Information about the necessary technical, qualitative and quantitative characteristics of the procurement item

Ite Service Code defined by Translation into English in Units


m the Unified Procurement compliance with Part 3, Article 10 of Qty. Service delivery period
No. Dictionary of the Law measurment
Calls to the well are made according to the request
provided by the customer by e-mail 24 hours before the
provision of equipment and services.
76110000-7 Послуги, пов’язані з
76110000-7 - Gas Production Services The service delivery period is within 48 hours from the
видобуванням газу
1 (Capillary tube installation and service 1 moment of arrival at the well, but not later than
(Послуги з монтажу та демонтажу
disassembly services) 31.12.2023.
капілярної трубки)
The first call for the provision of services shall be sent
no earlier than 90 calendar days from the date of signing
the contract.

1
Lot # 1 - 76111000-4 - Regasification services (Capillary tube installation and disassembly services)
Description of services Description of services
Customer requirements Units Quantity
offered, in Ukrainian* offered, in English*
1. After-sales service for the installation or disassembly of the capillary tube. Operations 130
The subject of the procurement is services for the installation and dismantling of a capillary tube with
a subsurface valve for the existing capillary chemicals injection system (hereinafter referred to as CCIS).
CCIS is designed to increase current production from wells, extend their service life and increase
inter-repair periods (WO and CU) due to periodic maintenance-free bottom hole cleaning from accumulated
fluid, prevent salts formation, paraffins, hydrates on the walls of tubing, and prevent corrosion effects on
subsurface equipment.
CCIS chemicals injection to the bottom hole is carried out through a capillary tube fixed to the x-mas
tree hanger, the bottom of the capillary tube is equipped with a depth valve, which provides metered injection
of chemicals to the bottom hole and prevents the reverse movement of gas and fluid, for each well, the depth
valve is adjusted separately based on reservoir pressure.
The service provides for the supply of equipment and provision of special equipment for carrying out
work by the contractor on the installation or dismantling of a capillary tube on a producing well at a well head
pressure of at least 200 bar determined by the customer, to a depth of at least 6000 meters to ensure CCIS    
operation.
The contractor is obliged to:
- ensure performance of 130 well operations for installation and dismantling of the capillary tube;
- ensure the presence of a check valve for sealing the capillary tube after running and mounted one on
the well hanger;
- The work plan is sent by the customer to the contractor together with the request for a call;
- all work on the well site should be carried out in accordance with the approved Work Plan;
- provide subsurface and surface equipment and installation equipment;
- use equipment certified on the territory of Ukraine;
- after capillary tube RIH, leave 15 meters of capillary tube with the end temporarily sealed;
- provide a certificate of acceptance and transfer of goods and work performed, a transcript of the
installed equipment and materials provided, signed by the Customer's branch.
2. Capillary tube Meters 260,000 Найменування Товару Goods’ description
(марка/модель/тип): (brand/model/type):
The capillary tube is designed for injection of CCIS chemicals to the bottom hole,
diameter 0.25 "- 0.5 ", maximum operating pressure not less than 9000 psi. It is made of corrosion-resistant Країна походження: Country of origin:
seamless stainless steel.
Requirements for mechanical properties - hardened tube for hot and cold processing. The tube is guaranteed Виробник товару: Goods’ manufacturer:
for 5 years of operation. The tube must be cut off by a gate using x-mass tree valves (DN 50,65,80 Ru
210,350,700,1050) and maintain tightness in accordance with the technical characteristics of the valves. Гарантійний строк на Warranty period for the
    Товар: Goods:
Minimum requirements for mechanical properties:
Інформація про Information on completeness
tensile strength Min 620 MPa
комплектацію та технічні, and technical, quality
0.2% tensile strength Min 448 MPa якісні характеристики** features** in accordance with
Relative elongation by 50 mm Min 25 % відповідно до вимог customer requirements:
Hardness Max 290 HB замовника:
3. Subsurface (discharge) valve Pcs. 65 ** If there is a range

2
The subsurface (discharge) valve is designed for controlled dosing of chemicals into a well, maximum ** У разі наявності indicator of technical and
diameter is 1", maximum operating pressure is 8400 psi. Made of corrosion - resistant stainless steel. The діапазонного показника quality features of the subject
    технічно-якісної of procurement in Customer’s
principle of operation of the valve is that the injection pressure exceeds the valve closing force, the spring
характеристики предмета requirements (for example:
contracts, lifts the ball and pushes the seat out, allowing chemicals to be introduced into the tubing.
закупівлі у вимогах from...to, not less than,.., Not
4. Capillary tube hanger, threaded Pcs. 65 Замовника (наприклад: more than…., Etc.) the
The threaded capillary tube hanger is designed to run and hold the capillary tube with a die and seal it using від….до, не менше…., не Participant indicates the
більше…. і т.д.) Учасник possible range of such
hydraulic pressure. Sealing (external) of the capillary tube is carried out by expanding from compression of    
зазначає можливий technical and quality featuters
the rubber seal. The maximum operating pressure is not less than 5000 psi. діапазон такої технічно- of the Goods proposed by the
5. Check valve Pcs. 65 якісної характеристики Participant or an out-of-range
    Товару, що пропонується specification value, if that
таким Учасником або value is accurate
недіапазонне значення
Designed for sealing (internal) capillary tube, maximum holding pressure of at least 5000 psi. Made of технічної
corrosion-resistant stainless steel. характеристики, у разі
якщо це значення є
точним.
General requirements for the procurement item and cooperation schemes:
The customer sends the contractor a letter about the need to develop a work plan for individual wells to the email address specified in clause 11.13 of the Contract. The date of receipt by the
Contractor of such a letter is considered to be the date of sending the email. Confirmation of the sending date is a screenshot.
The Contractor draws up a work plan and sends it for approval by the Customer within 3 days from the date of receipt of the letter about the need to develop a work plan.
Calls to the well are made according to the request.
The equipment shall be delivered tested, complete and with a technical data sheet. The introduction of equipment should not cause an accident in the well or cause a decrease (deterioration)
in the values of the well operation parameters. In case of depressurization of equipment at a well, it is necessary to suspend the operation of all kits. The Customer and the Contractor shall determine
the actual reason for the suspension of operation based on the results of diagnostics of a single kit as a whole, depending on the nature of the detected malfunction. Based on the results of diagnostics,
it is necessary to draw up an appropriate report, which is signed by representatives of the Parties. Premature end of operation of a single set of equipment is allowed and is issued by drawing up and
signing by representatives of the Parties of the relevant Act, if the reason for the suspension of trial operation is a malfunction or failure of the equipment, namely: – malfunction or failure of
components of the equipment. The contractor is obliged to eliminate defects in the equipment detected during the warranty period at its own expense, or replace the equipment, unless it proves that the
defects occurred as a result of the customer's violation of the rules of operation or storage of the equipment. In case of elimination of equipment defects for which the warranty period is set, this period
is extended for the time during which it was not used due to the defect, and when replacing the equipment, the warranty period is calculated anew from the date of replacement.

Terms of service provision:


Calls to the well are made according to the request provided by the customer by e-mail 24 hours before the provision of equipment and services. The service delivery period is within 48 hours from
the moment of arrival at a well.
The first call of the customer shall be sent no earlier than 90 calendar days from the date of signing the Contract.

3
Lot # 2-76111000-4 - Regasification services (Capillary tube installation and disassembly services)
Description of Goods Description of Goods
Customer requirements Units Quantity
offered, in Ukrainian* offered, in English*
1. After-sales service for the installation or disassembly of the capillary tube. Operations 60
The subject of the procurement is services for the installation and dismantling of a capillary tube with
a subsurface valve for the existing capillary chemicals injection system (hereinafter referred to as CCIS).
CCIS is designed to increase current production from wells, extend their service life and increase
inter-repair periods (WO and CU) due to periodic maintenance-free bottom hole cleaning from accumulated
fluid, prevent salts formation, paraffins, hydrates on the walls of tubing, and prevent corrosion effects on
subsurface equipment.
CCIS chemicals injection to the bottom hole is carried out through a capillary tube fixed to the x-mas
tree hanger, the bottom of the capillary tube is equipped with a depth valve, which provides metered injection
of chemicals to the bottom hole and prevents the reverse movement of gas and fluid, for each well, the depth
valve is adjusted separately based on reservoir pressure.
The service provides for the supply of equipment and provision of special equipment for carrying out
work by the contractor on the installation or dismantling of a capillary tube on a producing well at a well head
pressure of at least 200 bar determined by the customer, to a depth of at least 6000 meters to ensure CCIS    
operation.
The contractor is obliged to:
- ensure performance of 60 well operations for installation and dismantling of the capillary tube;
- ensure the presence of a check valve for sealing the capillary tube after running and mounted one on
the well hanger;
- The work plan is sent by the customer to the contractor together with the request for a call;
- all work on the well site should be carried out in accordance with the approved Work Plan;
- provide subsurface and surface equipment and installation equipment;
- use equipment certified on the territory of Ukraine;
- after capillary tube RIH, leave 15 meters of capillary tube with the end temporarily sealed;
- provide a certificate of acceptance and transfer of goods and work performed, a transcript of the installed
equipment and materials provided, signed by a Customer's branch.
2. Capillary tube Meters 120,000 Найменування Товару Goods’ description
The capillary tube is designed for injection of CCIS chemicals to the bottom hole, (марка/модель/тип): (brand/model/type):
diameter 0.25 "- 0.5 ", maximum operating pressure not less than 9000 psi. It is made of corrosion-resistant Країна походження: Country of origin:
seamless stainless steel.
Requirements for mechanical properties - hardened tube for hot and cold processing. The tube is guaranteed Виробник товару: Goods’ manufacturer:
for 5 years of operation. The tube must be cut off by a gate using x-mass tree valves (DN 50,65,80 Ru
210,350,700,1050) and maintain tightness in accordance with the technical characteristics of the valves. Гарантійний строк на Warranty period for the
    Товар: Goods:
Minimum requirements for mechanical properties:
tensile strength Min 620 MPa Інформація про Information on completeness
комплектацію та технічні, and technical, quality
0.2% tensile strength Min 448 MPa
якісні характеристики** features** in accordance with
Relative elongation by 50 mm Min 25 % відповідно до вимог customer requirements:
Hardness Max 290 HB замовника:
3. Subsurface (discharge) valve Pcs. 30 ** If there is a range

4
The subsurface (discharge) valve is designed for controlled dosing of chemicals into a well, maximum ** У разі наявності indicator of technical and
diameter is 1", maximum operating pressure is 8400 psi. Made of corrosion - resistant stainless steel. The діапазонного показника quality features of the subject
    технічно-якісної of procurement in Customer’s
principle of operation of the valve is that the injection pressure exceeds the valve closing force, the spring
характеристики предмета requirements (for example:
contracts, lifts the ball and pushes the seat out, allowing chemicals to be introduced into the tubing.
закупівлі у вимогах from...to, not less than,.., Not
4. Capillary tube hanger, threaded Pcs. 30 Замовника (наприклад: more than…., Etc.) the
від….до, не менше…., не Participant indicates the
більше…. і т.д.) Учасник possible range of such
The threaded capillary tube hanger is designed to run and hold the capillary tube with a die and seal it using зазначає можливий technical and quality featuters
hydraulic pressure. Sealing (external) of the capillary tube is carried out by expanding from compression of     діапазон такої технічно- of the Goods proposed by the
the rubber seal. The maximum operating pressure is not less than 5000 psi. якісної характеристики Participant or an out-of-range
Товару, що пропонується specification value, if that
таким Учасником або value is accurate
5. Check valve Pcs. 30 недіапазонне значення
    технічної
Designed for sealing (internal) capillary tube, maximum holding pressure of at least 5000 psi. Made of характеристики, у разі
corrosion-resistant stainless steel. якщо це значення є
точним.
General requirements for the procurement item and cooperation schemes:
The customer sends the contractor a letter about the need to develop a work plan for individual wells to the email address specified in clause 11.13 of the Contract. The date of receipt by the
Contractor of such a letter is considered to be the date of sending the email. Confirmation of the sending date is a screenshot.
The Contractor draws up a work plan and sends it for approval by the Customer within 3 days from the date of receipt of the letter about the need to develop a work plan.
Calls to the well are made according to the request.
The equipment shall be delivered tested, complete and with a technical data sheet. The introduction of equipment should not cause an accident in the well or cause a decrease (deterioration) in the
values of the well operation parameters. In case of depressurization of equipment at a well, it is necessary to suspend the operation of all kits. The Customer and the Contractor shall determine the
actual reason for the suspension of operation based on the results of diagnostics of a single kit as a whole, depending on the nature of the detected malfunction. Based on the results of diagnostics, it is
necessary to draw up an appropriate report, which is signed by representatives of the Parties. Premature end of operation of a single set of equipment is allowed and is issued by drawing up and
signing by representatives of the Parties of the relevant Act, if the reason for the suspension of trial operation is a malfunction or failure of the equipment, namely: – malfunction or failure of
components of the equipment. The contractor is obliged to eliminate defects in the equipment detected during the warranty period at its own expense, or replace the equipment, unless it proves that the
defects occurred as a result of the customer's violation of the rules of operation or storage of the equipment. In case of elimination of equipment defects for which the warranty period is set, this period
is extended for the time during which it was not used due to the defect, and when replacing the equipment, the warranty period is calculated anew from the date of replacement.

Terms of service provision:


Calls to the well are made according to the request provided by the customer by e-mail 24 hours before the provision of equipment and services. The service delivery period is within 48 hours from
the moment of arrival at a well.
The first call of the customer shall be sent no earlier than 90 calendar days from the date of signing the Contract.

5
Lot # 3 - 76111000-4 - Regasification services (Capillary tube installation and disassembly services)
Description of Goods Description of Goods
Customer requirements Units Quantity
offered, in Ukrainian* offered, in English*
1. After-sales service for the installation or disassembly of the capillary tube. Operations 10
The subject of the procurement is services for the installation and dismantling of a capillary tube with
a subsurface valve for the existing capillary chemicals injection system (hereinafter referred to as CCIS).
CCIS is designed to increase current production from wells, extend their service life and increase
inter-repair periods (WO and CU) due to periodic maintenance-free bottom hole cleaning from accumulated
fluid, prevent salts formation, paraffins, hydrates on the walls of tubing, and prevent corrosion effects on
subsurface equipment.
CCIS chemicals injection to the bottom hole is carried out through a capillary tube fixed to the x-mas
tree hanger, the bottom of the capillary tube is equipped with a depth valve, which provides metered injection
of chemicals to the bottom hole and prevents the reverse movement of gas and fluid, for each well, the depth
valve is adjusted separately based on reservoir pressure.
The service provides for the supply of equipment and provision of special equipment for carrying out
work by the contractor on the installation or dismantling of a capillary tube on a producing well at a well head
pressure of at least 200 bar determined by the customer, to a depth of at least 6000 meters to ensure CCIS    
operation.
The contractor is obliged to:
- ensure performance of 10 well operations for installation and dismantling of the capillary tube;
- ensure the presence of a check valve for sealing the capillary tube after running and mounted one on
the well hanger;
- The work plan is sent by the customer to the contractor together with the request for a call;
- all work on the well site should be carried out in accordance with the approved Work Plan;
- provide subsurface and surface equipment and installation equipment;
- use equipment certified on the territory of Ukraine;
- after capillary tube RIH, leave 15 meters of capillary tube with the end temporarily sealed;
- provide a certificate of acceptance and transfer of goods and work performed, a transcript of the installed
equipment and materials provided, signed by a Customer's branch.
2. Capillary tube Meters 20,000 Найменування Товару Country of origin:
The capillary tube is designed for injection of CCIS chemicals to the bottom hole, (марка/модель/тип):
Goods’ manufacturer:
diameter 0.25 "- 0.5 ", maximum operating pressure not less than 9000 psi. It is made of corrosion-resistant Країна походження:
seamless stainless steel. Warranty period for the
Requirements for mechanical properties - hardened tube for hot and cold processing. The tube is guaranteed Виробник товару: Goods:
for 5 years of operation. The tube must be cut off by a gate using x-mass tree valves (DN 50,65,80 Ru
210,350,700,1050) and maintain tightness in accordance with the technical characteristics of the valves. Гарантійний строк на Information on completeness
    Товар: and technical, quality
Minimum requirements for mechanical properties: features** in accordance with
Інформація про customer requirements:
tensile strength Min 620 MPa
комплектацію та технічні,
0.2% tensile strength Min 448 MPa ** If there is a range
якісні характеристики**
Relative elongation by 50 mm Min 25 % відповідно до вимог indicator of technical and
Hardness Max 290 HB замовника: quality features of the subject
3. Subsurface (discharge) valve Pcs. 5 of procurement in Customer’s

6
The subsurface (discharge) valve is designed for controlled dosing of chemicals into a well, maximum ** У разі наявності requirements (for example:
diameter is 1", maximum operating pressure is 8400 psi. Made of corrosion - resistant stainless steel. The діапазонного показника from...to, not less than,.., Not
    технічно-якісної more than…., Etc.) the
principle of operation of the valve is that the injection pressure exceeds the valve closing force, the spring
характеристики предмета Participant indicates the
contracts, lifts the ball and pushes the seat out, allowing chemicals to be introduced into the tubing.
закупівлі у вимогах possible range of such
4. Capillary tube hanger, threaded Pcs. 5 Замовника (наприклад: technical and quality featuters
The threaded capillary tube hanger is designed to run and hold the capillary tube with a die and seal it using від….до, не менше…., не of the Goods proposed by the
більше…. і т.д.) Учасник Participant or an out-of-range
hydraulic pressure. Sealing (external) of the capillary tube is carried out by expanding from compression of    
зазначає можливий specification value, if that
the rubber seal. The maximum operating pressure is not less than 5000 psi. діапазон такої технічно- value is accurate
5. Check valve Pcs. 5 якісної характеристики
    Товару, що пропонується
таким Учасником або
недіапазонне значення
Designed for sealing (internal) capillary tube, maximum holding pressure of at least 5000 psi. Made of технічної
corrosion-resistant stainless steel. характеристики, у разі
якщо це значення є
точним.
General requirements for the procurement item and cooperation schemes:
The customer sends the contractor a letter about the need to develop a work plan for individual wells to the email address specified in clause 11.13 of the Contract. The date of receipt by the
Contractor of such a letter is considered to be the date of sending the email. Confirmation of the sending date is a screenshot.
The Contractor draws up a work plan and sends it for approval by the Customer within 3 days from the date of receipt of the letter about the need to develop a work plan.
Calls to the well are made according to the request.
The equipment shall be delivered tested, complete and with a technical data sheet. The introduction of equipment should not cause an accident in the well or cause a decrease (deterioration) in the
values of the well operation parameters. In case of depressurization of equipment at a well, it is necessary to suspend the operation of all kits. The Customer and the Contractor shall determine the
actual reason for the suspension of operation based on the results of diagnostics of a single kit as a whole, depending on the nature of the detected malfunction. Based on the results of diagnostics, it is
necessary to draw up an appropriate report, which is signed by representatives of the Parties. Premature end of operation of a single set of equipment is allowed and is issued by drawing up and
signing by representatives of the Parties of the relevant Act, if the reason for the suspension of trial operation is a malfunction or failure of the equipment, namely: – malfunction or failure of
components of the equipment. The contractor is obliged to eliminate defects in the equipment detected during the warranty period at its own expense, or replace the equipment, unless it proves that the
defects occurred as a result of the customer's violation of the rules of operation or storage of the equipment. In case of elimination of equipment defects for which the warranty period is set, this period
is extended for the time during which it was not used due to the defect, and when replacing the equipment, the warranty period is calculated anew from the date of replacement.

Terms of service provision:


Calls to the well are made according to the request provided by the customer by e-mail 24 hours before the provision of equipment and services. The service delivery period is within 48 hours from
the moment of arrival at a well.
The first call of the customer shall be sent no earlier than 90 calendar days from the date of signing the Contract.

7
Year of manufacture of the equipment: no more than 12 months from the date of
production to the date of signing by the Parties of the Certificate of Acceptance and Transfer
of services rendered. The equipment shall be new and unused.
Place of service provision:
Lot # 1 - Poltavagasvydobuvannya GPU, 36008, Poltava region, Poltava City, 173,
Europeyska str., and / or according to the location specified in a well call application.
Lot # 2 - Shebelinkagasvydobuvannya, 64250, Kharkiv region, Donets village, 9, Stadionna
str., and / or according to the location specified in a well call application.
Lot # 3 - Lvivgasvydobuvannya GPU, 79026, Lviv region, Lviv City, 27, Rubchaka str.,
and / or according to the location specified in a well call application.
Warranty period for equipment: the warranty period shall correspond to the
warranty period of the equipment manufacturer, but not less than 12 months from the date of
signing by the Parties of the Certificate of Acceptance and Transfer of services rendered.
Warranty period for capillary tube - 5 years from the date of commissioning of the
equipment (each set), which is confirmed by the protocol of commissioning of the equipment
signed by the Parties, unless a longer period is set by a manufacturer.
Payment terms for services rendered: payment upon the fact of services rendered
within 30 calendar days from the moment the Parties sign the Certificate of Acceptance and
Transfer of services rendered.
Documents and / or requirements for them provided during the provision of
services:
1). Passport confirming the characteristics of the equipment in Ukrainian, if in another
language, the participant provides a translation into Ukrainian;
2) the operating manual (or another manufacturer operating document) in Ukrainian,
if in another language, the participant provides a translation into Ukrainian;
3) quality certificate for the equipment in Ukrainian, if in another language, the
participant provides a translation into Ukrainian.

By submitting its tender offer the bidder guarantees:

1. provision of services within the time limits stipulated in the terms of the tender documentation;
2. compliance of your offer with the technical, qualitative, quantitative and other requirements for the
procurement item and main provisions that will be included in the Procurement Contract;
3.conclusion and execution of the contract on the terms set out by the customer in Annex No. 4 to the
tender documentation (draft contract).

In order to confirm the proposal compliance with the technical requirements of


the Customer for the procurement item in accordance with Annex No. 3 to the tender
documentation, the bidder provides a completed Annex No. 3 to the tender
documentation with a description of the equipment offered by it under this
procurement procedure.