Professional Documents
Culture Documents
4124-AI-DU-21110S006S01-IS01 - AADC Input
4124-AI-DU-21110S006S01-IS01 - AADC Input
N NOTES:-
GEOGRAPHIC
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL ELEVATIONS AND SETTING OUT COORDINATES ARE IN METERS.
NORTH
22.377° 2. EL.100.000 = +23.00M ABOVE AVERAGE BALTIC SEA LEVEL IS REFERED TO THE H.P.P. (HIGH POINT PAVING).
PREVAILING
SUMMER WIND
S/W
3. MEMBER SHAPE - 25WT1 / 25WT2
WHERE 'T' STAND FOR TEE SECTION WHICH IS INDICATED HALF OF CUT SECTION TO 'W ' PROFILE.
4. REFER 4124-AI-DX-200000001-IS01E FOR EARTHING SYSTEM ON STRUCTURE.
5. FOR CONNECTION DETAIL OF CABLE TRAYS SUPPORT REFER TO STANDARD DRAWING NUMBER 4124-AI-DX-200000005.
PREVAILING
WINTER WIND 6. ALL NON-STANDARD CONNECTION SHALL BE DESIGN AND VERIFIED BY STEEL VENDOR SCOPE.
S/E
(AS PER PAR. 8.3.2 OF DOC. NO. 4124-AI-SS-200000001 "SUPPLY SPECIFICATION")
PLAN ATEL.100.300(BOB) NOTATION FOLLOWED
(SCALE 1:20 ) 50thk GROUT
FOR EXAMPLE 30W1 - EMHF - EMHF-N
400 A TOC 100.250
A 2000
20W1 20W1
BP1 BP1 MEMBER STANDARD JOINT CONNECTION NON STANDARD JOINT CONNECTION
SHAPE TYPOLOGY TYPOLOGY
600
1110-SS006I/A
10-16dia
300
2550
-
2
600
600
400 C10
EL.103.300(TOS) EL.103.200(TOS) 4124-AI-DX-200000008 TYPICAL CONNECTION STANDARD ALBUM
EL.103.300(TOS) EL.103.300(TOS)
C10 20W1 -DSD
EL.103.200(TOS) 4124-AI-DX-200000005 STANDARD CONNECTION DETAILS FOR CABLE TRAY SUPPORTS
350 1110-SS006I/A
C10 C10
2
-
350
350
C10 C10
2L
F-
20W1
20W1
20W1
20W1
L7
0*
5-
VB
L
2200
2200
EL.100.300(BOB) EL.100.300(BOB) EL.100.300(BOB)
2550
+
PREVAILING
WINTER WIND
+
S/E
+
BASE PLATE DETAIL FOR BP1 (N°2)
+
SECTION
+
1
(SCALE 1:10 ) (SCALE 1:10 ) -
+
+ +
-
1
+
250
20W1
50
50 150 50 UP
+
= = 12 THK. STIFFNER PLATE
N°4-24 DIA.HOLES
+
50
+
UP
8
250
+
50
+
= =
400
300
+
EL.100.300(BOB)
25
6
50 THK.
GROUT
+
50
CABLE TRAY
12 THK. STIFFNER PLATE
(TYP.)
NAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAMENAME
UP
DS DS DS DS DS
DN
LUBE OIL
+
1
-
DS DS DS DS DS
+
AIR PREHEATER
11-108-J
+
STRUCTURE 1110-SS006I
K.Sawant P.Nair
01 ISSUED FOR CONSTRUCTION 22.12.2021 G.Girardi
D.Pushkar
REV DESCRIPTION - DATE PREPARED CHECKED APPROVED
This copy of this document is LLC Eurochem Northwest-2's property and its copyright is vested in Tecnimont Spa. This document contains confidential information and cannot be copied to or used by any party for any purpose
for any purpose without Tecnimont’s Spa and LLC Eurochem Northwest-2’s prior written consent. Additional restrictions are as stated in the above confidentiality label, if any.
- - - - - -
LLC EUROCHEM NORTHWEST-2
- - - - - - PROJECT:
Ammonia and Urea Production, Kingisepp.
- - - - - -
PLANT:
3000 MTPD Ammonia
- - - - LOCATION:
- - - -
Kingisepp - Russian Federation P 01 01
- - - - TITLE:
SCALE:
A0 SHEET
PLAN AT EL.100.300(BOB), ELEVATIONS,
BASE PLATE DETAILS & SECTION
MODEL NO: 1110-SS006I