Professional Documents
Culture Documents
Electrical technical
office course
ﺍﻟﻜﻮﺭﺱ ﺍﻻﺣﺘﺮﺍﻓﻲ ﻟﻠﻤﻜﺘﺐ ﺍﻟﻔﻨﻲ
ﺍﻟﻜﻬﺮﺑﻲ ﻓﻲ ﺷﺮﻛﺎﺕ ﺍﻟﻤﻘﺎﻭﻻﺕ
Eng. Mohamed Faramawy
ﻣﺤﻤﺪ ﻓﺮﻣﺎﻭﻱ. ﻡ
Eng. Mohamed Faramawy
ﻣﻌﻠﻮﻣﺎﺕ ﻋﻦ ﺍﻟﻤﺤﺎﺿﺮ
ﺍﻟﻤﺤﺎﺿﺮ :ﻣﺤﻤﺪ ﻓﺮﻣﺎﻭﻱ
ﺧﺮﻳﺞ ﻫﻨﺪﺳﺔ ﻗﺴﻢ ﻗﻮﻱ ﻛﻬﺮﺑﻴﺔ ﺟﺎﻣﻌﺔ ﺣﻠﻮﺍﻥ ﺩﻓﻌﺔ . 2009 ‐
ﻋﻤﻠﺖ ﻛﻤﻬﻨﺪﺱ ﺍﺷﺮﺍﻑ ﻋﻠﻲ ﺍﻟﺘﻨﻔﻴﺬ ﻓﻲ ﺍﻟﻤﺠﻤﻮﻋﺔ ﺍﻻﺳﺘﺸﺎﺭﻳﺔ WECG ‐
ﻋﻤﻠﺖ ﻛﻤﻬﻨﺪﺱ ﺗﺼﻤﻴﻢ ﻓﻲ ﻫﻴﺌﺔ ﺍﻟﻤﺸﺮﻭﻋﺎﺕ ﺍﻟﺼﻨﺎﻋﻴﺔ ‐
ﻋﻤﻠﺖ ﻛﻤﻬﻨﺪﺱ ﺗﺼﻤﻴﻢ ﻓﻲ ﻣﻜﺘﺐ ﺍﻟﻤﻬﻨﺪﺳﻮﻥ ﺍﻻﺳﺘﺸﺎﺭﻳﻮﻥ ﺍﻟﻌﺮﺏ )ﻣﺤﺮﻡ – ﺑﺎﺧﻮﻡ( ‐
ﻋﻤﻠﺖ ﻛﻤﻬﻨﺪﺱ ﻛﻬﺮﺑﺎء ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺑﺸﺮﻛﺔ ﺭﻳﺪﻛﻮﻥ ﻟﻼﻧﺸﺎءﺍﺕ ‐
ﻋﻤﻠﺖ ﻛﻤﻬﻨﺪﺱ ﺍﻭﻝ ﻣﻜﺘﺐ ﻓﻨﻲ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺑﺸﺮﻛﺔ ﺟﺎﻣﺎ ﻟﻼﻧﺸﺎءﺍﺕ ﻭ ﺗﻤﺖ ﺗﺮﻗﻴﺘﻲ ﻟﻘﺎﺋﺪ ﻓﺮﻳﻖ ‐
ﺍﺧﻴﺮﺍ ﺍﻋﻤﻞ ﺣﺎﻟﻴﺎ ﻛﻜﺒﻴﺮ ﻣﻬﻨﺪﺳﻲ ﻣﻜﺘﺐ ﻓﻨﻲ ﻓﻲ ﺷﺮﻛﺔ ﺣﺴﻦ ﻋﻼﻡ ﻟﻼﻧﺸﺎءﺍﺕ ‐
Eng. Mohamed Faramawy
Course contents
Session 1 ‐ Introduction :
1 – What are project main elements ?
2 – What is sub contractor ?
3 – What is project baseline and what is its purpose ?
4 – How to understand project baseline .
5 – Brief on each role in contracting companies “Organization chart” .
6 – Brief on main tasks of technical office engineer .
7 – How contractor awarded the contract .
8 – What is IFC documents components ?
1st Task ‐ Preparing drawing list :
1 – What are drawing list and what is its purpose?
2 – What is the purpose of drawing list?
Eng. Mohamed Faramawy
Course contents
Session 2 – 2nd Task– Preparing shop drawings :
‐ 1ST : Shop drawing of lighting system
A – How to control lighting system ?
B – What is 1st , 2nd and 3rd fix of lighting system ?
C – what is filling ratio ?
D – what is hatchmark ?
E – How to start and finalize lighting shop drawings .
F – How to prepare lighting installation details .
G – Assignment NO.1 .
Eng. Mohamed Faramawy
Course contents
Session 3 – 2nd task – Preparing shop drawings :
‐ 2nd : Shop drawing of power system .
A – How to start and finalize power shop drawings .
B – How to prepare power installation details .
‐ 3rd : Shop drawing of AC power system .
A – How to start and finalize power shop drawings .
B – How to prepare power installation details .
C – Assignment no.2
Eng. Mohamed Faramawy
Course contents
Session 4 – 2nd task – Preparing shop drawings :
‐ 4th : Shop drawing of cable routing.
A – Understanding first fix of cable routing system.
B – What is the difference between cable trays , trunks and ladders ?
C – How to prepare shop drawing of cable routing system .
D – How to prepare installation details of cable routing system .
E – what is builder work plan and how to prepare it .
F – Brief on shop drawings of infrastructure works .
G – Equipment furnishing .
H ‐ Assignment no.3
Eng. Mohamed Faramawy
Course contents
Session 5 – 2nd task – Preparing shop drawings :
‐ 5th : Shop drawing of fire alarm system.
A – Understanding fire alarm system components .
B – Reading riser diagram of fire alarm system .
C – How to prepare shop drawing of fire alarm system .
D – How to prepare installation details of fire alarm system .
E – what are interfaces required for fire alarm system ?
F – What is cause and effect matrix ?
‐ 6th : Shop drawing of Access control system.
A – Understanding access control system components .
B – Reading riser diagram of access control system .
C – How to prepare shop drawing of access control system .
D – How to prepare installation details access control system .
E – what are interfaces required for access control system ?
F – What is biometric and time attendance system ?
G ‐ Assignment no.4
Eng. Mohamed Faramawy
Course contents
Session 6 – 2nd task – Preparing shop drawings :
‐ 7th : Shop drawing of Active and passive system.
A – Understanding active and passive system components .
B – Reading riser diagram of active and passive system .
C – How to prepare shop drawing of active and passive system .
D – How to prepare installation details of active and passive system .
E – what are interfaces required for active and passive system ?
‐ 8th : Shop drawing of CCTV system.
A – Understanding CCTV system components .
B – Reading riser diagram of CCTV system .
C – How to prepare shop drawing of CCTV system .
D – How to prepare installation details CCTV system .
E – what are interfaces required for CCTV system ?
F – What is the difference between analogue and IP CCTV system ?
G ‐ Assignment no.5
Eng. Mohamed Faramawy
Course contents
Session 7
3rd task – Preparing material submittal form (MSF):
A – Understanding what is MSF .
B – What are the main components of MSF .
C – How to prepare MSF .
C – What are possibilities of MSF submittal ?
4th task – Preparing quantity takeoff :
A – Understanding what is quantity takeoff .
B ‐ How to prepare quantity takeoff .
5th task – Preparing MSR:
A – Understanding what is MSR .
B ‐ How to prepare MSR .
Eng. Mohamed Faramawy
Course contents
Session 7
6th task – Preparing Quantity survey :
A – Understanding what is Quantity survey .
B – What is the purpose of quantity survey ?
7th task – Applying invoices :
A – Understanding what are types of invoices .
B – Understanding types of payments of project .
C– How to prepare invoices .
8th task – Submitting RFIs & RFPs:
A – Understanding what is RFI .
B– Understanding what is RFP .
C – What are the results of RFI or RFP ?
Eng. Mohamed Faramawy
Course contents
Session 8
9th task – Preparing variation orders (VOs):
A – Understanding what is VO .
B – What is the purpose of VO ?
C – What are the components of VO ?
4 – What is cost assessment ?
10th task – Preparing As built drawings :
A – Understanding what are as built drawings .
B – Understanding what is the purpose of as built drawings .
C – How to prepare as built drawings .
11th task – Preparing O&M manual :
A – Understanding what is O&M manual .
B– Understanding what is purpose of O&M manual .
C – What are the main components of O&M manual ?
12th task – Preparing Final invoice :
A – Understanding what is final invoice .
B– Understanding what is purpose of final invoice .
C – What is TOC ?
‐ Final discussion , Questions and answers and course feedback .
Eng. Mohamed Faramawy
Session 1 ‐ Introduction :
1 – What are project main elements ?
‐ OWNER
‐ Consultant
‐ Contractor
2 – What is sub contractor ?
Smaller Contracting company , which awarded the execution of project from main contractor
3 – How contractor awarded the contract .
‐ During tendering stage , less price with commitment with IFC documents .
‐ IFC Document : Contract , Design drawings , Bill of quantities (BOQ) , Technical specifications & Tender queries .
‐ Most common Project payment are Remeasured & Lumpsum .
Eng. Mohamed Faramawy
Session 1 ‐ Introduction :
4 – What is project baseline and what is its purpose ?
Baseline is detailed schedule to finalize the project within the required duration .
5 – How to understand project baseline .
Baseline consists of 3 stages :
‐ Engineering
‐ Procurement
‐ Construction
Eng. Mohamed Faramawy
Session 1 ‐ Introduction :
6 – Brief on each role in contracting companies “Organization chart” .
Project
Manager
Eng. Mohamed Faramawy
Session 1 ‐ Introduction :
7– Brief on main tasks of technical office engineer .
1 – Preparing shop drawing list & material list .
2 – Helping Planners finalize baseline .
3 – Preparing shop drawings of all systems .
4 – Preparing quantities takeoff .
5 – Preparing or revising material submittals .
6 – Submitting material supply requests .
7 – Preparing quantity survey .
8 – Applying invoices .
9 – Submitting RFIs .
10 – Preparing variation orders .
11 – Preparing field sketches .
12 – Preparing As built drawings .
13 – Preparing O&M manual .