You are on page 1of 27

PETROCHEMICAL COMPLEX IN

SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Package A1: OLEFINS PLANT

Contract No.: LSP-CA-136 SPECIAL AUXILIARY PIPE EPC Project No. :036909C
Page
SUPPORTS COLLECTION 1 of 27
Doc.No.: OL1-2P06-5000 Rev. 1
ZONE 2C EPC Doc No.: 102C-DW-1360-0000
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project

SPECIAL AUXILIARY PIPE SUPPORTS COLLECTION

ZONE 2C
between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time. 

DOCUMENT CLASS: 3

Vivek Dewangan Digitally signed by Mittal Doshi Digitally signed by Vishal Karnik
DN: cn=Vishal Karnik, o=TechnipFMC,
DN: cn=Mittal Doshi,
2020.12.24 14:06:48
Digitally signed by Amol Sankhe
ou=MOC,
o=TechnipFMC, ou=MOC, DN: cn=Amol Sankhe, o=Technipfmc, ou=Technipfmc,
email=vishal.karnik@technipfmc.com, email=amol.sankhe@technipfmc.com, c=IN
email=Mittal.Doshi@technipFMC. c=IN Date: 2020.12.24 14:59:44 +05'30'

+05'30' com, c=IN


Date: 2020.12.24 14:44:45 +05'30'
Date: 2020.12.24 14:45:21 +05'30'

1 23/12/2020 RE-ISSUE FOR CONSTRUCTION V.DEWANGAN M.DOSHI/ V.KARNIK A.SANKHE

0 31/10/2020 ISSUE FOR CONSTRUCTION V.DEWANGAN M.DOSHI/ V.KARNIK A.SANKHE

REV. DATE STATUS WRITTEN BY CHECKED BY APPROV./AUTHOR. BY


(DD/MM/YYYY) (name & visa) (name & visa) (name & visa)
DOCUMENT REVISIONS

TPSK Consortium c/o Level 15, Menara Technip Energies , 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Package A1: OLEFINS PLANT

Contract No.: LSP-CA-136 SPECIAL AUXILIARY PIPE EPC Project No.: 036909C
Page
SUPPORTS COLLECTION 2 of 27
Doc.No.: OL1-2P06-5000 Rev. 1 EPC Doc No.: 102C-DW-1360-0000
ZONE 2C
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project

DOCUMENT INFORMATION

The following required information is minimum requirement which need to be


updated each time the document is changed.

Created by : V.DEWANGAN
Review Frequency : As required
File Name : OL1-2P06-5000-1 SPECIAL AUXILIARY PIPE
SUPPORT COLLECTION - ZONE 2C.Docx
List of Qualified Approvers : Refer to Cover Page
Locations of Controlled Copies: TPSK EDMS
 Master Document ☐ CV ☐ CO ☐ CM ☐ EE ☐ EM
☐ ES ☐ FT ☐ FF ☐ IE ☐ IF
☐ LE ☐ ME ☐ PE ☐ PL ☐ PC
☐ PM ☐ QM ☐ SE ☒ MP
 Copied Document ☐ CV ☐ CO ☐ CM ☐ EE ☐ EM
between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time. 

☐ ES ☐ FT ☐ FF ☐ IE ☐ IF
(E-file) ☐ LE ☐ ME ☐ PE ☐ PL ☐ PC
☐ PM ☐ QM ☐ SE ☐ ……

Management of Change : ☐ Internal (MOC No.)


☐ External (Project Correspondence No.)
☐ New issue
Related Documents : Document Number Document Title
- -

TPSK Consortium c/o Level 15, Menara Technip Energies , 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time. 

1
0
Rev.
Doc.No.: OL1-2P06-5000
Contract No.: LSP-CA-136
Long Son Petrochemicals Co., Ltd

Rev. 1

Date

31/10/2020

23/12/2020
(dd/mm/yyyy)

-
ALL
Item
ZONE 2C

Page
SUPPORTS COLLECTION
SPECIAL AUXILIARY PIPE

REVISION LOG
SOUTH OF VIETNAM

Article
PETROCHEMICAL COMPLEX IN

Package A1: OLEFINS PLANT

Page
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM

3 of 27

Revised Detail
Description

issued isometrics in
continuation to Rev 0
Issue for Construction
Added SPS drawings of
EPC Project No.: 036909C

EPC Doc No.: 102C-DW-1360-0000

TPSK Consortium c/o Level 15, Menara Technip Energies , 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
PETROCHEMICAL COMPLEX IN
SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
Long Son Petrochemicals Co., Ltd
Package A1: OLEFINS PLANT

Contract No.: LSP-CA-136 SPECIAL AUXILIARY PIPE EPC Project No.: 036909C
Page
SUPPORTS COLLECTION 4 of 27
Doc.No.: OL1-2P06-5000 Rev. 1 EPC Doc No.: 102C-DW-1360-0000
ZONE 2C
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project

SUPPORT REVISION INDEX


Drawing N° SUPPORT DESCRIPTION SHT
TAG 0 1 2 3 4 5 6

036909C-102C-DW-1360-2448 S-2448 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2423 S-2422 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2423 S-2423 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2424 S-2424 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2425 S-2425 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2401 S-2429 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2402 S-2430 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2405 S-2431 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2406 S-2432 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2403 S-2433 SPECIAL SUPPORT 1 OF 2 X

036909C-102C-DW-1360-2403 S-2433 SPECIAL SUPPORT 2 OF 2 X

036909C-102C-DW-1360-2403 S-2434 SPECIAL SUPPORT 1 OF 2 X

036909C-102C-DW-1360-2403 S-2434 SPECIAL SUPPORT 2 OF 2 X


between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time. 

036909C-102C-DW-1360-2403 S-2435 SPECIAL SUPPORT 1 OF 2 X

036909C-102C-DW-1360-2403 S-2435 SPECIAL SUPPORT 2 OF 2 X

036909C-102C-DW-1360-2403 S-2436 SPECIAL SUPPORT 1 OF 2 X

036909C-102C-DW-1360-2403 S-2436 SPECIAL SUPPORT 2 OF 2 X

036909C-102C-DW-1360-2404 S-2437 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2434 S-2449 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2435 S-2450 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2433 S-2452 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2433 S-2453 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2433 S-2454 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2430 S-2458 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2431 S-2459 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2415 S-2472 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2416 S-2473 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2417 S-2474 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2420 S-2477 SPECIAL SUPPORT 1 OF 1 X

036909C-102C-DW-1360-2421 S-2478 SPECIAL SUPPORT 1 OF 1 X

TPSK Consortium c/o Level 15, Menara Technip Energies , 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited.The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectly, transferred, reproduced, copied,
disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project
between the Consortium of TPSK and Long Son Petrochemicals Company Limited dated 28 Dec 2017, as amended, supplemented and/or restated from time to time. 

Doc.No.: OL1-2P06-5000
Contract No.: LSP-CA-136

036909C-102C-DW-1360-2417
036909C-102C-DW-1360-2416
036909C-102C-DW-1360-2422
Long Son Petrochemicals Co., Ltd

Rev. 1

S-2499
S-2498
S-2479
ZONE 2C

SPECIAL SUPPORT
SPECIAL SUPPORT
SPECIAL SUPPORT
SUPPORTS COLLECTION
SPECIAL AUXILIARY PIPE
SOUTH OF VIETNAM

1 OF 1
1 OF 1
1 OF 1
PETROCHEMICAL COMPLEX IN

Package A1: OLEFINS PLANT

X
X
X
Page
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM

5 of 27
EPC Project No.: 036909C

EPC Doc No.: 102C-DW-1360-0000

TPSK Consortium c/o Level 15, Menara Technip Energies , 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
4. WS01 "SUPPORT TAG CALL OUT" ON ISOMETRIC.
5. THIS SPS IS ONLY THE REPRESENTATION OF ARRANGEMENT AND NO MTO IS COVERED
IN THIS SPS DRAWING.

LEGENDS

1. FGL = FINISHED GROUND LEVEL


2. MTO = MATERIAL TAKE-OFF

EL.+ 103670 EL.+ 103670


PLATFORM TOS. PLATFORM TOS.

3"-HL-27108-A4A-NI 3"-HL-27108-A4A-NI
CL EL. 102950 CL EL. 102950
25 mm GAP
DO NOT REST

VIEW LOOKING NORTH VIEW LOOKING EAST

0 30/10/2020 ISSUE FOR CONSTRUCTION RNS VD VK

PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


S-2448

TPSK Consortium c/o Level 15, Menara TechnipFMC, 38 Jalan Inai, 55100, Kuala Lumpur, Malaysia
NOTES:-
T-2710 VENDOR PIPING
CL-43 1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
770 2. FGL = EL. +100000
CL EL. +17000 3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
T-2710 WE01 4. BTL. EL.+ 106000.
CL-44 WR01 5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
1 WG02
CL EL. +16230 6. WR01, WG02 AND WE01 IS SUPPORT TAG CALL OUT ON ISOMETRIC.

800 `B' T-2710


CL-41/43
`A'
CL EL. +17000
`B' REFERENCE DOCUMENTS

45°
6"-HM-27138
200 VENDOR DWG. GA FOR
OL1-2M90-111188
`B1'
DEPENTANIZER

2
T-2710
PIPING

CL-42/44
770
`B1'
CL EL. +16230
VENDOR

200

LEGENDS


`A'
EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM
200
= =
2. BTL = BOTTOM TAN LINE.
200 140 3. FGL = FINISHED GROUND LEVEL.

(TYP.)
30
= = = = 4. MTO = MATERIAL TAKE OFF.
140

(TYP.)
82

30
= = = =
82
= =
NOTE:- ITEM NO. 1 & 2 ARE TRIM TO SUIT AT SITE
270 ° 90 ° 3

62
4 MTO FOR S-2422 & S-2423
I16
I16 ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.

= =
= =
220

280
160

= =
310

370
1 IPE160 800 L 2 TECHNIP SCOPE

230
0 15 THK.
40 2 IPE160 BRACING 900 L 2 TECHNIP SCOPE
Ø2 15 THK.

3 END PLATE 200 x 280 x 15THK 2 TECHNIP SCOPE

4 2 TECHNIP SCOPE
VENDOR

`A' END PLATE FOR BRACING 200 x 370 x 15THK


4 NOS. Ø22 HOLES FOR FULL THREADED STUD WITH
5
M20 x 100 LONG 16 LOT TECHNIP SCOPE
200

M20 FULL THREADED STUD 2 NUTS AND 2 WASHERS


SEE DETAIL '1'
4 NOS. Ø22 HOLES FOR
M20 FULL THREADED STUD
PIPING

SEE DETAIL '1'


770

180 °

6"-HM-27138

`A'
800
M20 FULL THREADED STUD
5
T-2710
CL-41 NUT (TYP)
5
CL EL. +17000 VESSEL CLEAT
STEEL PLATE
T-2710 VENDOR TO DESIGN 0 18/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
CL-42
CL EL. +16230 15 THK
3 4 STEEL PLATE
STEEL WASHER
5 PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
DETAIL `1'

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-41/42/43/44)
S-2422 & S-2423

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
VENDOR PIPING (REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
6. WE01, WR07 AND WG01 ARE SUPPORT TAGS CALL OUT ON ISOMETRIC.
645
F
1
`B' T-2710
CL-45/46 REFERENCE DOCUMENTS
CL EL. +16400 VENDOR DWG. GA FOR
`B' OL1-2M90-111188
DEPENTANIZER

45°
PIPING VENDOR


200
`B1'
WR07 2
WE01
T-2710
`A' `A'
`B1' CL-47/48
CL EL. +15729
LEGENDS
250

T-2710 3
CL-45/46 270 ° 90 ° EQPT. NO.- CLEAT NO.
6"-HM-27138 1.
CL EL. +16400 200
CL EL. IN MM
250

2. BTL = BOTTOM TAN LINE.


T-2710 3. FGL = FINISHED GROUND LEVEL.
CL-47/48 4. MTO = MATERIAL TAKE OFF.
CL EL. +15729
WG01 645

1865 NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE

MTO FOR S-2424

Ø24
ITEM QTY.

00
DESCRIPTION SIZE REMARK
200
NO. REQ.
= =
200 1 IPE160 850 LONG 2 TECHNIP SCOPE
140

(TYP.)
30
= = = =
2 IPE160 BRACING 700 LONG 2 TECHNIP SCOPE

180 °
140

(TYP.)
82

30
= = = =
82 3 ANGLE SUPPORT 75x75x8THK 750 LONG 2 TECHNIP SCOPE
= =
4 END PLATE 200 x 280 x 15THK 2 TECHNIP SCOPE
5

62
4 5 END PLATE FOR BRACING 200 x 370 x 15THK 2 TECHNIP SCOPE

I16 6 FULL THREADED STUD WITH M20 x 100 LONG 16 LOT TECHNIP SCOPE
I16 2 NUTS AND 2 WASHERS

= =
= =
220

280
160

= =
310

370
230
15 THK.

15 THK.

M20 FULL THREADED STUD


6
4 NOS. Ø22 HOLES FOR
NUT (TYP)
6 M20 FULL THREADED STUD
VESSEL CLEAT SEE DETAIL '1'
4 NOS. Ø22 HOLES FOR
STEEL PLATE
VENDOR TO DESIGN M20 FULL THREADED STUD
SEE DETAIL '1'

15 THK
4 5 STEEL PLATE
0 14/12/2020 ISSUE FOR CONSTRUCTION RNS VD VK
STEEL WASHER
6

PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


DETAIL `1' TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-45/46/47/48)
S-2424

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
6. WE01, WR01 AND WG04 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.

M20 FULL THREADED STUD


REFERENCE DOCUMENTS
3 VENDOR DWG. GA FOR
OL1-2M90-111188
DEPENTANIZER
NUT (TYP)
3
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN

15 THK
2 STEEL PLATE
STEEL WASHER
3 LEGENDS
EQPT. NO.- CLEAT NO.


1.
DETAIL `1' CL EL. IN MM

PIPING VENDOR 2. BTL = BOTTOM TAN LINE.


3. FGL = FINISHED GROUND LEVEL.
WG04 4. MTO = MATERIAL TAKE OFF.
WR01
WE01
T-2710 `B'
CL-49 270 ° 90 ° NOTE:- ITEM NO. 1 IS TRIM TO SUIT AT SITE
CL EL. +13750 6"-HM-27138
`B' MTO FOR S-2425

4 1 ITEM QTY.
DESCRIPTION SIZE REMARK
266 200 NO. REQ.

645 1 IPE160 300 LONG 1 TECHNIP SCOPE

1865 2 END PLATE 200 x 280 x 15THK 1 TECHNIP SCOPE


200
= = 3 FULL THREADED STUD WITH M20 x 100 LONG 4 LOT TECHNIP SCOPE
2 NUTS AND 2 WASHERS
Ø24
140

(TYP.)
30
= =
00 82 4 PLATE 240 x 200 x 10THK 1 TECHNIP SCOPE
= =
180 °

I16

= =
= =
220

280
160
15 THK.

4 NOS. Ø22 HOLES FOR


M20 FULL THREADED STUD
SEE DETAIL '1'

0 14/10/2020 ISSUE FOR CONSTRUCTION RNS VD VK

PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-49)
S-2425

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
M20 FULL THREADED STUD
6 1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
NUT (TYP) 3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
6 (REF. EL.+0.00) OF EQUIPMENT.
VESSEL CLEAT
STEEL PLATE 4. BTL. EL.+ 106900
VENDOR TO DESIGN 5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.


6. WE01, WG01 AND WR07 ARE SUPPORT TAGS CALL OUT ON ISOMETRIC.
VENDOR PIPING 16 THK
4 5 STEEL PLATE
STEEL WASHER
270 ° 90° 6
REFERENCE DOCUMENTS
VENDOR DWG. GA FOR
1280 DETAIL `1' OL1-2M90-101023
DEBUTANIZER
Ø2 F
200
B 1 T-2660
CL-01/02
CL EL. +23450

45°
B
200 B1
`A'
2
LEGENDS

VENDOR
T-2660
EQPT. NO.- CLEAT NO.
CL-03/04 1.
CL EL. IN MM
200
2395

B1 C
L EL. +22170 2. BTL. = BOTTOM TAN LINE.
3. FGL = FINISHED GROUND LEVEL

PIPING
4. MTO = MATERIAL TAKE-OFF
DETAIL-1
NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE WHENEVER REQUIRED.
1280

MTO FOR S-2429


3
ITEM QTY.
DESCRIPTION SIZE REMARK
270
NO. REQ.
WR07 = = HEA160 1725 L 2 TECHNIP SCOPE
1
210

(TYP.)
30
270 = = 2 HEA160 BRACING 1530 L 2 TECHNIP SCOPE
= = 160
210 = = 3 ANGLE SUPPORT 75 x 75 x 8 THK 1100 L 2 TECHNIP SCOPE

(TYP.)
30
= =
4 END PLATE 270 x 290 x 16 THK. 2 TECHNIP SCOPE
160
WG01 WE01
= = 5 END PLATE FOR BRACING 270 x 360 x 16 THK. 2 TECHNIP SCOPE
3 5
6 FULL THREADED STUD WITH M20 x 100 L 16 LOT TECHNIP SCOPE
`A' 2 NUTS AND 2 WASHER
4
400 400
H16
14"-HV-26106

H16

= =

= =
300

360
180 °

= =

= =

215
= =
230

290
152
T-2660
16 THK.
CL-01/02
16 THK.
CL EL. +23450
T-2660
CL-03/04
C 4 NOS. Ø22 HOLES FOR
L EL. +22170 4 NOS. Ø22 HOLES FOR
M20 FULL THREADED STUD M20 FULL THREADED STUD
0 10/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK

PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-01/02/03/04)
S-2429

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
M20 FULL THREADED STUD
6 1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
NUT (TYP) 3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
6 (REF. EL.+0.00) OF EQUIPMENT.
VESSEL CLEAT


STEEL PLATE 4. BTL. EL.+ 106900
VENDOR TO DESIGN 5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
VENDOR PIPING 6. WE01, WR01, WG02 AND SP04 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.

16 THK
270 ° 90° 4 5 STEEL PLATE
STEEL WASHER
6
1280
F REFERENCE DOCUMENTS
VENDOR DWG. GA FOR
Ø2 B 1 DETAIL `1' DEBUTANIZER
OL1-2M90-101023
20 T-2660
0 CL-05/06
CL EL. +14550

45°
B
200
B1
2
`A' T-2660

VENDOR
CL-07/08
LEGENDS
B1 CL EL. +13270
2395

EQPT. NO.- CLEAT NO.


1.
CL EL. IN MM

2. BTL. = BOTTOM TAN LINE.


DETAIL-1

PIPING
200
3. FGL = FINISHED GROUND LEVEL
4. MTO = MATERIAL TAKE-OFF

NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE WHENEVER REQUIRED.
1280

270
= =
MTO FOR S-2430
3
210

(TYP.)
30
270 = = ITEM QTY.
DESCRIPTION SIZE REMARK
= = 160 NO. REQ.
210 = =

(TYP.)
1 HEA160 1725 L 2 TECHNIP SCOPE

30
WE01 = =
160 HEA160 BRACING 1530 L 2 TECHNIP SCOPE
2
= =
5 3 ANGLE SUPPORT 75 x 75 x 8 THK 1000 L 2 TECHNIP SCOPE
SP04
4 END PLATE 270 x 290 x 16 THK. 2 TECHNIP SCOPE
WG02 4
WR01 3 H16
5 END PLATE FOR BRACING 270 x 360 x 16 THK. 2 TECHNIP SCOPE
H16 FULL THREADED STUD WITH

= =

= =
372.5 372.5 6 M20 x 100 L 16 LOT TECHNIP SCOPE

300

360
`A' 2 NUTS AND 2 WASHER

215
= =

= =
= =
14"-HV-26106

230

290
152
180 °

16 THK.

16 THK.
T-2660
CL-05/06
CL EL. +14550
4 NOS. Ø22 HOLES FOR 4 NOS. Ø22 HOLES FOR
T-2660 M20 FULL THREADED STUD
M20 FULL THREADED STUD
CL-07/08
CL EL. +13270

0 19/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK

PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-05/06/07/08)
S-2430

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.


4. BTL. EL.+ 106900
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
M20 FULL THREADED STUD
6

NUT (TYP)
PIPING VENDOR 6

0
20
VESSEL CLEAT
STEEL PLATE REFERENCE DOCUMENTS

Ø2
VENDOR TO DESIGN VENDOR DWG. GA FOR
OL1-2M90-101023
DEBUTANIZER
16 THK
`A' `A' 4 5 STEEL PLATE
STEEL WASHER
6

DETAIL `1'
300

3
3
270 ° 90°
6"-HM-24130 LEGENDS
300

200
EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM

2. BTL. = BOTTOM TAN LINE.


3. FGL = FINISHED GROUND LEVEL
T-2660 700 4. MTO = MATERIAL TAKE-OFF
CL-21/22
1815 NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE WHENEVER REQUIRED.
CL EL. +11050
T-2660 200
MTO FOR S-2431
CL-23/24 = =
200

180 °
140

(TYP.)
CL EL. +10350 ITEM QTY.

30
= = = = DESCRIPTION SIZE REMARK
140 NO. REQ.

(TYP.)
82

30
= = = =
82 1 IPE 160 1000 L 2 TECHNIP SCOPE
= =
2 IPE 160 BRACING 750 L 2 TECHNIP SCOPE

62
5 3 ANGLE SUPPORT 75 x 75 x 8 THK 800 L 2 TECHNIP SCOPE
4
4 END PLATE 200 x 280 x 16 THK. 2 TECHNIP SCOPE

I16 I16 5 END PLATE FOR BRACING 200 x 370 x 16 THK. 2 TECHNIP SCOPE

FULL THREADED STUD WITH

= =

= =
= =
6 M20 x 100 L 16 LOT TECHNIP SCOPE

220

280
160

= =

= =
2 NUTS AND 2 WASHER

310

370
VENDOR PIPING

230
16 THK.

16 THK.

700
F

B 1 T-2660
CL-21/22 4 NOS. Ø22 HOLES FOR

CL EL. +11050 M20 FULL THREADED STUD


4 NOS. Ø22 HOLES FOR
45°

B
M20 FULL THREADED STUD
200 B1
2

T-2660
0 19/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
CL-23/24
B1 CL EL. +10350

PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


DETAIL-1 TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-21/22/23/24)
S-2431

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106900
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
6. WE01, WG04 AND WR01 IS SUPPORT TAG CALL OUT ON ISOMETRIC.

T-2660
CL-25
REFERENCE DOCUMENTS


M20 FULL THREADED STUD
CL EL. +7720 30 70 18 3
6"-
0° 0 15 VENDOR DWG. GA FOR
OL1-2M90-101023
H M- 30 DEBUTANIZER
NUT (TYP)
24
13 5 3
0
VESSEL CLEAT
STEEL PLATE

0
4

20
VENDOR TO DESIGN
`A

Ø2
'

16 THK
P IP 2
I NG 20 STEEL WASHER
3
0
VE
ND `A LEGENDS
OR '
DETAIL `1'
EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM
270 ° 90° 2. BTL. = BOTTOM TAN LINE.
3. FGL = FINISHED GROUND LEVEL
4. MTO = MATERIAL TAKE-OFF

NOTE:- ITEM NO. 1 IS TRIM TO SUIT AT SITE WHENEVER REQUIRED.

MTO FOR S-2432

180°
ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.

1 IPE 160 350 L 1 TECHNIP SCOPE

200 2 END PLATE 200 x 280 x 16 THK. 1 TECHNIP SCOPE


= =
FULL THREADED STUD WITH M20 x 100 L 4 LOT TECHNIP SCOPE
140 3

(TYP.)
2 NUTS AND 2 WASHER

30
= =
82 4 PLATE 240 x 200 x 10 THK. 1 TECHNIP SCOPE
= =

I16

= =

= =
= =
220

280
160
PIPING VENDOR
16 THK.

B
WG04
4 NOS. Ø22 HOLES FOR
WE01
M20 FULL THREADED STUD
1 B 0 19/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK

200

WR01 DETAIL-1
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
700 TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-25)
S-2432

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106900


5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.

270 ° 90° 270 ° 90°


REFERENCE DOCUMENTS
VENDOR DWG. GA FOR
OL1-2M90-101023
DEBUTANIZER

17

17
58

58
VE

VE
ND

ND
00 00
22 22

OR

OR
Ø Ø

PIP

PIP
LEGENDS

ING

ING
64

64
' '
`A `A

4
4
20

20
EQPT. NO.- CLEAT NO.
1.

0
0

CL EL. IN MM
180°

180°
2. BTL. = BOTTOM TAN LINE.
3. FGL = FINISHED GROUND LEVEL
4. MTO = MATERIAL TAKE-OFF
41

42
3 3
7

2 2

2
1 5 1 5
22 22
A' 5 A' 25
` 22 ` 2
15

15
NOTE:- ITEM NO. 1 & 2 ARE TRIM TO SUIT AT SITE WHENEVER REQUIRED.


1. 2"-LN-54512 1. 2"-LN-54512
2. 2"-PA-54394 2. 2"-PA-54394
MTO FOR S-2433, S-2434, S-2435, S-2436
T-2660 T-2660
3. 3"-HL-26125 3. 3"-HL-26125
CL-09/10 CL-11/12
ITEM QTY.
CL EL. +21550 CL EL. +16550 DESCRIPTION SIZE REMARK
NO. REQ.

1 IPE120 450 L 8 TECHNIP SCOPE

2 CHANNEL SUPPORT U120 750 L 4 TECHNIP SCOPE

3 END PLATE 180 x 240 x 16 THK. 8 TECHNIP SCOPE

4 FULL THREADED STUD WITH M20 x 100 L 32 LOT TECHNIP SCOPE


2 NUTS AND 2 WASHER


270 ° 90° 270 ° 90°
VE

VE
17

17
ND

ND
58

58
OR

OR
00 00
22 22
Ø Ø
PIP

PIP
0 18/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
ING

ING
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
73

73
64

64
' '
0

0
`A `A TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM

4
4
20

20 PACKAGE A1 - OLEFINS PLANT


0
0
180°

180°

E&C
Long Son Petrochemicals Co., Ltd
42

42

3 4 3 4
2 2
2
2

1
22
5 1
22
5 SPECIAL PIPE SUPPORT
`A
'
2 25 `A
'
2 25 (PIPE CLEAT FOR CL-09/10/11/12/13/14/15/16
15

15

S-2433, S-2434, S-2435 AND S-2436



1. 2"-LN-54512 1. 2"-LN-54512
2. 2"-PA-54394 2. 2"-PA-54394
3. 3"-HL-26125 T-2660 3. 3"-HL-26125 T-2660
4. 2"-LS1-51583 CL-13/14 4. 2"-LS1-51583 CL-15/16
CL EL. +12050 CL EL. +7550

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
M20 FULL THREADED STUD
4

NUT (TYP)
4
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN

16 THK
3 STEEL PLATE
STEEL WASHER
4

180
= =
120

(TYP.)
30
= =
64
= =

I12 VENDOR PIPING


= =

= =
= =

240
120

180

200 2

B
16 THK.

B 1
4 NOS. Ø22 HOLES FOR
M20 FULL THREADED STUD
DETAIL-1

0 18/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK

PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-09/10/11/12/13/14/15/16
S-2433, S-2434, S-2435 AND S-2436

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106900
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.

16
4 4
M20 FULL THREADED STUD
15 4
57


NUT (TYP)
4 REFERENCE DOCUMENTS
VESSEL CLEAT
VENDOR DWG. GA FOR
44 STEEL PLATE OL1-2M90-101023
3 VENDOR TO DESIGN
DEBUTANIZER
270 °
90°
23 16 THK
3 3 STEEL PLATE
STEEL WASHER
4
20
0
4
DETAIL `1'
3
LEGENDS

5
0

27
20

2
Ø2

`A EQPT. NO.- CLEAT NO.


' 1 115 1.
CL EL. IN MM
°

5
27
2. BTL. = BOTTOM TAN LINE.
T-2660
3. FGL = FINISHED GROUND LEVEL
CL-17/18
VE `A
' 4. MTO = MATERIAL TAKE-OFF
N DO CL EL. +5650
R
PIP
180 °

ING
NOTE:- ITEM NO. 1 & 2 ARE TRIM TO SUIT AT SITE WHENEVER REQUIRED.
1. 2"-LN-54512
2. 2"-PA-54394
MTO FOR S-2437
3. 3"-HL-26125
4. 2"-LS1-51583 ITEM QTY.
DESCRIPTION SIZE REMARK
180 NO. REQ.
= =
1 IPE120 250 L 2 TECHNIP SCOPE
120

(TYP.)
30
= =
2 CHANNEL SUPPORT U120 850 L 1 TECHNIP SCOPE
64
= = END PLATE 180 x 240 x 16 THK. 2 TECHNIP SCOPE
3

4 FULL THREADED STUD WITH


M20 x 100 L 8 LOT TECHNIP SCOPE
2 NUTS AND 2 WASHER
3

I12

= =

= =
= =

240
120

180
16 THK.

200
2 4 NOS. Ø22 HOLES FOR
B M20 FULL THREADED STUD

B 1

0 19/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK

DETAIL-1

VENDOR PIPING
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-17/18)
S-2437

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000


3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 107000
270 5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
= = 6. WE01, WR07 AND WG01 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
210

(TYP.)
290

30
= =

0 I.
160

D.
= =

PIPING VENDOR REFERENCE DOCUMENTS


VENDOR DWG. GA FOR
OL1-2M90-101024
RERUN TOWER
H16
950
WR07

= =

= =
= =
230

290
152
WG01

16 THK.

90 °
LEGENDS
270 °
EQPT. NO.- CLEAT NO.
375

1.
CL EL. IN MM
T-2720 6 NOS. Ø22 HOLES FOR
3 2. BTL = BOTTOM TAN LINE.
CL-24/25 265 ° M20 FULL THREADED STUD 3. FGL = FINISHED GROUND LEVEL.
7 SEE DETAIL '1'
CL EL. +15670 14"-HM-2719 3 4. MTO = MATERIAL TAKE OFF.
375

T-2720
CL-26/27
CL EL. +14720 200 `A' NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE
`A' 2415 MTO FOR S-2449
WE01
ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.

270 1 HEA160 1300 LONG 2 TECHNIP SCOPE


= =
210 2 HEA160 BRACING 1150 LONG 2 TECHNIP SCOPE

(TYP.)
30
= =
160 3 ANGLE SUPPORT 75x75x8THK 1000 LONG 2 TECHNIP SCOPE
= =

180 °
4 END PLATE 270 x 290 x 16THK 2 TECHNIP SCOPE

5 2 TECHNIP SCOPE

88.5
END PLATE FOR BRACING 270 x 360 x 16THK

6 FULL THREADED STUD WITH M20 x 100 LONG 20LOT TECHNIP SCOPE
2 NUTS AND 2 WASHERS
H16
VENDOR PIPING

= =

= =
300

360
215
950
F

1
`B' T-2720 M20 FULL THREADED STUD
CL-24/25 6
16 THK.
CL EL. +15670 NUT (TYP)
6
45°

`B'
VESSEL CLEAT
200 STEEL PLATE
`B1' 2 VENDOR TO DESIGN 4 NOS. Ø22 HOLES FOR
M20 FULL THREADED STUD
SEE DETAIL '1'
16 THK
T-2720 4 5 STEEL PLATE
0 14/10/2020 ISSUE FOR CONSTRUCTION RNS VD VK
CL-26/27 STEEL WASHER
6
`B1' CL EL. +14720
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
DETAIL `1' TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-24/25/26/27)
S-2449

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 107000
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.


6. WE01, WR01, WG02 AND SP04 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
VENDOR PIPING

REFERENCE DOCUMENTS
VENDOR DWG. GA FOR
`B' OL1-2M90-101024
T-2720 RERUN TOWER
CL-28/29
`B'
CL EL. +13070
1
2415 200

WE01 950
LEGENDS
WR01 1
EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM
2. BTL = BOTTOM TAN LINE.
270 ° 90 ° 3. FGL = FINISHED GROUND LEVEL.
372.5

4. MTO = MATERIAL TAKE OFF.

T-2720
CL-28/29 265 ° 2
7 200
CL EL. +13070 14"-HM-2719
NOTE:- ITEM NO. 1 & 2 ARE TRIM TO SUIT AT SITE
372.5

2
MTO FOR S-2450
`A'

1 ITEM QTY.
`A' DESCRIPTION SIZE REMARK
NO. REQ.

PIPING VENDOR 1 HEA160 1300 LONG 2 TECHNIP SCOPE


SP04

.
I.D
WG02 2 ANGLE SUPPORT 75x75x8THK 1000 LONG 2 TECHNIP SCOPE

0
290
3 END PLATE 270 x 290 x 16THK 2 TECHNIP SCOPE
270
= =
4 FULL THREADED STUD WITH
210 M20 x 100 LONG 12 LOT TECHNIP SCOPE

(TYP.)
2 NUTS AND 2 WASHERS

30
= =
160

180 °
= =

H16

= =

= =
= =
230

290
152
16 THK.

M20 FULL THREADED STUD


4
6 NOS. Ø22 HOLES FOR
NUT (TYP)
4 M20 FULL THREADED STUD
SEE DETAIL '1' 0 14/12/2020 ISSUE FOR CONSTRUCTION RNS VD VK
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN

16 THK PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


3 STEEL PLATE TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
STEEL WASHER
4 PACKAGE A1 - OLEFINS PLANT

DETAIL `1' E&C


Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-28/29)
S-2450

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.


2. FGL = EL. +100000


3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 107000
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
. .
0 0 I.D 00 I
.D 6. WR01, WS02, WE01 AND WG04 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
Ø29 Ø29

REFERENCE DOCUMENTS
270 ° 90 ° 270 ° 90 ° VENDOR DWG. GA FOR
OL1-2M90-101024
RERUN TOWER
VE VE
ND ND
OR OR
PIP PIP
18
3 IN 28
I NG
G 4
`A
`A '
'

'
'

`B
`B
LEGENDS
3 EQPT. NO.- CLEAT NO.
18 1.
16 3 CL EL. IN MM

0
0

30
30
2 2. BTL = BOTTOM TAN LINE.
19
2 17 20 3. FGL = FINISHED GROUND LEVEL.
20 12 0 1 12
0 0 0° 4. MTO = MATERIAL TAKE OFF.
1 °

0
0

30
30
T-2720
WS02 CL-14/15 T-2720
'
`B

'
`B
CL-16/17 NOTE:- ITEM NO. 1 & 2 ARE TRIM TO SUIT AT SITE
WG04 CL EL. +21590 `A
`A
'
' 1. 3"-HL-27064 CL EL. +17700
180 °

180 °
1. 3"-HL-27064 MTO FOR S-2452, S-2453 AND S-2454
WR01 2. 2"-PA-54399
2. 2"-PA-54399 T-2720
WE01 3. 2"-LN-54517
3. 2"-LN-54517
CL-18/19
ITEM QTY.
CL EL. +15450 DESCRIPTION SIZE REMARK
NO. REQ.

1 IPE120 300 LONG 6 TECHNIP SCOPE

2 U120 700 LONG 3 TECHNIP SCOPE

3 END PLATE 180 x 240 x 16THK 6 TECHNIP SCOPE

4 FULL THREADED STUD WITH


2 NUTS AND 2 WASHERS M20 x 100 LONG 24 LOT TECHNIP SCOPE
180
= =
120 VENDOR PIPING

(TYP.)
30
= =
64
= =

2
3
M20 FULL THREADED STUD TYP.
4 `B'
I12
T-2720
NUT (TYP) CL-14/15
= =

= =
= =

4
240
120

180

VESSEL CLEAT `B'


C
L EL. +21590
STEEL PLATE
1 T-2720
VENDOR TO DESIGN 200
CL-16/17
3
16 THK 16 THK. CL EL. +17700
STEEL PLATE
STEEL WASHER
4 T-2720
4 NOS. Ø22 HOLES FOR CL-18/19
M20 FULL THREADED STUD
SEE DETAIL '1'
CL EL. +15450 0 11/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK

DETAIL `1'
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-14/15/16/17/18/19)
S-2452, S-2453 AND S-2454

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
DIAM
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
30 350
2. FGL = EL. +100000

31
" -H
V- = =


3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
27 TYP. SEE DTL "2" 290

(TYP.)
(REF. EL.+0.00) OF EQUIPMENT.

0
01 7

60

30
5 = = 4. BTL. EL.+ 107000
240
T-2720 8 5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
= = 6. LE01 AND WG01 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
CL-01/02 3
CL EL. +27350
6 00
T-2720 29 4
REFERENCE DOCUMENTS

14
CL-03/04 44

80
CL EL. +25757 `A H24
VENDOR DWG. GA FOR
OL1-2M90-101024
' RERUN TOWER

= =

= =
= =
230

300

360
16 THK.

3
WG01

'
`B


7
LEGENDS
EQPT. NO.- CLEAT NO.
1.
6 NOS. Ø22 HOLES FOR
CL EL. IN MM
8 2. BTL = BOTTOM TAN LINE.
M20 FULL THREADED STUD
SEE DETAIL '1' 3. FGL = FINISHED GROUND LEVEL.
LE01 4. MTO = MATERIAL TAKE OFF.

20
0
NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE
.
PI I.D MTO FOR S-2458
00
PI ' 29
N `B
G ITEM QTY.
DESCRIPTION SIZE REMARK
VE `A NO. REQ.
N ' 360
D HEA240 2150 LONG TECHNIP SCOPE
O = = 1 2
R 300

(TYP.)
30
= = 2 HEA240 BRACING 2050 LONG 2 TECHNIP SCOPE
MIN. 270 ° 90 ° 240
Ø6 VENT HOLE
= = 3 ANGLE SUPPORT 75x75x8THK 1550 LONG 2 TECHNIP SCOPE

4 END PLATE 350 x 360 x 16THK 2 TECHNIP SCOPE

5 5 2 TECHNIP SCOPE

62
END PLATE FOR BRACING 360 x 470 x 16THK

180 °
6 FULL THREADED STUD WITH M20 x 100 LONG 20LOT TECHNIP SCOPE
H24 2 NUTS AND 2 WASHERS

7 TRUNNION (16" PIPE / STD SCH.) 700 LONG 2 TECHNIP SCOPE


16 THK.
8 PLATE 500 x 500 x 5THK 2 TECHNIP SCOPE

= =

= =
410

470
VENDOR PIPING

325
1480
F
M20 FULL THREADED STUD
6
1 T-2720
`B'
CL-01/02 NUT (TYP)
6
CL EL. +27350 VESSEL CLEAT
STEEL PLATE
`B'
45°

VENDOR TO DESIGN
200
`B1'
2 16 THK 4 NOS. Ø22 HOLES FOR 0 10/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
4 5 STEEL PLATE
STEEL WASHER M20 FULL THREADED STUD
T-2720 6 SEE DETAIL '1'

`B1' CL-03/04
CL EL. +25757
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
DETAIL `1' TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-01/02/03/04)
S-2458

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
350
30

31
SP04 2. FGL = EL. +100000

6
" = =

66
-H

5
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.

°
V- 290

(TYP.)
27 (REF. EL.+0.00) OF EQUIPMENT.

30
01 = =
5 4. BTL. EL.+ 107000
T-2720 240
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
CL-05/06 3
= =
6. LE01, LR01 AND SP04 ARE SUPPORT TAGS CALL OUT ON ISOMETRIC.
CL EL. +17285
6
T-2720 66
4
CL-07/08
REFERENCE DOCUMENTS

14
CL EL. +16170

80
'
VENDOR DWG. GA FOR

`B
H24 OL1-2M90-101024
RERUN TOWER


`A

= =

= =
= =
'

230

300

360
29
16 THK.

44
3

LR01
LEGENDS
EQPT. NO.- CLEAT NO.
1.
6 NOS. Ø22 HOLES FOR CL EL. IN MM

M20 FULL THREADED STUD 2. BTL = BOTTOM TAN LINE.


LE01
SEE DETAIL '1' 3. FGL = FINISHED GROUND LEVEL.
' 4. MTO = MATERIAL TAKE OFF.
`B

NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE


20
PI .D.
0
PI I
N 00 MTO FOR S-2459
G 29
360
ITEM QTY.
VE

= = DESCRIPTION SIZE REMARK


NO. REQ.
N

300
D

(TYP.)
`A
O

30
= =
'
R

240 1 HEA240 2200 LONG 2 TECHNIP SCOPE


= =
270 ° 90 ° 2 HEA240 BRACING 1800 LONG 2 TECHNIP SCOPE

5 3 ANGLE SUPPORT 75x75x8THK 1650 LONG 2 TECHNIP SCOPE

62
4 END PLATE 350 x 360 x 16THK 2 TECHNIP SCOPE

180 °
H24 5 END PLATE FOR BRACING 360 x 470 x 16THK 2 TECHNIP SCOPE

6 FULL THREADED STUD WITH


M20 x 100 LONG 20LOT TECHNIP SCOPE
16 THK. 2 NUTS AND 2 WASHERS

= =

= =
410

470
VENDOR PIPING

325
T-2720 M20 FULL THREADED STUD
CL-05/06 6
`B1'
CL EL. +17285
NUT (TYP)
6
VESSEL CLEAT
STEEL PLATE
`B1'
2 VENDOR TO DESIGN
200
30°

4 NOS. Ø22 HOLES FOR


`B' T-2720 4 5
16 THK
M20 FULL THREADED STUD 0 10/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
CL-07/08 STEEL PLATE SEE DETAIL '1'
STEEL WASHER
CL EL. +16170 6
`B'
1480 1 PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
F DETAIL `1' TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-05/06/07/08)
S-2459

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.

VENDOR PIPING

1. 3"-HL-27056
2. 4"-HL-27954 4 REFERENCE DOCUMENTS
VENDOR DWG. GA FOR
T-2710 TYP. DEPENTANIZER
OL1-2M90-111188
CL-17/18 `A `B' T-2710


'
30 CL-17/18
CL EL. +21500 5°

5
27
CL EL. +21500
`B'
1 1
5

46 16 200

0
27

38

40
8 `A
'

Ø2
2

`B
'
LEGENDS
`B EQPT. NO.- CLEAT NO.
PI ' 1.
CL EL. IN MM
PI 25
NG 5 2. BTL. = BOTTOM TAN LINE.
20 3 . FGL = FINISHED GROUND LEVEL.
VE 0
ND 4. MTO = MATERIAL TAKE OFF.
OR

270 ° 90 °
NOTE:- ITEM NO. 1 IS TRIM TO SUIT AT SITE

MTO FOR S-2472

ITEM QTY.
DESCRIPTION SIZE
180 °
NO. REQ. REMARK

1 IPE160 300 LONG 2 TECHNIP SCOPE

2 END PLATE 200 x 280 x 15THK 2 TECHNIP SCOPE


200
= = FULL THREADED STUD WITH
3 M20 x 100 LONG 8 LOT TECHNIP SCOPE
140

(TYP.)
2 NUTS AND 2 WASHERS

30
= =
82 4 U160 750 LONG 1 TECHNIP SCOPE
= =

I16

= =

= =
= =
220

280
160
M20 FULL THREADED STUD
3
15 THK.
NUT (TYP)
3
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN
4 NOS. Ø22 HOLES FOR

15 THK M20 FULL THREADED STUD


2 STEEL PLATE
SEE DETAIL '1'
STEEL WASHER
3
0 30/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK

DETAIL `1' PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-17/18)
S-2472

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
1. 2"-LN-54513
2. FGL = EL. +100000
2. 2"-PA-54395 3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
3. 3"-HL-27056 (REF. EL.+0.00) OF EQUIPMENT.
4. 4"-HL-27954 4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.

T-2710
CL-19/20 25


`A 5
CL EL. +15500 30 ' VENDOR PIPING
5° 20

0
30
1 0
T-2710
2
`B
' REFERENCE DOCUMENTS
CL-21/22 VENDOR DWG. GA FOR
3 4

0
`B OL1-2M90-111188

30
CL EL. +11000 ' `A
'
DEPENTANIZER
4 TYP.
46 `B' T-2710
8 CL-19/20
CL EL. +15500
`B'
PI 1 T-2710
PI 200 CL-21/22
NG
CL EL. +11000
VE
ND
LEGENDS
OR 16
33 EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM
270 ° 90 °
2. BTL = BOTTOM TAN LINE.
3. FGL = FINISHED GROUND LEVEL.
4. MTO = MATERIAL TAKE OFF.

. NOTE:- ITEM NO. 1 IS TRIM TO SUIT AT SITE


I.D
0
40

180 °
Ø2 MTO FOR S-2473 AND S-2498

ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.

1 IPE160 300 LONG 4 TECHNIP SCOPE

200
2 END PLATE 200 x 280 x 15THK 4 TECHNIP SCOPE
= =
140

(TYP.)
3 FULL THREADED STUD WITH M20 x 100 LONG 16 LOT TECHNIP SCOPE

30
= =
2 NUTS AND 2 WASHERS
82
= =
4 U160 900 LONG 2 TECHNIP SCOPE

I16

= =

= =
= =
220

280
160
M20 FULL THREADED STUD
3 15 THK.

NUT (TYP)
3
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN 4 NOS. Ø22 HOLES FOR
M20 FULL THREADED STUD
15 THK SEE DETAIL '1'
2 STEEL PLATE
STEEL WASHER
3
0 30/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK

DETAIL `1'
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-19/20/21/22)
S-2473 AND S-2498

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
1. 2"-LS1-51585
2. 2"-LN-54513
3. 2"-PA-54395
T-2710 VENDOR PIPING
4. 3"-HL-27056
CL-23/24
CL EL. +6500
5. 4"-HL-27954
REFERENCE DOCUMENTS
`A VENDOR DWG. GA FOR
' 4 OL1-2M90-111188
T-2710 1 28 DEPENTANIZER
CL-25/26 5


TYP.
30

0
20 T-2710
40
CL EL. +1000 5° 2
0 `B'
`B
'
CL-23/24
3
`B CL EL. +6500
4 ' `B'
`A 1 T-2710
0

'
40

200 CL-25/26
5
46 CL EL. +1000 LEGENDS
8
EQPT. NO.- CLEAT NO.
1.
CL EL. IN MM
PI 2. BTL = BOTTOM TAN LINE.
PI
NG 3. FGL = FINISHED GROUND LEVEL.
4. MTO = MATERIAL TAKE OFF.
VE
ND
OR
16
270 ° 33 90 °
NOTE:- ITEM NO. 1 IS TRIM TO SUIT AT SITE

MTO FOR S-2474 AND S-2499

ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.
. IPE160 300 LONG TECHNIP SCOPE
I.D 1 4
00
24 2 END PLATE 200 x 280 x 15THK 4 TECHNIP SCOPE
Ø
180 °

3 FULL THREADED STUD WITH M20 x 100 LONG 16 LOT TECHNIP SCOPE
200
2 NUTS AND 2 WASHERS
= =
140

(TYP.)
4 U160 1100 LONG 2 TECHNIP SCOPE

30
= =
82
= =

I16

= =

= =
= =
220

280
160
15 THK.
M20 FULL THREADED STUD
3

NUT (TYP)
3 4 NOS. Ø22 HOLES FOR
VESSEL CLEAT
STEEL PLATE M20 FULL THREADED STUD
SEE DETAIL '1' 0 30/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
VENDOR TO DESIGN

15 THK
2 STEEL PLATE
STEEL WASHER
3 PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
DETAIL `1'

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-23/24/25/26)
S-2474 AND S-2499

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
T-2710 1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
CL-32/33 2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
CL EL. +29700 (REF. EL.+0.00) OF EQUIPMENT.
T-2710 4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
CL-34/35 VENDOR PIPING 6. WE01, WR07 AND WG01 ARE SUPPORT TAG CALL OUT ON ISOMETRIC.
CL EL. +29133

056
550

L-27
F REFERENCE DOCUMENTS

18°
`A'

4"-H
200 1 VENDOR DWG. GA FOR
OL1-2M90-111188
200 `B' T-2710 DEPENTANIZER
CL-32/33

NG
WE01 3 CL EL. +29700

PIPI
`B'

45°
WG01
WR07 200
R `B1' 2
DO
VEN

T-2710
`B1' CL-34/35 LEGENDS

550
CL EL. +29133
200
EQPT. NO.- CLEAT NO.

0
1.

177
CL EL. IN MM
`A'
2. BTL = BOTTOM TAN LINE.
3. FGL = FINISHED GROUND LEVEL.
4. MTO = MATERIAL TAKE OFF.
Ø
24
00

NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE

MTO FOR S-2477

ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.

270 ° 90 ° 180 1 IPE120 700 LONG 2 TECHNIP SCOPE


= =
120 2 IPE120 BRACING 550 LONG 2 TECHNIP SCOPE

(TYP.)
30
= =
180
64 3 ANGLE SUPPORT 75x75x8THK 650 LONG 2 TECHNIP SCOPE
= =
= =
120

(TYP.)
4 END PLATE 180 x 240 x 15THK 2 TECHNIP SCOPE

30
180 °

= =
64
5 END PLATE FOR BRACING 180 x 310 x 15THK 2 TECHNIP SCOPE
= =

60
5 6 FULL THREADED STUD WITH M20 x 100 LONG 16 LOT TECHNIP SCOPE
4
2 NUTS AND 2 WASHERS
I12

= =

= =
250

310
I12

170
= =

= =
= =

240
120

180
15 THK.

15 THK.

M20 FULL THREADED STUD 4 NOS. Ø22 HOLES FOR 4 NOS. Ø22 HOLES FOR
6
M20 FULL THREADED STUD M20 FULL THREADED STUD
SEE DETAIL '1' SEE DETAIL '1'
NUT (TYP)
6
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN 0 19/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK

15 THK
4 5 STEEL PLATE
STEEL WASHER
6
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT
DETAIL `1'

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-32/33/34/35)
S-2477

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
4. BTL. EL.+ 106000.
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.

REFERENCE DOCUMENTS
VENDOR DWG. GA FOR
M20 FULL THREADED STUD OL1-2M90-111188
T-2710 DEPENTANIZER
3
CL-36
NUT (TYP)
CL EL. +28450 3
VESSEL CLEAT
STEEL PLATE

PIP
340
VENDOR TO DESIGN
3"-H

IN
°
L-27

G
15 THK
2
056

1 STEEL PLATE
STEEL WASHER LEGENDS

VEN
4 3
EQPT. NO.- CLEAT NO.

DO
1.
305

CL EL. IN MM
DETAIL `1'
R
2. BTL = BOTTOM TAN LINE.
`B'
550

3. FGL = FINISHED GROUND LEVEL.


`B'

4. MTO = MATERIAL TAKE OFF.
200
177
0

NOTE:- ITEM NO. 1 IS TRIM TO SUIT AT SITE

MTO FOR S-2478


0
40
Ø2

ITEM QTY.
DESCRIPTION SIZE REMARK
NO. REQ.

1 IPE120 350 LONG 1 TECHNIP SCOPE

2 END PLATE 180 x 240 x 15THK 1 TECHNIP SCOPE


180
= = FULL THREADED STUD WITH M20 x 100 LONG 4 LOT TECHNIP SCOPE
3
120

(TYP.)
2 NUTS AND 2 WASHERS

30
270 ° 90 ° = =
64 BACKING SUPPORT PLATE 200 x 160 x 5THK 1 TECHNIP SCOPE
4
= =

2
180 °

I12

= =

= =
= =

240
120

180
15 THK.

4 NOS. Ø22 HOLES FOR


M20 FULL THREADED STUD
SEE DETAIL '1'

0 27/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK

PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM


TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-36)
S-2478

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia
NOTES:-
VENDOR PIPING
1. ALL DIMENSIONS & ELEVATION ARE IN MM UNLESS OTHERWISE SPECIFIED.
2. FGL = EL. +100000
3. CLEAT ELEVATIONS ARE SHOWN FROM BTL.
(REF. EL.+0.00) OF EQUIPMENT.
550 4. BTL. EL.+ 106000.
F
5. REFER PIPE ISOMETRIC FOR PRIMARY SUPPORT TAG.
1
`B' T-2710
T-2710 CL-37/38
CL-37/38 CL EL. +23700
CL EL. +23700 `B'
REFERENCE DOCUMENTS

45°
T-2710 200 VENDOR DWG. GA FOR
`B1' OL1-2M90-111188
CL-39/40 2 DEPENTANIZER

CL EL. +23137
T-2710
3"-H `B1' CL-39/40
3
CL EL. +23137
40°
L-27

`A'
056

175

PIP
175

IN
3 LEGENDS

G
EQPT. NO.- CLEAT NO.
1.

VEN
CL EL. IN MM
2. BTL = BOTTOM TAN LINE.

DO
3 3. FGL = FINISHED GROUND LEVEL.
180

R
4. MTO = MATERIAL TAKE OFF.
= =
120

(TYP.)
30
= =

180
64
200
550

= =
= =
120 NOTE:- ITEM NO. 1, 2 & 3 ARE TRIM TO SUIT AT SITE

(TYP.)
30
`A' = =
177

64 MTO FOR S-2479


= =
0

60
40

5 ITEM QTY.
Ø2

4 DESCRIPTION SIZE REMARK


I12 NO. REQ.
IPE120 750 LONG TECHNIP SCOPE

= =

= =
1 2

250

310
I12

170
= =

= =
= =

240
IPE120 BRACING 550 LONG TECHNIP SCOPE

120

180
2 2
15 THK.
3 ANGLE SUPPORT 75x75x8THK 650 LONG 2 TECHNIP SCOPE

4 END PLATE 180 x 240 x 15THK 2 TECHNIP SCOPE


15 THK.

5 END PLATE FOR BRACING 180 x 310 x 15THK 2 TECHNIP SCOPE


270 ° 90 °
4 NOS. Ø22 HOLES FOR 4 NOS. Ø22 HOLES FOR
6 FULL THREADED STUD WITH M20 x 100 LONG 16 LOT TECHNIP SCOPE
M20 FULL THREADED STUD M20 FULL THREADED STUD
SEE DETAIL '1' SEE DETAIL '1' 2 NUTS AND 2 WASHERS
180 °

M20 FULL THREADED STUD


6

NUT (TYP)
6
VESSEL CLEAT
STEEL PLATE
VENDOR TO DESIGN
0 10/11/2020 ISSUE FOR CONSTRUCTION RNS VD VK
15 THK
4 5 STEEL PLATE
STEEL WASHER
6
PETROCHEMICAL COMPLEX IN SOUTH OF VIETNAM
TỔ HỢP HÓA DẦU MIỀN NAM VIỆT NAM
DETAIL `1' PACKAGE A1 - OLEFINS PLANT

E&C
Long Son Petrochemicals Co., Ltd

SPECIAL PIPE SUPPORT


(PIPE CLEAT FOR CL-37/38/39/40)
S-2479

TPSK Consortium c/o Level 15 Menara Technip Energies, 38 Jalan Inai, 55100 Kuala Lumpur, Malaysia

You might also like