15 12.60 Below CW slab
192 47+792 47+804 CW 12.00 7.00 0.15 12.60 Below CW slab
193 47+906 47+918 CW 12.00 7.00 0.15 12.60 Below CW slab
194 47+974 47+986 CW 12.00 7.00 0.15 12.60 Below CW slab
195 48+113 48+125 CW 12.00 6.00 0.15 10.80 Below CW slab
196 48+332 48+344 CW 12.00 6.00 0.15 10.80 Below CW slab
197 48+568 48+583 CW 15.00 7.00 0.15 15.75 Below CW slab
198 48+662 48+674 CW 12.00 6.00 0.15 10.80 Below CW slab
199 48+795 48+816 CW 21.00 7.00 0.15 22.05 Below CW slab
200 49+017 49+029 CW 12.00 7.00 0.15 12.60 Below CW slab
201 49+225 49+237 CW 12.00 7.00 0.15 12.60 Below CW slab
202 49+492 49+513 CW 21.00 7.00 0.15 22.05 Below CW slab
203 49+863 49+875 CW 12.00 6.00 0.15 10.80 Below CW slab
204 49+913 49+928 CW 15.00 7.00 0.15 15.75 Below CW slab
205 50+055 50+070 CW 15.00 7.00 0.15 15.75 Below CW slab
206 50+346 50+358 CW 12.00 6.00 0.15 10.80 Below CW slab
207 50+586 50+598 CW 12.00 6.00 0.15 10.80 Below CW slab
208 51+055 51+067 CW 12.00 7.00 0.15 12.60 Below CW slab

Page 234 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.01
Description of work: Supply and place dry stone soling , all complete.(SS/SP- 2406)
Chainage Type / Length Width Height Quantity
S.N. Remarks
From To Shape (m) (m) (m) (cu.m)
209 52+450 52+462 CW 12.00 6.00 0.15 10.80 Below CW slab
210 52+775 52+787 CW 12.00 6.00 0.15 10.80 Below CW slab
211 52+844 52+856 CW 12.00 6.00 0.15 10.80 Below CW slab
212 53+154 53+166 CW 12.00 6.00 0.15 10.80 Below CW slab
213 53+388 53+400 CW 12.00 7.00 0.15 12.60 Below CW slab
214 8.00 1.00 0.15 1.20 US stone soling
215 53+556 53+568 CW 12.00 7.00 0.15 12.60 Below CW slab
216 53+825 53+837 CW 12.00 7.00 0.15 12.60 Below CW slab
217 54+040 54+052 CW 12.00 6.00 0.15 10.80 Below CW slab
218 9.00 1.00 0.15 1.35 US stone soling
219 54+220 54+232 CW 12.00 6.00 0.15 10.80 Below CW slab
220 54+520 54+532 CW 12.00 6.00 0.15 10.80 Below CW slab
221 54+596 54+608 CW 12.00 7.00 0.15 12.60 Below CW slab
222 54+700 54+712 CW 12.00 6.00 0.15 10.80 Below CW slab
223 54+772 54+784 CW 12.00 6.00 0.15 10.80 Below CW slab
224 54+855 54+867 CW 12.00 6.00 0.15 10.80 Below CW slab
225 55+220 55+235 CW 15.00 7.00 0.15 15.75 Below CW slab
226 55+372 55+384 CW 12.00 7.00 0.15 12.60 Below CW slab
227 55+600 55+612 CW 12.00 7.00 0.15 12.60 Below CW slab
228 55+768 55+783 CW 8.00 7.00 0.15 8.40 Below CW slab
229 15.00 1.50 0.15 3.38 US stone soling
230 55+994 56+009 CW 15.00 7.00 0.15 15.75 Below CW slab
231 15.00 5.00 0.15 11.25 U/S soling
232 56+198 56+210 CW 12.00 7.00 0.15 12.60 Below CW slab
233 56+244 56+256 CW 12.00 7.00 0.15 12.60 Below CW slab
234 56+313 56+325 CW 12.00 7.00 0.15 12.60 Below CW slab
235 10.00 2.00 0.15 3.00 U/S soling
236 56+372 56+384 CW 12.00 6.00 0.15 10.80 Below CW slab
237 56+550 56+562 CW 12.00 6.00 0.15 10.80 Below CW slab
238 56+742 56+754 CW 12.00 7.00 0.15 12.60 Below CW slab
239 56+894 56+906 CW 12.00 6.00 0.15 10.80 Below CW slab
240 57+194 57+206 CW 12.00 6.00 0.15 10.80 Below CW slab
241 57+438 57+450 CW 12.00 7.00 0.15 12.60 Below CW slab
242 57+555 57+567 CW 12.00 6.00 0.15 10.80 Below CW slab
243 57+675 57+687 CW 12.00 7.00 0.15 12.60 Below CW slab
244 57+946 57+958 CW 12.00 6.00 0.15 10.80 Below CW slab
245 58+083 58+095 CW 12.00 7.00 0.15 12.60 Below CW slab
246 58+235 58+256 CW 21.00 7.00 0.15 22.05 Below CW slab
247 0.15 16.50 soling of 110m2 at us
248 58+975 58+996 CW 21.00 7.00 0.15 22.05 Below CW slab
249 10.00 0.15 6.50 us of CW
250 59+092 59+104 CW 12.00 6.00 0.15 10.80 Below CW slab
251 59+292 59+307 CW 15.00 6.00 0.15 13.50 Below CW slab
252 59+594 59+606 CW 12.00 6.00 0.15 10.80 Below CW slab
253 59+722 59+734 CW 12.00 7.00 0.15 12.60 Below CW slab
254 59+784 59+796 CW 12.00 6.00 0.15 10.80 Below CW slab
255 59+810 59+822 CW 12.00 7.00 0.15 12.60 Below CW slab
256 59+920 59+932 CW 12.00 7.00 0.15 12.60 Below CW slab
257 59+992 60+007 CW 15.00 7.00 0.15 15.75 Below CW slab
258 60+119 60+131 CW 12.00 6.00 0.15 10.80 Below CW slab
259 60+405 60+417 CW 12.00 7.00 0.15 12.60 Below CW slab
260 60+742 60+754 CW 12.00 7.00 0.15 12.60 Below CW slab
261 10.00 2.00 0.15 3.00 US stone soling
262 61+288 61+303 CW 15.00 7.00 0.15 15.75 Below CW slab
263 61+560 61+575 CW 15.00 7.00 0.15 15.75 Below CW slab
264 62+460 62+472 CW 12.00 6.00 0.15 10.80 Below CW slab
265 62+868 62+880 CW 12.00 6.00 0.15 10.80 Below CW slab
266 63+372 63+384 CW 12.00 7.00 0.15 12.60 Below CW slab

Page 235 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.01
Description of work: Supply and place dry stone soling , all complete.(SS/SP- 2406)
Chainage Type / Length Width Height Quantity
S.N. Remarks
From To Shape (m) (m) (m) (cu.m)
267 63+620 63+632 CW 12.00 6.00 0.15 10.80 Below CW slab
268 64+192 64+204 CW 12.00 6.00 0.15 10.80 Below CW slab
Total 3,452.38 cu.m

Page 236 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 7.02


Providing and placing cement concrete M10/40 including compaction, curing,
Description of work:
testing etc., all complete as per Drawings.(SS/SP- 2000)
Length Breadth Height Quantity
S.N. Chainage Type Nos. Remarks
(m) (m) (m) (cu.m)
Cross drainage Structures
1 0+825.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
2 4+658.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
3 8+701.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
4 13+324.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
5 13+855.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
6 14+502.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
7 14+695.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
8 15+225.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
9 16+365.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
10 17+255.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW (P2)
1.00 2.40 1.35 0.100 0.324 DS HW
11 17+560.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
12 22+345.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW (P2)
1.00 2.40 1.35 0.100 0.324 DS HW
13 25+025.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
14 27+950.0 PC 1.00 2.40 1.25 0.100 0.300 US HW
1.00 2.40 1.35 0.100 0.324 DS HW
15 28+587.0 PC 1.00 2.40 1.25 0.100 0.300 US HW
1.00 2.40 1.35 0.100 0.324 DS HW
16 29+160.0 PC 1.00 2.40 3.55 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
1.00 2.60 0.6 0.100 0.156 D/S tail wall
16 29+275.0 PC 1.00 2.40 3.55 0.100 0.852 Catch pit +US HW
1.00 2.40 1.35 0.100 0.324 DS HW
17 30+029.0 PC 1.00 2.40 1.25 0.100 0.300
1.00 2.40 1.35 0.100 0.324
18 30+895.0 PC 1.00 2.40 3.55 0.100 0.852 Catch pit +US HW
1.00 2.40 1.35 0.100 0.324 DS HW
19 32+388.0 PC 1.00 2.40 1.35 0.100 0.324 US HW
1.00 2.40 1.35 0.100 0.324 DS HW
20 32+886.0 PC 1.00 2.40 1.35 0.100 0.324 US HW
1.00 2.40 1.35 0.100 0.324 DS HW
21 35+175.0 PC 1.00 2.40 3.55 0.100 0.852 Catch pit +US HW
1.00 2.40 1.35 0.100 0.324 DS HW
1.00 2.60 0.6 0.100 0.156 D/S tail wall
22 35+325.0 PC 1.00 2.40 3.55 0.100 0.852 Catch pit +US HW
1.00 2.40 1.35 0.100 0.324 DS HW
1.00 2.60 0.6 0.100 0.156 D/S tail wall
23 36+660.0 PC 1.00 2.40 1.35 0.100 0.324 US HW
1.00 2.40 1.35 0.100 0.324 DS HW
24 40+330.0 PC 1.00 2.40 3.55 0.100 0.852 Catch pit +US HW
1.00 2.40 1.35 0.100 0.324 DS HW

Page 237 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.02


Providing and placing cement concrete M10/40 including compaction, curing,
Description of work:
testing etc., all complete as per Drawings.(SS/SP- 2000)
Length Breadth Height Quantity
S.N. Chainage Type Nos. Remarks
(m) (m) (m) (cu.m)
25 46+475.0 PC 1.00 3.55 2.4 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
1.00 0.60 2.4 0.100 0.144 PCC on bed of protection wall
26 46+876.0 PC 1.00 3.55 2.4 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
27 49+680.0 PC 1.00 3.55 2.4 0.100 0.852 Catch Pit + US HW
28 51+336.0 PC 1.00 3.55 2.4 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
29 52+190.0 PC 1.00 3.55 2.4 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
PCC on bed of SM wall at dS of
30 55+600.0 SM 1 10.00 3.25 0.100 3.250
CW
31 55+742.0 PC 1.00 3.00 2.3 0.100 0.690 Catch Pit + US HW
1.00 1.25 2.3 0.100 0.288 DS HW
32 56+503.0 PC 1.00 2.3 0.8 0.100 0.184 US HW
1.00 1.25 2.3 0.100 0.288 DS HW
33 56+610.0 PC 1.00 2.3 0.8 0.100 0.184 US HW
1.00 1.25 2.3 0.100 0.288 DS HW
34 57+330.0 PC 1.00 2.3 0.8 0.100 0.184 US HW
1.00 1.25 2.3 0.100 0.288 DS HW
35 57+852.0 PC 1.00 2.3 0.8 0.100 0.184 US HW
1.00 1.25 2.3 0.100 0.288 DS HW
36 58+565.0 PC 1.00 3.55 2.4 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
37 58+750.0 PC 1.00 2.3 0.8 0.100 0.184 US HW
1.00 1.25 2.3 0.100 0.288 DS HW
SM 1.00 2.00 0.6 0.100 0.120 Protection wall
38 59+230.0 PC 1.00 2.3 0.8 0.100 0.184 US HW
1.00 1.25 2.3 0.100 0.288 DS HW
39 61+070.0 PC 1.00 2.3 0.8 0.100 0.184 US HW
1.00 1.25 2.3 0.100 0.288 DS HW
40 61+975.0 PC 1.00 3.55 2.4 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
1.00 0.60 2.4 0.100 0.144 PCC on bed of protection wall
41 64+560.0 PC 1.00 3.55 2.4 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
42 64+965.0 PC 1.00 3.55 2.4 0.100 0.852 Catch Pit + US HW
1.00 2.40 1.35 0.100 0.324 DS HW
Total 44.500 cu.m

Page 238 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 7.03


Providing and placing cement concrete M15/40 including compaction, curing,
Description of work:
testing etc., all complete as per Drawings.(SS/SP- 2000)
Chainage Length Breadth Height Quantity
S.N. Type Side Remarks
From To (m) (m) (m) (cu.m)
PCC on bed of Proposed drain
1 4+495 4+652 SM/T1 L 157.00 0.20 0.05 1.570
2 4+720 4+846 SM/T1 R 126.00 0.20 0.05 1.260
3 4+859 4+910 SM/T1 R 51.00 0.20 0.05 0.510
4 5+560 5+576 SM/T1 R 16.00 0.20 0.05 0.160
5 5+777 6+050 SM/T1 R 273.00 0.20 0.05 2.730
6 SM/T1 R 20.00 0.20 0.05 0.200
7 6+675 6+815 SM/T1 140.00 0.20 0.05 1.400
8 7+955 7+975 SM/T1 L 20.00 0.20 0.05 0.200
9 7+975 7+985 SM/T1 L 10.00 0.20 0.05 0.100
10 7+985 8+075 SM/T1 L 90.00 0.20 0.05 0.900
11 10+288 SM/T3 L 25.00 0.40 0.05 0.500
12 10+290 10+395 SM/T3 R 105.00 0.40 0.05 2.100
13 10+395 10+505 SM/T3 R 110.00 0.40 0.05 2.200
14 10+515 10+600 SM/T1 L 85.00 0.40 0.05 1.700
15 10+612 10+704 SM/T3 L 92.00 0.40 0.05 1.840
16 10+714 10+815 SM/T3 L 101.00 0.40 0.05 2.020
17 10+831 11+025 SM/T3 L 194.00 0.40 0.05 3.880
18 12+752 12+925 SM/T3 R 173.00 0.40 0.05 3.460
19 13+050 13+500 SM/T3 R 450.00 0.40 0.05 9.000
20 13+515 13+715 SM/T3 R 200.00 0.40 0.05 4.000
21 13+729 14+027 SM/T3 R 298.00 0.40 0.05 5.960
22 14+035 14+225 SM/T3 R 190.00 0.40 0.05 3.800
23 14+237 14+606 SM/T3 R 369.00 0.40 0.05 7.380
24 14+622 14+695 SM/T3 73.00 0.40 0.05 1.460
Provisional Quantity @3% 1.750
Total 60.080 cu.m
PCC on bed of Existing drain
1 5+162 5+375 SM/T2 213.00 0.35 0.05 3.728
2 5+576 5+708 SM/T2 132.00 0.35 0.05 2.310
3 7+673 7+955 SM/T3 282.00 0.40 0.05 5.640
Total 11.678 cu.m
Total PCC on drain 71.757 cu.m

Page 239 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 7.04


Providing and placing cement concrete M20/20 including compaction,
Description of work:
curing, testing etc. all complete as per Drawings.(SS/SP- 2000)
Chainage
Type / Quantity
S.N. Length (m) Width (m) Height (m) Remarks
From To Shape (cu.m)

Cross drainage Structures


1 0+002 0+014 CW 12.00 6.00 0.20 14.400
2 0+137 0+149 CW 12.00 6.00 0.20 14.400
3 0+350 0+362 CW 12.00 6.00 0.20 14.400
4 0+980 0+995 CW 12.00 6.00 0.20 14.400
5 1+362 1+374 CW 12.00 6.00 0.20 14.400
6 1+654 1+666 CW 12.00 6.00 0.20 14.400
7 2+044 2+056 CW 12.00 6.00 0.20 14.400
8 2+363 2+375 CW 12.00 6.00 0.20 14.400
9 2+440 2+452 CW 12.00 6.00 0.20 14.400
10 2+502 2+514 CW 12.00 6.00 0.20 14.400
11 2+606 CW 12.00 7.00 0.20 16.800
12 3+116 3+128 CW 12.00 6.00 0.20 14.400
13 3+138 3+150 CW 12.00 6.00 0.20 14.400
14 3+346 3+358 CW 12.00 6.00 0.20 14.400
15 3+398 3+410 CW 12.00 6.00 0.20 14.400
16 3+497 3+509 CW 12.00 6.00 0.20 14.400
17 3+944 3+956 CW 12.00 6.00 0.20 14.400
18 4+088 4+100 CW 12.00 6.00 0.20 14.400
19 4+847 4+859 CW 12.00 6.00 0.20 14.400
20 4+910 4+922 CW 12.00 6.00 0.20 14.400
21 5+765 5+767 CW 12.00 6.00 0.20 14.400
22 6+134 6+146 CW 12.00 6.00 0.20 14.400
23 6+260 6+272 CW 12.00 6.00 0.20 14.400
24 7+655 7+673 CW 8.00 7.00 0.20 11.200
25 8+161 8+173 CW 12.00 6.00 0.20 14.400
26 8+494 8+506 CW 12.00 7.00 0.20 16.800
27 8+886 8+898 CW 12.00 6.00 0.20 14.400
28 9+056 9+068 CW 12.00 6.00 0.20 14.400
29 9+370 9+382 CW 12.00 6.00 0.20 14.400
30 10+704 10+716 CW 12.00 6.00 0.20 14.400
31 10+819 10+831 CW 12.00 6.00 0.20 14.400
32 11+020 11+032 CW 12.00 6.00 0.20 14.400
33 11+242 11+254 CW 12.00 6.00 0.20 14.400
34 11+333 11+348 CW 15.00 7.00 0.20 21.000
35 11+400 11+412 CW 12.00 6.00 0.20 14.400
36 11+504 11+516 CW 12.00 7.00 0.20 16.800
37 11+692 11+704 CW 12.00 7.00 0.20 16.800
38 11+739 11+751 CW 12.00 7.00 0.20 16.800
39 11+844 11+856 CW 12.00 7.00 0.20 16.800
40 12+047 12+059 CW 12.00 6.00 0.20 14.400
41 12+163 12+178 CW 15.00 6.00 0.20 18.000
42 12+216 12+234 CW 18.00 7.00 0.20 25.200
43 12+269 12+281 CW 12.00 6.00 0.20 14.400
44 12+344 12+356 CW 12.00 7.00 0.20 16.800
45 12+481 12+493 CW 12.00 6.00 0.20 14.400
46 12+542 12+554 CW 12.00 6.00 0.20 14.400
47 12+743 12+755 CW 12.00 6.00 0.20 14.400
48 13+036 13+048 CW 12.00 7.00 0.20 16.800
49 13+716 13+731 CW 15.00 7.00 0.20 21.000
50 14+024 14+036 CW 12.00 6.00 0.20 14.400
51 14+225 14+234 CW 3.00 7.00 0.20 4.200

Page 240 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.04


Providing and placing cement concrete M20/20 including compaction,
Description of work:
curing, testing etc. all complete as per Drawings.(SS/SP- 2000)
Chainage
Type / Quantity
S.N. Length (m) Width (m) Height (m) Remarks
From To Shape (cu.m)

52 15+120 15+132 CW 12.00 6.00 0.20 14.400


53 15+630 15+642 CW 12.00 6.00 0.20 14.400
54 15+794 15+806 CW 12.00 7.00 0.20 16.800
55 15+833 15+845 CW 12.00 6.00 0.20 14.400
56 15+944 15+956 CW 12.00 6.00 0.20 14.400
57 16+023 16+035 CW 12.00 6.00 0.20 14.400
58 16+090 16+112 CW 15.00 6.00 0.20 18.000
59 16+271 16+286 CW 15.00 7.00 0.20 21.000
60 16+414 16+426 CW 12.00 6.00 0.20 14.400
61 16+982 16+994 CW 12.00 6.00 0.20 14.400
62 17+942 17+954 CW 12.00 6.00 0.20 14.400
63 18+316 18+328 CW 12.00 6.00 0.20 14.400
64 18+620 18+632 CW 12.00 6.00 0.20 14.400
65 18+800 18+812 CW 12.00 6.00 0.20 14.400
66 18+844 18+856 CW 12.00 6.00 0.20 14.400
67 18+975 18+987 CW 12.00 6.00 0.20 14.400
68 19+219 19+231 CW 12.00 7.00 0.20 16.800
69 19+420 19+432 CW 12.00 7.00 0.20 16.800
70 19+692 19+704 CW 12.00 6.00 0.20 14.400
71 19+722 19+734 CW 12.00 6.00 0.20 14.400
72 20+010 20+025 CW 15.00 7.00 0.20 21.000
73 20+432 20+444 CW 12.00 7.00 0.20 16.800
74 20+546 20+558 CW 12.00 6.00 0.20 14.400
75 20+765 20+777 CW 12.00 6.00 0.20 14.400
76 21+120 21+135 CW 15.00 7.00 0.20 21.000
77 21+183 21+195 CW 12.00 6.00 0.20 14.400
77 21+524 21+539 CW 15.00 7.00 0.20 21.000
78 21+562 21+577 CW 15.00 7.00 0.20 21.000
79 21+669 21+681 CW 12.00 7.00 0.20 16.800
80 21+817 21+829 CW 12.00 7.00 0.20 16.800
81 22+008 22+020 CW 12.00 7.00 0.20 16.800
82 22+235 22+247 CW 12.00 7.00 0.20 16.800
83 22+444 22+456 CW 12.00 7.00 0.20 16.800
84 22+572 22+584 CW 12.00 7.00 0.20 16.800
85 22+644 22+656 CW 12.00 7.00 0.20 16.800
86 22+723 22+735 CW 12.00 7.00 0.20 16.800
87 22+835 22+847 CW 12.00 7.00 0.20 16.800
88 22+938 22+950 CW 12.00 7.00 0.20 16.800
89 23+067 23+079 CW 12.00 7.00 0.20 16.800
90 23+230 23+242 CW 12.00 7.00 0.20 16.800
91 23+319 23+331 CW 12.00 6.00 0.20 14.400
92 23+490 23+502 CW 12.00 7.00 0.20 16.800
93 23+563 23+575 CW 12.00 7.00 0.20 16.800
94 23+694 23+706 CW 12.00 6.00 0.20 14.400
95 24+100 24+112 CW 12.00 6.00 0.20 14.400
96 24+217 24+229 CW 12.00 7.00 0.20 16.800
97 24+519 24+531 CW 12.00 7.00 0.20 16.800
98 24+800 24+812 CW 12.00 7.00 0.20 16.800
99 24+838 24+853 CW 15.00 7.00 0.20 21.000
100 25+260 25+272 CW 12.00 7.00 0.20 16.800
101 25+340 25+352 CW 12.00 7.00 0.20 16.800
102 25+494 25+506 CW 12.00 7.00 0.20 16.800
103 25+763 25+775 CW 12.00 7.00 0.20 16.800
104 26+330 26+342 CW 12.00 6.00 0.20 14.400
105 26+475 26+490 CW 15.00 7.00 0.20 21.000
106 26+700 26+712 CW 12.00 7.00 0.20 16.800

Page 241 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.04


Providing and placing cement concrete M20/20 including compaction,
Description of work:
curing, testing etc. all complete as per Drawings.(SS/SP- 2000)
Chainage
Type / Quantity
S.N. Length (m) Width (m) Height (m) Remarks
From To Shape (cu.m)

107 27+175 27+187 CW 12.00 6.00 0.20 14.400


108 27+250 27+262 CW 12.00 7.00 0.20 16.800
109 27+417 27+429 CW 12.00 7.00 0.20 16.800
110 27+555 27+567 CW 12.00 7.00 0.20 16.800
111 27+619 27+631 CW 12.00 7.00 0.20 16.800
112 28+111 28+123 CW 12.00 7.00 0.20 16.800
113 28+380 28+392 CW 12.00 7.00 0.20 16.800
114 28+647 28+659 CW 12.00 7.00 0.20 16.800
115 29+670 29+682 CW 12.00 7.00 0.20 16.800
116 30+376 30+388 CW 12.00 7.00 0.20 16.800
117 30+419 30+431 CW 12.00 7.00 0.20 16.800
118 31+301 31+313 CW 12.00 7.00 0.20 16.800
119 31+700 31+712 CW 12.00 7.00 0.20 16.800
120 31+945 3+957 CW 12.00 7.00 0.20 16.800
121 32+582 32+594 CW 12.00 7.00 0.20 16.800
122 32+655 32+667 CW 12.00 7.00 0.20 16.800
123 33+016 33+028 CW 12.00 7.00 0.20 16.800
124 33+130 33+142 CW 12.00 7.00 0.20 16.800
125 33+397 33+409 CW 12.00 7.00 0.20 16.800
126 33+556 33+568 CW 12.00 7.00 0.20 16.800
127 33+825 33+837 CW 12.00 7.00 0.20 16.800
128 34+125 34+143 CW 18.00 7.00 0.20 25.200
129 34+216 34+228 CW 12.00 7.00 0.20 16.800
130 34+350 34+377 CW 27.00 7.00 0.20 37.800
131 34+877 34+889 CW 12.00 7.00 0.20 16.800
132 35+530 35+542 CW 12.00 7.00 0.20 16.800
133 35+634 35+646 CW 12.00 7.00 0.20 16.800
134 35+888 35+900 CW 12.00 7.00 0.20 16.800
135 36+269 36+281 CW 12.00 7.00 0.20 16.800
136 36+485 36+497 CW 12.00 7.00 0.20 16.800
137 36+988 37+000 CW 12.00 7.00 0.20 16.800
138 37+096 37+108 CW 12.00 7.00 0.20 16.800
139 37+314 37+326 CW 12.00 7.00 0.20 16.800
140 37+455 37+467 CW 12.00 7.00 0.20 16.800
141 37+634 37+646 CW 12.00 7.00 0.20 16.800
142 37+700 37+712 CW 12.00 7.00 0.20 16.800
143 37+920 37+932 CW 12.00 7.00 0.20 16.800
144 38+066 38+078 CW 12.00 7.00 0.20 16.800
145 38+530 38+542 CW 12.00 7.00 0.20 16.800
146 38+648 38+660 CW 12.00 7.00 0.20 16.800
147 38+713 38+723 CW 12.00 7.00 0.20 16.800
148 38+815 38+827 CW 12.00 7.00 0.20 16.800
149 38+920 38+932 CW 12.00 7.00 0.20 16.800
150 39+030 39+042 CW 12.00 7.00 0.20 16.800
151 39+200 39+212 CW 12.00 7.00 0.20 16.800
152 39+342 39+354 CW 12.00 7.00 0.20 16.800
153 39+568 39+580 CW 12.00 7.00 0.20 16.800
154 39+694 39+706 CW 12.00 7.00 0.20 16.800
155 39+792 39+804 CW 12.00 7.00 0.20 16.800
156 40+109 40+121 CW 12.00 7.00 0.20 16.800
157 40+419 40+431 CW 12.00 7.00 0.20 16.800
158 40+790 40+802 CW 12.00 7.00 0.20 16.800
159 41+047 41+059 CW 12.00 6.00 0.20 14.400
160 41+275 41+287 CW 12.00 7.00 0.20 16.800
161 41+854 41+886 CW 12.00 7.00 0.20 16.800
162 42+038 42+050 CW 12.00 7.00 0.20 16.800

Page 242 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.04


Providing and placing cement concrete M20/20 including compaction,
Description of work:
curing, testing etc. all complete as per Drawings.(SS/SP- 2000)
Chainage
Type / Quantity
S.N. Length (m) Width (m) Height (m) Remarks
From To Shape (cu.m)

163 42+202 42+214 CW 12.00 6.00 0.20 14.400


164 42+286 42+298 CW 12.00 7.00 0.20 16.800
165 42+380 42+392 CW 12.00 6.00 0.20 14.400
166 42+417 42+429 CW 12.00 6.00 0.20 14.400
167 42+820 42+832 CW 12.00 7.00 0.20 16.800
168 42+866 42+878 CW 12.00 7.00 0.20 16.800
169 42+966 42+978 CW 12.00 7.00 0.20 16.800
170 43+102 43+024 CW 12.00 7.00 0.20 16.800
171 43+131 43+143 CW 12.00 7.00 0.20 16.800
172 43+231 43+243 CW 12.00 6.00 0.20 14.400
173 43+417 43+429 CW 12.00 6.00 0.20 14.400
174 43+549 43+561 CW 12.00 7.00 0.20 16.800
175 43+750 43+762 CW 12.00 7.00 0.20 16.800
176 43+926 43+938 CW 12.00 6.00 0.20 14.400
177 44+000 44+012 CW 12.00 6.00 0.20 14.400
178 44+155 44+167 CW 12.00 6.00 0.20 14.400
179 44+246 44+258 CW 12.00 6.00 0.20 14.400
180 44+385 44+397 CW 12.00 6.00 0.20 14.400
181 44+714 44+726 CW 12.00 7.00 0.20 16.800
182 44+788 44+800 CW 12.00 6.00 0.20 14.400
183 44+900 44+912 CW 12.00 7.00 0.20 16.800
184 45+002 45+014 CW 12.00 6.00 0.20 14.400
185 45+247 45+259 CW 12.00 6.00 0.20 14.400
186 45+371 45+383 CW 12.00 6.00 0.20 14.400
187 45+705 45+717 CW 12.00 7.00 0.20 16.800
188 47+317 47+329 CW 12.00 7.00 0.20 16.800
189 47+454 47+466 CW 12.00 7.00 0.20 16.800
190 47+568 47+580 CW 12.00 7.00 0.20 16.800
191 47+792 47+804 CW 12.00 7.00 0.20 16.800
192 47+906 47+918 CW 12.00 7.00 0.20 16.800
193 47+974 47+986 CW 12.00 7.00 0.20 16.800
194 48+113 48+125 CW 12.00 6.00 0.20 14.400
195 48+332 48+344 CW 12.00 6.00 0.20 14.400
196 48+568 48+583 CW 15.00 7.00 0.20 21.000
197 48+662 48+674 CW 12.00 6.00 0.20 14.400
198 48+795 48+816 CW 21.00 7.00 0.20 29.400
199 49+017 49+029 CW 12.00 7.00 0.20 16.800
200 49+225 49+237 CW 12.00 7.00 0.20 16.800
201 49+492 49+513 CW 21.00 7.00 0.20 29.400
202 49+863 49+875 CW 12.00 6.00 0.20 14.400
203 49+913 49+928 CW 15.00 7.00 0.20 21.000
204 50+055 50+070 CW 15.00 7.00 0.20 21.000
205 50+346 50+358 CW 12.00 6.00 0.20 14.400
206 50+586 50+598 CW 12.00 6.00 0.20 14.400
207 51+055 50+067 CW 12.00 7.00 0.20 16.800
208 52+450 52+462 CW 12.00 6.00 0.20 14.400
209 52+775 52+787 CW 12.00 6.00 0.20 14.400
210 52+844 52+856 CW 12.00 6.00 0.20 14.400
211 53+154 53+166 CW 12.00 6.00 0.20 14.400
212 53+388 53+400 CW 12.00 7.00 0.20 16.800
213 53+556 53+568 CW 12.00 7.00 0.20 16.800
214 53+825 53+837 CW 12.00 7.00 0.20 16.800
215 54+040 54+052 CW 12.00 6.00 0.20 14.400
216 54+220 54+232 CW 12.00 6.00 0.20 14.400
217 54+520 54+532 CW 12.00 6.00 0.20 14.400
218 54+596 54+608 CW 12.00 7.00 0.20 16.800

Page 243 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.04


Providing and placing cement concrete M20/20 including compaction,
Description of work:
curing, testing etc. all complete as per Drawings.(SS/SP- 2000)
Chainage
Type / Quantity
S.N. Length (m) Width (m) Height (m) Remarks
From To Shape (cu.m)

219 54+700 54+712 CW 12.00 6.00 0.20 14.400


220 54+772 54+784 CW 12.00 6.00 0.20 14.400
221 54+855 54+867 CW 12.00 6.00 0.20 14.400
222 55+220 55+235 CW 15.00 7.00 0.20 21.000
223 55+372 55+384 CW 12.00 7.00 0.20 16.800
224 55+600 55+612 CW 12.00 7.00 0.20 16.800
225 55+768 55+783 CW 8.00 7.00 0.20 11.200
226 55+768 55+783 CW 7.00 1.50 0.20 2.100
227 55+994 56+009 CW 15.00 7.00 0.20 21.000
228 56+198 56+210 CW 15.00 7.00 0.20 21.000
229 56+244 56+256 CW 12.00 7.00 0.20 16.800
230 56+313 56+325 CW 12.00 7.00 0.20 16.800
231 56+372 56+384 CW 12.00 6.00 0.20 14.400
232 56+550 56+562 CW 12.00 6.00 0.20 14.400
233 56+742 56+754 CW 12.00 7.00 0.20 16.800
234 56+894 56+906 CW 12.00 6.00 0.20 14.400
235 57+194 57+206 CW 12.00 6.00 0.20 14.400
236 57+438 57+450 CW 12.00 7.00 0.20 16.800
237 57+555 57+567 CW 12.00 6.00 0.20 14.400
238 57+675 57+687 CW 12.00 7.00 0.20 16.800
239 57+946 57+958 CW 12.00 6.00 0.20 14.400
240 58+083 58+095 CW 12.00 7.00 0.20 16.800
241 58+235 58+256 CW 21.00 7.00 0.20 29.400
242 58+975 58+996 CW 21.00 7.00 0.20 29.400
243 59+092 59+104 CW 12.00 6.00 0.20 14.400
244 59+292 59+307 CW 15.00 6.00 0.20 18.000
245 59+594 59+606 CW 12.00 6.00 0.20 14.400
246 59+722 59+734 CW 12.00 7.00 0.20 16.800
247 59+784 59+796 CW 12.00 6.00 0.20 14.400
248 59+810 59+822 CW 12.00 7.00 0.20 16.800
249 59+920 59+932 CW 12.00 7.00 0.20 16.800
250 59+992 60+007 CW 15.00 7.00 0.20 21.000
251 60+119 60+131 CW 12.00 6.00 0.20 14.400
252 60+405 60+417 CW 12.00 7.00 0.20 16.800
253 60+742 60+754 CW 12.00 7.00 0.20 16.800
254 61+288 61+303 CW 15.00 7.00 0.20 21.000
255 61+560 61+575 CW 15.00 7.00 0.20 21.000
256 62+460 62+472 CW 12.00 6.00 0.20 14.400
257 62+868 62+880 CW 12.00 6.00 0.20 14.400
258 63+372 63+384 CW 12.00 7.00 0.20 16.800
259 63+620 63+632 CW 12.00 6.00 0.20 14.400
260 64+192 64+204 CW 12.00 6.00 0.20 14.400
Total 4,261.700 cu.m

Page 244 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 7.05


Providing and placing precast cement concrete M25/20 slab for drain cover
Description of work:
and similar works [2000].
Chainage Type / Length Width Height Quantity
S.N. Remarks
From To Shape (m) (m) (m) (cu.m)
Road Side Drain Cover
1 6+925 7+050 RCC Cover 125.00 1.05 0.15 19.688 At Jarayotar
2 6+925 7+050 RCC Cover 125.00 1.05 0.15 19.688 At Jarayotar
3 7+050 7+270 RCC Cover 220.00 1.05 0.15 34.650 At Jarayotar
4 7+182 7+410 RCC Cover 228.00 1.05 0.15 35.910 At Jarayotar
5 16+428 16+550 RCC Cover 122.00 1.25 0.15 22.875 At rock fall area
6 16+550 16+637 RCC Cover 87.00 1.25 0.15 16.313 At rock fall area
7 16+637 16+775 RCC Cover 138.00 1.25 0.15 25.875 At rock fall area
8 27+725 RCC Cover 2.00 1.00 0.15 0.300 For pedestrain way
9 28+042 RCC Cover 2.00 1.00 0.15 0.300 For pedestrain way
10 28+130 RCC Cover 2.00 1.00 0.15 0.300 For pedestrain way
11 28+325 RCC Cover 2.00 1.00 0.15 0.300 For pedestrain way
12 28+338 RCC Cover 2.00 1.00 0.15 0.300 For pedestrain way
13 29+025 RCC Cover 4.00 1.00 0.15 0.600 For pedestrain way
14 29+925 RCC Cover 4.00 1.00 0.15 0.600 For pedestrain way
15 30+569 RCC Cover 4.00 1.00 0.15 0.600 For pedestrain way
16 30+677 RCC Cover 4.00 1.00 0.15 0.600 For pedestrain way
17 41+550 41+650.0 RCC Cover 100.00 1.00 0.15 15.000
18 41+600 RCC Cover 40.00 1.00 0.15 6.000 On Dingla road
19 45+440 45+455 RCC Cover 15.00 1.00 0.15 2.250
20 61+976 62+025 RCC Cover 49.00 1.00 0.15 7.350
Drain Cover for Foot Track
1 1+800 RCC Cover 3.00 1.00 0.15 0.450
2 6+090 RCC Cover 3.00 1.00 0.15 0.450
3 23+875 RCC Cover 2.00 1.00 0.15 0.300
4 25+850 RCC Cover 2.00 1.00 0.15 0.300
5 26+150 RCC Cover 2.00 1.00 0.15 0.300
6 27+280 RCC Cover 2.00 1.00 0.15 0.300
7 27+725 RCC Cover 2.00 1.00 0.15 0.300
8 29+180 RCC Cover 2.00 1.00 0.15 0.300
9 30+527 RCC Cover 2.00 1.00 0.15 0.300
10 30+531 RCC Cover 2.00 1.00 0.15 0.290
11 31+200 RCC Cover 2.00 1.00 0.15 0.300
12 31+475 RCC Cover 2.00 1.00 0.15 0.300
13 31+550 RCC Cover 2.00 1.00 0.15 0.300
14 31+550 RCC Cover 2.00 1.00 0.15 0.300
15 31+952 RCC Cover 2.00 1.00 0.15 0.300
16 31+952 RCC Cover 2.00 1.00 0.15 0.300
17 32+000 RCC Cover 2.00 1.00 0.15 0.300
18 32+000 RCC Cover 2.00 1.00 0.15 0.300
19 32+066 RCC Cover 2.00 1.00 0.15 0.300
20 32+180 RCC Cover 2.00 1.00 0.15 0.300
21 32+180 RCC Cover 2.00 1.00 0.15 0.300
22 32+200 RCC Cover 2.00 1.00 0.15 0.300
23 32+200 RCC Cover 2.00 1.00 0.15 0.300
24 32+250 RCC Cover 2.00 1.00 0.15 0.300
25 32+250 RCC Cover 2.00 1.00 0.15 0.300
26 32+282 RCC Cover 2.00 1.00 0.15 0.300
27 32+282 RCC Cover 2.00 1.00 0.15 0.300
28 32+305 RCC Cover 2.00 1.00 0.15 0.300
29 32+352 RCC Cover 2.00 1.00 0.15 0.300
30 32+425 RCC Cover 2.00 1.00 0.15 0.300
31 32+425 RCC Cover 2.00 1.00 0.15 0.300

Page 245 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.05


Providing and placing precast cement concrete M25/20 slab for drain cover
Description of work:
and similar works [2000].
Chainage Type / Length Width Height Quantity
S.N. Remarks
From To Shape (m) (m) (m) (cu.m)
32 32+452 RCC Cover 2.00 1.00 0.15 0.300
33 32+705 RCC Cover 2.00 1.00 0.15 0.300
34 32+795 RCC Cover 2.00 1.00 0.15 0.300
35 32+795 RCC Cover 2.00 1.00 0.15 0.300
36 34+650 RCC Cover 2.00 1.00 0.15 0.300
37 35+951 RCC Cover 2.00 1.00 0.15 0.300
38 36+250 RCC Cover 2.00 1.00 0.15 0.300
39 36+370 RCC Cover 2.00 1.00 0.15 0.300
40 36+400 RCC Cover 2.00 1.00 0.15 0.300
41 36+630 RCC Cover 2.00 1.00 0.15 0.300
42 37+225 RCC Cover 2.00 1.00 0.15 0.300
43 37+375 RCC Cover 2.00 1.00 0.15 0.300
44 37+402 RCC Cover 2.00 1.00 0.15 0.300
45 37+482 RCC Cover 2.00 1.00 0.15 0.300
46 37+555 RCC Cover 2.00 1.00 0.15 0.300
47 37+626 RCC Cover 2.00 1.00 0.15 0.300
48 37+802 RCC Cover 2.00 1.00 0.15 0.300
49 37+874 RCC Cover 2.00 1.20 0.15 0.360
50 38+225 RCC Cover 4.00 1.20 0.15 0.720
51 38+612 RCC Cover 2.00 1.20 0.15 0.360
52 38+706 RCC Cover 2.00 1.00 0.15 0.300
53 39+761 RCC Cover 2.00 1.00 0.15 0.300
54 39+800 RCC Cover 2.00 1.00 0.15 0.300
55 39+852 RCC Cover 2.00 1.00 0.15 0.300
56 40+023 RCC Cover 2.00 1.00 0.15 0.300
57 40+145 RCC Cover 2.00 1.00 0.15 0.300
58 40+308 RCC Cover 2.00 1.00 0.15 0.300
59 40+355 RCC Cover 2.00 1.00 0.15 0.300
60 40+522 RCC Cover 2.00 1.00 0.15 0.300
61 40+720 RCC Cover 2.00 1.00 0.15 0.300
62 40+908 RCC Cover 2.00 1.00 0.15 0.300
63 41+152 RCC Cover 2.00 1.00 0.15 0.300
64 41+625 RCC Cover 3.00 1.00 0.15 0.450
65 41+685 RCC Cover 2.00 1.00 0.15 0.300
66 41+860 RCC Cover 3.00 1.00 0.15 0.450
67 42+175 RCC Cover 2.00 1.00 0.15 0.300
68 42+205 RCC Cover 2.00 1.00 0.15 0.300
69 43+405 RCC Cover 2.00 1.00 0.15 0.300
70 43+418 RCC Cover 2.00 1.00 0.15 0.300
71 43+644 RCC Cover 2.00 1.00 0.15 0.300
72 43+927 RCC Cover 2.00 1.00 0.15 0.300
73 43+930 RCC Cover 2.00 1.00 0.15 0.300
74 44+164 RCC Cover 2.00 1.20 0.15 0.360
75 44+402 RCC Cover 2.00 1.20 0.15 0.360
76 44+460 RCC Cover 2.00 1.25 0.15 0.375
77 44+470 RCC Cover 2.00 1.20 0.15 0.360
78 44+577 RCC Cover 2.00 1.20 0.15 0.360
79 44+690 RCC Cover 2.00 1.20 0.15 0.360
80 45+100 RCC Cover 2.00 1.00 0.15 0.300
81 45+152 RCC Cover 2.00 1.00 0.15 0.300
82 45+301 RCC Cover 2.00 1.00 0.15 0.300
83 45+400 RCC Cover 2.00 1.00 0.15 0.300
84 45+650 RCC Cover 3.00 1.00 0.15 0.450
85 45+850 RCC Cover 3.00 1.00 0.15 0.450
86 46+005 RCC Cover 2.00 1.05 0.15 0.315
87 46+650 RCC Cover 3.00 1.00 0.15 0.450
88 46+850 RCC Cover 2.00 1.00 0.15 0.300

Page 246 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.05


Providing and placing precast cement concrete M25/20 slab for drain cover
Description of work:
and similar works [2000].
Chainage Type / Length Width Height Quantity
S.N. Remarks
From To Shape (m) (m) (m) (cu.m)
89 46+955 RCC Cover 3.00 1.00 0.15 0.450
90 48+850 RCC Cover 2.00 1.00 0.15 0.300
91 48+896 RCC Cover 2.00 1.00 0.15 0.300
92 49+125 RCC Cover 2.00 1.00 0.15 0.300
93 49+427 RCC Cover 2.00 1.00 0.15 0.300
94 50+125 RCC Cover 3.00 1.00 0.15 0.450
95 50+475 RCC Cover 2.00 1.00 0.15 0.300
96 50+600 RCC Cover 2.00 1.00 0.15 0.300
97 50+748 RCC Cover 2.00 1.00 0.15 0.300
98 53+140 RCC Cover 2.00 1.00 0.15 0.300
99 53+155 RCC Cover 2.00 1.00 0.15 0.300
100 53+235 RCC Cover 2.00 1.00 0.15 0.300
101 53+320 RCC Cover 2.00 1.00 0.15 0.300
102 53+560 RCC Cover 2.00 1.00 0.15 0.300
103 53+575 RCC Cover 2.00 1.00 0.15 0.300
104 53+875 RCC Cover 2.00 1.00 0.15 0.300
105 54+270 RCC Cover 2.00 1.00 0.15 0.300
106 54+572 RCC Cover 3.00 1.00 0.15 0.450
107 54+702 RCC Cover 2.00 1.00 0.15 0.300
108 54+820 RCC Cover 2.00 1.00 0.15 0.300
109 54+900 RCC Cover 2.00 1.00 0.15 0.300
110 56+163 RCC Cover 2.00 1.00 0.15 0.300
111 56+665 RCC Cover 2.00 1.00 0.15 0.300
112 56+760 RCC Cover 2.00 1.00 0.15 0.300
113 57+100 RCC Cover 2.00 1.00 0.15 0.300
114 57+125 RCC Cover 2.00 1.00 0.15 0.300
115 57+200 RCC Cover 2.00 1.00 0.15 0.300
116 57+710 RCC Cover 2.00 1.25 0.15 0.375
117 57+808 RCC Cover 2.00 1.25 0.15 0.375
118 57+910 RCC Cover 2.00 1.00 0.15 0.300
119 58+125 RCC Cover 2.00 1.00 0.15 0.300
120 58+475 RCC Cover 2.00 1.00 0.15 0.300
121 58+625 RCC Cover 2.00 1.25 0.15 0.375
122 59+370 RCC Cover 2.00 1.25 0.15 0.375
123 59+450 RCC Cover 2.00 1.25 0.15 0.375
124 60+178 RCC Cover 2.00 1.00 0.15 0.300
125 60+250 RCC Cover 2.00 1.00 0.15 0.300
126 60+375 RCC Cover 2.00 1.00 0.15 0.300
127 60+476 RCC Cover 2.00 1.00 0.15 0.300
128 60+524 RCC Cover 2.00 1.00 0.15 0.300
129 60+551 RCC Cover 2.00 1.00 0.15 0.300
130 60+780 RCC Cover 2.00 1.00 0.15 0.300
131 61+052 RCC Cover 2.00 1.05 0.15 0.315
132 61+270 RCC Cover 2.00 1.05 0.15 0.315
133 61+452 RCC Cover 2.00 1.05 0.15 0.315
134 61+652 RCC Cover 2.00 1.00 0.15 0.300
135 61+850 RCC Cover 2.00 1.00 0.15 0.300
136 61+974 RCC Cover 2.00 1.00 0.15 0.300
137 62+101 RCC Cover 2.00 1.00 0.15 0.300
138 62+322 RCC Cover 2.00 1.00 0.15 0.300
139 63+080 RCC Cover 2.00 1.00 0.15 0.300
140 63+462 RCC Cover 3.00 1.00 0.15 0.450
141 63+525 RCC Cover 2.00 1.00 0.15 0.300
Total 254.79 cu.m

Page 247 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.:7.06
Providing and placing plum-concrete with 70% M15/40 concrete and 30%
Description of work:
boulders/stones (SS/SP 2406)
Chainage
Length Height Quantity
S.N. Nos. Width (m) Remarks
From To (m) (m) (cu.m)

Cross drainage Structures


1 1+362 1+374 2 15.00 2.00 0.075 4.500 PCC above stone soling
2 2+044 2+056 1 6.00 3.00 0.075 1.350 Gabion matress
3 2+363 2+375 1 7.00 3.00 0.075 1.575 Gabion matress
4 2+606 1 10.00 4.00 0.075 3.000 US gabion matress
1 20.00 6.00 0.075 9.000 DS gabion matress
5 3+116 3+128 1 5.00 2.50 0.075 0.938
6 3+138 3+150 1 6.00 2.50 0.075 1.125
7 5+765 5+767 1 6.00 2.00 0.075 0.900
1 8.00 1.00 0.075 0.600
8 6+134 6+146 1 12.00 6.00 0.075 5.400
1 6.00 1.00 0.075 0.450
9 9+370 9+382 1 12.00 2.00 0.075 1.800
10 10+819 10+831 1 6.00 1.50 0.075 0.675
1 8.00 1.00 0.075 0.600
11 11+020 11+032 1 6.00 1.50 0.075 0.675
1 8.00 1.50 0.075 0.900
12 11+333 11+348 1 10.00 7.00 0.075 5.250
13 11+400 11+412 1 6.00 2.00 0.075 0.900
14 11+504 11+516 1 6.00 2.00 0.075 0.900
15 11+692 11+704 1 5.00 1.50 0.075 0.563
1 7.00 1.00 0.075 0.525
16 11+739 11+751 1 6.00 1.00 0.075 0.450
17 12+047 12+059 1 8.00 1.00 0.075 0.600
18 12+216 12+234 1 12.00 1.00 0.075 0.900
1 10.00 1.00 0.075 0.750
19 12+344 12+356 2 5.00 1.00 0.075 0.750
20 12+481 12+493 1 4.00 1.00 0.075 0.300
21 13+036 13+048 1 6.00 1.00 0.075 0.450
22 15+794 15+806 1 8.00 3.00 0.075 1.800
23 15+833 15+845 1 3.00 1.50 0.075 0.338
24 15+944 15+956 1 5.00 1.00 0.075 0.375
25 16+023 16+035 1 8.00 1.00 0.075 0.600
26 16+090 16+112 1 10.00 2.00 0.075 1.500
27 16+271 16+286 1 12.00 6.00 0.075 5.400
1 8.00 2.00 0.075 1.200
28 18+316 18+328 1 4.00 1.00 0.075 0.300
29 18+620 18+632 1 5.00 2.00 0.075 0.750
30 18+800 18+812 1 7.00 2.00 0.075 1.050
31 18+844 18+856 1 5.00 2.50 0.075 0.938
32 18+975 18+987 1 7.00 2.00 0.075 1.050
33 19+219 19+231 1 5.00 2.00 0.075 0.750
1 6.00 2.00 0.075 0.900
34 19+420 19+432 1 12.00 1.00 0.075 0.900
35 19+692 19+704 1 8.00 1.00 0.075 0.600
36 19+722 19+734 1 7.00 2.00 0.075 1.050
37 20+010 20+025 1 8.50 3.00 0.075 1.913
38 20+432 20+444 1 10.00 3.00 0.075 2.250
39 20+546 20+558 1 8.00 1.00 0.075 0.600
40 20+765 20+777 1 7.00 1.00 0.075 0.525
41 21+120 21+135 1 7.50 7.00 0.075 3.938
42 21+183 21+195 1 5.00 2.00 0.075 0.750

Page 248 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.06
Providing and placing plum-concrete with 70% M15/40 concrete and 30%
Description of work:
boulders/stones (SS/SP 2406)
Chainage
Length Height Quantity
S.N. Nos. Width (m) Remarks
From To (m) (m) (cu.m)

43 22+444 22+456 1 5.00 1.50 0.075 0.563


44 22+572 22+584 1 5.00 1.50 0.075 0.563
45 23+490 23+502 1 10.00 3.50 0.075 2.625
46 23+563 23+575 1 5.00 1.00 0.075 0.375
47 24+100 24+112 1 10.00 5.00 0.075 3.750
48 24+217 24+229 1 6.00 2.00 0.075 0.900
49 24+519 24+531 1 10.00 1.20 0.075 0.900
50 24+800 24+812 1 8.50 7.00 0.075 4.463
51 24+838 24+853 1 10.00 3.50 0.075 2.625
52 25+260 25+272 1 8.00 5.00 0.075 3.000
53 25+340 25+352 2 6.00 1.00 0.075 0.900 US & DS
54 25+494 25+506 2 6.50 2.00 0.075 1.950 US & DS
55 25+763 25+775 2 7.00 1.00 0.075 1.050 US & DS
56 26+330 26+342 1 5.00 1.50 0.075 0.563
1 5.00 1.00 0.075 0.375
57 27+417 27+429 1 6.00 1.00 0.075 0.450 US
1 5.00 1.00 0.075 0.375 DS
58 27+619 27+631 1 10.00 2.00 0.075 1.500 US
59 28+111 28+123 1 10.00 8.00 0.075 6.000 DS
60 30+419 30+431 1 10.00 6.00 0.075 4.500 u/s
1 6.00 1.00 0.075 0.450 D/S
61 33+130 33+142 2 10.00 5.00 0.075 7.500 Both U/S and D/S
62 33+556 33+568 1 12.00 2.00 0.075 1.800
63 33+825 33+837 1 8.00 2.00 0.075 1.200
64 34+125 34+143 1 9.00 7.00 0.075 4.725
65 37+214 37+326 1 10.00 2.00 0.075 1.500
66 53+388 53+400 1.00 8.00 1.00 0.075 0.600
67 54+040 54+052 1.00 9.00 1.00 0.075 0.675
68 55+994 56+009 1.00 15.00 5.00 0.075 5.625
1.00 6.00 1.00 0.075 0.450 on gabbin top opening
69 56+313 56+325 1.00 10.00 2.00 0.075 1.500
70 58+235 58+256 1.00 0.075 8.250 PCC on 110m2 at us
71 58+975 58+996 1.00 10.00 0.075 3.248 US of CW
72 59+920 59+932 1.00 4.00 1.00 0.075 0.300
73 60+742 60+754 1.00 10.00 2.00 0.075 1.500 US of CW
74 61+975 1.00 2.73 2.40 0.075 0.491 PCC on RRM
Total 152.539 cu.m

Page 249 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 7.07


Providing and laying Random rubble stone masonry in cement sand mortar MM 5 including
Description of work:
curing, etc. all complete (SS/SP- 2600)
Chainage Type/ Length Width Height Sectional Quantity
S.N. Nos. Remarks
From To Shape (m) (m) (m) Area(sq.m) (cu.m)
Crossing Structures
1 0+002 0+014 SM 1 12.00 0.6-0.35 1.00 0.475 5.700 CW Cut-off Wall
SM 2 2.00 0.50 0.75 0.375 1.500 Guide wall
2 0+137 0+149 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
3 0+350 0+362 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
4 0+825 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
2 2.40 1.20 0.30 0.360 1.728 DS drop structure
5 0+980 0+995 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
6 1+362 1+374 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
7 1+654 1+666 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
8 2+044 2+056 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
9 2+363 2+375 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
10 2+440 2+452 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
11 2+502 2+514 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
SM 1 2.00 0.70 1.50 1.050 2.100 CW cut-off wall
12 2+606 SM 1 3.00 1.00 0.475 1.425 CW cut-off wall
13 3+116 3+128 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
14 3+138 3+150 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
15 3+346 3+358 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
16 3+398 3+410 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
17 3+497 3+509 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
18 3+944 3+956 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
DS Guide Wall to
SM 2 3.00 0.50 0.75 0.375 2.250
turnout drain
19 4+088 4+100 SM 1 12.00 1.00 0.475 5.700 CW Cut-off Wall
US Guide Wall to
SM 2 2.00 0.50 0.75 0.375 1.500
turnout drain
20 4+658 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
21 4+847 4+859 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
22 4+910 4+922 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
23 5+765 5+767 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
24 6+134 6+146 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
25 6+260 6+272 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
26 7+655 7+673 SM 1 8.00 1.00 0.475 3.800 CW cut-off wall
27 8+161 8+173 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
28 8+243 8+253 SM 2 5.00 0.75 0.75 0.563 5.625 Guide wall
29 8+494 8+506 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
30 8+701 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
2 2.40 1.20 0.30 0.360 1.728 DS drop structure
31 8+886 8+898 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
32 9+056 9+068 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall

Page 250 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.07


Providing and laying Random rubble stone masonry in cement sand mortar MM 5 including
Description of work:
curing, etc. all complete (SS/SP- 2600)
Chainage Type/ Length Width Height Sectional Quantity
S.N. Nos. Remarks
From To Shape (m) (m) (m) Area(sq.m) (cu.m)
33 9+370 9+382 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
33 10+000 PC 2 3.00 2.60 2.250 11.580 HW (P2)
34 10+704 10+716 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
35 10+819 10+831 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
36 11+020 11+032 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
37 11+242 11+254 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
38 11+333 11+348 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
1 5.00 0.50 0.75 0.375 1.875 Guide wall
39 11+400 11+412 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
40 11+504 11+516 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
41 11+692 11+704 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
42 11+739 11+751 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
43 11+844 11+856 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
44 12+047 12+059 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
45 12+163 12+178 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
2 4.00 1.00 0.75 0.750 6.000 Guide wall
46 12+216 12+234 SM 1 18.00 1.00 0.475 8.550 CW cut-off wall
2 4.00 1.00 0.75 0.750 6.000 Guide wall
47 12+269 12+281 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
48 12+344 12+356 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
49 12+481 12+493 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
50 12+542 12+554 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
51 12+743 12+755 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
52 13+036 13+048 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
53 13+324 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
2 2.40 1.20 0.30 0.360 1.728 DS drop structure
54 13+716 13+731 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
55 13+855 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
2 2.40 1.20 0.30 0.360 1.728 DS drop structure
56 14+024 14+036 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
1 2.00 0.50 0.75 0.375 0.750 Guide wall
57 14+225 14+234 SM 1 3.00 1.00 0.475 1.425 CW cut-off wall (P2)
58 14+502 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
59 14+695 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
60 15+120 15+132 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
1 3.00 0.75 0.75 0.563 1.688 Guide wall
61 15+225 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW

Page 251 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.07


Providing and laying Random rubble stone masonry in cement sand mortar MM 5 including
Description of work:
curing, etc. all complete (SS/SP- 2600)
Chainage Type/ Length Width Height Sectional Quantity
S.N. Nos. Remarks
From To Shape (m) (m) (m) Area(sq.m) (cu.m)
2 2.40 1.20 0.30 0.360 1.728 DS drop structure
62 15+794 15+806 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
63 15+833 15+845 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
64 15+944 15+956 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
65 16+023 16+035 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
66 16+090 16+112 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
67 16+271 16+286 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
67 16+365 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
2 2.40 1.20 0.30 0.360 1.728 DS drop structure
68 16+414 16+426 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
1 2.00 0.50 0.75 0.375 0.750 Guide wall
69 16+982 16+994 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
70 17+255 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
2 2.40 1.20 0.30 0.360 1.728 DS drop structure
71 17+560 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
2 2.40 1.20 0.30 0.360 1.728 DS drop structure
72 17+942 17+954 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
73 18+316 18+328 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
74 18+620 18+632 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
75 18+800 18+812 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
76 18+844 18+856 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
77 18+975 18+987 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
78 19+219 19+231 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
79 19+420 19+432 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
1 2.00 0.50 0.75 0.375 0.750 Guide wall
80 19+692 19+704 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
81 19+722 19+734 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
82 20+010 20+025 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
83 20+432 20+444 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
84 20+546 20+558 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
85 20+765 20+777 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
86 21+120 21+135 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
87 21+183 21+195 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
88 21+524 21+539 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
89 21+562 21+577 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
90 21+669 21+681 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall

Page 252 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.07


Providing and laying Random rubble stone masonry in cement sand mortar MM 5 including
Description of work:
curing, etc. all complete (SS/SP- 2600)
Chainage Type/ Length Width Height Sectional Quantity
S.N. Nos. Remarks
From To Shape (m) (m) (m) Area(sq.m) (cu.m)
91 21+817 21+829 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
92 22+008 22+020 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
93 22+235 22+247 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
94 22+345 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
2 2.40 1.20 0.30 0.360 1.728 DS drop structure
95 22+444 22+456 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
96 22+572 22+584 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
97 22+644 22+656 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
98 22+723 22+735 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
99 22+835 22+847 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
100 22+938 22+950 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
101 23+067 23+079 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
102 23+230 23+242 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
103 23+319 23+331 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
104 23+490 23+502 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
2 2.00 0.50 0.75 0.375 1.500 Guide wall
105 23+563 23+575 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
106 23+694 23+706 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
107 24+100 24+112 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
108 24+217 24+229 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
2 2.00 0.50 0.75 0.375 1.500 Guide wall
109 24+519 24+531 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
110 24+800 24+812 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
111 24+838 24+853 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
109 25+025 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
2 2.40 1.20 0.30 0.360 1.728 DS drop structure
110 25+260 25+272 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
111 25+340 25+352 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
112 25+494 25+506 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
113 25+763 25+775 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
114 26+330 26+342 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
115 26+475 26+490 SM 1 15.00 1.00 0.475 7.125 CW cut of wall
116 26+700 26+712 SM 1 12.00 1.00 0.475 5.700 CW cut of wall
116 27+175 27+187 SM 1 12.00 1.00 0.475 5.700 CW cut of wall
117 27+250 27+262 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
118 27+417 27+429 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
119 27+555 27+567 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
120 27+619 27+631 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
121 27+950 PC 1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
122 28+111 28+123 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
123 28+380 28+390 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
124 28+587 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW

Page 253 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.07


Providing and laying Random rubble stone masonry in cement sand mortar MM 5 including
Description of work:
curing, etc. all complete (SS/SP- 2600)
Chainage Type/ Length Width Height Sectional Quantity
S.N. Nos. Remarks
From To Shape (m) (m) (m) Area(sq.m) (cu.m)
1 2.40 2.90 2.350 4.685 DS HW
125 28+647 28+659 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
126 29+160 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW

127 29+670 29+682 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall


128 30+029 PC 1 2.40 2.60 1.500 3.262 US HW
1 2.40 2.90 2.280 5.035 DS HW
129 30+061 PC 1 2.40 2.60 1.500 3.262 US HW
1 2.40 2.90 2.280 5.035 DS HW

130 30+376 30+388 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall


131 30+419 30+431 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
132 30+895 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
133 31+301 31+313 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
134 31+700 31+712 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
135 31+945 31+957 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
136 32+388 PC 1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
137 32+582 32+594 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
138 32+555 32+567 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
139 32+886 PC 1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
140 33+016 33+028 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
141 33+130 33+142 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
142 33+397 33+409 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
143 33+556 33+837 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
144 33+825 33+837 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
145 34+125 34+143 SM 1 18.00 1.00 0.480 8.640 CW cutt of wall
146 34+216 34+228 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
147 34+350 34+377 SM 1 27.00 1.00 0.480 12.960 CW cutt of wall
148 34+877 34+889 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
149 35+175 PC 1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
Tail masonrry
1 2.60 0.500 1.300
structure
150 35+325 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
Tail masonrry
1 2.60 0.500 1.300
structure
151 35+530 35+542 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
152 35+634 35+646 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
153 35+888 35+900 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
154 36+269 36+281 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
155 36+485 36+497 SM 1 12.00 1.00 0.480 5.760

Page 254 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.07


Providing and laying Random rubble stone masonry in cement sand mortar MM 5 including
Description of work:
curing, etc. all complete (SS/SP- 2600)
Chainage Type/ Length Width Height Sectional Quantity
S.N. Nos. Remarks
From To Shape (m) (m) (m) Area(sq.m) (cu.m)
156 36+660 PC 1 2.40 2.60 2.250 4.436 US HW P2
1 2.40 2.90 2.350 4.685 DS HW
1 5.00 2.00 1.700 8.500 SM work
157 36+988 37+000 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
158 37+096 37+108 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
159 37+314 37+326 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
160 37+455 37+467 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
161 37+634 37+646 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
162 37+700 37+712 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
163 37+920 37+932 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
164 38+066 38+078 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
165 38+530 38+542 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
166 38+648 38+660 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
167 38+713 38+725 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
168 38+815 38+827 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
169 38+920 38+932 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
170 39+030 39+042 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
171 39+200 39+212 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
172 39+342 39+354 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
173 39+568 39+580 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
174 39+694 39+706 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
175 39+792 39+804 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
176 40+109 40+212 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
177 40+330 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
178 40+419 40+431 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
179 40+790 40+802 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
180 41+047 41+059 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
181 41+275 41+287 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
182 41+854 41+866 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
183 42+038 42+050 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
184 42+202 42+214 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
185 42+286 42+298 SM 1 12.00 1.00 0.480 5.760 CW cutt of wall
186 42+380 42+392 SM 1 12.00 1.00 0.480 5.760
187 42+417 42+429 SM 1 12.00 1.00 0.480 5.760
188 42+820 42+832 SM 1 12.00 1.00 0.480 5.760
189 42+866 42+878 SM 1 12.00 1.00 0.480 5.760
190 42+966 42+978 SM 1 12.00 1.00 0.480 5.760
191 43+102 43+024 SM 1 12.00 1.00 0.480 5.760
192 43+131 43+143 SM 1 12.00 1.00 0.480 5.760
193 43+231 43+243 SM 1 12.00 1.00 0.480 5.760
194 43+417 43+561 SM 1 12.00 1.00 0.480 5.760
195 43+549 43+762 SM 1 12.00 1.00 0.480 5.760
196 43+750 43+938 SM 1 12.00 1.00 0.480 5.760
197 43+926 43+938 SM 1 12.00 1.00 0.480 5.760
198 44+000 44+012 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
199 44+155 44+167 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
200 44+246 44+258 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
201 44+385 44+397 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
202 44+714 44+726 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
203 44+788 44+800 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
204 44+900 44+912 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall

Page 255 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.07


Providing and laying Random rubble stone masonry in cement sand mortar MM 5 including
Description of work:
curing, etc. all complete (SS/SP- 2600)
Chainage Type/ Length Width Height Sectional Quantity
S.N. Nos. Remarks
From To Shape (m) (m) (m) Area(sq.m) (cu.m)
205 45+002 45+014 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
206 45+254 45+259 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
207 45+371 45+383 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
208 45+705 45+717 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
209 46+475 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
SM 1 2.73 2.40 0.30 0.720 1.966 RRM
SM 1 2.40 0.45 1.00 0.450 1.080 protection wall
210 46+876 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
211 47+317 47+329 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
212 47+454 47+466 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
213 47+568 47+580 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
214 47+792 47+804 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
215 47+906 47+918 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
216 47+974 47+986 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
217 48+113 48+125 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
218 48+332 48+344 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
219 48+568 48+583 CW 1 15.00 1.00 0.480 7.200 CW cut-off wall
220 48+662 48+674 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
221 48+795 48+816 CW 1 21.00 1.00 0.480 10.080 CW cut-off wall
222 49+017 49+029 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
223 49+225 49+237 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
224 49+492 49+513 CW 1 21.00 1.00 0.480 10.080 CW cut-off wall
225 49+680 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
226 49+863 49+875 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
227 49+913 49+928 CW 1 15.00 1.00 0.480 7.200 CW cut-off wall
228 50+055 50+070 SM 1 15.00 1.00 0.475 7.125 CW cut-off wall
229 50+346 50+358 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
2 2.00 0.50 0.75 0.375 1.500
230 50+586 50+598 SM 1 12.00 1.00 0.475 5.700 CW cut-off wall
231 51+055 51+067 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
232 51+335 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
233 52+190 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
234 52+450 52+462 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
235 52+775 52+787 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall

Page 256 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.07


Providing and laying Random rubble stone masonry in cement sand mortar MM 5 including
Description of work:
curing, etc. all complete (SS/SP- 2600)
Chainage Type/ Length Width Height Sectional Quantity
S.N. Nos. Remarks
From To Shape (m) (m) (m) Area(sq.m) (cu.m)
236 52+844 52+856 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
237 53+154 53+166 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
238 53+388 53+400 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
239 53+556 53+568 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
240 53+825 53+837 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
241 54+040 54+052 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
242 54+220 54+232 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
243 54+520 54+532 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
244 54+596 54+608 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
245 54+700 54+712 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
246 54+772 54+784 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
247 54+855 54+867 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
248 55+220 55+235 SM 1 15.00 1.00 0.480 7.200 CW cut-off wall
249 55+372 55+384 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
250 55+600 55+612 SM 1 12.00 1.00 0.480 5.760 CW cut-off wall
SM 1 10.00 5.00 17.950 179.500 protection wall
opening on
1 5.00 1.00 1.118 5.590
protection wall
251 55+742 PC 1 2.30 1.80 0.970 2.231 Catch pit wall
2 1.40 0.670 1.876 Catch pit wall
1 2.30 2.00 0.30 0.600 1.380 Catch pit bed
1 2.30 2.30 1.495 3.100 US HW
1 2.30 2.60 2.275 4.795 DS HW
252 55+768 55+783 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
253 55+994 56+009 CW 1 15.00 1.00 0.480 7.200 CW cut-off wall
254 56+198 56+210 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
255 56+244 56+256 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
256 56+313 56+325 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
257 56+372 56+384 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
258 56+503 PC 1 2.30 2.30 1.495 3.100 US HW
1 2.30 2.60 2.275 4.795 DS HW
259 56+550 56+562 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
260 56+610 PC 1 2.30 2.30 1.495 3.100 US HW
1 2.30 2.60 2.275 4.795 DS HW
261 56+742 56+754 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
262 56+894 56+906 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
263 57+194 57+206 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
264 57+330 PC 1 2.30 2.30 1.495 3.100 US HW
1 2.30 2.60 2.275 4.795 DS HW
265 57+438 57+450 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
266 57+555 57+567 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
267 57+675 57+687 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
268 57+852 PC 1 2.30 2.30 1.495 3.100 US HW
1 2.30 2.60 2.275 4.795 DS HW
269 57+946 57+958 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
270 58+083 58+095 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
271 58+235 58+256 CW 1 21.00 1.00 0.480 10.080 CW cut-off wall
272 58+565 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
273 58+750 PC 1 2.30 2.30 1.495 3.100 US HW
1 2.30 2.60 2.275 4.795 DS HW
1 2.05 2.00 0.30 0.600 1.230 protection structure
1 2.00 0.45 1.00 0.450 0.900 protection wall
274 58+975 58+996 CW 1 21.00 1.00 0.480 10.080 CW cut-off wall
275 59+092 59+104 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
276 59+230 PC 1 2.30 2.30 1.495 3.100 US HW

Page 257 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.07


Providing and laying Random rubble stone masonry in cement sand mortar MM 5 including
Description of work:
curing, etc. all complete (SS/SP- 2600)
Chainage Type/ Length Width Height Sectional Quantity
S.N. Nos. Remarks
From To Shape (m) (m) (m) Area(sq.m) (cu.m)
1 2.30 2.60 2.275 4.795 DS HW
277 59+292 59+307 CW 1 15.00 1.00 0.480 7.200 CW cut-off wall
2 5.00 0.50 0.50 0.250 2.500 guide wall
278 59+594 59+606 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
279 59+722 59+734 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
280 59+784 59+796 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
281 59+810 59+822 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
282 59+920 59+932 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
283 59+992 60+007 CW 1 15.00 1.00 0.480 7.200 CW cut-off wall
284 60+119 60+131 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
285 60+405 60+417 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
286 60+742 60+754 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
287 61+070 PC 1 2.30 2.30 1.495 3.100 US HW
1 2.30 2.60 2.275 4.795 DS HW
288 61+288 61+303 CW 1 15.00 1.00 0.480 7.200 CW cut-off wall
289 61+560 61+575 CW 1 15.00 1.00 0.480 7.200 CW cut-off wall
290 61+975 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
SM 1 2.73 2.40 0.30 0.720 1.966 RRM
SM 1 2.40 0.45 1.00 0.450 1.080 protection wall
291 62+460 62+472 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
292 62+868 62+880 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
SM 1 3.000 US guide wall
293 63+372 63+384 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
294 63+620 63+632 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
295 64+192 64+204 CW 1 12.00 1.00 0.480 5.760 CW cut-off wall
SM 1 5.000 US guide wall
296 64+560 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
297 64+965 PC 1 2.40 1.80 1.170 2.808 Catch pit wall
2 1.50 0.810 2.430 Catch pit wall
1 2.40 2.00 0.30 0.600 1.440 Catch pit bed
1 2.40 2.60 2.250 4.436 US HW
1 2.40 2.90 2.350 4.685 DS HW
Extra Structure
1 16+450 10.00 0.660 6.600
2 16+550 7.00 0.450 3.150
Total 2,372.670 cu.m

Page 258 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
Road Side Drain
1 0+012 0+131 SM/T2 R 119.00 0.380 45.220
2 0+131 0+137 SM/T2 L 6.00 0.380 2.280
3 0+149 0+207 SM/T2 L 58.00 0.380 22.040
4 0+250 0+350 SM/T2 L 100.00 0.380 38.000
5 0+512 0+824 SM/T2 L 312.00 0.380 118.560
6 0+826 0+920 SM/T2 L 94.00 0.380 35.720
7 0+826 0+920 SM/T2 R 94.00 0.380 35.720
8 0+950 0+975 SM/T2 L 25.00 0.380 9.500
9 0+995 1+052 SM/T2 L 57.00 0.380 21.660
10 1+054 1+148 SM/T2 L 94.00 0.380 35.720
11 1+155 1+231 SM/T2 L 76.00 0.380 28.880
12 1+325 1+362 SM/T2 L 37.00 0.380 14.060
13 1+374 1+654 SM/T2 L 280.00 0.380 106.400
14 1+420 1+475 SM/T2 R 55.00 0.380 20.900
15 1+890 2+044 SM/T2 L 154.00 0.380 58.520
16 SM/T2 R 2.00 0.380 0.760
2m turnout drain and
17 R 15.00 9.225 cascade of 15m length
SM/T2
18 2+610 2+635 SM/T2 R 25.00 0.380 9.500
19 2+865 2+942 SM/T2 R 77.00 0.380 29.260
20 2+952 3+050 SM/T2 L 98.00 0.380 37.240
21 3+152 3+255 SM/T2 L 103.00 0.380 39.140
22 3+255 3+340 SM/T2 L 85.00 0.380 32.300
23 3+325 3+340 SM/T2 R 15.00 0.380 5.700
24 3+340 3+346 SM/T2 L 6.00 0.380 2.280
25 3+358 3+398 SM/T2 L 40.00 0.380 15.200
26 3+410 3+497 SM/T2 L 87.00 0.380 33.060
27 3+509 3+637 SM/T2 L 128.00 0.380 48.640
28 3+647 3+780 SM/T2 L 133.00 0.380 50.540
29 3+944 SM/T9 R 60.00 0.500 30.000 turnout drain after CW
30 3+888 3+944 SM/T2 R 56.00 0.380 21.280
31 3+956 4+088 SM/T2 R 132.00 0.380 50.160
32 4+160 4+300 SM/T2 R 140.00 0.380 53.200
33 4+330 4+403 SM/T1 L 73.00 0.280 20.440
PCC in bottom due to
34 L 157.00 0.280 43.960 high slope
4+495 4+652 SM/T1
PCC in bottom due to
35 R 126.00 0.280 35.280
4+720 4+846 SM/T1 high slope
PCC in bottom due to
36 R 51.00 0.280 14.280 high slope
4+859 4+910 SM/T1
PCC in bottom due to
37 R 16.00 0.280 4.480
5+560 5+576 SM/T1 high slope
38 5+710 5+765 SM/T1 R 55.00 0.280 15.400
PCC in bottom due to
39 R 273.00 0.280 76.440 high slope
5+777 6+050 SM/T1
Turnout drain 20m with
40 20.00 0.380 7.600 8 drop of 0.5m
6+090 SM/T2
extra SM work for 8
41 0.190 1.520 drops
SM
42 6+090 6+132 SM/T1 L 42.00 0.280 11.760
43 6+150 6+253 SM/T1 L 103.00 0.280 28.840
44 6+400 6+580 SM/T1 R 180.00 0.280 50.400

Page 259 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
45 6+625 6+815 SM/T1 L 190.00 0.280 53.200
Chute drop in d/s about
46 R 20.00 0.280 5.600
SM/T1 20m (PCC on bed)
47 6+675 6+815 SM/T1 R 140.00 0.280 39.200
both side drain with
20cm drop in every 10m
48 R 125.00 0.450 56.250 length , cover drain
6+925 7+050 SM/T3 starts
extra SM work for 26
49 0.090 2.340
SM drop on drain
50 6+925 7+050 SM/T3 L 125.00 0.450 56.250
51 7+050 7+270 SM/T3 R 220.00 0.450 99.000
52 7+182 7+410 SM/T3 L 228.00 0.450 102.600 cover drain ends
53 7+270 7+325 SM/T1 R 55.00 0.280 15.400
one drop is provided in
54 L 20.00 0.450 9.000
7+410 7+430 SM/T3 mid length
extra SM work for one
55 0.092 0.092
0.2m drop
bottom PCC is Required
56 L 20.00 0.380 7.600
7+955 7+975 SM/T2
bottom PCC is Required
57 L 10.00 0.380 3.800
7+975 7+985 SM/T2
bottom PCC is Required
58 L 90.00 0.380 34.200
7+985 8+075 SM/T2
59 8+075 8+160 SM/T7 L 85.00 0.000 0.000
60 8+173 8+240 SM/T1 L 67.00 0.280 18.760
61 8+260 8+494 SM/T1 L 234.00 0.280 65.520
62 8+506 8+700 SM/T2 L 194.00 0.380 73.720
63 8+702 8+831 SM/T2 L 129.00 0.380 49.020
cascade structure of
64 R 15.00 15.150 15m length from PC
8+701
65 8+836 8+886 SM/T1 L 50.00 0.280 14.000
66 8+898 9+000 SM/T1 L 102.00 0.280 28.560
67 9+044 9+056 SM/T3 L 12.00 0.450 5.400
68 9+068 9+370 SM/T3 L 302.00 0.450 135.900
69 9+270 9+335 SM/T1 R 65.00 0.280 18.200 right side cutting
70 9+382 9+758 SM/T2 L 376.00 0.380 142.880
71 9+763 9+992 SM/T2 L 229.00 0.380 87.020
72 10+007 10+150 SM/T2 L 143.00 0.380 54.340 bothside cutting
SM/T2 Extension turnout drain
73 R 10.00 0.380 3.800 of length 10m upto
10+007 Kholsa is required
74 10+007 10+150 SM/T2 R 143.00 0.380 54.340
SM/T3 Chute drop in d/s about
75 L 25.00 0.450 11.250 25m length(.5m drop in
10+288 3m) PCC on bed
extra SM works for 8
76 0.200 1.600 drops in 25m long chute

SM/T3 PCC in bottom due to


77 R 105.00 0.450 47.250 high slope
10+290 10+395
SM/T3 PCC in bottom due to
78 R 110.00 0.450 49.500
10+395 10+505 high slope
SM/T2 turnout drain of 15m
79 L 15.00 0.380 5.700 length with 1m fall in 5m
10+420

Page 260 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
extra SM works for 6
80 0.195 1.170
drop on turn out drain
81 10+515 10+600 SM/T1 L 85.00 0.280 23.800 PCC in bottom of drain
82 10+614 10+704 SM/T3 L 90.00 0.450 40.500 PCC in bottom of drain
83 10+716 10+815 SM/T3 L 99.00 0.450 44.550
84 10+831 11+020 SM/T3 L 189.00 0.450 85.050 PCC in bottom of drain
85 11+032 11+057 SM/T1 L 25.00 0.280 7.000
86 11+057 11+240 SM/T3 L 183.00 0.450 82.350
87 11+254 11+328 SM/T1 L 74.00 0.280 20.720 Pokheri khola
88 11+352 11+400 SM/T1 L 48.00 0.280 13.440
89 11+412 11+423 SM/T1 L 11.00 0.280 3.080
90 11+430 11+504 SM/T3 L 74.00 0.450 33.300
91 11+516 11+690 SM/T1 L 174.00 0.280 48.720
92 11+705 11+739 SM/T2 L 34.00 0.380 12.920
93 11+751 11+844 SM/T2 L 93.00 0.380 35.340
94 11+856 11+877 SM/T2 L 21.00 0.380 7.980
SM/T3 15m turnout drain in
95 R 15.00 0.450 6.750 right side is required
11+960
96 11+960 12+047 SM/T3 R 87.00 0.450 39.150
97 12+059 12+156 SM/T3 R 97.00 0.450 43.650
98 12+178 12+216 SM/T1 R 38.00 0.280 10.640
99 12+234 12+269 SM/T1 R 35.00 0.280 9.800
100 12+281 12+344 SM/T1 R 63.00 0.280 17.640
101 12+356 12+481 SM/T3 R 125.00 0.450 56.250
102 12+493 12+542 SM/T3 R 49.00 0.450 22.050
103 12+554 12+743 SM/T3 R 189.00 0.450 85.050
SM/T3 PCC in bottom of drain
104 R 170.00 0.450 76.500 required
12+755 12+925
SM/T3 PCC in bottom of drain
105 R 273.00 0.450 122.850
13+050 13+323 required
SM/T3 PCC in bottom of drain
106 R 175.00 0.450 78.750
13+325 13+500 required
SM/T3 PCC in bottom of drain
107 R 200.00 0.450 90.000 required
13+515 13+715
SM/T3 PCC in bottom of drain
108 R 123.00 0.450 55.350 required
13+731 13+854
109 13+856 14+024 SM/T3 R 168.00 0.450 75.600
SM/T3 PCC in bottom of drain
110 R 189.00 0.450 85.050 required
14+036 14+225
SM/T3 PCC in bottom of drain
111 R 264.00 0.450 118.800
14+237 14+501 required
112 14+503 14+606 SM/T3 R 103.00 0.450 46.350
113 14+622 14+695 SM/T3 R 73.00 0.450 32.850
114 14+700 14+950 SM/T3 R 250.00 0.450 112.500
SM/T3 10m turnout drain is
115 L 10.00 0.450 4.500 required(hairpin bend)
14+950
116 14+950 15+120 SM/T3 L 170.00 0.450 76.500
117 14+950 15+100 SM/T2 R 150.00 0.380 57.000
118 15+132 15+224 SM/T8 L 92.00 0.590 54.280
119 15+230 15+600 SM/T8 L 370.00 0.590 218.300
120 15+600 15+630 SM/T1 L 30.00 0.280 8.400
121 15+642 15+780 SM/T1 L 138.00 0.280 38.640
122 15+806 15+833 SM/T1 L 27.00 0.280 7.560
123 15+850 15+944 SM/T1 L 94.00 0.280 26.320
124 15+956 16+023 SM/T3 L 67.00 0.450 30.150
125 16+040 16+080 SM/T4 L 40.00 0.260 10.400 (good rock condition)
126 16+105 16+271 SM/T3 L 166.00 0.450 74.700

Page 261 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
127 16+300 16+361 SM/T3 L 61.00 0.450 27.450
128 16+361 16+364 SM/T3 R 3.00 0.450 1.350
129 16+366 16+414 SM/T3 R 48.00 0.450 21.600
SM/T8 cover drain required
130 R 124.00 0.590 73.160 (stone falling and less
16+426 16+550 stable area)
SM/T8 cover drain required
131 R 87.00 0.590 51.330 (stone falling and less
16+550 16+637 stable area)
SM/T8 cover drain required
132 R 138.00 0.590 81.420 (stone falling and less
16+637 16+775 stable area)
133 16+775 16+982 SM/T2 R 207.00 0.380 78.660
134 16+994 17+085 SM/T3 R 91.00 0.450 40.950
SM/T3 9m turnout drain is
135 L 9.00 0.450 4.050
17+110 required
136 17+110 17+142 SM/T8 L 32.00 0.590 18.880
137 17+142 17+224 SM/T8 L 82.00 0.590 48.380
138 17+226 17+255 SM/T8 L 29.00 0.590 17.110
139 17+225 15.00 15.150 15m masonary cascade
140 17+255 17+375 SM/T3 L 120.00 0.450 54.000
141 17+375 17+455 SM/T4 L 80.00 0.260 20.800
142 17+455 17+559 SM/T2 L 104.00 0.380 39.520
143 17+561 L 15.00 15.150 15m masonary cascade
144 17+560 17+800 SM/T3 L 240.00 0.450 108.000
145 17+800 17+942 SM/T2 L 142.00 0.380 53.960
SM/T2 30m turnout drain
146 L 30.00 0.380 11.400
17+954 required on left side
147 17+954 18+316 SM/T2 L 362.00 0.380 137.560
148 18+328 18+448 SM/T2 L 120.00 0.380 45.600
149 18+453 18+620 SM/T2 L 167.00 0.380 63.460
150 18+632 18+800 SM/T2 L 168.00 0.380 63.840
151 18+814 18+844 SM/T2 L 30.00 0.380 11.400
152 18+856 18+975 SM/T2 L 119.00 0.380 45.220
153 18+987 19+219 SM/T2 L 232.00 0.380 88.160
154 19+231 19+420 SM/T2 L 189.00 0.380 71.820
155 19+432 19+475 SM/T2 L 43.00 0.380 16.340
156 19+475 19+490 SM/T2 L 15.00 0.380 5.700
157 19+548 19+692 SM/T2 L 144.00 0.380 54.720
158 19+704 19+722 SM/T2 L 18.00 0.380 6.840
159 19+734 19+915 SM/T3 L 181.00 0.450 81.450
160 19+915 20+010 SM/T2 L 95.00 0.380 36.100
161 20+025 20+325 SM/T2 L 300.00 0.380 114.000
162 20+340 20+432 SM/T2 L 92.00 0.380 34.960
163 20+444 20+546 SM/T2 L 102.00 0.380 38.760
164 20+558 20+750 SM/T2 L 192.00 0.380 72.960
165 20+777 21+120 SM/T2 L 343.00 0.380 130.340
166 21+135 21+183 SM/T2 L 48.00 0.380 18.240
167 21+539 21+562 SM/T2 L 23.00 0.380 8.740
168 21+577 21+669 SM/T2 L 92.00 0.380 34.960
169 21+681 21+817 SM/T2 L 136.00 0.380 51.680
170 22+110 22+235 SM/T2 L 125.00 0.380 47.500
171 22+250 22+443 SM/T2 L 193.00 0.380 73.340
30m masonary turnout
172 30.00 0.600 18.000 drain
22+345
173 22+456 22+572 SM/T2 L 116.00 0.380 44.080
174 22+584 22+644 SM/T2 L 60.00 0.380 22.800

Page 262 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
175 22+656 22+723 SM/T2 L 67.00 0.380 25.460
176 22+735 22+835 SM/T2 L 100.00 0.380 38.000
177 22+847 22+938 SM/T2 L 91.00 0.380 34.580
178 22+950 23+067 SM/T2 L 117.00 0.380 44.460
179 23+079 23+230 SM/T2 L 151.00 0.380 57.380
180 23+242 23+319 SM/T2 L 77.00 0.380 29.260
181 23+331 23+490 SM/T2 L 159.00 0.380 60.420
182 23+502 23+563 SM/T2 L 61.00 0.380 23.180
183 23+575 23+694 SM/T2 L 119.00 0.380 45.220
184 23+706 23+760 SM/T2 L 54.00 0.380 20.520
185 23+955 24+100 SM/T2 L 145.00 0.380 55.100
186 24+112 24+177 SM/T2 L 65.00 0.380 24.700
187 24+189 24+217 SM/T2 L 28.00 0.380 10.640
188 24+229 24+519 SM/T2 L 290.00 0.380 110.200
189 24+658 24+800 SM/T2 L 142.00 0.380 53.960
190 24+812 24+838 SM/T2 L 26.00 0.380 9.880 rocky hill section
191 24+853 25+017 SM/T2 L 164.00 0.380 62.320
192 25+033 25+260 SM/T2 L 227.00 0.380 86.260
193 25+274 25+340 SM/T2 L 66.00 0.380 25.080
194 25+352 25+494 SM/T2 L 142.00 0.380 53.960
195 25+506 25+752 SM/T2 L 246.00 0.380 93.480
196 25+775 26+330 SM/T2 L 555.00 0.380 210.900
197 26+342 26+472 SM/T2 L 130.00 0.380 49.400
198 26+490 26+700 SM/T2 L 210.00 0.380 79.800
199 26+715 27+175 SM/T2 L 460.00 0.380 174.800
200 27+187 27+250 SM/T2 L 63.00 0.380 23.940
201 27+262 27+417 SM/T1 L 155.00 0.280 43.400
202 27+432 27+553 SM/T1 L 121.00 0.280 33.880
203 27+567 27+619 SM/T2 L 52.00 0.380 19.760
SM/T2 27+725 way to village
204 L 354.00 0.380 134.520
27+631 27+985 4no. Of drain cover
SM/T2 28+042 way to village
205 L 114.00 0.380 43.320 4no. Of drain cover
27+997 28+111
SM/T2 28+130,28+325,28+338
206 L 257.00 0.380 97.660 way to village 4no. Of
28+123 28+380 drain cover in each way
207 28+392 28+647 SM/T2 L 255.00 0.380 96.900
SM/T2 29+025 cover drain for
208 L 436.00 0.380 165.680 4m
28+659 29+095
209 29+095 29+275 SM/T2 L 180.00 0.380 68.400
210 29+160 SM/T10 25.00 1.050 26.250 Cascade drop
211 29+275 29+295 SM/T2 L 20.00 0.380 7.600 Hair Pin Bend
212 29+520 29+550 SM/T2 R 30.00 0.380 11.400
SM/T2 15m turnout drain
213 L 15.00 0.380 5.700
29+525 required
214 29+525 29+550 SM/T2 L 25.00 0.380 9.500
215 29+550 29+669 SM/T7 R 119.00 0.000 0.000 rocky box cutting zone
216 29+681 29+725 SM/T2 R 44.00 0.380 16.720
SM/T1 29+925, way to village
217 R 650.00 0.280 182.000 coverdrain required for
29+725 30+375 4m
218 30+388 30+419 SM/T2 R 31.00 0.380 11.780
219 30+589 30+677 SM/T2 R 88.00 0.380 33.440
220 30+810 30+875 SM/T2 R 65.00 0.380 24.700
221 30+875 30+890 SM/T2 R 15.00 0.380 5.700
222 30+890 30+950 SM/T1 R 60.00 0.280 16.800 (good rock condition)
223 30+950 31+000 SM/T1 R 50.00 0.280 14.000 (good rock condition)

Page 263 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
224 31+000 31+301 SM/T2 R 301.00 0.380 114.380
225 31+313 31+700 SM/T2 R 387.00 0.380 147.060
226 31+712 31+945 SM/T2 R 233.00 0.380 88.540
227 31+957 32+265 SM/T2 R 308.00 0.380 117.040
228 32+265 32+386 SM/T2 R 121.00 0.380 45.980
229 32+400 32+435 SM/T2 R 35.00 0.380 13.300
230 32+435 32+582 SM/T2 R 147.00 0.380 55.860
231 32+594 32+645 SM/T2 R 51.00 0.380 19.380
232 32+645 32+655 SM/T2 R 10.00 0.380 3.800
233 32+667 32+880 SM/T2 R 213.00 0.380 80.940
234 32+892 32+950 SM/T4 R 58.00 0.260 15.080
235 32+950 33+016 SM/T4 R 66.00 0.260 17.160
236 33+028 33+070 SM/T4 R 42.00 0.260 10.920
237 33+070 33+110 SM/T4 R 40.00 0.260 10.400
238 33+110 33+130 SM/T2 R 20.00 0.380 7.600
239 33+142 33+200 SM/T4 R 58.00 0.260 15.080
240 33+200 33+350 SM/T4 R 150.00 0.260 39.000
241 33+350 33+397 SM/T2 R 47.00 0.380 17.860
242 33+409 33+445 SM/T2 R 36.00 0.380 13.680
243 33+445 33+556 SM/T2 R 111.00 0.380 42.180
244 33+568 33+625 SM/T4 R 57.00 0.260 14.820
245 33+625 33+690 SM/T2 R 65.00 0.380 24.700
246 33+690 33+790 SM/T4 R 100.00 0.260 26.000
247 33+790 33+825 SM/T4 R 35.00 0.260 9.100
248 33+837 33+900 SM/T4 R 63.00 0.260 16.380
249 33+900 34+075 SM/T2 R 175.00 0.380 66.500
250 34+075 34+125 SM/T2 R 50.00 0.380 19.000
251 34+143 34+216 SM/T4 R 73.00 0.260 18.980
252 34+228 34+350 SM/T2 R 122.00 0.380 46.360
253 34+377 34+450 SM/T4 R 73.00 0.260 18.980
254 34+450 34+550 SM/T4 R 100.00 0.260 26.000
255 34+577 34+765 SM/T4 R 188.00 0.260 48.880
256 34+765 34+877 SM/T2 R 112.00 0.380 42.560 no hill side wall on 92m
257 34+889 35+000 SM/T4 R 111.00 0.260 28.860
258 35+000 35+050 SM/T1 R 50.00 0.280 14.000
259 35+050 35+175 SM/T2 R 125.00 0.380 47.500
SM/T1 At 35+115 junction road
crossing of 600mm dia
hume pipe and cascade
260 35+115 35+175 L 60.00 0.280 16.800 of masonary work of
length 15m with 5 step
drop

SM/T2 SM work for 15m


261 R 15.00 6.675 cascade
262 35+175 35+250 SM/T2 L 75.00 0.380 28.500
263 35+250 35+324 SM/T4 L 74.00 0.260 19.240
264 35+325 35+530 SM/T4 L 205.00 0.260 53.300
265 35+542 35+634 SM/T4 L 92.00 0.260 23.920
266 35+646 35+680 SM/T2 L 34.00 0.380 12.920
267 35+690 35+868 SM/T4 R 178.00 0.260 46.280
268 SM/T4 25.00 0.260 6.500
35+690 Turnout drain is required
269 35+868 35+888 SM/T4 R 20.00 0.260 5.200
270 35+900 36+265 SM/T4 R 365.00 0.260 94.900
271 36+281 36+375 SM/T4 R 94.00 0.260 24.440
272 36+375 36+455 SM/T2 R 80.00 0.380 30.400

Page 264 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
273 36+455 36+485 SM/T2 R 30.00 0.380 11.400
274 36+497 36+600 SM/T4 R 103.00 0.260 26.780
275 36+600 36+760 SM/T2 R 160.00 0.380 60.800
276 36+775 36+986 SM/T2 R 211.00 0.380 80.180
277 37+000 37+070 SM/T2 R 70.00 0.380 26.600
278 37+070 37+096 SM/T2 R 26.00 0.380 9.880
279 37+108 37+250 SM/T2 R 142.00 0.380 53.960
280 37+250 37+314 SM/T2 R 64.00 0.380 24.320
281 37+326 37+385 SM/T2 R 59.00 0.380 22.420
282 37+385 37+455 SM/T2 R 70.00 0.380 26.600
283 37+467 37+634 SM/T2 R 167.00 0.380 63.460
284 37+646 37+700 SM/T2 R 54.00 0.380 20.520
285 37+712 37+920 SM/T2 R 208.00 0.380 79.040
286 37+932 38+050 SM/T2 R 118.00 0.380 44.840
287 38+050 38+060 SM/T2 R 10.00 0.380 3.800
288 38+078 38+120 SM/T2 R 42.00 0.380 15.960
289 38+120 38+225 SM/T2 R 105.00 0.380 39.900
290 38+225 38+415 SM/T4 R 190.00 0.260 49.400
291 38+415 38+530 SM/T5 R 115.00 0.710 81.650
292 38+542 38+549 SM/T5 R 7.00 0.710 4.970
293 38+549 38+574 SM/T4 R 25.00 0.260 6.500
294 38+574 38+648 SM/T5 R 74.00 0.710 52.540
295 38+660 38+713 SM/T2 R 53.00 0.380 20.140
296 38+725 38+750 SM/T2 R 25.00 0.380 9.500
297 38+750 38+815 SM/T2 R 65.00 0.380 24.700
298 38+827 38+920 SM/T2 R 93.00 0.380 35.340
299 38+932 39+030 SM/T7 R 98.00 0.000 0.000
300 39+042 39+185 SM/T5 R 143.00 0.710 101.530
301 39+185 39+200 SM/T5 R 15.00 0.710 10.650
302 39+212 39+300 SM/T5 R 88.00 0.710 62.480
303 39+300 39+342 SM/T7 R 42.00 0.000 0.000
304 39+354 39+568 SM/T7 R 214.00 0.000 0.000
305 39+580 39+675 SM/T7 R 95.00 0.000 0.000
306 39+675 39+694 SM/T2 R 19.00 0.380 7.220
307 39+706 39+762 SM/T7 R 56.00 0.000 0.000
308 39+762 39+792 SM/T2 R 30.00 0.380 11.400
309 39+804 40+075 SM/T7 R 271.00 0.000 0.000
310 40+075 40+109 SM/T2 R 34.00 0.380 12.920
311 40+121 40+330 SM/T2 R 209.00 0.380 79.420
312 40+330 40+419 SM/T2 R 89.00 0.380 33.820
313 40+431 40+440 SM/T2 R 9.00 0.380 3.420
314 40+440 40+460 SM/T7 R 20.00 0.000 0.000
315 40+460 40+790 SM/T2 R 330.00 0.380 125.400
316 40+802 41+047 SM/T2 R 245.00 0.380 93.100
317 41+059 41+078 SM/T2 R 19.00 0.380 7.220
318 41+090 41+150 SM/T2 R 60.00 0.380 22.800
319 41+150 41+220 SM/T7 R 70.00 1.380 96.600
320 41+220 41+275 SM/T2 R 55.00 2.380 130.900
321 41+287 41+300 SM/T2 R 13.00 0.380 4.940
322 41+300 41+350 SM/T7 R 50.00 0.000 0.000
323 41+350 41+410 SM/T2 R 60.00 0.380 22.800
324 41+410 41+425 SM/T7 R 15.00 0.000 0.000

Page 265 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
SM/T2 cover drain required for
ch. 41+550 to 41+650
and other 40m length in
325 41+425 41+650 R 225.00 0.380 85.500
hile bhanjang and also
150m turnout open
drain, 20m road
326 at Hile SM/T2 R 40.00 0.380 15.200 crossing of NP3
cover drain
327 at Hile SM/T8 R 60.00 0.590 35.400 pipe(450mmφ)
on Dingla Road
328 41+650 41+854 SM/T2 R 204.00 0.380 77.520
329 41+866 42+020 SM/T2 R 154.00 0.380 58.520
330 42+020 42+038 SM/T2 R 18.00 0.380 6.840
331 42+050 42+125 SM/T4 R 75.00 0.260 19.500
332 42+125 42+202 SM/T2 R 77.00 0.380 29.260
333 42+214 42+225 SM/T4 R 11.00 0.260 2.860
334 42+225 42+276 SM/T2 R 51.00 0.380 19.380
335 42+276 42+286 SM/T2 R 10.00 0.380 3.800
336 42+298 42+380 SM/T2 R 82.00 0.380 31.160 rock fall and slide area
337 42+392 42+417 SM/T2 R 25.00 0.380 9.500 rock fall and slide area
338 42+429 42+625 SM/T2 R 196.00 0.380 74.480 rock fall and slide area
SM/T2 10m turnout drain
339 L 10.00 0.380 3.800
required
340 42+630 42+820 SM/T2 L 190.00 0.380 72.200
341 42+832 42+866 SM/T2 L 34.00 0.380 12.920
342 42+878 42+920 SM/T2 L 42.00 0.380 15.960
343 42+932 42+966 SM/T2 L 34.00 0.380 12.920
344 42+978 43+012 SM/T2 L 34.00 0.380 12.920
345 43+024 43+070 SM/T2 L 46.00 0.380 17.480
346 43+070 43+131 SM/T2 L 61.00 0.380 23.180
347 43+143 43+231 SM/T2 L 88.00 0.380 33.440
348 43+243 43+275 SM/T2 L 32.00 0.380 12.160
349 43+275 43+417 SM/T2 R 142.00 0.380 53.960
SM/T2 20m turnout drain at
350 R 20.00 0.380 7.600
right side with 5 drop
extra SM woks for 5
351 0.195 0.975 drops
352 43+429 43+520 SM/T2 R 91.00 0.380 34.580
353 43+520 43+549 SM/T2 R 29.00 0.380 11.020
354 43+561 43+610 SM/T7 R 49.00 0.000 0.000
355 43+610 43+710 SM/T2 R 100.00 0.380 38.000
356 43+710 43+750 SM/T4 R 40.00 0.260 10.400
357 43+762 43+781 SM/T2 R 19.00 0.380 7.220
358 43+781 43+825 SM/T4 R 44.00 0.260 11.440
359 43+825 43+926 SM/T2 R 101.00 0.380 38.380
360 43+938 44+000 SM/T2 R 62.00 0.380 23.560
361 44+012 44+155 SM/T5 R 143.00 0.710 101.530
362 44+167 44+246 SM/T5 R 79.00 0.710 56.090
363 44+258 44+385 SM/T5 R 127.00 0.710 90.170
364 44+397 44+575 SM/T5 R 178.00 0.710 126.380
365 44+585 44+714 SM/T5 R 129.00 0.710 91.590
366 44+726 44+788 SM/T5 R 62.00 0.710 44.020
367 44+800 44+890 SM/T2 R 90.00 0.380 34.200
368 44+912 44+925 SM/T5 R 13.00 0.710 9.230
369 44+925 45+002 SM/T5 R 77.00 0.710 54.670
370 45+014 45+110 SM/T2 R 96.00 0.380 36.480
SM/T2 required 2 drop structure
371 R 137.00 0.380 52.060
45+110 45+247

Page 266 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
extra SM works for 2
372 0.195 0.390
drops
373 45+259 45+371 SM/T2 R 112.00 0.380 42.560
374 45+393 45+440 SM/T2 R 47.00 0.380 17.860
375 45+440 45+455 SM/T2 R 15.00 0.380 5.700 cover drain required
376 45+455 45+705 SM/T2 R 250.00 0.380 95.000
377 45+717 46+000 SM/T2 R 283.00 0.380 107.540
378 46+000 46+135 SM/T3 R 135.00 0.450 60.750
SM/T2 12m turnout drain with 3
379 R 12.00 0.380 4.560 drops
extra SM works for 3
380 0.240 0.720 step drop of .5m each
381 46+135 46+475 SM/T2 R 340.00 0.380 129.200
382 46+487 46+615 SM/T2 R 128.00 0.380 48.640
383 46+615 46+875 SM/T2 R 260.00 0.380 98.800
384 46+876 47+175 SM/T4 R 299.00 0.260 77.740 turning at 47+175
385 47+175 47+317 SM/T4 R 142.00 0.260 36.920
386 47+329 47+454 SM/T4 R 125.00 0.260 32.500
387 47+466 47+568 SM/T7 R 102.00 0.000 0.000
388 47+580 47+792 SM/T7 R 212.00 0.000 0.000
389 47+804 47+906 SM/T7 R 102.00 0.000 0.000
390 47+918 47+974 SM/T4 R 56.00 0.260 14.560
391 47+986 48+113 SM/T4 R 127.00 0.260 33.020
392 48+125 48+170 SM/T2 R 45.00 0.380 17.100
393 48+170 48+320 SM/T4 R 150.00 0.260 39.000
394 48+320 48+332 SM/T3 R 12.00 0.450 5.400
395 48+344 48+568 SM/T2 R 224.00 0.380 85.120
396 48+583 48+662 SM/T2 R 79.00 0.380 30.020
397 48+674 48+760 SM/T7 R 86.00 0.000 0.000
398 48+760 48+794 SM/T7 R 34.00 0.000 0.000
399 48+815 49+017 SM/T2 R 202.00 0.380 76.760
400 49+029 49+225 SM/T2 R 196.00 0.380 74.480
401 49+237 49+260 SM/T2 R 23.00 0.380 8.740
SM/T4 with drop on every 10m
402 R 232.00 0.260 60.320 interval
49+260 49+492
extra SM works for 24
403 0.054 1.296 drops on regular drain
404 49+513 49+530 SM/T2 R 17.00 0.380 6.460
405 49+530 49+650 SM/T2 R 120.00 0.380 45.600
406 49+650 49+680 SM/T4 R 30.00 0.260 7.800
407 49+685 49+775 SM/T7 R 90.00 0.000 0.000
408 49+775 49+863 SM/T2 R 88.00 0.380 33.440
409 49+875 49+913 SM/T2 R 38.00 0.380 14.440
410 49+928 49+955 SM/T5 R 27.00 0.710 19.170
411 49+955 50+055 SM/T5 R 100.00 0.710 71.000
412 50+075 50+346 SM/T2 R 271.00 0.380 102.980
413 50+358 50+586 SM/T2 R 228.00 0.380 86.640
414 50+598 50+850 SM/T2 R 252.00 0.380 95.760
SM/T2 10m length turnout with
415 L 10.00 0.380 3.800
casecade 5 step
extra SM works for 5
416 0.240 1.200 step drop
417 50+790 51+055 SM/T2 L 265.00 0.380 100.700
418 51+067 51+200 SM/T2 L 133.00 0.380 50.540
419 51+220 51+250 SM/T2 L 30.00 0.380 11.400
420 51+250 51+297 SM/T2 L 47.00 0.380 17.860
421 51+307 51+335 SM/T5 L 28.00 0.710 19.880

Page 267 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
422 51+337 51+545 SM/T5 L 208.00 0.710 147.680
423 51+660 51+685 SM/T3 L 25.00 0.450 11.250
SM/T2 turnout drain of length
424 R 25.00 0.380 9.500
25m
425 51+625 51+660 SM/T2 R 35.00 0.380 13.300
426 51+950 52+050 SM/T3 R 100.00 0.450 45.000
427 52+120 52+126 SM/T3 R 6.00 0.450 2.700
428 52+126 52+146 SM/T4 R 20.00 0.260 5.200
429 52+146 52+157 SM/T3 R 11.00 0.450 4.950
430 52+192 52+207 SM/T4 R 15.00 0.260 3.900
431 52+207 52+350 SM/T4 R 143.00 0.260 37.180
432 52+629 52+735 SM/T5 R 106.00 0.710 75.260
433 52+735 52+775 SM/T5 R 40.00 0.710 28.400
434 52+787 52+844 SM/T5 R 57.00 0.710 40.470
435 52+856 53+154 SM/T5 R 298.00 0.710 211.580
436 53+166 53+388 SM/T2 R 222.00 0.380 84.360
437 53+400 53+556 SM/T2 R 156.00 0.380 59.280
438 53+568 53+825 SM/T2 R 257.00 0.380 97.660
439 53+837 54+020 SM/T2 R 183.00 0.380 69.540
440 54+020 54+040 SM/T2 R 20.00 0.380 7.600
441 54+052 54+220 SM/T2 R 168.00 0.380 63.840
442 54+232 54+320 SM/T2 R 88.00 0.380 33.440
443 54+320 54+520 SM/T2 R 200.00 0.380 76.000
444 54+532 54+540 SM/T2 R 8.00 0.380 3.040
445 54+540 54+594 SM/T2 R 54.00 0.380 20.520
446 54+606 54+700 SM/T2 R 94.00 0.380 35.720
447 54+712 54+772 SM/T2 R 60.00 0.380 22.800
448 54+784 54+799 SM/T2 R 15.00 0.380 5.700
449 54+799 54+855 SM/T2 R 56.00 0.380 21.280
450 54+867 55+025 SM/T2 R 158.00 0.380 60.040
451 SM/T2 L 5.00 0.380 1.900 5m turnout drain
452 54+925 55+220 SM/T2 L 295.00 0.380 112.100
453 55+235 55+300 SM/T2 L 65.00 0.380 24.700
454 SM/T2 R 5.00 0.380 1.900 5m turnout drain
455 55+235 55+365 SM/T2 R 130.00 0.380 49.400
456 55+385 55+600 SM/T2 R 215.00 0.380 81.700
457 55+612 55+740 SM/T2 R 128.00 0.380 48.640
458 55+742 55+768 SM/T2 R 26.00 0.380 9.880
459 55+783 55+880 SM/T5 R 97.00 0.710 68.870
460 55+908 55+994 SM/T2 R 86.00 0.380 32.680
461 56+006 56+198 SM/T2 R 192.00 0.380 72.960
462 56+210 56+244 SM/T2 R 34.00 0.380 12.920
463 56+256 56+313 SM/T2 R 57.00 0.380 21.660
464 56+325 56+372 SM/T2 R 47.00 0.380 17.860
465 56+386 56+550 SM/T2 R 164.00 0.380 62.320
466 56+562 56+700 SM/T2 R 138.00 0.380 52.440
467 56+700 56+742 SM/T2 R 42.00 0.380 15.960
468 56+754 56+867 SM/T2 R 113.00 0.380 42.940
469 56+867 56+894 SM/T2 R 27.00 0.380 10.260
470 56+906 57+194 SM/T2 R 288.00 0.380 109.440
471 57+206 57+300 SM/T2 R 94.00 0.380 35.720
472 57+300 57+375 SM/T5 R 75.00 0.710 53.250
473 57+375 57+438 SM/T5 R 63.00 0.710 44.730
474 57+450 57+555 SM/T2 R 105.00 0.380 39.900
475 57+567 57+615 SM/T2 R 48.00 0.380 18.240
476 57+615 57+675 SM/T2 R 60.00 0.380 22.800
477 57+687 57+851 SM/T5 R 164.00 0.710 116.440

Page 268 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
478 57+851 57+946 SM/T5 R 95.00 0.710 67.450
479 57+958 58+067 SM/T2 R 109.00 0.380 41.420
480 58+067 58+083 SM/T4 R 16.00 0.260 4.160
481 58+095 58+175 SM/T2 R 80.00 0.380 30.400
482 58+175 58+235 SM/T2 R 60.00 0.380 22.800
483 58+256 58+310 SM/T2 R 54.00 0.380 20.520
484 58+310 58+565 SM/T2 R 255.00 0.380 96.900
485 58+565 58+825 SM/T6 R 260.00 0.800 208.000
486 58+825 58+975 SM/T6 R 150.00 0.800 120.000 on existing canal
487 58+996 59+092 SM/T2 R 96.00 0.380 36.480
488 59+104 59+200 SM/T2 R 96.00 0.380 36.480
489 59+200 59+292 SM/T2 R 92.00 0.380 34.960
490 59+307 59+594 SM/T5 R 287.00 0.710 203.770
491 59+606 59+685 SM/T5 R 79.00 0.710 56.090
492 59+685 59+722 SM/T2 R 37.00 0.380 14.060
493 59+734 59+784 SM/T2 R 50.00 0.380 19.000
494 59+796 59+810 SM/T2 R 14.00 0.380 5.320
495 59+822 59+890 SM/T2 R 68.00 0.380 25.840
496 59+890 59+920 SM/T2 R 30.00 0.380 11.400
497 59+932 59+950 SM/T2 R 18.00 0.380 6.840
498 59+950 59+992 SM/T5 R 42.00 0.710 29.820
499 60+007 60+119 SM/T2 R 112.00 0.380 42.560
500 60+131 60+280 SM/T2 R 149.00 0.380 56.620
501 60+280 60+405 SM/T2 R 125.00 0.380 47.500
502 60+417 60+450 SM/T2 R 33.00 0.380 12.540
503 60+450 60+742 SM/T2 R 292.00 0.380 110.960
504 60+754 61+000 SM/T2 R 246.00 0.380 93.480
505 61+000 61+288 SM/T3 R 288.00 0.450 129.600
506 61+303 61+560 SM/T2 R 257.00 0.380 97.660
507 61+575 61+850 SM/T2 R 275.00 0.380 104.500
508 61+850 61+975 SM/T3 R 125.00 0.450 56.250
509 61+977 62+025 SM/T2 R 48.00 0.380 18.240
510 62+025 62+460 SM/T3 R 435.00 0.450 195.750
511 62+472 62+775 SM/T2 R 303.00 0.380 115.140
512 62+830 62+868 SM/T3 R 38.00 0.450 17.100
513 62+880 63+200 SM/T2 R 320.00 0.380 121.600
SM/T2 63+200 slide area,
514 L 25.00 0.380 9.500 turnout drain of 25m
required
515 63+250 63+372 SM/T2 L 122.00 0.380 46.360
516 63+384 63+620 SM/T2 L 236.00 0.380 89.680
517 63+632 63+920 SM/T2 L 288.00 0.380 109.440
518 64+185 64+192 SM/T2 L 7.00 0.380 2.660
519 64+204 64+220 SM/T2 L 16.00 0.380 6.080
520 64+300 64+465 SM/T2 L 165.00 0.380 62.700
521 64+561 64+775 SM/T2 L 214.00 0.380 81.320
522 64+775 64+820 SM/T2 L 45.00 0.380 17.100
523 64+910 64+964 SM/T2 L 54.00 0.380 20.520
Provisional Quantity @3% 658.968
Sub-Total 22,624.571 cu.m

Page 269 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.07
Providing and laying Random rubble stone masonry in cement sand mortar
Description of work :
MM 5 including scaffolding, curing etc. all complete (SS/SP- 2600).
Chainage Drain Length Sectional Quantity
S.N. Side Remarks
From To Type (m) Area (sq.m) (cu.m)
Quantity for Reconstruction
1 0+362 0+485 SM/T2 5.00 0.185 0.925
2 0+506 0+685 SM/T2 6.00 0.185 1.110
3 1+240 1+363 SM/T2 12.00 0.185 2.220
4 2+375 2+439 SM/T2 4.00 0.185 0.740
5 2+570 2+575 SM/T2 5.00 0.185 0.925
6 2+950 3+092 SM/T2 10.00 0.185 1.850
7 3+805 3+888 SM/T2 24.50 0.185 4.533
8 4+095 4+160 SM/T2 7.00 0.185 1.295
9 4+145 4+330 SM/T2 15.00 0.185 2.775
10 4+410 4+495 SM/T2 7.00 0.185 1.295
11 4+516 4+652 SM/T2 5.00 0.185 0.925
12 4+659 4+720 SM/T2 12.00 0.185 2.220
13 5+162 5+375 SM/T2 10.00 0.185 1.850
14 5+384 5+576 SM/T2 15.00 0.185 2.775
15 5+576 5+708 SM/T2 15.00 0.185 2.775
16 6+315 6+402 SM/T2 8.00 0.185 1.480
17 6+525 6+625 SM/T2 7.00 0.185 1.295
18 7+480 7+575 SM/T2 40.00 0.185 7.400
19 7+575 7+610 SM/T2 35.00 0.380 13.300
20 7+610 7+655 SM/T2 15.00 0.185 2.775
21 7+673 7+955 SM/T3 70.00 0.220 15.400
22 10+420 10+515 SM/T2 31.00 0.185 5.735
23 21+198 21+515 SM/T2 50.00 0.185 9.250
24 21+825 22+004 SM/T2 15.00 0.185 2.775
25 23+750 23+955 SM/T2 7.00 0.185 1.295
26 24+533 24+658 SM/T2 17.00 0.185 3.145
27 29+406 29+520 SM/T2 37.00 0.185 6.845
28 30+443 30+551 SM/T2 13.00 0.185 2.405
29 30+551 30+589 SM/T2 36.00 0.185 6.660
30 30+600 30+626 SM/T2 5.00 0.185 0.925
31 30+677 30+810 SM/T2 11.00 0.185 2.035
32 51+425 51+500 SM/T3 75.00 0.450 33.750
33 51+545 51+580 SM/T2 35.00 0.380 13.300
34 51+580 51+660 SM/T2 80.00 0.380 30.400
35 51+660 51+772 SM/T3 112.00 0.450 50.400
36 51+774 51+840 SM/T2 66.00 0.380 25.080
37 51+840 51+875 SM/T2 35.00 0.380 13.300
38 51+875 51+950 SM/T3 75.00 0.450 33.750
39 52+050 52+120 SM/T3 70.00 0.450 31.500
40 52+157 52+175 SM/T2 18.00 0.380 6.840
41 52+175 52+190 SM/T2 15.00 0.380 5.700
42 58+572 58+597 SM/T2 25.00 0.185 4.625
43 58+825 58+975 SM/T6 150.00 0.800 120.000
44 62+775 62+830 SM/T2 15.00 0.185 2.775
45 64+465 64+545 SM/T2 25.00 0.185 4.625
Sub-Total 486.978 cu.m
Total 23,111.549 cu.m

Page 270 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.:7.08
Description of work:
Supply, fabrication and assembling of gabion boxes, of hexagonal mesh type 100
mm x 120 mm, with mesh wire 10 swg, selvedge wire 7 swg, binding wire 12 swg and
stone filling in gabions including transport and fixing of gabions in position, tying with
binding and tension wire all complete (SS/SP 2401)
Chainage
Length Width Height Sectional Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) area (sq.m) (cu.m)

Crossing Structures
1 0+350 0+362 GW 1 6.00 2.00 2.500 15.000
Deduction for Opening -1 2.00 1.00 1.00 1.000 -2.000
2 0+500 0+512 GW 1 6.00 2.00 2.500 15.000
Deduction for Opening -1 3.00 1.00 1.00 1.000 -3.000
3 2+044 2+056 GW 1 6.00 3.00 0.50 1.500 9.000 Gabbion Matress
4 2+363 2+375 GW 1 7.00 3.00 0.50 1.500 10.500 Gabbion Matress
5 2+606 GW 1 10.00 3.00 0.50 1.500 15.000 Gabbion Matress
GW 1 20.00 6.50 0.50 3.250 65.000 Gabbion Matress
6 2+950 PC 1 3.00 3.00 4.500 13.500 Replace existing GW
7 3+138 3+150 GW 1 4.00 6.00 0.50 3.000 12.000 Gabbion Matress
8 3+398 3+410 GW 1 10.00 2.00 2.500 25.000 Gabbion Matress
Deduction for Opening -1 4.00 1.00 1.00 1.000 -4.000
9 3+497 3+509 GW 1 3.00 3.00 4.500 13.500 Gabbion Matress
10 4+403 GW 1 4.00 2.00 2.500 10.000 Replace existing GW
11 4+658 GW 1 5.00 2.00 8.000 40.000 Casecade structures
12 5+765 5+767 GW 1 10.00 2.00 2.500 25.000 US check dam
1 8.00 4.00 7.000 56.000 DS check dam
Deduction for Opening -1 3.00 1.00 1.00 1.000 -3.000
13 6+260 6+272 GW 1 4.00 3.00 0.50 1.500 6.000 Gabbion Matress
14 7+655 7+673 GW 1 5.00 2.00 2.500 12.500 US S1 checkdam
1 8.00 2.00 2.500 20.000 US S2 checkdam
Deduction for Opening -1 4.00 1.00 1.00 1.000 -4.000
1 15.00 1.00 1.000 15.000 DS GW
2 6.00 2.00 2.500 30.000 DS check dam
Deduction for Opening -1 6.00 1.00 1.00 1.000 -6.000
15 8+161 8+173 GW 1 6.00 1.00 1.000 6.000 US additional layer
16 8+243 8+253 GW 1 10.00 2.00 2.500 25.000 US checkdam
1 5.00 4.00 0.50 2.000 10.000 Gabbion Matress
1 2.00 1.00 2.00 2.000 4.000 Repair work
17 8+494 8+506 GW 1 4.00 2.00 2.500 10.000 US checkdam
1 6.00 3.00 4.500 27.000 DS checkdam
Deduction for Opening -1 5.00 1.00 1.00 1.000 -5.000
18 8+886 8+898 GW 1 6.00 2.00 2.500 15.000 US checkdam
Deduction for Opening -1 3.00 1.00 1.00 1.000 -3.000
19 10+000 GW 1 5.00 4.00 0.50 2.000 10.000 Gabbion Matress
20 10+604 10+614 GW 1 8.00 4.00 7.000 56.000 Extension of GW
21 10+704 10+716 GW 1 10.00 3.00 4.500 45.000 US checkdam
Deduction for Opening -1 3.00 1.00 1.00 1.000 -3.000
22 10+819 10+831 GW 1 6.00 2.00 2.500 15.000 US checkdam
Deduction for Opening -1 3.00 1.00 1.00 1.000 -3.000
23 11+020 11+032 GW 1 6.00 2.00 2.500 15.000 US checkdam
Deduction for Opening -1 3.00 1.00 1.00 1.000 -3.000
24 11+242 11+254 GW 1 8.00 4.00 7.000 56.000 US checkdam
1 3.00 1.00 4.500 13.500 DS checkdam
US opening on
Deduction for Opening -1 4.00 1.00 1.00 1.000 -4.000
checkdam
25 11+692 11+704 GW 1 4.00 2.00 2.500 10.000 US checkdam
US opening on
Deduction for Opening -1 2.00 1.00 1.00 1.000 -2.000
checkdam
26 11+739 11+751 GW 1 6.00 1.00 1.000 6.000 Additioanl layer at DS
26 13+716 13+731 GW 1 12.00 2.00 2.500 30.000 US checkdam
US opening on
Deduction for Opening -1 5.00 1.00 1.00 1.000 -5.000
checkdam

Page 271 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.08
Description of work:
Supply, fabrication and assembling of gabion boxes, of hexagonal mesh type 100
mm x 120 mm, with mesh wire 10 swg, selvedge wire 7 swg, binding wire 12 swg and
stone filling in gabions including transport and fixing of gabions in position, tying with
binding and tension wire all complete (SS/SP 2401)
Chainage
Length Width Height Sectional Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) area (sq.m) (cu.m)

27 14+024 14+036 GW 1 4.00 2.00 2.500 10.000 US checkdam


US opening on
Deduction for Opening -1 2.00 1.00 1.00 1.000 -2.000
checkdam
28 14+502 GW 1 5.00 2.00 8.000 40.000 Casecade structures
29 14+695 GW 1 2.00 2.00 8.000 16.000 Casecade structures
30 15+833 15+845 GW 1 4.00 2.00 2.500 10.000 US checkdam
US opening on
Deduction for Opening -1 2.00 1.00 1.00 1.000 -2.000
checkdam
31 15+944 15+956 GW 1 6.00 2.00 2.500 15.000 US checkdam
US opening on
Deduction for Opening -1 3.00 1.00 1.00 1.000 -3.000
checkdam
32 16+023 16+035 GW 1 3.00 3.00 4.500 13.500 DS extension
GW 1 20.00 2.00 10.000 200.000 Casecade (P2)
33 16+090 16+112 GW 1 6.00 3.00 4.500 27.000 Maintenance
GW 1 20.00 2.00 10.000 200.000 Casecade
Gabbion Matress below
34 16+271 16+286 GW 1 10.00 4.00 0.50 2.000 20.000
DS gabion
35 16+982 16+994 GW 1 3.00 2.00 2.500 7.500 US checkdam
US opening on
Deduction for Opening -1 1.00 1.00 1.00 1.000 -1.000
checkdam
36 17+942 17+954 GW 1 20.00 3.00 4.500 90.000 US checkdam
US opening on
Deduction for Opening -1 3.00 1.00 1.00 1.000 -3.000
checkdam
37 19+219 19+231 GW 1 4.00 2.00 2.500 10.000 US checkdam
US opening on
Deduction for Opening -1 3.00 1.00 1.00 1.000 -3.000
checkdam
GW 1 10.00 1.00 1.000 10.000 DS checkdam
38 20+432 20+444 GW 1 10.00 2.00 2.500 25.000 US checkdam
US opening on
Deduction for Opening -1 5.00 1.00 1.00 1.000 -5.000
checkdam
39 23+490 23+502 GW 1 10.00 1.00 1.000 10.000 US checkdam
40 24+519 24+531 GW 1 10.00 2.00 2.500 25.000 US checkdam
US opening on
Deduction for Opening -1 5.00 1.00 1.00 1.000 -5.000
checkdam
41 24+800 24+812 GW 1 3.00 2.00 2.500 7.500 US checkdam
US opening on
Deduction for Opening -1 1.00 1.00 1.00 1.000 -1.000
checkdam
42 24+838 24+853 GW 1 6.00 1.00 1.000 6.000 US checkdam
43 25+260 25+272 GW 1 6.00 1.00 1.000 6.000 replacing existing DW
44 25+340 25+352 GW 1 3.00 1.00 1.000 3.000 replacing existing DW
extensino of existing GW
45 26+330 26+342 GW 1 3.00 2.00 2.500 7.500
46 26+475 26+490 GW 1 12.00 2.00 2.500 24.000 6m opening
47 27+175 27+187 GW 1 2.00 1.00 1.000 2.000
48 27+250 27+262 GW 1 5.00 2.00 2.500 9.500 3m opening
49 27+555 27+567 GW 1 10.00 2.00 2.500 22.000
50 28+647 28+659 GW 1 12.00 5.00 10.000 114.000 6m opening.
51 29+670 29+682 GW 1 5.00 3.00 4.500 19.500 US
1 2.00 2.00 2.500 5.000 DS
1 10.00 1 2.500 25.000 Guide Wall
52 30+419 30+431 GW 1 12.00 3.00 4.500 54.000
0.4 cum addition with 2
53 30+301 30+313 2.400
cum maintanance
GW 1 5.00 2.00 2.500 12.500 check dam
D/S protection 4m
54 31+945 31+957 GW 1 12.00 3.00 4.500 50.000
opening
8 cum each above
55 32+388 GW 2 16.000
existing

Page 272 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.08
Description of work:
Supply, fabrication and assembling of gabion boxes, of hexagonal mesh type 100
mm x 120 mm, with mesh wire 10 swg, selvedge wire 7 swg, binding wire 12 swg and
stone filling in gabions including transport and fixing of gabions in position, tying with
binding and tension wire all complete (SS/SP 2401)
Chainage
Length Width Height Sectional Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) area (sq.m) (cu.m)

56 32+582 32+594 GW 1 6.000 on existing


D/S protection 4m
2.000
opening
57 32+655 32+667 GW 1 12.00 4.00 7.000 79.000 5m opening.
58 33+016 33+028 GW 1 10.00 2.00 2.500 20.000 5m opening.
59 33+397 GW 1 30.00 3.00 4.500 131.000 4m opening
60 34+216 34+228 GW 1 14.00 2.00 2.500 32.000 3m openinng
61 34+350 34+377 GW 3.00 3.00 4.500 10.500
4.000 replacing existing GRW
62 34+877 34+889 GW 1 2.000
63 35+530 35+542 GW 1 8.00 2.00 2.500 16.000 4m opening
64 35+634 35+646 GW 1 3.00 2.00 2.500 7.500 Guide Wall
65 36+269 36+281 GW 1 20.00 1.00 1.000 20.000 U/S GW
67 36+988 37+000 GW 1 10.00 2.00 2.500 21.000 4m opening
68 37+455 37+467 GW 1 4.00 2.00 2.500 8.000 2m opening
69 37+700 37+712 GW 1 2.00 1.50 1.500 3.000 Guide Wall
70 39+200 39+212 GW 1 10.00 5.00 10.000 96.000 4m opening
71 40+109 40+121 GW 1 12.00 1.00 1.000 8.000 Maintenance
72 40+790 40+802 GW 1 6.00 2.00 2.500 15.000 Guide wall
D/S protection 4m
73 41+854 41+866 GW 1 12.00 6.00 13.500 158.000
opening
74 42+286 42+298 GW 1 7.00 2.00 2.500 14.500 check dam
75 43+926 43+938 GW 2 6.00 3.00 4.500 54.000 check dam
76 44+714 44+726 GW 1 6.00 3.00 4.500 18.000 US check dam
-1 3.00 1.00 1.00 1.000 -3.000
77 49+680 GW 1 6.000
1 3.00 1.00 1.00 1.000 3.000 GW above SM wall
78 49+913 49+928 GW 1 5.00 3.00 4.500 15.000
-1 3.00 1.00 1.00 1.000 -3.000 opening on GRW
1 12.00 3.00 4.500 36.000
-1 5.00 1.00 1.00 1.000 -5.000 opening on GRW
maintanance of D/S
79 50+055 50+070 GW 1 2.00 1.00 1.00 1.000 2.000
GRW top
80 50+586 50+598 GW 1 4.00 3.00 0.50 1.500 6.000 Gabbin matress
81 51+055 51+067 GW 1 15.00 3.00 4.500 67.500
-1 5.00 1.00 1.00 1.000 -5.000 deduction for opening
82 51+336 GW 1 3.00 2.00 10.000 30.000 3m length casaecade
83 53+154 GW 1 6.00 3.00 4.500 27.000
-1 3.00 1.00 1.00 1.000 -3.000
84 53+825 53+837 GW 1 6.00 3.00 4.500 27.000
-1 3.00 1.00 1.00 1.000 -3.000
85 54+596 54+608 GW 1 20.00 2.00 2.500 50.000
86 55+220 55+235 GW 1 6.00 3.00 4.500 27.000
-1 2.00 1.00 1.00 1.000 -2.000
1 3.00 2.00 2.500 7.500
-1 1.00 1.00 1.00 1.000 -1.000
87 55+372 55+384 GW 1 32.00 2.00 2.500 80.000
-1 5.00 1.00 1.00 1.000 -5.000
prapet wall on existing
1 16.000
GW
88 56+198 56+210 GW 1 6.00 2.00 2.500 15.000
-1 3.00 1.00 1.00 1.000 -3.000 opening on GW
89 56+244 56+256 GW 1 10.00 2.00 2.500 25.000
-1 3.00 1.00 1.00 1.000 -3.000 opening on GW
90 56+742 56+754 GW 1 5.00 3.00 4.500 22.500
-1 2.00 1.00 1.00 1.000 -2.000 opening on GW
91 56+894 56+906 GW 1 5.00 2.00 2.500 12.500
92 57+194 57+206 GW 1 12.00 3.00 4.500 54.000

Page 273 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.:7.08
Description of work:
Supply, fabrication and assembling of gabion boxes, of hexagonal mesh type 100
mm x 120 mm, with mesh wire 10 swg, selvedge wire 7 swg, binding wire 12 swg and
stone filling in gabions including transport and fixing of gabions in position, tying with
binding and tension wire all complete (SS/SP 2401)
Chainage
Length Width Height Sectional Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) area (sq.m) (cu.m)

-1 3.00 1.00 1.00 1.000 -3.000 opening on GW


93 57+555 57+567 GW 1 8.00 2.00 2.500 20.000
-1 2.00 1.00 1.00 1.000 -2.000 opening on GW
94 57+675 57+687 GW 1 8.00 3.00 4.500 36.000
-1 3.00 1.00 1.00 1.000 -3.000 opening on GW
95 57+852 GW 1 2.00 8.000 16.000 2m 2step casecade
96 57+946 57+958 GW 1 4.000 Replacing existing
Replacing existing Dry
97 58+083 58+095 GW 1 4.000
wall
98 58+235 58+256 GW 1 6.00 2.00 2.500 15.000
-1 2.00 1.00 1.00 1.000 -2.000 opening on GW
99 59+784 59+796 GW 1 12.00 4.00 7.000 84.000
-1 4.00 1.00 1.00 1.000 -4.000
100 59+810 59+822 GW 1 15.00 1.00 1.00 1.000 15.000
101 59+920 59+932 GW 1 5.000 extention
1 12.00 5.000 60.000 12m long casecade
102 60+119 60+131 GW 1 8.00 1.00 1.00 1.000 8.000
103 61+288 61+303 GW 2.000
104 62+460 62+472 GW 1 6.00 2.00 2.500 15.000
-1 3.00 1.00 1.00 1.000 -3.000
1 3.000 DS extention in height
Extra Structure
1 3+720.0 GW 1 10.00 9.00 90.00 cascade of 10m length
2 6+090.0 GW 1 20.00 8.00 160.00 cascade of 20m length
3 10+300.0 10+340.0 GW 1 40.00 2.00 2.50 100.00 GRW
4 16+421.0 1 4.00
5 26+600.0 GW 1 4.00 GRW Replace
Total 3,645.900 cu.m
Stones from dismantling of existing Gabion Works 153.300 cu.m
Gabion works using new stones 3,492.600 cu.m

Page 274 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 7.09, 9.04


Description of work: Dismantling gabion works including stockpiling the reusable materials within 50m lead
[202]
Chainage Length Width Height Sectional Quantity
S.N. Type Side Remarks
From To (m) (m) (m) Area (sqm) (cu.m)
Crossing Structures
1 2+950 GW 2.00 1.00 2.00 2.000 4.000 DS of PC
2 4+403 GW 4.00 2.00 2.500 10.000 DS of PC
3 4+658 GW 3.00 2.00 2.500 7.500 DS of PC
4 8+243 8+253 GW 2.00 1.00 2.00 2.000 4.000 DS of CW
5 10+000 GW 6.00 3.00 4.500 27.000 PC US and DS
6 10+604 10+614 GW 5.00 3.00 4.500 22.500
7 14+695 GW 22.000 GW for PC Installation
8 16+090 16+112 GW 6.00 3.00 4.500 27.000
9 16+421 GW 4.000 of cascade drop
10 26+600 GW 4.000 GRW replce
11 27+175 27+187 GW 2.00 1.00 1.000 2.000
Desmental existing
12 27+950 GW 8.00 3.00 4.500 36.000
wall
13 31+301 31+313 2.000 D/S maintanance
14 32+582 32+594 GW 2.000 D/S maintanance
15 34+350 34+377 GW 4.000 replace
16 34+877 34+889 GW 2.000 replace
17 40+109 40+121 GW 12.00 1.00 1.000 12.000
Desmental existing
18 40+330 GW 3.000
wall
To replace with DS
19 49+680 GW 3.00 1.00 1.00 1.000 3.000
head wall
20 50+055 50+070 GRW 2.00 1.00 1.00 1.000 2.000 D/s of causeway
21 57+946 57+958 GRW 4.000 D/S of causeway
22 59+810 59+822 GRW 15.00 1.00 1.00 1.000 15.000
Total 219.000 cu.m
Stone Recovered @ 70% of total quantity 153.300 cu.m
Dismantling of existing poor condition gabion wall
1 43+934 43+957 GRW R/S 17.00 3.00 4.500 76.500
2 55+815 55+870 GRW L/S 55.00 4.00 7.000 385.000
3 58+774 58+788 GRW L/S 14.00 4.00 7.000 98.000
4 60+681 60+697 GRW L/S 16.00 2.00 2.500 40.000
Total 599.500 cu.m
Stone Recovered @ 70% of total quantity cu.m

Page 275 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 7.10


Providing, Preparing and Installing formwork including necessary supports
Description of work:
and removing after completion using timber (SS/SP -1804,1805)
Chainage Length Breadth Height Quantity
S.N. Type Remarks
From To (m) (m) (m) (sq.m)
Formwork for Drain Cover
1 For one cover slab of 1mx0.5mx0.15m
3.10 0.15 0.465
Total number of drain cover slab 350.00
Total quantity of Formwork for drain cover slab 162.750 sq.m

2 For cover slab of 1.05×0.5mx0.15m


3.20 0.15 0.480
Total number of drain cover slab 1396.00
Total quantity of Formwork for drain cover slab 670.080 sq.m

3 For one cover slab of 1.25×0.5mx0.15m


3.60 0.15 0.540
Total number of drain cover slab 694.00
Total quantity of Formwork for drain cover slab 374.760 sq.m

Total Form work for Drain Cover 1,207.590 sq.m

Page 276 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 7.10


Providing, Preparing and Installing formwork including necessary supports
Description of work:
and removing after completion using timber (SS/SP -1804,1805)
Chainage Length Breadth Height Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) (sq.m)
1 0+002 0+014 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
2 0+137 0+149 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
3 0+350 0+362 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
4 0+980 0+995 RCC CW 3.00 15.00 0.20 9.000
7.00 6.00 0.20 8.400
5 1+362 1+374 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
6 1+654 1+666 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
7 2+044 2+056 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
8 2+363 2+375 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
9 2+440 2+452 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
10 2+502 2+514 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
11 2+606 RCC CW 3.00 3.00 0.20 1.800
2.00 7.00 0.20 2.800
12 3+116 3+128 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
13 3+138 3+150 RCC CW 3.00 15.00 0.20 9.000
7.00 6.00 0.20 8.400
14 3+346 3+358 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
15 3+398 3+410 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
16 3+497 3+509 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
17 3+944 3+956 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
18 4+088 4+100 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
19 4+847 4+859 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
20 4+910 4+922 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
21 5+765 5+767 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
22 6+134 6+146 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
23 6+260 6+272 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
24 7+655 7+673 RCC CW 3.00 8.00 0.20 4.800
3.00 7.00 0.20 4.200
25 8+161 8+173 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
26 8+494 8+506 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
27 8+886 8+898 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800

Page 277 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.10


Providing, Preparing and Installing formwork including necessary supports
Description of work:
and removing after completion using timber (SS/SP -1804,1805)
Chainage Length Breadth Height Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) (sq.m)
28 9+056 9+068 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
29 9+370 9+382 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
30 10+704 10+716 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
31 10+819 10+831 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
32 11+020 11+032 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
33 11+242 11+254 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
34 11+333 11+348 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
35 11+400 11+412 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
36 11+504 11+516 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
37 11+692 11+704 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
38 11+739 11+751 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
39 11+844 11+856 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
40 12+047 12+059 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
41 12+163 12+178 RCC CW 3.00 15.00 0.20 9.000
7.00 6.00 0.20 8.400
42 12+216 12+234 RCC CW 3.00 18.00 0.20 10.800
7.00 7.00 0.20 9.800
43 12+269 12+281 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
44 12+344 12+356 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
45 12+481 12+493 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
46 12+542 12+554 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
47 12+743 12+755 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
48 13+036 13+048 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
49 13+716 13+731 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
50 14+024 14+036 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
51 14+225 14+234 RCC CW 3.00 3.00 0.20 1.800
2.00 7.00 0.20 2.800
52 15+120 15+132 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
53 15+630 15+642 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
54 15+794 15+806 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
55 15+833 15+845 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
56 15+944 15+956 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800

Page 278 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.10


Providing, Preparing and Installing formwork including necessary supports
Description of work:
and removing after completion using timber (SS/SP -1804,1805)
Chainage Length Breadth Height Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) (sq.m)
57 16+023 16+035 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
58 16+090 16+112 RCC CW 3.00 15.00 0.20 9.000
7.00 6.00 0.20 8.400
59 16+271 16+286 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
60 16+414 16+426 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
61 16+982 16+994 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
62 17+942 17+954 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
63 18+316 18+328 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
64 18+620 18+632 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
65 18+800 18+812 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
66 18+844 18+856 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
67 18+975 18+987 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
68 19+219 19+231 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
69 19+420 19+432 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
70 19+692 19+704 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
71 19+722 19+734 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
72 20+010 20+025 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
73 20+432 20+444 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
74 20+546 20+558 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
75 20+765 20+777 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
76 21+120 21+135 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
77 21+183 21+195 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
78 21+524 21+539 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
79 21+562 21+577 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
80 21+669 21+681 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
81 21+817 21+829 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
82 22+008 22+020 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
83 22+235 22+247 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
84 22+444 22+456 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
85 22+572 22+584 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600

Page 279 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.10


Providing, Preparing and Installing formwork including necessary supports
Description of work:
and removing after completion using timber (SS/SP -1804,1805)
Chainage Length Breadth Height Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) (sq.m)
86 22+644 22+656 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
87 22+723 22+735 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
88 22+835 22+847 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
89 22+938 22+950 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
90 23+067 23+079 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
91 23+230 23+242 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
92 23+319 23+331 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
93 23+490 23+502 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
94 23+563 23+575 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
95 23+694 23+706 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
96 24+100 24+112 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
97 24+217 24+229 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
98 24+519 24+531 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
99 24+800 24+812 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
100 24+838 24+853 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
101 25+260 25+272 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
102 25+340 25+352 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
103 25+494 25+506 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
104 25+763 25+775 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
105 26+330 26+342 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
106 26+475 26+490 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
107 26+700 26+712 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
108 27+175 27+187 RCC CW 3.00 12.00 0.20 2.400
4.00 6.00 0.20 4.800
109 27+250 27+262 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
110 27+417 27+429 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
111 27+555 27+567 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
112 27+619 27+631 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
113 28+111 28+123 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
114 28+380 28+392 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600

Page 280 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.10


Providing, Preparing and Installing formwork including necessary supports
Description of work:
and removing after completion using timber (SS/SP -1804,1805)
Chainage Length Breadth Height Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) (sq.m)
115 28+647 28+659 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
116 29+670 29+682 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
117 30+376 30+388 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
118 30+419 30+431 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
119 31+301 31+313 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
120 31+700 31+712 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
121 31+945 31+957 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
122 32+582 32+594 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
123 32+655 32+667 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
124 33+016 33+028 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
125 33+130 33+142 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
126 33+397 33+409 RCC CW 3.00 12.00 0.20 2.400
4.00 7.00 0.20 5.600
127 33+556 33+568 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
128 33+825 33+837 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
129 34+125 34+143 RCC CW 3.00 18.00 0.20 10.800
7.00 7.00 0.20 9.800
130 34+216 34+228 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
131 34+350 34+377 RCC CW 3.00 27.00 0.20 16.200
9.00 7.00 0.20 12.600
132 34+877 34+889 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
133 35+530 35+542 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
134 35+634 35+646 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
135 35+888 35+900 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
136 36+269 36+281 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
137 36+485 36+497 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
138 36+988 37+000 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
139 37+096 37+108 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
140 37+314 37+326 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
141 37+455 37+467 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
142 37+634 37+646 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
143 37+700 37+712 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600

Page 281 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.10


Providing, Preparing and Installing formwork including necessary supports
Description of work:
and removing after completion using timber (SS/SP -1804,1805)
Chainage Length Breadth Height Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) (sq.m)
144 37+920 37+932 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
145 38+066 38+078 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
146 38+530 38+542 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
147 38+648 38+660 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
148 38+713 38+723 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
149 38+815 38+827 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
150 38+920 38+932 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
151 39+030 39+042 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
152 39+200 39+212 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
153 39+342 39+354 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
154 39+568 39+580 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
155 39+694 39+706 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
156 39+792 39+804 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
157 40+109 40+121 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
158 40+419 40+431 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
159 40+790 40+802 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
160 41+047 41+059 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
161 41+275 41+287 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
162 41+854 41+886 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
163 42+038 42+050 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
164 42+202 42+214 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
165 42+286 42+298 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
166 42+380 42+392 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
167 42+417 42+429 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
168 42+820 42+832 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
169 42+866 42+878 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
170 42+966 42+978 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
171 43+012 43+024 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
172 43+131 43+143 RCC CW 3.00 12.00 0.20 7.200

Page 282 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.10


Providing, Preparing and Installing formwork including necessary supports
Description of work:
and removing after completion using timber (SS/SP -1804,1805)
Chainage Length Breadth Height Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) (sq.m)
4.00 7.00 0.20 5.600
173 43+231 43+243 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
174 43+417 43+429 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
175 43+549 43+561 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
176 43+750 43+762 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
177 43+926 43+938 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
176 44+000 44+012 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
177 44+155 44+167 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
178 44+246 44+258 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
179 44+385 44+397 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
180 44+714 44+726 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
181 44+788 44+800 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
182 44+900 44+912 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
183 45+002 45+014 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
184 45+247 45+259 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
185 45+371 45+383 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
186 45+705 45+717 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
187 47+317 47+329 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
188 47+454 47+466 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
189 47+568 47+580 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
190 47+792 47+804 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
191 47+906 47+918 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
192 47+974 47+986 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
193 48+113 48+125 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
194 48+322 48+344 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
195 48+568 48+583 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
196 48+662 48+674 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
197 48+795 48+816 RCC CW 3.00 21.00 0.20 12.600
7.00 7.00 0.20 9.800
198 49+017 49+029 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
199 49+225 49+237 RCC CW 3.00 12.00 0.20 7.200

Page 283 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.10


Providing, Preparing and Installing formwork including necessary supports
Description of work:
and removing after completion using timber (SS/SP -1804,1805)
Chainage Length Breadth Height Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) (sq.m)

4.00 7.00 0.20 5.600

200 49+492 49+513 RCC CW 3.00 21.00 0.20 12.600

7.00 7.00 0.20 9.800

201 49+863 49+875 RCC CW 3.00 12.00 0.20 7.200


4.00 6.00 0.20 4.800
202 49+913 49+928 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
203 50+055 50+070 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
204 50+346 50+358 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
205 50+586 50+598 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
206 51+055 51+067 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
207 52+450 52+462 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
208 52+775 52+787 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
209 52+844 52+856 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
210 53+154 53+166 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
211 53+388 53+400 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
212 53+556 53+568 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
213 53+825 53+837 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
214 54+040 54+052 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
215 54+220 54+232 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
216 54+520 54+532 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
217 54+596 54+608 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
218 54+700 54+712 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
219 54+772 54+784 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
220 54+855 54+867 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
221 55+220 55+235 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
222 55+372 55+384 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
223 55+600 55+612 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
224 55+768 55+783 RCC CW 6.00 4.00 0.20 4.800
4.00 3.50 0.20 2.800
225 55+994 56+009 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
226 56+198 56+210 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600

Page 284 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.10


Providing, Preparing and Installing formwork including necessary supports
Description of work:
and removing after completion using timber (SS/SP -1804,1805)
Chainage Length Breadth Height Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) (sq.m)
227 56+244 56+256 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
228 56+313 56+325 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
229 56+372 56+384 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
230 56+550 56+562 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
231 56+742 56+754 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
232 56+894 56+906 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
233 57+194 57+206 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
234 57+438 57+450 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
235 57+550 57+567 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
236 57+675 57+687 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
237 57+946 57+958 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
238 58+083 58+095 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
239 58+235 58+256 RCC CW 3.00 21.00 0.20 12.600
7.00 7.00 0.20 9.800
240 58+975 58+996 RCC CW 3.00 21.00 0.20 12.600
7.00 7.00 0.20 9.800
241 59+092 59+104 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
242 59+292 59+307 RCC CW 3.00 15.00 0.20 9.000
7.00 6.00 0.20 8.400
243 59+594 59+606 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
244 59+722 59+734 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
245 59+784 59+796 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
246 59+810 59+822 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
247 59+920 59+932 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
248 59+992 60+007 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
249 60+119 60+131 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
250 60+405 60+417 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
251 60+742 60+754 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
252 61+288 61+303 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
253 61+560 61+575 RCC CW 3.00 15.00 0.20 9.000
7.00 7.00 0.20 9.800
254 62+460 62+472 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
255 62+868 62+880 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800

Page 285 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.10


Providing, Preparing and Installing formwork including necessary supports
Description of work:
and removing after completion using timber (SS/SP -1804,1805)
Chainage Length Breadth Height Quantity
S.N. Type Nos. Remarks
From To (m) (m) (m) (sq.m)
256 63+372 63+384 RCC CW 3.00 12.00 0.20 7.200
4.00 7.00 0.20 5.600
257 63+620 63+632 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
258 64+192 64+204 RCC CW 3.00 12.00 0.20 7.200
4.00 6.00 0.20 4.800
Total 3,328.80 sq.m

Page 286 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No. 7.11


Description of work:
Providing and laying steel reinforcement conforming to IS 1786 for RCC works including
cutting, bending, binding, fixing in position etc. all complete as per Drawings. (SS/SP-
2000)

Description of work Dia (mm) No Length Weight /m Quantity(Kg) Remarks


For One Causeway of 12x6 sqm standard
Longitudinal Bar 8 96.00 3.95 0.40 149.81
Transverse Bar 12 84.00 2.95 0.89 220.27 Ref. Typical Dwg of
Longitudinal Dowel Bar 25 40.00 1.05 3.86 162.04 CW
Transverse Dowel Bar 12 24.00 0.75 0.89 16.00
Total 548.111 Per 12x6m CW
Total Number of 12x6m CW = 103.00

(At Ch:- 0+002 - 0+014, 0+137 - 0+149, 0+350 - 0+362, 1+362 - 1+372, 1+654 - 1+666, 2+044 - 2+056, 2+363 - 2+375,
2+440 - 2+452, 2+502 - 2+514, 3+116 - 3+128, 3+346 - 3+358, 3+398 - 3+410, 3+497 - 3+509, 3+944 - 3+956, 4+088 -
4+100, 4+847 - 4+859, 4+910 - 4+922, 5+765 - 5+767, 6+134 - 6+146, 6+260 - 6+272, 8+161 - 8+173, 8+886 - 8+898, 9+056
- 9+068, 9+370 - 9+382, 10+704 - 10+716, 10+819 - 10+831, 11+020 - 11+032, 11+242 - 11+254, 11+400 - 11+412, 12+047
- 12+059, 12+269 - 12+281, 12+481 - 12+493, 12+542 - 12+554, 12+743 - 12+755, 14+024 - 14+036, 15+120 - 15+132,
15+630 - 15+642, 15+833 - 15+845, 15+944 - 15+956, 16+023 - 16+035, 16+414 - 16+426, 16+982 - 16+994, 17+942 -
17+954, 18+316 - 18+328, 18+620 - 18+632, 18+800 - 18+812, 18+844 - 18+856, 18+975 - 18+987, 19+692 - 19+704,
19+722 - 19+734, 20+546 - 20+558, 20+765 - 20+777, 21+183 - 21+195, 23+319 - 23+331, 23+694 - 23+706, 24+100 -
24+112, 26+330 - 26+342, 27+175 - 27+187, 39+200 - 39+212, 41+047 - 41+059, 42+202 - 42+214, 42+380 - 42+392,
42+417 - 42+429,

43+231 - 43+243, 43+417 + 43+429, 43+926 - 43+938,44+000 - 44+012, 44+155 - 44+167, 44+246 - 44+258 , 44+385 -
44+397, 44+788 - 44+800, 45+002 - 45+014, 45+247 - 45+259, 45+371 - 45+383, 48+113 - 48+125 , 48+332 - 48+344 ,
48+662 - 48+674, 50+346 - 50+358, 50+586 - 50+598, 52+450 -52+462, 52+775 - 52+787, 52+844 - 52+856, 53+154 -
53+166, 54+040 - 54+052, 54+220 - 54+232, 54+520 - 54+532, 54+700 - 54+712, 54+772 - 54+784, 54+855 - 54+867,
56+372 - 56+384, 56+550 -56+562, 56+894 - 56+906, 57+194 - 57+206, 57+555 - 57+567, 57+946 - 57+958, 59+092 -
59+104, 59+594 - 59+606, 59+784 - 59+796, 60+119 - 60+131, 62+460 - 62+472, 62+868 - 62+880, 63+620 - 63+632,
64+192 - 64+204 )

Total Reinforcement Bars for all 12x6m CW= 56,455.444 kg

For One Causeway of 15x6 sqm standard


Longitudinal Bar 8 192.00 2.45 0.40 185.84
Transverse Bar 12 120.00 2.95 0.89 314.67 Ref. Typical Dwg of
Longitudinal Dowel Bar 25 100.00 1.05 3.86 405.09 CW
Transverse Dowel Bar 12 30.00 0.75 0.89 20.00
Total 925.596 Per 15x6m CW
(At Ch:- 0+980 - 0+995, 3+138 - 3+150, 12+163 - 12+178, 16+090 -
Total Number of 15x6m CW = 5.00
16+105, 59+292- 59+307)
Total Reinforcement Bars for all 15x6m CW= 4,627.981 kg

For extension of CW by certain length


For 3x7sqm extension
Longitudinal Bar 8 38.00 2.95 0.40 44.29
Transverse Bar 12 20.00 3.45 0.89 61.33 Ref. Typical Dwg of
Longitudinal Dowel Bar 25 0.00 0.00 3.86 0.00 CW
Transverse Dowel Bar 12 12.00 0.75 0.89 8.00
Total 113.620 Per 3x7m CW
Total Number of 3x7m CW = 2.00 (At Ch:- 2+606, 14+225 - 14+234 (P2))
Total Reinforcement Bars for all 3x7m CW= 227.240 Kg

Page 287 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. 7.11


Description of work:
Providing and laying steel reinforcement conforming to IS 1786 for RCC works including
cutting, bending, binding, fixing in position etc. all complete as per Drawings. (SS/SP-
2000)

Description of work Dia (mm) No Length Weight /m Quantity(Kg) Remarks


For extension of CW by certain length
For 8x7sqm extension
Longitudinal Bar 8 76.00 3.95 0.40 118.60
Transverse Bar 12 60.00 3.45 0.89 184.00 Ref. Typical Dwg of
Longitudinal Dowel Bar 32 26.00 1.05 6.32 172.56 CW
Transverse Dowel Bar 12 16.00 0.75 0.89 10.67
Total 485.827 Per 3x7m CW
Total Number of 8x7m CW = 2.00 (At Ch:- 7+655 - 7+673, 55+768 -55+783)
Total Reinforcement Bars for all 8x7m CW= 971.654 kg

For One Causeway of 12x7 sqm standard


Longitudinal Bar 8 114.00 3.95 0.40 177.90
Transverse Bar 12 90.00 3.45 0.89 276.00 Ref. Typical Dwg of
Longitudinal Dowel Bar 25 52.00 1.05 3.86 210.65 CW
Transverse Dowel Bar 12 24.00 0.75 0.89 16.00
Total 680.544 Per 12x7m CW
Total Number of 12x7m CW = 123.00

(At Ch:- 8+494 - 8+506, 11+504 - 11+516, 11+692 - 11+704, 11+739 - 11+751, 11+844 - 11+856, 12+344 - 12+356, 13+036 -
13+048, 15+794 - 15+806, 19+219 - 19+231, 19+420 - 19+432, 20+432 - 20+444, 21+669 - 21+681, 21+817 - 21+829,
22+008 - 22+020, 22+235 - 22+247, 22+444 - 22+456, 22+572 - 22+584, 22+644 - 22+656, 22+723 - 22+735, 22+835 -
22+847, 22+938 - 22+950, 23+047 - 23+079, 23+230 - 23+242, 23+490 - 23+502, 23+563 - 23+575, 24+217 - 24+229,
24+519 - 24+531, 24+800 - 24+812, 25+260 - 25+272, 25+340 - 25+352, 25+494 - 25+506, 25+763 - 25+775, 26+700 -
26+712 , 27+250 - 27+262, 27+417 - 27+429, 27+555 - 27+567, 27+619 - 27631, 28+111 - 28+123, 28+380 - 28+392,
28+647 - 28+659, 29+670 - 29+682, 30+376 - 30+431, 30+419 - 30+431, 31+301 - 31+313, 31+700 - 31+712, 31+945 -
31+957, 32+582 - 32+594, 32+655 - 32+677,

33+016 - 33+028, 33+130 - 33+142, 33+397 - 33+409, 33+556 - 33+568, 33+825 - 33+837, 34+216 - 34+228, 34+877 -
34+889, 35+530 - 35+542, 35+643 - 35+646, 35+888 - 35+900, 36+269 - 36+281, 36+485 - 36+497, 36+988 - 37+000,
37+096 - 37+108, 37+314 - 37+326, 37+455 - 37+467, 37+634 + 37+646, 37+700 -37+712, 37+920 - 37+932, 38+066 -
38+078, 38+530 - 38+542, 38+648 - 38+660, 38+713 - 38+723, 38+815 - 38+827, 38+920 - 38+932, 39+030 - 39+042,
39+200 - 39+212, 39+342 - 39+354, 39+568 - 39+580, 39+694 - 39+706 - 39+792 - 39+804, 40+109 - 40+121, 40+419 -
40+431, 40+790 - 40+802, 41+275 - 41+287, 41+854 - 41+886, 42+038 - 42+050, 42+286 - 42+298, 42+820 - 42+832,
42+866 - 42+878, 42+966 - 42+978, 43+012 - 43+024,

43+131 - 43+143, 43+549 - 43+561 - 43+750 - 43+762, 44+714- 44+726, 44+900- 44+912, 45+705- 45+717, 47+317-
47+329, 47+454- 47+466, 47+566-47+580, 47+792- 47+804, 47+906-47+918, 47+974- 47+986, 49+017- 49+029, 49+225-
49+237, 49+863- 49+875, 51+055 - 51+067, 53+388- 53+400, 53+556- 53+568, 53+825- 53+837, 54+596- 54+608,55+372-
55+384, 55+600 -55+612,56+198-56+210, 56+244- 56+256, 56+313- 56+325, 56+742-56+754, 57+438- 57+450, 57+675-
57+687, 58+083-58+095, 59+722- 59+734, 59+810- 59+822, 59+920- 59+932, 60+405- 60+417, 60+742- 60+754, 63+372-
63+384)

Total Reinforcement Bars for all 12x7m CW= 83,706.967 Kg

For One Causeway of 15x7 sqm standard


Longitudinal Bar 8 228.00 2.45 0.40 220.68
Transverse Bar 12 120.00 3.45 0.89 368.00 Ref. Typical Dwg of
Longitudinal Dowel Bar 25 130.00 1.05 3.86 526.62 CW
Transverse Dowel Bar 12 30.00 0.75 0.89 20.00
Total 1,135.302 Per 15x7m CW
(At Ch:- 11+333 - 11+348, 13+716 - 13+731, 16+271 - 16+286,
Total Number of 15x7m CW = 9.00 20+010 - 20+025, 21+120 - 21+135, 21+524 - 21+539, 21+562 -
21+577, 24+838 - 24+853, 26+475 - 26+490 )
Total Reinforcement Bars for all 15x7m CW= 10,217.717 kg

Page 288 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. 7.11


Description of work:
Providing and laying steel reinforcement conforming to IS 1786 for RCC works including
cutting, bending, binding, fixing in position etc. all complete as per Drawings. (SS/SP-
2000)

Description of work Dia (mm) No Length Weight /m Quantity(Kg) Remarks


For One Causeway of 18x7 sqm standard
Longitudinal Bar 8 228.00 2.95 0.40 265.72
Transverse Bar 12 132.00 3.45 0.89 404.80 Ref. Typical Dwg of
Longitudinal Dowel Bar 25 130.00 1.05 3.86 526.62 CW
Transverse Dowel Bar 12 36.00 0.75 0.89 24.00
Total 1,221.139 Per 18x7m CW

(At Ch:- 12+216 - 12+234, 48+568- 48+583, 49+913- 49+928,


Total Number of 18x7m CW = 9.00 50+055- 50+070, 55+220 -55+235, 55+994- 56+009, 59+992-
60+007, 61+288-61+303, 61+560- 61+575 )
Total Reinforcement Bars for all 18x7m CW= 10,990.250 kg

For One Causeway of 21x7 sqm standard


Longitudinal Bar 8 228.00 3.45 0.40 310.76
Transverse Bar 12 156.00 3.45 0.89 478.40 Ref. Typical Dwg of
Longitudinal Dowel Bar 25 130.00 1.05 3.86 526.62 CW
Transverse Dowel Bar 12 42.00 0.75 0.89 28.00
Total 1343.78 Per 21x7m CW
(At Ch. 48+795- 48+816, 49+492-49+513, 58+235- 58+256, 58+975-
Total Number of 21x7m CW = 4.00
58+996,)
Total Reinforcement Bars for all 21x7m CW= 5,375.104 kg

For One Causeway of 27x7 sqm standard


Longitudinal Bar 8 342.00 2.95 0.40 398.58
Transverse Bar 12 198.00 3.45 0.89 607.20
Longitudinal Dowel Bar 25 208.00 1.05 3.86 842.59
Transverse Dowel Bar 12 54.00 0.75 0.89 36.00
Total 1884.37 Per 27x7m CW
Total Number of 27x7m CW = 1.00 (AT. CH:34+350 - 34+377)
Total Reinforcement Bars for all 27x7m CW= 1,884.370 kg

Page 289 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No. 7.11

Providing and laying steel reinforcement conforming to IS 1786 for RCC works
Description of work: including cutting, bending, binding, fixing in position etc. all complete as per
Drawings. (SS/SP- 2000)

Description of work Diameter (mm) No. Length (m) Weight /m Quantity(kg) Remarks
Road Side Drain Cover Reinforcement
For one drain cover slab of 0.075 cum RCC (1mx0.5mx0.15m)
12.00 5.00 1.15 0.89 5.111
8.00 8.00 0.45 0.40 1.422
Total 6.533
Total number of drain cover slab 858.00 nos.
Total quantity of Reinforcement for drain cover slab 5,605.600 kg

For one drain cover slab of .079cum RCC(1.05×0.5mx0.15m)


12 5.00 1.20 0.89 5.333
8 8.00 0.45 0.40 1.422
Total 6.756
Total number of drain cover slab 1412.00 nos.
Total quantity of Reinforcement for drain cover slab 9,538.844 kg

For one drain cover slab of 0.125cum RCC(1.25×0.5mx0.15m)


12 5.00 1.40 0.89 6.222
8 9.00 0.45 0.40 1.600
Total 7.822 kg
Total number of drain cover slab 718.00 nos.
Total quantity of Reinforcement for drain cover slab 5,616.356 kg

For one drain cover slab of 0.09cum RCC(1.2×0.5mx0.15m)


12 5.00 1.40 0.89 6.22
8 9.00 0.45 0.40 1.60
Total 7.82 kg
Total number of drain cover slab 36.00 nos.
Total quantity of Reinforcement for drain cover slab 281.60 kg

Page 290 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.7.12

Providing and laying RCC pipes (NP3) , jointed with stiff mixture of cement mortar in
Description of work:
the proportion of 1:2 (1 cement : 2 fine sand), all complete.(SS/SP- 701)

S.N. Chainage Type/Shape Length (m) Remarks


a) 600 mm diameter (Internal)
Cross drainage Structures
1 1+053 PC 7.5 Irrigation Crossing
2 21+272 PC 7.5
3 24+414 PC 7.5 Irrigation Crossing
4 25+025 PC 7.5 Irrigation Crossing
5 28+587 PC 7.5
6 30+029 PC 10
7 30+061 PC 10
8 52+987 PC 7.5 Irrigation Crossing
9 54+260 PC 10
10 55+525 PC 7.5
11 55+742 PC 7.5
12 55+503 PC 7.5
13 56+610 PC 7.5
14 57+330 PC 7.5
15 57+852 PC 7.5
16 58+750 PC 7.5
17 59+230 PC 7.5
18 61+070 PC 6.5
Link Road
1 4+820 PC 9
2 7+975 PC 7.5
3 17+250 PC 7.5
4 24+325 PC 15
5 28+860 PC 10
6 29+285 PC 10
7 31+250 PC 10
8 63+925 PC 10
Total 220.5 m
b) 900 mm diameter (Internal)
Cross drainage Structures
1 0+825 PC 7.5
2 4+658 PC 15
3 8+701 PC 7.5
4 10+000 PC 7.5
5 13+324 PC 7.5
6 13+855 PC 7.5
7 14+502 PC 7.5
8 14+695 PC 7.5
9 15+225 PC 7.5
10 16+365 PC 7.5
11 17+255 PC 7.5
12 17+560 PC 7.5
13 22+345 PC 7.5
14 25+025 PC 7.5
15 27+950 PC 7.5
16 29+160 PC 7.5
16 29+275 PC 7.5
17 30+895 PC 7.5
17 32+388 PC 7.5
18 32+886 PC 7.5

Page 291 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.7.12

Providing and laying RCC pipes (NP3) , jointed with stiff mixture of cement mortar in
Description of work:
the proportion of 1:2 (1 cement : 2 fine sand), all complete.(SS/SP- 701)

S.N. Chainage Type/Shape Length (m) Remarks


19 35+175 PC 7.5
20 35+325 PC 10
21 36+660 PC 7.5
22 40+300 PC 7.5
23 55+525 PC 7.5
24 55+742 PC 7.5
25 55+503 PC 7.5
26 56+610 PC 7.5
27 57+330 PC 7.5
28 57+852 PC 7.5
29 58+750 PC 7.5
30 59+230 PC 7.5
31 61+070 PC 6.5
32 46+475 PC 7.5
33 46+876 PC 7.5
34 49+680 PC 10
35 51+336 PC 7.5
36 52+190 PC 7.5
37 58+565 PC 7.5
38 61+975 PC 7.5
39 64+560 PC 7.5
40 64+965 P) 7.5
Link Road
1 50+980 PC 7.5
Total 334 m

Page 292 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 7.13

Providing and laying granular bedding for pipe culverts (SS/SP- 701)
Description of work:
Sectional Area Quantity
S.N. Chainage Nos Length (m) Remarks
(sq.m)
(cu.m)
1 0+825.0 1.00 5.40 3.55 19.170 7.5m NP3 900mm dia pipe bed
2 1+053.0 1.00 7.50 2.70 20.250 7.5m NP3 600mm dia pipe
3 4+658.0 1.00 13.50 3.55 47.925
4 8+701.0 1.00 5.50 3.55 19.525 7.5m NP3 900mm dia pipe bed
5 10+000.0 1.00 6.00 3.55 21.300 7.5m NP3 900mm dia pipe bed
6 13+324.0 1.00 5.40 3.55 19.170 7.5m NP3 900mm dia pipe bed
7 13+855.0 1.00 5.40 3.55 19.170 7.5m NP3 900mm dia pipe bed
8 14+502.0 1.00 5.40 3.55 19.170 7.5m NP3 900mm dia pipe bed
9 14+695.0 1.00 5.40 3.55 19.170 7.5m NP3 900mm dia pipe bed
10 15+225.0 1.00 5.40 3.55 19.170 7.5m NP3 900mm dia pipe bed
11 16+365.0 1.00 5.40 3.55 19.170 7.5m NP3 900mm dia pipe bed
12 17+255.0 1.00 5.40 3.55 19.170
13 17+560.0 1.00 5.40 3.55 19.170
13 21+272.0 1.00 7.50 2.70 20.250
14 22+345.0 1.00 5.40 3.55 19.170
15 24+414.0 1.00 7.50 2.70 20.250 Irrigation Crossing
16 24+620.0 1.00 7.50 2.70 20.250 Irrigation Crossing
17 25+025.0 1.00 5.40 3.55 19.170
18 27+950.0 1.00 8.40 3.55 29.820
19 28+587.0 1.00 5.40 2.70 14.580
20 30+029.0 1.00 8.40 2.70 22.680 Irrigation CrossingU/S and D/S HW
22 30+061.0 1.00 8.10 2.70 21.870
23 30+895.0 1.00 5.40 3.55 19.170
24 32+388.0 1.00 5.40 3.55 19.170
25 32+886.0 1.00 5.40 3.55 19.170
26 35+175.0 1.00 5.40 3.55 19.170
24 35+325.0 1.00 8.40 3.55 29.820 10m lenght with dia. 0.9m
25 36+660.0 1.00 5.40 3.55 19.170
26 40+330.0 1.00 5.40 3.55 19.170
27 46+475.0 1.00 5.40 3.55 19.170 PC 900mm
28 46+876.0 1.00 5.40 3.55 19.170 PC 900mm
29 49+680.0 1.00 8.40 3.55 29.820 PC 900mm
30 51+336.0 1.00 5.40 3.55 19.170 PC 900mm
31 52+190.0 1.00 5.40 3.55 19.170 PC 900mm
32 52+987.0 1.00 7.50 2.70 20.250 Irrigation Crossing
33 54+260.0 1.00 9.00 2.70 24.300
34 55+525.0 1.00 7.50 2.70 20.250 Irrigation Crossing
35 55+742.0 1.00 5.40 2.70 14.580 Irrigation Crossing (with headwall)
36 56+503.0 1.00 5.40 2.70 14.580 Irrigation Crossing (with headwall)
37 56+610.0 1.00 5.40 2.70 14.580 Irrigation Crossing (with headwall)
38 57+330.0 1.00 5.40 2.70 14.580 Irrigation Crossing (with headwall)
39 57+852.0 1.00 5.40 2.70 14.580 Irrigation Crossing (with headwall)
40 58+565.0 1.00 5.40 3.55 19.170 PC 900mm
41 58+750.0 1.00 5.40 2.70 14.580 Irrigation Crossing (with headwall)
42 59+230.0 1.00 5.40 2.70 14.580 Irrigation Crossing (with headwall)
43 61+070.0 1.00 4.40 2.70 11.880 Irrigation Crossing (with headwall)
44 61+975.0 1.00 5.40 3.55 19.170 PC 900mm
45 64+560.0 1.00 5.40 3.55 19.170 PC 900mm
46 64+965.0 1.00 5.40 3.55 19.170 PC 900mm
Total 976.330 cu.m

Page 293 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 7.14,9.05


Supply and place geotextile as per design drawings, all complete (SS/SP-
Description of work :
3110)
Chainage Height Quantity
S.N. Length (m) Remarks
From To (m) (sq.m)
Geotextile for cross drainage structure
1 0+744.00 0+746.00 8 5.5 44 CW / DS
1 1+125.00 1+129.00 6 2.5 15 CW / DS
1 1+290.00 1+294.00 6 4 24 CW / DS
1 1+589.00 1+593.00 3 4 12 CW / DS
1 1+859.00 1+861.00 12 11.5 138 CW / DS
1 1+955.00 1+957.00
1 2+333.00 2+337.00
1 2+595.00 2+597.00
1 2+740.00 2+742.00
1 3+130.00 3+132.00
1 4+700.00 4+702.00

3+720.00

Total 233.00 sq.m

Page 294 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 7.15


Dismantling of masonary drain including stockpiling the reusable materials and
Description of work:
disposal of unusable materials in 50 m lead [202]
Chainage Sectional Quantity
S.N. Remarks
From To Drain Type Length (m) Area (sq.m) (cu.m)
Road Side Drain
5m section is required to be
1 0.185 0.925
0+362 0+485 SM/T2 5.00 reconstructed
2 0+506 0+685 SM/T2 6.00 0.185 1.110 6m need to be repair at 0+616
Masonary drain with 12m need to be
3 0.185 2.220
1+240 1+363 SM/T2 12.00 repaired
4 0.185 0.740 4m drain wall damaged maintanance
2+375 2+439 SM/T2 4.00 is needed
5 0.185 0.925 dismantle and maintanance is
2+570 2+575 SM/T2 5.00 necessary
6 2+950 3+092 SM/T2 10.00 0.185 1.850 ok(10m maintanance is needed
7 3+805 3+888 SM/T2 24.50 0.185 4.533 24.5m damaged need to repair
7m need to dismantle and need to
8 0.185 1.295
4+095 4+160 SM/T2 7.00 repair
9 4+145 4+330 SM/T2 15.00 0.185 2.775 15m need to dismantle and repair
7m need to dismantle and need to
10 0.185 1.295
4+410 4+495 SM/T2 7.00 repair
5mdrain wall need to dismantle and
11 0.185 0.925
4+516 4+652 SM/T2 5.00 to repair
12m damaged need to dismantleand
12 0.185 2.220
4+659 4+720 SM/T2 12.00 repair
10m need to dismantle and
13 0.185 1.850
5+162 5+375 SM/T2 10.00 repair(PCC required)
14 5+384 5+576 SM/T2 15.00 0.185 2.775 15m need to dismantle and repair
15m need to dismantle and
15 0.185 2.775
5+576 5+708 SM/T2 15.00 repair(PCC required)
16 6+315 6+402 SM/T2 8.00 0.185 1.480 8m need to dismantle and repair
7m need to dismantle and need to
17 0.185 1.295
6+525 6+625 SM/T2 7.00 repair
90m need to be dismantle and
18 0.185 16.650
7+480 7+655 SM/T2 90.00 reconstruct
19 0.220 15.400
7+673 7+955 SM/T3 70.00 70m need to repair(PCC on bottom)
20 0.185 5.735
10+420 10+515 SM/T2 31.00 31m need dismantle and reconstruct
50m length is damaged need to
21 0.185 9.250
21+198 21+515 SM/T2 50.00 repair
22 21+825 22+004 SM/T2 15.00 0.185 2.775 15m is damaged need to repair
23 23+750 23+955 SM/T2 7.00 0.185 1.295 7m damaged need to repair
24 24+533 24+658 SM/T2 17.00 0.185 3.145 17m damaged need to repair
25 29+406 29+520 SM/T2 37.00 0.185 6.845 37m damaged need to repair
26 30+443 30+551 SM/T2 13.00 0.185 2.405 13m need to repair
27 30+551 30+589 SM/T2 36.00 0.185 6.660 36m need to repair
28 30+600 30+626 SM/T2 5.00 0.185 0.925 5m need to repair
29 30+677 30+810 SM/T2 11.00 0.185 2.035 11m need to repair
30 0.450 33.750 15m total re construction nedded
51+425 51+500 SM/T3 75.00 (Reconstruct it totally P2)
30m to be repaired (Reconstruct it
31 0.380 13.300
51+545 51+580 SM/T2 35.00 totally P2)
32 51+580 51+660 SM/T2 80.00 0.380 30.400 (Reconstruct it totally P2)
33 51+660 51+772 SM/T3 112.00 0.450 50.400 (Reconstruct it totally P2)
2m required maintanance
34 0.380 25.080
51+774 51+840 SM/T2 66.00 (Reconstruct it totally P2)
10m required maintanance
35 0.380 13.300
51+840 51+875 SM/T2 35.00 (Reconstruct it totally P2)
36 51+875 51+950 SM/T3 75.00 0.450 33.750 (Reconstruct it totally P2)

Page 295 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 7.15


Dismantling of masonary drain including stockpiling the reusable materials and
Description of work:
disposal of unusable materials in 50 m lead [202]
Chainage Sectional Quantity
S.N. Remarks
From To Drain Type Length (m) Area (sq.m) (cu.m)
10m required maintanance
37 0.450 31.500
52+050 52+120 SM/T3 70.00 (Reconstruct it totally P2)
38 52+157 52+175 SM/T2 18.00 0.380 6.840 (Reconstruct it totally P2)
39 52+175 52+190 SM/T2 15.00 0.380 5.700 (Reconstruct it totally P2)
40 58+572 58+597 SM/T2 25.00 0.185 4.625 need to dismantle and reconstruct
required totally dismantle and
41 0.450 67.500
58+825 58+975 SM/T3 150.00 reconstruction of type THA
42 62+775 62+830 SM/T2 15.00 0.185 2.775 15m to be maintanance
43 64+465 64+545 SM/T2 25.00 0.185 4.625 required 25m maintanance
Total Dismantle 427.653 cu.m

Page 296 of 313


8 ROAD FURNITURE AND TRAFFIC SAFETY MEASURES
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No. : 8.01, 8.03


Description of work : Traffic Sign

S.No. Chainage Description Side Existing Proposed Remarks

a) Traffice Sign Borads


1 0+072 Right Turn L/S 1 Repainting required
2 0+223 Left Turn L/S 1
3 0+249 Left Turn L/S 1
4 1+341 Left Turn L/S 1
5 1+700 Right Turn R/S 1
6 1+913 Right Turn L/S 1
7 2+120 Left Turn R/S 1
8 2+232 Left Turn L/S 1
9 3+161 U Turn L/S 1
10 3+650 U Turn L/S 1
11 3+795 U Turn R/S 1
12 4+105 U Turn L/S 1
13 4+305 Left Turn R/S 1
14 4+645 Left Turn R/S 1
15 4+655 Right Turn L/S 1
16 4+817 Left Turn R/S 1
17 4+998 Left Turn L/S 1
18 5+200 Left Turn R/S 1
19 5+475 U Turn L/S 1
20 5+770 U Turn R/S 1
21 5+841 Left Turn L/S 1
22 6+057 Left Turn R/S 1
23 6+575 U Turn L/S 1
24 6+796 U Turn L/S 1
25 11+950 U Turn 2
26 14+950 U Turn 2
27 16+350 U Turn 2
28 16+350 U Turn 2
29 16+800 Left Turn / Right Turn 2
30 17+150 U Turn 2
31 29+550 U Turn 2
32 35+125 U Turn 2
33 35+675 U Turn 2
34 39+100 Rock fall area 2
35 42+625 U Turn 2
36 43+275 U Turn 2
37 46+200 Right Turn 1
38 50+850 U Turn 2
39 51+650 U Turn 2
40 52+200 Narrow wide 2
41 55+025 U Turn 2
42 55+275 U Turn 2
43 63+200 U Turn 2
Provisional Quantity 10
Total 24 47 nos.
@ 0.3 sqm= 7.2 Sqm
b) Information Borads
1 6+817 Jarayotar L/S 1
2 7+529 Jarayotar R/S 1
3 19+500 Sapakhola 2
4 23+850 Chamtang R/S 2
5 28+768 Pyaule 1

Page 298 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No. : 8.01, 8.03


Description of work : Traffic Sign

S.No. Chainage Description Side Existing Proposed Remarks

6 29+484 Pyaule 1
7 29+550 Way to Chainpur R/S 1
8 30+900 Bijaya Bas 2
9 37+570 Tiwari Bhanjyan 2
10 40+750 Hile Bhanjan 2
11 45+160 Shyamsila 2
12 52+350 Ashinay khola 1
13 55+800 Adheri khola 2
14 61+400 Pani Tanki 2
15 64+000 Deurali Chowk 2
16 64+400 Saudachowk 2
17 65+000 Bhojpur Bus park 2
Provisional Quantity 10
Total 5 33 nos.
@ 0.5 sqm= 2.5 Sqm 0.8x0.5
Total Painting 9.7 Sqm
Total area
c) Kilometer Posts nos. area (Sqm)
(Sq.m)
5 km post @1post/ 5km 13 0.9 11.7
2 1 km post 52 0.4 20.8
Total 1 32.50 sq.m

Page 299 of 313


9.0 RETAINING AND BREAST WALLS
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 9.01


Description of work:
Providing and laying coursed random rubble stone masonry in cement sand mortar
MM 5 including curing, etc. all complete as per Drawings.(SS/SP- 2600)
Chainage Type/ Length Height Sectional Quantity
S.N. Side Nos. Remarks
From To Shape (m) (m) Area(sq.m) (cu.m)
Road Side Structures
1 0+759 0+786 SBW L 1 27.00 2.50 2.613 70.538
2 2+390 2+410 SBW R 1 20.00 1.50 1.091 21.810
3 29+130 29+145 SBW L 1 15.00 2.50 2.613 39.188
4 38+289 38+325 SBW R 1 36.00 2.00 1.772 63.792
5 38+325 38+530 SBW R 1 205.00 1.50 1.091 223.553
6 38+549 38+574 SBW R 1 25.00 1.50 1.091 27.263
7 43+781 43+825 SBW R 1 43.00 1.50 1.091 46.892
8 52+126 52+146 SBW R 1 20.00 1.50 1.091 21.810
9 58+067 58+082 SBW R 1 15.00 1.50 1.091 16.358
10 8+275 8+290 SRW R 1 15.00 3.00 3.612 54.180
11 11+580 11+605 SRW R 1 25.00 1.50 1.091 27.263
12 13+728 13+752 SRW L 1 24.00 2.00 1.772 42.528
13 14+662 14+628 SRW L 1 6.00 3.00 3.612 21.672
14 28+628 28+640 SRW R 1 12.00 3.00 3.612 43.344
15 29+078 29+120 SRW R 1 42.00 2.30 2.257 94.803
16 29+150 29+175 SRW R 1 25.00 4.50 7.565 189.113
17 34+901 34+913 SRW L 1 12.00 3.00 3.612 43.344
18 36+577 36+586 SRW L 1 9.00 2.80 3.193 28.738
19 37+172 37+176 SRW L 1 4.00 2.50 2.613 10.450
20 38+232 38+247 SRW L 1 15.00 2.50 2.613 39.188
21 38+415 38+425 SRW L 1 10.00 2.20 2.089 20.891
22 38+932 38+965 SRW L 1 33.00 2.40 2.432 80.245
23 38+983 39+012 SRW L 1 29.00 2.40 2.432 70.519
24 42+075 42+081 SRW L 1 6.00 3.80 5.542 33.252
25 42+083 42+094 SRW L 1 11.00 4.00 6.088 66.968
26 43+722 43+745 SRW L 1 23.00 2.50 2.613 60.088
27 44+747 44+754 SRW L 1 7.00 3.00 3.612 25.284
28 44+825 44+835 SRW L 1 10.00 3.00 3.612 36.120
29 48+244 48+252 SRW L 1 8.00 3.20 4.056 32.451
30 49+623 49+632 SRW L 1 9.00 2.00 1.772 15.948
31 49+814 49+816 SRW L 1 2.00 2.80 3.193 6.386
32 49+877 49+893 SRW L 1 16.00 4.00 6.088 97.408
33 50+011 50+021 SRW L 1 10.00 3.50 4.771 47.705
34 52+199 52+217 SRW L 1 18.00 2.80 3.193 57.476
35 52+248 52+254 SRW L 1 6.00 4.00 6.088 36.528
36 52+256 52+260 SRW L 1 4.00 5.00 9.200 36.800
37 52+274 52+292 SRW L 1 18.00 4.50 7.565 136.161
38 52+319 52+325 SRW L 1 6.00 2.80 3.193 19.159
39 55+612 55+620 SRW L 1 8.00 2.80 3.193 25.545
40 55+652 55+665 SRW L 1 13.00 4.00 6.088 79.144
Total Quantity of Masonary 2,109.900 cu.m

Page 301 of 313


ADB TA 7411-NEP Road Connectivity ProjectDraft Final Report, September 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 9.01


Providing and laying coursed random rubble stone masonry in cement sand mortar
MM 5 including curing, etc. all complete as per Drawings.(SS/SP- 2600)
Description of work:
No. of Width Section Area Quantity
S.N. Chainage Side Remarks
Step (m) (sq.m) (cu.m)
For foot track
1 1+850.0 R 10.00 3.00 1.550 4.650
2 6+090.0 R 10.00 3.00 1.550 4.650
3 29+180.0 R 20.00 3.00 2.750 8.250
4 30+531.0 R 20.00 2.00 2.750 5.500
5 31+424.0 R 3.00 2.00 0.710 1.420
6 31+952.0 R 4.00 2.00 0.830 1.660
7 32+000.0 R 6.00 2.00 1.070 2.140
8 32+180.0 R 3.00 2.00 0.710 1.420
9 32+200.0 R 2.00 2.00 0.590 1.180
10 32+250.0 R 2.00 2.00 0.590 1.180
11 32+282.0 R 4.00 2.00 0.830 1.660
12 32+352.0 R 7.00 2.00 1.190 2.380
13 32+425.0 R 4.00 2.00 0.830 1.660
14 32+452.0 L 3.00 2.00 0.710 1.420
15 32+795.0 L 5.00 2.00 0.950 1.900
16 33+900.0 L 4.00 2.00 0.830 1.660
17 34+650.0 L 6.00 2.00 1.070 2.140
18 35+951.0 L 3.00 2.00 0.710 1.420
19 36+250.0 L 4.00 2.00 0.830 1.660
20 36+499.0 L 4.00 2.00 0.830 1.660
21 37+225.0 R 4.00 2.00 0.830 1.660
22 37+375.0 R 5.00 2.00 0.950 1.900
23 37+402.0 R 3.00 2.00 0.710 1.420
24 37+482.0 R 5.00 2.00 0.950 1.900
25 37+482.0 L 10.00 2.00 1.550 3.100
26 37+555.0 R 4.00 2.00 0.830 1.660
27 37+626.0 R 4.00 2.00 0.830 1.660
28 37+802.0 R 3.00 2.00 0.710 1.420
29 37+874.0 R 2.00 2.00 0.590 1.180
30 38+225.0 L 2.00 2.00 0.590 1.180
31 38+612.0 R 7.00 2.00 1.190 2.380
32 38+706.0 R 2.00 2.00 0.590 1.180
33 39+761.0 R 4.00 2.00 0.830 1.660
34 40+023.0 R 2.00 2.00 0.590 1.180
35 40+145.0 R 5.00 2.00 0.950 1.900
36 40+522.0 R 6.00 2.00 1.070 2.140
37 40+720.0 R 2.00 2.00 0.590 1.180
38 40+908.0 R 4.00 2.00 0.830 1.660
39 42+175.0 R 4.00 2.00 0.830 1.660
40 42+205.0 R 3.00 2.00 0.710 1.420
41 43+405.0 R 10.00 2.00 1.550 3.100
42 43+644.0 R 3.00 2.00 0.710 1.420
43 43+927.0 R 8.00 2.00 1.310 2.620
44 43+930.0 R 20.00 2.00 2.750 5.500
45 44+164.0 R 2.00 2.00 0.590 1.180
46 44+402.0 R 3.00 2.00 0.710 1.420
47 44+470.0 R 2.00 2.00 0.590 1.180
48 44+577.0 R 6.00 2.00 1.070 2.140
49 44+690.0 R 2.00 2.00 0.590 1.180
50 45+152.0 R 3.00 2.00 0.710 1.420
51 45+301.0 R 8.00 2.00 1.310 2.620
52 45+400.0 R 2.00 2.00 0.590 1.180

Page 302 of 313


ADB TA 7411-NEP Road Connectivity ProjectDraft Final Report, September 2010 WSP-GEOCE

Item No.: 9.01


Providing and laying coursed random rubble stone masonry in cement sand mortar
MM 5 including curing, etc. all complete as per Drawings.(SS/SP- 2600)
Description of work:
No. of Width Section Area Quantity
S.N. Chainage Side Remarks
Step (m) (sq.m) (cu.m)
53 45+850.0 R 6.00 2.00 1.070 2.140
54 46+005.0 R 2.00 2.00 0.590 1.180
55 46+850.0 L 6.00 2.00 1.070 2.140
56 48+850.0 L 4.00 2.00 0.830 1.660
57 48+896.0 L 4.00 2.00 0.830 1.660
58 49+025.0 R 10.00 2.00 1.550 3.100
59 49+125.0 R 2.00 2.00 0.590 1.180
60 49+427.0 R 4.00 2.00 0.830 1.660
61 50+475.0 R 10.00 2.00 1.550 3.100
62 50+600.0 R 7.00 2.00 1.190 2.380
63 50+748.0 R 4.00 2.00 0.830 1.660
64 53+140.0 R 10.00 2.00 1.550 3.100
65 53+155.0 R 10.00 2.00 1.550 3.100
66 53+235.0 R 10.00 2.00 1.550 3.100
67 53+320.0 R 10.00 2.00 1.550 3.100
68 53+560.0 R 10.00 2.00 1.550 3.100
69 53+575.0 L 10.00 2.00 1.550 3.100
70 53+875.0 R 10.00 2.00 1.550 3.100
71 54+270.0 R 7.00 2.00 1.190 2.380
72 54+320.0 R 5.00 2.00 0.950 1.900
73 54+572.0 R 2.00 2.00 0.590 1.180
74 54+702.0 R 4.00 2.00 0.830 1.660
75 54+820.0 R 4.00 2.00 0.830 1.660
76 54+900.0 R 3.00 2.00 0.710 1.420
77 56+163.0 R 10.00 2.00 1.550 3.100
78 56+665.0 R 10.00 2.00 1.550 3.100
79 56+760.0 R 10.00 2.00 1.550 3.100
80 57+100.0 L 10.00 2.00 1.550 3.100
81 57+210.0 L 20.00 2.00 2.750 5.500
82 57+610.0 R 25.00 2.00 3.350 6.700
83 57+710.0 L 25.00 2.00 3.350 6.700
84 57+808.0 R 20.00 2.00 2.750 5.500
85 57+910.0 R 10.00 2.00 1.550 3.100
86 58+125.0 R 10.00 2.00 1.550 3.100
87 58+475.0 R 10.00 2.00 1.550 3.100
88 58+625.0 L 20.00 2.00 2.750 5.500
89 59+370.0 R 10.00 2.00 1.550 3.100
90 60+375.0 R 2.00 2.00 0.590 1.180
91 60+476.0 R 6.00 2.00 1.070 2.140
92 60+524.0 R 3.00 2.00 0.710 1.420
93 60+551.0 R 3.00 2.00 0.710 1.420
94 60+780.0 R 9.00 2.00 1.430 2.860
95 61+052.0 R 3.00 2.00 0.710 1.420
96 61+152.0 R 6.00 2.00 1.070 2.140
97 61+270.0 R 2.00 2.00 0.590 1.180
98 61+652.0 R 3.00 2.00 0.710 1.420
99 61+850.0 R 4.00 2.00 0.830 1.660
100 62+322.0 R 3.00 2.00 0.710 1.420
101 63+525.0 L 3.00 2.00 0.710 1.420
Total 236.150 cu.m

Page 303 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.:9.02
Description of work:
Supply, fabrication and assembling of gabion boxes, of hexagonal mesh type 100 mm
x 120 mm, with mesh wire 10 swg, selvedge wire 7 swg, binding wire 12 swg and stone
filling in gabions including transport and fixing of gabions in position, tying with
binding and tension wire all complete (SS/SP 2401).
Chainage
Width Height Sectional Quantity
S.N. Type Side Length (m) Remarks
From To (m) (m) area (sq.m) (cu.m)

Road Side Structures


Gabion Works

Total 0.000 cu.m

Page 304 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 9.04


Description of work:
Providing and placing cement concrete M10/40 including compaction,
curing, testing etc., all complete as per Drawings.(SS/SP- 2000)
Chainage Length Breadth Quantity
S.N. Type Side Height (m) Remarks
From To (m) (m) (cu.m)
Road Side Structures
1 0+759 0+786 SBW L 27 1.5 0.1 4.050
2 2+390 2+410 SBW R 20 0.9 0.1 1.800
3 29+130 29+160 SBW L 30 1.5 0.1 4.500
4 38+289 38+325 SBW R 36 1.2 0.1 4.320
5 38+325 38+530 SBW R 25 0.9 0.1 2.250
6 38+549 38+574 SBW R 25 0.9 0.1 2.250
7 43+781 43+825 SBW R 43 0.9 0.1 3.870
8 52+126 52+146 SBW R 20 1.8 0.1 3.600
9 58+067 58+082 SBW R 15 1.8 0.1 2.700
10 8+275 8+290 SRW R 15 1.8 0.1 2.700
11 11+580 11+605 SRW R 25 1.2 0.1 3.000
12 13+728 13+752 SRW L 24 1.2 0.1 2.880
13 14+662 14+628 SRW L 6 1.8 0.1 1.080
14 28+628 28+640 SRW R 12 1.8 0.1 2.160
15 29+078 29+120 SRW R 32 1.38 0.1 4.416
16 29+150 29+275 SRW R 25 2.7 0.1 6.750
17 34+901 34+913 SRW L 12 1.8 0.1 2.160
18 36+577 36+586 SRW L 23 1.68 0.1 3.864
19 37+172 37+176 SRW L 4 1.5 0.1 0.600
20 38+232 38+247 SRW L 15 1.5 0.1 2.250
21 38+415 38+425 SRW L 10 1.32 0.1 1.320
22 38+932 38+965 SRW L 33 1.44 0.1 4.752
23 38+983 39+012 SRW L 19 1.44 0.1 2.736
24 42+075 42+081 SRW L 6 2.28 0.1 1.368
25 42+083 42+094 SRW L 11 2.4 0.1 2.640
26 43+722 43+745 SRW L 23 1.5 0.1 3.450
27 44+747 44+734 SRW L 7 1.8 0.1 1.260
28 44+825 44+835 SRW L 10 1.8 0.1 1.800
29 48+244 48+252 SRW L 8 1.92 0.1 1.536
30 49+623 49+632 SRW L 15 1.2 0.1 1.800
31 49+814 49+816 SRW L 4 1.68 0.1 0.672
32 49+877 49+893 SRW L 16 2.4 0.1 3.840
33 50+011 50+021 SRW L 10 2.1 0.1 2.100
34 52+199 52+217 SRW L 18 1.68 0.1 3.024
35 52+248 52+254 SRW L 6 2.4 0.1 1.440
36 52+256 52+260 SRW L 4 3 0.1 1.200
37 52+274 52+292 SRW L 18 2.7 0.1 4.860
38 52+199 52+325 SRW L 6 1.68 0.1 1.008
39 55+612 55+620 SRW L 8 1.68 0.1 1.344
40 55+652 55+665 SRW L 13 2.4 0.1 3.120
Total 106.470 cu.m

Page 305 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 9.06


Description of work: Dismantling Dry Stone works including stockpiling the reusable materials within 50m
lead [202]
Chainage
Length Width Height Sectional Quantity
S.N. Type Side Remarks
From To (m) (m) (m) Area (sq.m) (cu.m)
Cross drainage Structures
1 3+497 3+509 DW 2.00 1.50 1.00 1.500 3.000 DS of CW
2 23+694 23+706 DW 35.00 1.00 1.00 1.000 35.000 DS of CW
3 25+260 25+272 DW 5.00 1.00 1.00 1.000 5.000 DS of CW
4 25+340 25+352 DW 3.00 0.50 0.75 0.375 1.125 DS of CW
5 37+455 37+467 DW 4.00 0.50 1.00 0.500 2.000 DS of CW
6 51+055 51+067 DW 13.00 2.00 1.500 19.500 DS of CW
6 56+894 56+906 DW 5.00 2.00 1.500 7.500
7 58+083 58+095 DW 4.00 1.00 1.00 1.000 4.000
Sub total 77.125 Cum
Road Side Structures
1 1+528 1+550 DW 2.00 22.00 0.75 1.00 0.750 16.500 Replace by GRW
2 1+992 1+996 DW -2.50 4.00 0.75 1.00 0.750 3.000
3 3+380 3+390 DW 4.50 10.00 1.00 2.00 2.000 20.000
4 3+545 3+563 DW 4.50 18.00 1.00 2.00 2.000 36.000
5 5+075 5+140 DW 3.50 65.00 0.80 1.00 0.800 52.000
6 5+280 5+290 DW -3.00 10.00 1.00 1.50 1.500 15.000
7 6+275 6+315 DW -3.00 40.00 1.00 2.00 2.000 80.000
8 7+605 7+630 DW 3.50 25.00 1.00 1.50 1.500 37.500
9 8+615 8+675 DW 3.00 60.00 1.00 1.50 1.500 90.000
10 8+704 8+722 DW 3.20 18.00 1.00 1.00 1.000 18.000
11 8+836 8+856 DW 3.20 20.00 1.00 1.50 1.500 30.000
12 8+905 8+930 DW 3.50 25.00 1.00 2.50 2.500 62.500
13 9+531 9+600 DW -4.00 69.00 0.75 1.40 1.050 72.450
14 9+765 9+825 DW -4.00 60.00 0.75 1.50 1.125 67.500
15 10+235 10+290 DW -3.20 55.00 0.50 0.50 0.250 13.750
16 11+032 11+060 DW 3.00 28.00 0.75 1.50 1.125 31.500
17 11+100 11+148 DW 3.00 48.00 0.80 1.80 1.440 69.120
18 11+815 11+826 DW 3.00 11.00 0.75 2.00 1.500 16.500
19 11+875 11+948 DW 2.50 73.00 0.75 1.00 0.750 54.750
20 11+895 11+975 DW -2.50 80.00 0.75 1.00 0.750 60.000
21 14+558 14+582 DW -3.50 24.00 1.25 2.20 2.750 66.000
22 14+668 14+690 DW -3.00 22.00 0.75 1.00 0.750 16.500
23 14+754 14+825 DW -5.00 71.00 0.75 1.00 0.750 53.250
24 14+830 14+860 DW -5.00 30.00 1.00 0.75 0.750 22.500
25 15+160 15+172 DW -3.20 12.00 1.00 1.00 1.000 12.000
26 15+600 15+632 DW 6.00 32.00 1.00 1.50 1.500 48.000
27 15+960 15+966 DW 2.30 6.00 0.75 0.50 0.375 2.250
28 15+978 16+012 DW 3.50 34.00 1.00 1.20 1.200 40.800
29 16+560 16+593 DW -2.30 33.00 1.00 4.00 4.000 132.000
30 17+850 17+950 DW 3.50 100.00 1.00 1.10 1.100 110.000
31 18+090 18+120 DW 2.50 30.00 0.50 0.75 0.375 11.250
32 18+165 18+315 DW 3.00 150.00 0.50 0.80 0.400 60.000
33 18+342 18+352 DW 4.00 10.00 1.00 1.00 1.000 10.000
34 18+370 18+375 DW 3.70 5.00 1.00 1.00 1.000 5.000
35 18+375 18+410 DW 3.70 35.00 0.75 0.50 0.375 13.125
36 18+540 18+570 DW 2.50 30.00 1.00 1.00 1.000 30.000
37 18+839 18+844 DW 3.20 5.00 1.00 2.00 2.000 10.000
38 18+990 19+025 DW 1.00 35.00 1.50 0.80 1.200 42.000
39 19+045 19+095 DW 3.00 50.00 1.00 2.00 2.000 100.000
40 19+178 19+188 DW 3.50 10.00 1.00 0.70 0.700 7.000
41 19+317 19+321 DW 3.00 4.00 1.00 2.00 2.000 8.000
42 20+570 20+580 DW 3.40 10.00 1.00 2.00 2.000 20.000
43 20+685 20+690 DW 3.20 5.00 1.00 1.50 1.500 7.500
44 20+790 20+795 DW 3.00 5.00 0.50 0.75 0.375 1.875
45 20+900 20+906 DW 2.80 6.00 1.00 2.00 2.000 12.000

Page 306 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 9.06


Description of work: Dismantling Dry Stone works including stockpiling the reusable materials within 50m
lead [202]
Chainage
Length Width Height Sectional Quantity
S.N. Type Side Remarks
From To (m) (m) (m) Area (sq.m) (cu.m)
46 20+905 20+915 DW 2.70 10.00 1.00 0.30 0.300 3.000 DW on GW top
47 20+905 20+930 DW 3.00 25.00 1.00 1.50 1.500 37.500
48 21+463 21+471 DW 2.50 8.00 1.00 2.00 2.000 16.000
49 21+490 21+496 DW 2.60 6.00 1.00 2.00 2.000 12.000
50 21+780 21+790 DW 2.60 10.00 1.00 2.00 2.000 20.000
51 22+005 22+015 DW 10.00 1.00 1.00 1.000 10.000
52 22+025 22+050 DW 25.00 1.00 1.00 1.000 25.000
53 22+638 22+742 DW 104.00 1.00 2.00 2.000 208.000
54 23+583 23+593 DW 10.00 1.00 2.00 2.000 20.000
55 23+915 23+925 DW 5.00 10.00 0.75 2.00 1.500 15.000
56 24+310 24+335 DW 25.00 1.00 2.50 2.500 62.500
57 24+608 24+620 DW 3.00 12.00 1.00 1.50 1.500 18.000
58 24+713 24+725 DW 3.00 12.00 1.00 1.00 1.000 12.000
59 24+742 24+764 DW 4.00 22.00 1.00 1.00 1.000 22.000
60 24+785 24+795 DW 7.00 10.00 1.00 2.00 2.000 20.000
61 29+295 29+340 DW 3.00 45.00 0.75 1.20 0.900 40.500
62 29+410 29+520 DW 3.00 110.00 1.00 2.00 2.000 220.000
63 29+650 29+655 DW 5.00 1.00 1.50 1.500 7.500
64 31+936 31+952 DW -3.80 16.00 1.00 2.50 2.500 40.000
65 32+997 33+000 DW -3.70 3.00 1.00 3.00 3.000 9.000
66 33+124 33+126 DW -3.60 2.00 1.00 1.00 1.000 2.000
67 33+303 33+325 DW -4.10 22.00 1.00 2.00 2.000 44.000
68 33+450 33+456 DW -4.50 6.00 1.20 1.40 1.680 10.080
69 33+955 33+968 DW -2.80 13.00 1.00 1.50 1.500 19.500
70 38+425 38+565 DW -6.00 140.00 1.00 1.20 1.200 168.000
71 40+350 40+361 DW -2.60 11.00 1.00 1.80 1.800 19.800
72 42+121 42+135 DW -3.80 14.00 1.00 1.80 1.800 25.200
73 42+269 42+276 DW -3.00 7.00 1.00 1.15 1.150 8.050
74 43+578 43+585 DW -2.00 7.00 1.00 1.20 1.200 8.400
75 43+600 43+606 DW -2.00 6.00 1.00 0.50 0.500 3.000
76 44+181 44+231 DW -2.70 50.00 1.00 2.00 2.000 100.000
77 44+294 44+325 DW -4.60 31.00 1.00 1.00 1.000 31.000
78 47+994 47+997 DW -2.80 3.00 1.00 0.80 0.800 2.400
79 48+302 48+330 DW -3.00 28.00 1.00 2.00 2.000 56.000
80 48+725 48+775 DW -2.00 50.00 1.00 1.00 1.000 50.000
81 50+232 50+252 DW -2.20 20.00 1.00 1.50 1.500 30.000
82 52+855 52+876 DW -3.00 21.00 1.00 1.50 1.500 31.500
83 53+000 53+026 DW -3.40 26.00 1.00 1.50 1.500 39.000
84 55+785 55+792 DW -2.80 7.00 1.00 2.00 2.000 14.000
85 56+213 56+216 DW -3.20 3.00 1.00 2.00 2.000 6.000
86 56+256 56+263 DW -2.50 7.00 0.75 0.50 0.375 2.625
87 58+600 58+615 DW -3.80 15.00 1.00 1.50 1.500 22.500
88 58+724 58+738 DW -3.50 14.00 1.00 2.00 2.000 28.000
89 58+950 58+965 DW -3.00 15.00 1.00 1.00 1.000 15.000
90 59+750 59+763 DW -2.60 13.00 1.00 2.00 2.000 26.000
91 59+827 59+850 DW -2.50 23.00 1.00 1.20 1.200 27.600
92 62+522 62+533 DW -2.60 11.00 1.00 1.00 1.000 11.000
93 63+215 63+308 DW 4.00 93.00 0.75 0.80 0.600 55.800
94 63+400 63+405 DW 3.50 5.00 1.00 2.00 2.000 10.000
Sub total 3,371.575 cu.m
Total 3,448.700 cu.m
Stone recovered from dismantle @ 40% cu.m

Page 307 of 313


10 MISCELLANEOUS WORKS
ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

4 Leguwaghat-Bhojpur Road
Appendix-4
Quantity Calculation Sheet

Item No.: 10.01


Dismantling of dry stone soling including stockpiling the reusable
Description of work:
materials and disposal of unusable materials in 50 m lead [202]
Chainage Length Breadth Height Quantity
S.N. Remarks
From To (m) (m) (m) (cu.m)
Cross drainage Structures
Existing soling work in very poor
1 0+002 0+014 10.00 5.00 0.20 10.000
condition
2 0+137 0+149 10.00 5.00 0.20 10.000
3 0+350 0+362 10.00 5.00 0.20 10.000
4 0+980 0+995 10.00 5.00 0.20 10.000
5 1+362 1+374 12.00 10.00 0.20 24.000
6 1+654 1+666 10.00 5.00 0.20 10.000
7 2+044 2+056 10.00 5.00 0.20 10.000
8 2+363 2+375 12.00 7.00 0.20 16.800
9 2+440 2+452 12.00 7.00 0.20 16.800
10 2+502 2+514 10.00 5.00 0.20 10.000
11 3+346 3+358 10.00 5.00 0.20 10.000
12 3+398 3+410 10.00 5.00 0.20 10.000
13 3+497 3+509 10.00 5.00 0.20 10.000
14 4+088 4+100 10.00 5.00 0.20 10.000
15 4+847 4+859 10.00 5.00 0.20 10.000
16 4+910 4+922 10.00 5.00 0.20 10.000
17 6+134 6+146 10.00 5.00 0.20 10.000
18 6+260 6+272 10.00 5.00 0.20 10.000
19 8+886 8+898 10.00 5.00 0.20 10.000
20 9+056 9+068 10.00 5.00 0.20 10.000
21 9+370 9+382 10.00 5.00 0.20 10.000
22 10+819 10+831 10.00 5.00 0.20 10.000
23 11+020 11+032 10.00 6.00 0.20 12.000
24 11+242 11+254 10.00 6.00 0.20 12.000
25 11+333 11+348 15.00 12.00 0.20 36.000
26 11+400 11+412 10.00 5.00 0.20 10.000
27 11+504 11+516 12.00 7.00 0.20 16.800
28 11+692 11+704 12.00 8.00 0.20 19.200
29 11+739 11+751 12.00 7.00 0.20 16.800
30 11+844 11+856 12.00 7.00 0.20 16.800
31 12+047 12+059 10.00 5.00 0.20 10.000
32 12+163 12+178 10.00 5.00 0.20 10.000
33 12+216 12+234 18.00 7.00 0.20 25.200
34 12+269 12+281 10.00 5.00 0.20 10.000
35 12+344 12+356 10.00 5.00 0.20 10.000
36 12+481 12+493 10.00 5.00 0.20 10.000
37 12+743 12+755 10.00 5.00 0.20 10.000
38 13+036 13+048 12.00 6.00 0.20 14.400
39 13+716 13+731 15.00 6.00 0.20 18.000
40 14+024 14+036 10.00 5.00 0.20 10.000
41 15+120 15+132 10.00 5.00 0.20 10.000
42 15+630 15+642 10.00 5.00 0.20 10.000
43 15+794 15+806 10.00 5.00 0.20 10.000
44 15+833 15+845 12.00 6.00 0.20 14.400
45 15+944 15+956 12.00 6.00 0.20 14.400
46 16+023 16+035 12.00 6.00 0.20 14.400
47 16+090 16+112 12.00 6.00 0.20 14.400
48 16+271 16+286 15.00 7.00 0.20 21.000
49 16+414 16+426 12.00 6.00 0.20 14.400
50 18+316 18+328 12.00 6.00 0.20 14.400
51 18+620 18+632 12.00 6.00 0.20 14.400

Page 309 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 10.01


Dismantling of dry stone soling including stockpiling the reusable
Description of work:
materials and disposal of unusable materials in 50 m lead [202]
Chainage Length Breadth Height Quantity
S.N. Remarks
From To (m) (m) (m) (cu.m)
52 18+800 18+812 12.00 6.00 0.20 14.400
53 18+844 18+856 12.00 6.00 0.20 14.400
54 18+975 18+987 12.00 6.00 0.20 14.400
55 19+219 19+231 12.00 7.00 0.20 16.800
56 19+420 19+432 12.00 7.00 0.20 16.800
57 19+692 19+704 12.00 6.00 0.20 14.400
58 19+722 19+734 12.00 6.00 0.20 14.400
59 20+010 20+025 12.00 7.00 0.20 16.800
60 20+432 20+444 12.00 7.00 0.20 16.800
61 20+546 20+558 12.00 6.00 0.20 14.400
62 20+765 20+777 12.00 6.00 0.20 14.400
63 21+120 21+135 14.00 7.00 0.20 19.600
64 21+183 21+195 12.00 6.00 0.20 14.400
65 21+524 21+539 14.00 7.00 0.20 19.600
66 21+562 21+577 14.00 7.00 0.20 19.600
67 21+669 21+681 12.00 7.00 0.20 16.800
68 21+817 21+829 12.00 7.00 0.20 16.800
69 22+008 22+020 12.00 7.00 0.20 16.800
70 22+235 22+247 10.00 6.00 0.20 12.000
71 22+444 22+456 10.00 6.00 0.20 12.000
72 22+572 22+584 10.00 6.00 0.20 12.000
73 22+644 22+656 10.00 6.00 0.20 12.000
74 22+723 22+735 10.00 6.00 0.20 12.000
75 22+835 22+847 10.00 6.00 0.20 12.000
76 22+938 22+950 10.00 6.00 0.20 12.000
77 23+067 23+079 10.00 6.00 0.20 12.000
78 23+230 23+242 10.00 6.00 0.20 12.000
79 23+319 23+331 12.00 7.00 0.20 16.800
80 23+490 23+502 10.00 6.00 0.20 12.000
81 23+563 23+575 10.00 6.00 0.20 12.000
82 23+694 23+706 10.00 6.00 0.20 12.000
83 24+100 24+112 10.00 6.00 0.20 12.000
84 24+217 24+229 10.00 6.00 0.20 12.000
85 24+519 24+531 10.00 6.00 0.20 12.000
86 24+800 24+812 10.00 6.00 0.20 12.000
87 24+838 24+853 12.00 6.00 0.20 14.400
88 25+260 25+272 12.00 6.00 0.20 14.400
89 25+340 25+352 12.00 6.00 0.20 14.400
90 25+494 25+506 12.00 6.00 0.20 14.400
91 25+763 25+775 12.00 6.00 0.20 14.400
92 26+330 26+342 12.00 6.00 0.20 14.400
93 26+475 26+490 15.00 7.00 0.20 21.000
94 26+700 26+712 12.00 7.00 0.20 16.800
95 27+175 27+187 12.00 6.00 0.20 14.400
96 27+250 27+262 12.00 7.00 0.20 16.800
97 27+417 27+429 12.00 7.00 0.20 16.800
98 27+555 27+567 12.00 7.00 0.20 16.800
99 27+619 27+631 10.00 7.00 0.20 14.000
100 28+111 28+123 12.00 7.00 0.20 16.800
101 28+380 28+392 12.00 7.00 0.20 16.800
111 29+670 29+682 12.00 7.00 0.20 16.800
112 30+376 30+388 12.00 7.00 0.20 16.800
113 30+419 30+431 12.00 7.00 0.20 16.800
114 31+301 31+313 12.00 7.00 0.20 16.800
115 31+700 31+712 12.00 7.00 0.20 16.800
116 33+556 33+568 12.00 7.00 0.20 16.800
117 33+825 33+837 12.00 7.00 0.20 16.800

Page 310 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 10.01


Dismantling of dry stone soling including stockpiling the reusable
Description of work:
materials and disposal of unusable materials in 50 m lead [202]
Chainage Length Breadth Height Quantity
S.N. Remarks
From To (m) (m) (m) (cu.m)
118 34+125 34+143 18.00 7.00 0.20 25.200
119 34+216 34+228 12.00 7.00 0.20 16.800
120 34+350 34+377 27.00 7.00 0.20 37.800
121 34+877 34+889 12.00 7.00 0.20 16.800
122 35+530 35+542 12.00 7.00 0.20 16.800
123 35+888 35+900 12.00 7.00 0.20 16.800
124 36+269 36+281 12.00 7.00 0.20 16.800
125 36+485 36+497 12.00 7.00 0.20 16.800
126 37+096 37+108 12.00 7.00 0.20 16.800
127 37+314 37+326 12.00 7.00 0.20 16.800
128 37+455 37+467 12.00 7.00 0.20 16.800
129 37+634 37+646 12.00 7.00 0.20 16.800
130 37+700 37+712 12.00 7.00 0.20 16.800
131 37+920 37+932 12.00 7.00 0.20 16.800
132 38+066 38+078 12.00 7.00 0.20 16.800
133 38+530 38+542 12.00 7.00 0.20 16.800
134 38+648 38+660 12.00 7.00 0.20 16.800
135 38+713 38+725 12.00 7.00 0.20 16.800
136 38+815 38+827 12.00 7.00 0.20 16.800
137 38+920 38+932 12.00 7.00 0.20 16.800
138 39+030 39+042 12.00 7.00 0.20 16.800
139 40+109 40+121 12.00 7.00 0.20 16.800
140 40+419 40+431 12.00 7.00 0.20 16.800
141 40+790 40+802 12.00 7.00 0.20 16.800
142 41+047 41+059 12.00 6.00 0.20 14.400
143 41+275 41+287 12.00 7.00 0.20 16.800
144 42+038 42+050 12.00 7.00 0.20 16.800
145 42+202 42+214 12.00 6.00 0.20 14.400
155 42+286 42+298 12.00 7.00 0.20 16.800
10.00 2.00 0.20 4.000
156 44+000 44+012 12.00 5.00 0.20 12.000
157 44+155 44+167 12.00 6.00 0.20 14.400
158 44+246 44+258 12.00 6.00 0.20 14.400
159 44+385 44+397 12.00 5.00 0.20 12.000
160 44+788 44+800 12.00 5.50 0.20 13.200
161 44+900 44+912 12.00 5.00 0.20 12.000
162 45+002 45+014 12.00 5.00 0.20 12.000
163 45+247 45+259 12.00 5.00 0.20 12.000
164 45+371 45+383 12.00 5.00 0.20 12.000
165 45+705 45+717 12.00 5.50 0.20 13.200
166 47+317 47+329 12.00 6.00 0.20 14.400
167 47+454 47+466 12.00 6.00 0.20 14.400
168 47+568 47+580 12.00 6.00 0.20 14.400
169 47+792 47+804 12.00 6.00 0.20 14.400
170 47+906 47+918 12.00 6.00 0.20 14.400
171 47+974 47+986 12.00 6.00 0.20 14.400
172 48+113 48+125 12.00 5.00 0.20 12.000
173 48+332 48+344 12.00 5.00 0.20 12.000
174 48+568 48+583 15.00 6.00 0.20 18.000
175 48+795 48+816 21.00 6.00 0.20 25.200
176 49+017 49+029 12.00 6.00 0.20 14.400
177 49+225 49+237 12.00 6.00 0.20 14.400
178 49+492 49+513 21.00 6.00 0.20 25.200
179 49+913 49+928 15.00 6.00 0.20 18.000
180 50+055 50+070 15.00 7.00 0.20 21.000
181 50+346 50+358 12.00 5.00 0.20 12.000
182 50+586 50+598 12.00 4.50 0.20 10.800

Page 311 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 10.01


Dismantling of dry stone soling including stockpiling the reusable
Description of work:
materials and disposal of unusable materials in 50 m lead [202]
Chainage Length Breadth Height Quantity
S.N. Remarks
From To (m) (m) (m) (cu.m)
183 51+055 51+067 12.00 5.00 0.20 12.000
184 52+450 52+462 12.00 5.00 0.20 12.000
185 52+844 52+856 12.00 5.00 0.20 12.000
186 53+154 53+166 12.00 4.50 0.20 10.800
187 53+388 53+400 12.00 6.00 0.20 14.400
188 53+556 53+568 12.00 5.50 0.20 13.200
189 54+520 54+532 12.00 5.00 0.20 12.000
190 54+596 54+608 12.00 5.00 0.20 12.000
191 54+700 54+712 12.00 5.00 0.20 12.000
192 54+772 54+784 12.00 4.50 0.20 10.800
193 54+855 54+867 12.00 5.00 0.20 12.000
194 55+220 55+235 15.00 5.00 0.20 15.000
195 55+372 55+384 12.00 5.00 0.20 12.000
196 55+994 56+009 15.00 6.00 0.20 18.000
197 56+198 56+210 12.00 5.00 0.20 12.000
198 56+244 56+256 12.00 5.00 0.20 12.000
199 56+313 56+325 12.00 6.00 0.20 14.400
200 56+372 56+384 12.00 5.00 0.20 12.000
201 56+742 56+754 12.00 6.00 0.20 14.400
202 56+894 56+906 12.00 5.00 0.20 12.000
203 57+438 57+450 12.00 6.00 0.20 14.400
204 57+946 57+958 12.00 5.00 0.20 12.000
205 58+083 58+095 12.00 6.00 0.20 14.400
206 58+235 58+256 21.00 6.00 0.20 25.200
207 58+975 58+996 21.00 6.00 0.20 25.200
208 59+092 59+104 12.00 5.00 0.20 12.000
209 59+292 59+307 15.00 5.00 0.20 15.000
210 59+594 59+606 12.00 5.00 0.20 12.000
211 59+722 59+734 12.00 7.00 0.20 16.800
212 59+784 59+796 12.00 6.00 0.20 14.400
213 59+810 59+822 12.00 6.50 0.20 15.600
214 59+920 59+932 12.00 7.00 0.20 16.800
215 59+992 60+007 15.00 6.50 0.20 19.500
216 60+119 60+131 12.00 6.00 0.20 14.400
217 60+405 60+417 12.00 6.50 0.20 15.600
218 60+742 60+754 12.00 6.00 0.20 14.400
219 61+288 61+300 12.00 6.00 0.20 14.400
220 61+560 61+575 15.00 6.00 0.20 18.000
221 62+460 62+472 12.00 5.00 0.20 12.000
222 62+868 62+880 12.00 5.50 0.20 13.200
223 63+372 63+384 12.00 6.00 0.20 14.400
224 63+620 63+632 12.00 5.00 0.20 12.000
225 64+192 64+204 12.00 5.50 0.20 13.200
Road Stone Soling Work
1 21+450.0 21+530.0 80.00 3.50 0.20 56.00
2 23+535.0 23+575.0 40.00 3.50 0.20 28.00
3 24+345.0 24+475.0 130.00 4.50 0.20 117.00
4 28+800.0 28+890.0 90.00 5.00 0.20 90.00
5 29+517.0 29+550.0 33.00 5.00 0.20 33.00
6 29+650.0 29+720.0 70.00 5.00 0.20 70.00
7 30+270.0 30+305.0 35.00 5.00 0.20 35.00
8 30+350.0 30+435.0 85.00 5.00 0.20 85.00
9 30+460.0 30+810.0 350.00 4.50 0.20 315.00
10 30+944.0 31+035.0 91.00 4.00 0.20 72.80
11 33+900.0 33+925.0 25.00 4.00 0.20 20.00
12 37+441.0 37+482.0 41.00 4.00 0.20 32.80
13 48+098.0 48+103.0 5.00 7.00 0.20 7.00

Page 312 of 313


ADB TA 7411-NEP Road Connectivity ProjectFinal Report, December 2010 WSP-GEOCE

Item No.: 10.01


Dismantling of dry stone soling including stockpiling the reusable
Description of work:
materials and disposal of unusable materials in 50 m lead [202]
Chainage Length Breadth Height Quantity
S.N. Remarks
From To (m) (m) (m) (cu.m)
14 51+618.0 51+680.0 62.00 4.00 0.20 49.60
15 54+270.0 54+430.0 160.00 4.00 0.20 128.00
16 55+020.0 55+031.0 11.00 4.00 0.20 8.80
17 56+010.0 56+032.0 22.00 4.50 0.20 19.80
18 56+256.0 56+283.0 27.00 5.00 0.20 27.00
19 56+325.0 56+375.0 50.00 5.00 0.20 50.00
20 56+442.0 56+540.0 98.00 5.00 0.20 98.00
21 56+906.0 56+981.0 75.00 4.50 0.20 67.50
22 57+540.0 57+585.0 45.00 4.00 0.20 36.00
23 57+915.0 57+960.0 45.00 4.50 0.20 40.50
24 64+465.0 64+600.0 135.00 4.50 0.20 121.50
Total 4,651.800 cu.m