Professional Documents
Culture Documents
Stress
Preheating
60 Preheating Relieving & Full Batch Every Batch PLC Prodn.Sup. Adjust Temp and Time
Furnace
Oil Burning
Activation:
Prodn.
Temp:880ºC ±10ºC Temp controller 1 Reading Every 10'-30'
Supervisor
Direct Prodn.
70 SQF- 01 1 Activation Time:46' ±10' PLC 1 Reading Every 10'-30'
Hardening Supervisor
Adjust Time,Temp & Gas
PLC
Flows
Prodn.
CP:0.25 % ± 0.05% CP controller 1 Reading Every 10'-30'
Supervisor
Quench delay - 45 Sec max Tempering Delay Between Quenching And Tempering Process 4 Hrs Max
Bath % 2% - 4% Refractometer 2-3 Drops Weekly Twice Calibrated Instrument Quality In charge Top-up Alkaline Base Oil
Tempering
100 Tempering Furnace Temp & Time Temp: 450ºC ±10ºC Temp Controller 100% Every Batch Calibrated Instrument Prodn.Sup. Adjust Temp and time.
(TF1/TF2)
Rockwell Hardness
Surface Hardness 25- 30 HRC 13 Nos Random Per Batch Rockwell Hardness Rockwell Hardness
Tester
Rockwell Hardness
Core Hardness 25- 30 HRC 1 No's Random Per Batch Rockwell Hardness Rockwell Hardness
Tester
Fine Tempered
Case Micro structure Microscope 1 No. Per Batch Microscope Microscope
Martensite
Fine Tempered
Core Micro structure Microscope 1 No. Per Batch Microscope Microscope
Martensite