Comprehensive Development for Namibe Bay

( Pakage -2) Namibe

LIGTHNING PROTECTION
Description: Inspection Checklist for Installation of Ligthning Protection Date:

Test Voltage : Temperature: Type of Rating: Cal Due Date:

III. INSPECTION CHECK ITEMS

TOA Employers
Representative
ITEMS COMMENTS
Not Not
Passed Passed Passed Passed

1 Check down conductor routing against as per Approved Construction Drawing and any other
related documents. □ □ □ □
2 Testing of down conductor continuity prior to installation. □ □ □ □
3 Installation
others.
of air terminal base, elevation rods, test clamps, saddles, braackets, locknut and
□ □ □ □
4 Clamping/fixing of tape clips down and conductors to wall/roof/structure. □ □ □ □
5 Bonding of down conductors cross connection including down conductor to air terminal base. □ □ □ □
6 Down conductor to ground earth connection as per detail and layout drawing. □ □ □ □
7 Ligthning pit resistance checked. □ □ □ □
8 □ □ □ □
9 □ □ □ □
10 □ □ □ □
11 □ □ □ □
12 □ □ □ □
13 □ □ □ □
14 □ □ □ □

Contractor Employers Representative


TOA CORPORATION Logistica
Name Name

Signature Signature
Remark: Passed ,Not Passed