Professional Documents
Culture Documents
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Package A1: OLEFINS PLANT
Contract No.: LSP-CA-136 SPECIAL AUXILIARY PIPE EPC Project No. :036909C
Page
SUPPORTS COLLECTION 1 of 27
Doc.No.: OL1-2P06-5000 Rev. 1
ZONE 2C EPC Doc No.: 102C-DW-1360-0000
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
ZONE 2C
between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
DOCUMENT CLASS: 3
Vivek Dewangan Digitally signed by Mittal Doshi Digitally signed by Vishal Karnik
DN: cn=Vishal Karnik, o=TechnipFMC,
DN: cn=Mittal Doshi,
2020.12.24 14:06:48
Digitally signed by Amol Sankhe
ou=MOC,
o=TechnipFMC, ou=MOC, DN: cn=Amol Sankhe, o=Technipfmc, ou=Technipfmc,
email=vishal.karnik@technipfmc.com, email=amol.sankhe@technipfmc.com, c=IN
email=Mittal.Doshi@technipFMC. c=IN Date: 2020.12.24 14:59:44 +05'30'
TPSK Consortium c/o Level 15, Menara Technip Energies , 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Package A1: OLEFINS PLANT
Contract No.: LSP-CA-136 SPECIAL AUXILIARY PIPE EPC Project No.: 036909C
Page
SUPPORTS COLLECTION 2 of 27
Doc.No.: OL1-2P06-5000 Rev. 1 EPC Doc No.: 102C-DW-1360-0000
ZONE 2C
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
DOCUMENT INFORMATION
Created by : V.DEWANGAN
Review Frequency : As required
File Name : OL1-2P06-5000-1 SPECIAL AUXILIARY PIPE
SUPPORT COLLECTION - ZONE 2C.Docx
List of Qualified Approvers : Refer to Cover Page
Locations of Controlled Copies: TPSK EDMS
Master Document ☐ CV ☐ CO ☐ CM ☐ EE ☐ EM
☐ ES ☐ FT ☐ FF ☐ IE ☐ IF
☐ LE ☐ ME ☐ PE ☐ PL ☐ PC
☐ PM ☐ QM ☐ SE ☒ MP
Copied Document ☐ CV ☐ CO ☐ CM ☐ EE ☐ EM
between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
☐ ES ☐ FT ☐ FF ☐ IE ☐ IF
(E-file) ☐ LE ☐ ME ☐ PE ☐ PL ☐ PC
☐ PM ☐ QM ☐ SE ☐ ……
TPSK Consortium c/o Level 15, Menara Technip Energies , 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
1
0
Rev.
Doc.No.: OL1-2P06-5000
Contract No.: LSP-CA-136
Long Son Petrochemicals Co., Ltd
Rev. 1
Date
31/10/2020
23/12/2020
(dd/mm/yyyy)
-
ALL
Item
ZONE 2C
Page
SUPPORTS COLLECTION
SPECIAL AUXILIARY PIPE
REVISION LOG
SOUTH OF VIETNAM
Article
PETROCHEMICAL COMPLEX IN
Page
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
3 of 27
Revised Detail
Description
issued isometrics in
continuation to Rev 0
Issue for Construction
Added SPS drawings of
EPC Project No.: 036909C
TPSK Consortium c/o Level 15, Menara Technip Energies , 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Package A1: OLEFINS PLANT
Contract No.: LSP-CA-136 SPECIAL AUXILIARY PIPE EPC Project No.: 036909C
Page
SUPPORTS COLLECTION 4 of 27
Doc.No.: OL1-2P06-5000 Rev. 1 EPC Doc No.: 102C-DW-1360-0000
ZONE 2C
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
TPSK Consortium c/o Level 15, Menara Technip Energies , 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time.
Doc.No.: OL1-2P06-5000
Contract No.: LSP-CA-136
036909C-102C-DW-1360-2417
036909C-102C-DW-1360-2416
036909C-102C-DW-1360-2422
Long Son Petrochemicals Co., Ltd
Rev. 1
S-2499
S-2498
S-2479
ZONE 2C
SPECIAL SUPPORT
SPECIAL SUPPORT
SPECIAL SUPPORT
SUPPORTS COLLECTION
SPECIAL AUXILIARY PIPE
SOUTH OF VIETNAM
1 OF 1
1 OF 1
1 OF 1
PETROCHEMICAL COMPLEX IN
X
X
X
Page
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
5 of 27
EPC Project No.: 036909C
TPSK Consortium c/o Level 15, Menara Technip Energies , 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
4. WS01 "SUPPORT TAG CALL OUT" ON ISOMETRIC.
5. THIS SPS IS ONLY THE REPRESENTATION OF ARRANGEMENT AND NO MTO IS COVERED
IN THIS SPS DRAWING.
LEGENDS
3"-HL-27108-A4A-NI 3"-HL-27108-A4A-NI
CL EL. 102950 CL EL. 102950
25 mm GAP
DO NOT REST
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
NOTES:-
T-2710 VENDOR PIPING
CL-43 1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
770 2. FGL = EL. +100000
CL EL. +17000 3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
T-2710 WE01 4. BTL. EL.+ 106000.
CL-44 WR01 5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
1 WG02
CL EL. +16230 6. WR01, WG02 AND WE01 IS SUPPORT TAG CALL OUT ON ISOMETRIC.
45°
6"-HM-27138
200 VENDOR DWG. GA FOR
OL1-2M90-111188
`B1'
DEPENTANIZER
2
T-2710
PIPING
CL-42/44
770
`B1'
CL EL. +16230
VENDOR
200
LEGENDS
0°
`A'
EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM
200
= =
2. BTL = BOTTOM TAN LINE.
200 140 3. FGL = FINISHED GROUND LEVEL.
(TYP.)
30
= = = = 4. MTO = MATERIAL TAKE OFF.
140
(TYP.)
82
30
= = = =
82
= =
NOTE:- ITEM NO. 1 & 2 ARE TRIM TO SUIT AT SITE
270 ° 90 ° 3
62
4 MTO FOR S-2422 & S-2423
I16
I16 ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.
= =
= =
220
280
160
= =
310
370
1 IPE160 800 L 2 TECHNIP SCOPE
230
0 15 THK.
40 2 IPE160 BRACING 900 L 2 TECHNIP SCOPE
Ø2 15 THK.
4 2 TECHNIP SCOPE
VENDOR
180 °
6"-HM-27138
`A'
800
M20 FULL THREADED STUD
5
T-2710
CL-41 NUT (TYP)
5
CL EL. +17000 VESSEL CLEAT
STEEL PLATE
T-2710 VENDOR TO DESIGN 0 18/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
CL-42
CL EL. +16230 15 THK
3 4 STEEL PLATE
STEEL WASHER
5 PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
DETAIL `1'
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
VENDOR PIPING (REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
6. WE01, WR07 AND WG01 ARE SUPPORT TAGS CALL OUT ON ISOMETRIC.
645
F
1
`B' T-2710
CL-45/46 REFERENCE DOCUMENTS
CL EL. +16400 VENDOR DWG. GA FOR
`B' OL1-2M90-111188
DEPENTANIZER
45°
PIPING VENDOR
0°
200
`B1'
WR07 2
WE01
T-2710
`A' `A'
`B1' CL-47/48
CL EL. +15729
LEGENDS
250
T-2710 3
CL-45/46 270 ° 90 ° EQPT. NO.- CLEAT NO.
6"-HM-27138 1.
CL EL. +16400 200
CL EL. IN MM
250
Ø24
ITEM QTY.
00
DESCRIPTION SIZE REMARK
200
NO. REQ.
= =
200 1 IPE160 850 LONG 2 TECHNIP SCOPE
140
(TYP.)
30
= = = =
2 IPE160 BRACING 700 LONG 2 TECHNIP SCOPE
180 °
140
(TYP.)
82
30
= = = =
82 3 ANGLE SUPPORT 75x75x8THK 750 LONG 2 TECHNIP SCOPE
= =
4 END PLATE 200 x 280 x 15THK 2 TECHNIP SCOPE
5
62
4 5 END PLATE FOR BRACING 200 x 370 x 15THK 2 TECHNIP SCOPE
I16 6 FULL THREADED STUD WITH M20 x 100 LONG 16 LOT TECHNIP SCOPE
I16 2 NUTS AND 2 WASHERS
= =
= =
220
280
160
= =
310
370
230
15 THK.
15 THK.
15 THK
4 5 STEEL PLATE
0 14/12/2020 ISSUE FOR CONSTRUCTION RNS VD VK
STEEL WASHER
6
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
6. WE01, WR01 AND WG04 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
15 THK
2 STEEL PLATE
STEEL WASHER
3 LEGENDS
EQPT. NO.- CLEAT NO.
0°
1.
DETAIL `1' CL EL. IN MM
4 1 ITEM QTY.
DESCRIPTION SIZE REMARK
266 200 NO. REQ.
(TYP.)
30
= =
00 82 4 PLATE 240 x 200 x 10THK 1 TECHNIP SCOPE
= =
180 °
I16
= =
= =
220
280
160
15 THK.
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
M20 FULL THREADED STUD
6 1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
NUT (TYP) 3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
6 (REF. EL.+0.00) OF EQUIPMENT.
VESSEL CLEAT
STEEL PLATE 4. BTL. EL.+ 106900
VENDOR TO DESIGN 5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
0°
6. WE01, WG01 AND WR07 ARE SUPPORT TAGS CALL OUT ON ISOMETRIC.
VENDOR PIPING 16 THK
4 5 STEEL PLATE
STEEL WASHER
270 ° 90° 6
REFERENCE DOCUMENTS
VENDOR DWG. GA FOR
1280 DETAIL `1' OL1-2M90-101023
DEBUTANIZER
Ø2 F
200
B 1 T-2660
CL-01/02
CL EL. +23450
45°
B
200 B1
`A'
2
LEGENDS
VENDOR
T-2660
EQPT. NO.- CLEAT NO.
CL-03/04 1.
CL EL. IN MM
200
2395
B1 C
L EL. +22170 2. BTL. = BOTTOM TAN LINE.
3. FGL = FINISHED GROUND LEVEL
PIPING
4. MTO = MATERIAL TAKE-OFF
DETAIL-1
NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE WHENEVER REQUIRED.
1280
(TYP.)
30
270 = = 2 HEA160 BRACING 1530 L 2 TECHNIP SCOPE
= = 160
210 = = 3 ANGLE SUPPORT 75 x 75 x 8 THK 1100 L 2 TECHNIP SCOPE
(TYP.)
30
= =
4 END PLATE 270 x 290 x 16 THK. 2 TECHNIP SCOPE
160
WG01 WE01
= = 5 END PLATE FOR BRACING 270 x 360 x 16 THK. 2 TECHNIP SCOPE
3 5
6 FULL THREADED STUD WITH M20 x 100 L 16 LOT TECHNIP SCOPE
`A' 2 NUTS AND 2 WASHER
4
400 400
H16
14"-HV-26106
H16
= =
= =
300
360
180 °
= =
= =
215
= =
230
290
152
T-2660
16 THK.
CL-01/02
16 THK.
CL EL. +23450
T-2660
CL-03/04
C 4 NOS. Ø22 HOLES FOR
L EL. +22170 4 NOS. Ø22 HOLES FOR
M20 FULL THREADED STUD M20 FULL THREADED STUD
0 10/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
M20 FULL THREADED STUD
6 1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
NUT (TYP) 3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
6 (REF. EL.+0.00) OF EQUIPMENT.
VESSEL CLEAT
0°
STEEL PLATE 4. BTL. EL.+ 106900
VENDOR TO DESIGN 5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
VENDOR PIPING 6. WE01, WR01, WG02 AND SP04 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
16 THK
270 ° 90° 4 5 STEEL PLATE
STEEL WASHER
6
1280
F REFERENCE DOCUMENTS
VENDOR DWG. GA FOR
Ø2 B 1 DETAIL `1' DEBUTANIZER
OL1-2M90-101023
20 T-2660
0 CL-05/06
CL EL. +14550
45°
B
200
B1
2
`A' T-2660
VENDOR
CL-07/08
LEGENDS
B1 CL EL. +13270
2395
PIPING
200
3. FGL = FINISHED GROUND LEVEL
4. MTO = MATERIAL TAKE-OFF
NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE WHENEVER REQUIRED.
1280
270
= =
MTO FOR S-2430
3
210
(TYP.)
30
270 = = ITEM QTY.
DESCRIPTION SIZE REMARK
= = 160 NO. REQ.
210 = =
(TYP.)
1 HEA160 1725 L 2 TECHNIP SCOPE
30
WE01 = =
160 HEA160 BRACING 1530 L 2 TECHNIP SCOPE
2
= =
5 3 ANGLE SUPPORT 75 x 75 x 8 THK 1000 L 2 TECHNIP SCOPE
SP04
4 END PLATE 270 x 290 x 16 THK. 2 TECHNIP SCOPE
WG02 4
WR01 3 H16
5 END PLATE FOR BRACING 270 x 360 x 16 THK. 2 TECHNIP SCOPE
H16 FULL THREADED STUD WITH
= =
= =
372.5 372.5 6 M20 x 100 L 16 LOT TECHNIP SCOPE
300
360
`A' 2 NUTS AND 2 WASHER
215
= =
= =
= =
14"-HV-26106
230
290
152
180 °
16 THK.
16 THK.
T-2660
CL-05/06
CL EL. +14550
4 NOS. Ø22 HOLES FOR 4 NOS. Ø22 HOLES FOR
T-2660 M20 FULL THREADED STUD
M20 FULL THREADED STUD
CL-07/08
CL EL. +13270
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
0°
4. BTL. EL.+ 106900
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
M20 FULL THREADED STUD
6
NUT (TYP)
PIPING VENDOR 6
0
20
VESSEL CLEAT
STEEL PLATE REFERENCE DOCUMENTS
Ø2
VENDOR TO DESIGN VENDOR DWG. GA FOR
OL1-2M90-101023
DEBUTANIZER
16 THK
`A' `A' 4 5 STEEL PLATE
STEEL WASHER
6
DETAIL `1'
300
3
3
270 ° 90°
6"-HM-24130 LEGENDS
300
200
EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM
180 °
140
(TYP.)
CL EL. +10350 ITEM QTY.
30
= = = = DESCRIPTION SIZE REMARK
140 NO. REQ.
(TYP.)
82
30
= = = =
82 1 IPE 160 1000 L 2 TECHNIP SCOPE
= =
2 IPE 160 BRACING 750 L 2 TECHNIP SCOPE
62
5 3 ANGLE SUPPORT 75 x 75 x 8 THK 800 L 2 TECHNIP SCOPE
4
4 END PLATE 200 x 280 x 16 THK. 2 TECHNIP SCOPE
I16 I16 5 END PLATE FOR BRACING 200 x 370 x 16 THK. 2 TECHNIP SCOPE
= =
= =
= =
6 M20 x 100 L 16 LOT TECHNIP SCOPE
220
280
160
= =
= =
2 NUTS AND 2 WASHER
310
370
VENDOR PIPING
230
16 THK.
16 THK.
700
F
B 1 T-2660
CL-21/22 4 NOS. Ø22 HOLES FOR
B
M20 FULL THREADED STUD
200 B1
2
T-2660
0 19/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
CL-23/24
B1 CL EL. +10350
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106900
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
6. WE01, WG04 AND WR01 IS SUPPORT TAG CALL OUT ON ISOMETRIC.
T-2660
CL-25
REFERENCE DOCUMENTS
0°
M20 FULL THREADED STUD
CL EL. +7720 30 70 18 3
6"-
0° 0 15 VENDOR DWG. GA FOR
OL1-2M90-101023
H M- 30 DEBUTANIZER
NUT (TYP)
24
13 5 3
0
VESSEL CLEAT
STEEL PLATE
0
4
20
VENDOR TO DESIGN
`A
Ø2
'
16 THK
P IP 2
I NG 20 STEEL WASHER
3
0
VE
ND `A LEGENDS
OR '
DETAIL `1'
EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM
270 ° 90° 2. BTL. = BOTTOM TAN LINE.
3. FGL = FINISHED GROUND LEVEL
4. MTO = MATERIAL TAKE-OFF
180°
ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.
(TYP.)
2 NUTS AND 2 WASHER
30
= =
82 4 PLATE 240 x 200 x 10 THK. 1 TECHNIP SCOPE
= =
I16
= =
= =
= =
220
280
160
PIPING VENDOR
16 THK.
B
WG04
4 NOS. Ø22 HOLES FOR
WE01
M20 FULL THREADED STUD
1 B 0 19/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
200
WR01 DETAIL-1
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
700 TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106900
0°
0°
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
17
17
58
58
VE
VE
ND
ND
00 00
22 22
OR
OR
Ø Ø
PIP
PIP
LEGENDS
ING
ING
64
64
' '
`A `A
4
4
20
20
EQPT. NO.- CLEAT NO.
1.
0
0
CL EL. IN MM
180°
180°
2. BTL. = BOTTOM TAN LINE.
3. FGL = FINISHED GROUND LEVEL
4. MTO = MATERIAL TAKE-OFF
41
42
3 3
7
2 2
2
1 5 1 5
22 22
A' 5 A' 25
` 22 ` 2
15
15
NOTE:- ITEM NO. 1 & 2 ARE TRIM TO SUIT AT SITE WHENEVER REQUIRED.
0°
0°
1. 2"-LN-54512 1. 2"-LN-54512
2. 2"-PA-54394 2. 2"-PA-54394
MTO FOR S-2433, S-2434, S-2435, S-2436
T-2660 T-2660
3. 3"-HL-26125 3. 3"-HL-26125
CL-09/10 CL-11/12
ITEM QTY.
CL EL. +21550 CL EL. +16550 DESCRIPTION SIZE REMARK
NO. REQ.
0°
270 ° 90° 270 ° 90°
VE
VE
17
17
ND
ND
58
58
OR
OR
00 00
22 22
Ø Ø
PIP
PIP
0 18/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
ING
ING
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
73
73
64
64
' '
0
0
`A `A TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
4
4
20
180°
E&C
Long Son Petrochemicals Co., Ltd
42
42
3 4 3 4
2 2
2
2
1
22
5 1
22
5 SPECIAL PIPE SUPPORT
`A
'
2 25 `A
'
2 25 (PIPE CLEAT FOR CL-09/10/11/12/13/14/15/16
15
15
0°
1. 2"-LN-54512 1. 2"-LN-54512
2. 2"-PA-54394 2. 2"-PA-54394
3. 3"-HL-26125 T-2660 3. 3"-HL-26125 T-2660
4. 2"-LS1-51583 CL-13/14 4. 2"-LS1-51583 CL-15/16
CL EL. +12050 CL EL. +7550
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
M20 FULL THREADED STUD
4
NUT (TYP)
4
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN
16 THK
3 STEEL PLATE
STEEL WASHER
4
180
= =
120
(TYP.)
30
= =
64
= =
= =
= =
240
120
180
200 2
B
16 THK.
B 1
4 NOS. Ø22 HOLES FOR
M20 FULL THREADED STUD
DETAIL-1
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106900
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
16
4 4
M20 FULL THREADED STUD
15 4
57
0°
NUT (TYP)
4 REFERENCE DOCUMENTS
VESSEL CLEAT
VENDOR DWG. GA FOR
44 STEEL PLATE OL1-2M90-101023
3 VENDOR TO DESIGN
DEBUTANIZER
270 °
90°
23 16 THK
3 3 STEEL PLATE
STEEL WASHER
4
20
0
4
DETAIL `1'
3
LEGENDS
5
0
27
20
2
Ø2
5
27
2. BTL. = BOTTOM TAN LINE.
T-2660
3. FGL = FINISHED GROUND LEVEL
CL-17/18
VE `A
' 4. MTO = MATERIAL TAKE-OFF
N DO CL EL. +5650
R
PIP
180 °
ING
NOTE:- ITEM NO. 1 & 2 ARE TRIM TO SUIT AT SITE WHENEVER REQUIRED.
1. 2"-LN-54512
2. 2"-PA-54394
MTO FOR S-2437
3. 3"-HL-26125
4. 2"-LS1-51583 ITEM QTY.
DESCRIPTION SIZE REMARK
180 NO. REQ.
= =
1 IPE120 250 L 2 TECHNIP SCOPE
120
(TYP.)
30
= =
2 CHANNEL SUPPORT U120 850 L 1 TECHNIP SCOPE
64
= = END PLATE 180 x 240 x 16 THK. 2 TECHNIP SCOPE
3
I12
= =
= =
= =
240
120
180
16 THK.
200
2 4 NOS. Ø22 HOLES FOR
B M20 FULL THREADED STUD
B 1
DETAIL-1
VENDOR PIPING
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
0°
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 107000
270 5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
= = 6. WE01, WR07 AND WG01 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
210
(TYP.)
290
30
= =
0 I.
160
D.
= =
= =
= =
= =
230
290
152
WG01
16 THK.
90 °
LEGENDS
270 °
EQPT. NO.- CLEAT NO.
375
1.
CL EL. IN MM
T-2720 6 NOS. Ø22 HOLES FOR
3 2. BTL = BOTTOM TAN LINE.
CL-24/25 265 ° M20 FULL THREADED STUD 3. FGL = FINISHED GROUND LEVEL.
7 SEE DETAIL '1'
CL EL. +15670 14"-HM-2719 3 4. MTO = MATERIAL TAKE OFF.
375
T-2720
CL-26/27
CL EL. +14720 200 `A' NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE
`A' 2415 MTO FOR S-2449
WE01
ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.
(TYP.)
30
= =
160 3 ANGLE SUPPORT 75x75x8THK 1000 LONG 2 TECHNIP SCOPE
= =
180 °
4 END PLATE 270 x 290 x 16THK 2 TECHNIP SCOPE
5 2 TECHNIP SCOPE
88.5
END PLATE FOR BRACING 270 x 360 x 16THK
6 FULL THREADED STUD WITH M20 x 100 LONG 20LOT TECHNIP SCOPE
2 NUTS AND 2 WASHERS
H16
VENDOR PIPING
= =
= =
300
360
215
950
F
1
`B' T-2720 M20 FULL THREADED STUD
CL-24/25 6
16 THK.
CL EL. +15670 NUT (TYP)
6
45°
`B'
VESSEL CLEAT
200 STEEL PLATE
`B1' 2 VENDOR TO DESIGN 4 NOS. Ø22 HOLES FOR
M20 FULL THREADED STUD
SEE DETAIL '1'
16 THK
T-2720 4 5 STEEL PLATE
0 14/10/2020 ISSUE FOR CONSTRUCTION RNS VD VK
CL-26/27 STEEL WASHER
6
`B1' CL EL. +14720
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
DETAIL `1' TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 107000
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
0°
6. WE01, WR01, WG02 AND SP04 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
VENDOR PIPING
REFERENCE DOCUMENTS
VENDOR DWG. GA FOR
`B' OL1-2M90-101024
T-2720 RERUN TOWER
CL-28/29
`B'
CL EL. +13070
1
2415 200
WE01 950
LEGENDS
WR01 1
EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM
2. BTL = BOTTOM TAN LINE.
270 ° 90 ° 3. FGL = FINISHED GROUND LEVEL.
372.5
T-2720
CL-28/29 265 ° 2
7 200
CL EL. +13070 14"-HM-2719
NOTE:- ITEM NO. 1 & 2 ARE TRIM TO SUIT AT SITE
372.5
2
MTO FOR S-2450
`A'
1 ITEM QTY.
`A' DESCRIPTION SIZE REMARK
NO. REQ.
.
I.D
WG02 2 ANGLE SUPPORT 75x75x8THK 1000 LONG 2 TECHNIP SCOPE
0
290
3 END PLATE 270 x 290 x 16THK 2 TECHNIP SCOPE
270
= =
4 FULL THREADED STUD WITH
210 M20 x 100 LONG 12 LOT TECHNIP SCOPE
(TYP.)
2 NUTS AND 2 WASHERS
30
= =
160
180 °
= =
H16
= =
= =
= =
230
290
152
16 THK.
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
0°
2. FGL = EL. +100000
0°
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 107000
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
. .
0 0 I.D 00 I
.D 6. WR01, WS02, WE01 AND WG04 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
Ø29 Ø29
REFERENCE DOCUMENTS
270 ° 90 ° 270 ° 90 ° VENDOR DWG. GA FOR
OL1-2M90-101024
RERUN TOWER
VE VE
ND ND
OR OR
PIP PIP
18
3 IN 28
I NG
G 4
`A
`A '
'
'
'
`B
`B
LEGENDS
3 EQPT. NO.- CLEAT NO.
18 1.
16 3 CL EL. IN MM
0
0
30
30
2 2. BTL = BOTTOM TAN LINE.
19
2 17 20 3. FGL = FINISHED GROUND LEVEL.
20 12 0 1 12
0 0 0° 4. MTO = MATERIAL TAKE OFF.
1 °
0
0
30
30
T-2720
WS02 CL-14/15 T-2720
'
`B
'
`B
CL-16/17 NOTE:- ITEM NO. 1 & 2 ARE TRIM TO SUIT AT SITE
WG04 CL EL. +21590 `A
`A
'
' 1. 3"-HL-27064 CL EL. +17700
180 °
180 °
1. 3"-HL-27064 MTO FOR S-2452, S-2453 AND S-2454
WR01 2. 2"-PA-54399
2. 2"-PA-54399 T-2720
WE01 3. 2"-LN-54517
3. 2"-LN-54517
CL-18/19
ITEM QTY.
CL EL. +15450 DESCRIPTION SIZE REMARK
NO. REQ.
(TYP.)
30
= =
64
= =
2
3
M20 FULL THREADED STUD TYP.
4 `B'
I12
T-2720
NUT (TYP) CL-14/15
= =
= =
= =
4
240
120
180
DETAIL `1'
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
DIAM
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
30 350
2. FGL = EL. +100000
31
" -H
V- = =
5°
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
27 TYP. SEE DTL "2" 290
(TYP.)
(REF. EL.+0.00) OF EQUIPMENT.
0
01 7
60
30
5 = = 4. BTL. EL.+ 107000
240
T-2720 8 5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
= = 6. LE01 AND WG01 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
CL-01/02 3
CL EL. +27350
6 00
T-2720 29 4
REFERENCE DOCUMENTS
14
CL-03/04 44
80
CL EL. +25757 `A H24
VENDOR DWG. GA FOR
OL1-2M90-101024
' RERUN TOWER
= =
= =
= =
230
300
360
16 THK.
3
WG01
'
`B
0°
7
LEGENDS
EQPT. NO.- CLEAT NO.
1.
6 NOS. Ø22 HOLES FOR
CL EL. IN MM
8 2. BTL = BOTTOM TAN LINE.
M20 FULL THREADED STUD
SEE DETAIL '1' 3. FGL = FINISHED GROUND LEVEL.
LE01 4. MTO = MATERIAL TAKE OFF.
20
0
NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE
.
PI I.D MTO FOR S-2458
00
PI ' 29
N `B
G ITEM QTY.
DESCRIPTION SIZE REMARK
VE `A NO. REQ.
N ' 360
D HEA240 2150 LONG TECHNIP SCOPE
O = = 1 2
R 300
(TYP.)
30
= = 2 HEA240 BRACING 2050 LONG 2 TECHNIP SCOPE
MIN. 270 ° 90 ° 240
Ø6 VENT HOLE
= = 3 ANGLE SUPPORT 75x75x8THK 1550 LONG 2 TECHNIP SCOPE
5 5 2 TECHNIP SCOPE
62
END PLATE FOR BRACING 360 x 470 x 16THK
180 °
6 FULL THREADED STUD WITH M20 x 100 LONG 20LOT TECHNIP SCOPE
H24 2 NUTS AND 2 WASHERS
= =
= =
410
470
VENDOR PIPING
325
1480
F
M20 FULL THREADED STUD
6
1 T-2720
`B'
CL-01/02 NUT (TYP)
6
CL EL. +27350 VESSEL CLEAT
STEEL PLATE
`B'
45°
VENDOR TO DESIGN
200
`B1'
2 16 THK 4 NOS. Ø22 HOLES FOR 0 10/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
4 5 STEEL PLATE
STEEL WASHER M20 FULL THREADED STUD
T-2720 6 SEE DETAIL '1'
`B1' CL-03/04
CL EL. +25757
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
DETAIL `1' TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
350
30
31
SP04 2. FGL = EL. +100000
6
" = =
66
-H
5
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
°
V- 290
(TYP.)
27 (REF. EL.+0.00) OF EQUIPMENT.
30
01 = =
5 4. BTL. EL.+ 107000
T-2720 240
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
CL-05/06 3
= =
6. LE01, LR01 AND SP04 ARE SUPPORT TAGS CALL OUT ON ISOMETRIC.
CL EL. +17285
6
T-2720 66
4
CL-07/08
REFERENCE DOCUMENTS
14
CL EL. +16170
80
'
VENDOR DWG. GA FOR
`B
H24 OL1-2M90-101024
RERUN TOWER
0°
`A
= =
= =
= =
'
230
300
360
29
16 THK.
44
3
LR01
LEGENDS
EQPT. NO.- CLEAT NO.
1.
6 NOS. Ø22 HOLES FOR CL EL. IN MM
300
D
(TYP.)
`A
O
30
= =
'
R
62
4 END PLATE 350 x 360 x 16THK 2 TECHNIP SCOPE
180 °
H24 5 END PLATE FOR BRACING 360 x 470 x 16THK 2 TECHNIP SCOPE
= =
= =
410
470
VENDOR PIPING
325
T-2720 M20 FULL THREADED STUD
CL-05/06 6
`B1'
CL EL. +17285
NUT (TYP)
6
VESSEL CLEAT
STEEL PLATE
`B1'
2 VENDOR TO DESIGN
200
30°
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
VENDOR PIPING
1. 3"-HL-27056
2. 4"-HL-27954 4 REFERENCE DOCUMENTS
VENDOR DWG. GA FOR
T-2710 TYP. DEPENTANIZER
OL1-2M90-111188
CL-17/18 `A `B' T-2710
0°
'
30 CL-17/18
CL EL. +21500 5°
5
27
CL EL. +21500
`B'
1 1
5
46 16 200
0
27
38
40
8 `A
'
Ø2
2
`B
'
LEGENDS
`B EQPT. NO.- CLEAT NO.
PI ' 1.
CL EL. IN MM
PI 25
NG 5 2. BTL. = BOTTOM TAN LINE.
20 3 . FGL = FINISHED GROUND LEVEL.
VE 0
ND 4. MTO = MATERIAL TAKE OFF.
OR
270 ° 90 °
NOTE:- ITEM NO. 1 IS TRIM TO SUIT AT SITE
ITEM QTY.
DESCRIPTION SIZE
180 °
NO. REQ. REMARK
(TYP.)
2 NUTS AND 2 WASHERS
30
= =
82 4 U160 750 LONG 1 TECHNIP SCOPE
= =
I16
= =
= =
= =
220
280
160
M20 FULL THREADED STUD
3
15 THK.
NUT (TYP)
3
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN
4 NOS. Ø22 HOLES FOR
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
1. 2"-LN-54513
2. FGL = EL. +100000
2. 2"-PA-54395 3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
3. 3"-HL-27056 (REF. EL.+0.00) OF EQUIPMENT.
4. 4"-HL-27954 4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
T-2710
CL-19/20 25
0°
`A 5
CL EL. +15500 30 ' VENDOR PIPING
5° 20
0
30
1 0
T-2710
2
`B
' REFERENCE DOCUMENTS
CL-21/22 VENDOR DWG. GA FOR
3 4
0
`B OL1-2M90-111188
30
CL EL. +11000 ' `A
'
DEPENTANIZER
4 TYP.
46 `B' T-2710
8 CL-19/20
CL EL. +15500
`B'
PI 1 T-2710
PI 200 CL-21/22
NG
CL EL. +11000
VE
ND
LEGENDS
OR 16
33 EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM
270 ° 90 °
2. BTL = BOTTOM TAN LINE.
3. FGL = FINISHED GROUND LEVEL.
4. MTO = MATERIAL TAKE OFF.
180 °
Ø2 MTO FOR S-2473 AND S-2498
ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.
200
2 END PLATE 200 x 280 x 15THK 4 TECHNIP SCOPE
= =
140
(TYP.)
3 FULL THREADED STUD WITH M20 x 100 LONG 16 LOT TECHNIP SCOPE
30
= =
2 NUTS AND 2 WASHERS
82
= =
4 U160 900 LONG 2 TECHNIP SCOPE
I16
= =
= =
= =
220
280
160
M20 FULL THREADED STUD
3 15 THK.
NUT (TYP)
3
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN 4 NOS. Ø22 HOLES FOR
M20 FULL THREADED STUD
15 THK SEE DETAIL '1'
2 STEEL PLATE
STEEL WASHER
3
0 30/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
DETAIL `1'
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
1. 2"-LS1-51585
2. 2"-LN-54513
3. 2"-PA-54395
T-2710 VENDOR PIPING
4. 3"-HL-27056
CL-23/24
CL EL. +6500
5. 4"-HL-27954
REFERENCE DOCUMENTS
`A VENDOR DWG. GA FOR
' 4 OL1-2M90-111188
T-2710 1 28 DEPENTANIZER
CL-25/26 5
0°
TYP.
30
0
20 T-2710
40
CL EL. +1000 5° 2
0 `B'
`B
'
CL-23/24
3
`B CL EL. +6500
4 ' `B'
`A 1 T-2710
0
'
40
200 CL-25/26
5
46 CL EL. +1000 LEGENDS
8
EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM
PI 2. BTL = BOTTOM TAN LINE.
PI
NG 3. FGL = FINISHED GROUND LEVEL.
4. MTO = MATERIAL TAKE OFF.
VE
ND
OR
16
270 ° 33 90 °
NOTE:- ITEM NO. 1 IS TRIM TO SUIT AT SITE
ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.
. IPE160 300 LONG TECHNIP SCOPE
I.D 1 4
00
24 2 END PLATE 200 x 280 x 15THK 4 TECHNIP SCOPE
Ø
180 °
3 FULL THREADED STUD WITH M20 x 100 LONG 16 LOT TECHNIP SCOPE
200
2 NUTS AND 2 WASHERS
= =
140
(TYP.)
4 U160 1100 LONG 2 TECHNIP SCOPE
30
= =
82
= =
I16
= =
= =
= =
220
280
160
15 THK.
M20 FULL THREADED STUD
3
NUT (TYP)
3 4 NOS. Ø22 HOLES FOR
VESSEL CLEAT
STEEL PLATE M20 FULL THREADED STUD
SEE DETAIL '1' 0 30/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
VENDOR TO DESIGN
15 THK
2 STEEL PLATE
STEEL WASHER
3 PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
DETAIL `1'
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
T-2710 1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
CL-32/33 2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
CL EL. +29700 (REF. EL.+0.00) OF EQUIPMENT.
T-2710 4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
CL-34/35 VENDOR PIPING 6. WE01, WR07 AND WG01 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
CL EL. +29133
056
550
L-27
F REFERENCE DOCUMENTS
18°
`A'
4"-H
200 1 VENDOR DWG. GA FOR
OL1-2M90-111188
200 `B' T-2710 DEPENTANIZER
CL-32/33
NG
WE01 3 CL EL. +29700
PIPI
`B'
45°
WG01
WR07 200
R `B1' 2
DO
VEN
T-2710
`B1' CL-34/35 LEGENDS
0°
550
CL EL. +29133
200
EQPT. NO.- CLEAT NO.
0
1.
177
CL EL. IN MM
`A'
2. BTL = BOTTOM TAN LINE.
3. FGL = FINISHED GROUND LEVEL.
4. MTO = MATERIAL TAKE OFF.
Ø
24
00
ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.
(TYP.)
30
= =
180
64 3 ANGLE SUPPORT 75x75x8THK 650 LONG 2 TECHNIP SCOPE
= =
= =
120
(TYP.)
4 END PLATE 180 x 240 x 15THK 2 TECHNIP SCOPE
30
180 °
= =
64
5 END PLATE FOR BRACING 180 x 310 x 15THK 2 TECHNIP SCOPE
= =
60
5 6 FULL THREADED STUD WITH M20 x 100 LONG 16 LOT TECHNIP SCOPE
4
2 NUTS AND 2 WASHERS
I12
= =
= =
250
310
I12
170
= =
= =
= =
240
120
180
15 THK.
15 THK.
M20 FULL THREADED STUD 4 NOS. Ø22 HOLES FOR 4 NOS. Ø22 HOLES FOR
6
M20 FULL THREADED STUD M20 FULL THREADED STUD
SEE DETAIL '1' SEE DETAIL '1'
NUT (TYP)
6
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN 0 19/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
15 THK
4 5 STEEL PLATE
STEEL WASHER
6
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
DETAIL `1'
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
REFERENCE DOCUMENTS
VENDOR DWG. GA FOR
M20 FULL THREADED STUD OL1-2M90-111188
T-2710 DEPENTANIZER
3
CL-36
NUT (TYP)
CL EL. +28450 3
VESSEL CLEAT
STEEL PLATE
PIP
340
VENDOR TO DESIGN
3"-H
IN
°
L-27
G
15 THK
2
056
1 STEEL PLATE
STEEL WASHER LEGENDS
VEN
4 3
EQPT. NO.- CLEAT NO.
DO
1.
305
CL EL. IN MM
DETAIL `1'
R
2. BTL = BOTTOM TAN LINE.
`B'
550
ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.
(TYP.)
2 NUTS AND 2 WASHERS
30
270 ° 90 ° = =
64 BACKING SUPPORT PLATE 200 x 160 x 5THK 1 TECHNIP SCOPE
4
= =
2
180 °
I12
= =
= =
= =
240
120
180
15 THK.
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
VENDOR PIPING
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
550 4. BTL. EL.+ 106000.
F
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
1
`B' T-2710
T-2710 CL-37/38
CL-37/38 CL EL. +23700
CL EL. +23700 `B'
REFERENCE DOCUMENTS
45°
T-2710 200 VENDOR DWG. GA FOR
`B1' OL1-2M90-111188
CL-39/40 2 DEPENTANIZER
CL EL. +23137
T-2710
3"-H `B1' CL-39/40
3
CL EL. +23137
40°
L-27
`A'
056
175
PIP
175
IN
3 LEGENDS
G
EQPT. NO.- CLEAT NO.
1.
VEN
CL EL. IN MM
2. BTL = BOTTOM TAN LINE.
DO
3 3. FGL = FINISHED GROUND LEVEL.
180
R
4. MTO = MATERIAL TAKE OFF.
= =
120
(TYP.)
30
= =
0°
180
64
200
550
= =
= =
120 NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE
(TYP.)
30
`A' = =
177
60
40
5 ITEM QTY.
Ø2
= =
= =
1 2
250
310
I12
170
= =
= =
= =
240
IPE120 BRACING 550 LONG TECHNIP SCOPE
120
180
2 2
15 THK.
3 ANGLE SUPPORT 75x75x8THK 650 LONG 2 TECHNIP SCOPE
NUT (TYP)
6
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN
0 10/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
15 THK
4 5 STEEL PLATE
STEEL WASHER
6
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
DETAIL `1' PACKAGE A1 - OLEFINS PLANT
E&C
Long Son Petrochemicals Co., Ltd
TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia