OVERVIEW OF

GUYING

BY
NAWAPONG NUTADEE
ENGINEER OF POWER SYSTEM STANDARD
DIVISION
1
OBJECTIVE
Strain Insulator

❑ Increase Strength
❑ Balance Tension

2
DUTY OF GUYS
1. Terminal guys

Dead-End Tap-Line
Terminal guys is used for receive tension from Dead-End,
Tap-Line or pole that line deflection Angle over 60º
3
2. Side guys

Front View Top View


Side guys is used for receive tension from pole
that line deflection angle 5º - 60º
4
3. Line guys

2-3 km

Line guys is used for balance tension in Line


recommend : Install regular 2 km – 3 km
4. Storm guys

Front View Top View


Side Guys is used for Prevent Damage from Storm
Recommend : Install regular 500 m – 1,000 m
6
5. Fix guys

Front View Top View


fix Guys is Summarize of Line Guys and Storm Guys
Recommend : Install regular 2 km – 3 km
Guy Type

Anchor guys

Side Walk guys

8
Guy Type
Stub guys

Stub Length 2.5 m– 4 m

9
Guy Type
Pole guys

8 m long

10
Guy for overhead
ground wire

11
Installation instructions for guying

12
Installation instructions for guying

13
Installation instructions for guying

14
For Distribution System

Strain Insulator
GY: Guys
2 : Distribution System
1 :Type 1

Terminal Anchor guys 2 Feeder Side Anchor guys 2 Feeder


15
For Distribution and Low voltage Distribution System

Strain Insulator

Side Anchor guys

16
For Distribution and Low voltage Distribution System on Same pole

Strain Insulator
Low voltage
across Guys

Terminal Anchor guys

17
For Distribution and Low voltage Distribution System on Same pole

Strain Insulator

Both Terminal Anchor guys

18
Tie Method

19

ทีม่ า: การประกอบเลขที่ 8429


CONCRETE ANCHOR PLATE ASSEMBLY

20
Line guys

สาหรับ 1 วงจร 2 Feeder


21
Strom guys

1 Feeder 2 Feeder
22
Guys Sizing (LV)

23
Guys Sizing (HV)

24

ทีม่ า: การประกอบเลขที่ 8405


Case Studies

25
Twin Pole

26
Thank you
Question ?