You are on page 1of 4

Application For Inspection

ENGINEERING, PROCUREMENT & CONSTRUCTION FOR PRODUCED WATER TREATMENT AND WATER INJECTION
FACILITIES EXPANSION (PHASE 1) AT THE WEST QURNA (PHASE2) CONTRACT AREA

CONSTRUCTION DISCIPLINE: Civil AFI No. AFI-SC03-QRBN-CI-00233

INSPECTION DATE: 14/Dec/2022


PRECISE UNIT/LOCATION: CPF / PIPE RACK SC-00-PR-003.

INSPECTION TIME CONTRACTOR QA/QC CONTRACTOR CONSTRUCTION

Name: Senthil Nachiappan Name: Serhan Filiz


8:30AM
Contact details: 07834668775 Contact details: 0783 597 6692

Point of Inspection
ITP Item No. Description of Inspection & Test Type
CONTRACTOR COMPANY

Backfilling & Compaction test for the 1st & 2nd Layers related to Around the
5.7 Foundation W W
of CPF / PIPE RACK SC-00-PR-003 A(type 1) to E (type 1).

ITP Number: 8015-0151-SC03-00-000-QC-IP-00013

DRW Number: 8015-0151-SC03-22-000-CI-DF-00032


Remarks:

CONTRACTOR QAQC (Date and sign) COMPANY (Date and Sign)

ISSUED BY RECEIVED BY
CTR: Senthil Nachiappan
13/12/2022
Acknowledgement (See remarks if any)

Contractor QA/QC Result of Inspection

Name: □ Acceptable

Sign: □ Acceptable w/comments

Date: □ Not Acceptable (See comments)

Company

Name: □ Witnessed □ Reviewed

Sign:

Date:
Any inspection or witnessing of the WORK by COMPANY or failure on the part of the COMPANY to inspect the WORK or witness a test or to test or to discover
DEFECTS or to reject WORK performed by CONTRACTOR which is not in accordance with the CONTRACT, shall not relieve CONTRACTOR from any liability or
obligation under the CONTRACT.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
PREVAILING
WIND PN

SC-00-PR-003 N
THIS DRAWING
FOUNDATION PLAN AT EL.100.200
A

A
Scale 1 : 50

PREVAILING
WIND PN DETAIL 1 SECTION Y-Y
Scale 1 : 10 Scale 1 : 10
A B B1 C D E
620
N 4000 3900 5100 6000 6000 NO. 4 TYPE A ANCHOR BOLT M24
(SEE 8015-0151-SC03-00-000-SB-DA-00013 150 320 150
EL.100.200 EL.100.200 EL.100.200 EL.100.200 EL.100.200 E 718945,650 = =
STANDARD DRAWING ANCHOR BOLTS)
N 3435209,190

F H 620 GROUT THK 25mm


2
B

B
420
EL.100.200 EL. 100.200 TOC.
NOTES
1 TYPE 1 TYPE 1 TYPE 1 2 TYPE 2 1 TYPE 1 1. ALL DIMENSIONS ARE IN MILLIMETERS AND COORDINATES AND

150
ELEVATIONS ARE IN METERS, UNLESS OTHERWISE NOTED.
2. PLAN ELEVATION OF H.P.P. +100.000 CORRESPONDS TO 1.50m
ABOVE M.S.L.
4000

EL.99.600 EL.99.600 EL.99.600 EL.99.600 EL.99.600 EL.99.600 3. COORDINATE SYSTEM INFORMATION:


SPHEROID: WGS84,

420
620

320

600
GEOID: EGM2008
GROUT THK 25mm PROJECTION: UTM ZONE 38N
ELEVATION: ELEVATION 0.00M CORREPONDS TO MSL OF "AL-FAW"
STATION

150
C

C
EL. 99.600
4. MATERIAL FOR SUBGRADE AND SUB-BASE SHALL BE COMPACTED UP
1 95% OF MAXIMUM DRY DENSITY AS PER ASTM D-1556
E 718920,650
N 3435205,190 150 320 150

G G

Y
PREVAILING TYPE 1 - TYPICAL FOUNDATION TYPE 2 - TYPICAL FOUNDATION DETAIL 2 SECTION Z-Z
WIND PN Scale 1 : 20 Scale 1 : 20 Scale 1 : 10 Scale 1 : 10
D

D
C D
N 2000 2
NO. 4 TYPE A ANCHOR BOLT M24
(SEE 8015-0151-SC03-00-000-SB-DA-00013
STANDARD DRAWING ANCHOR BOLTS)
620

690 620 690 150 320 150


= =

620
540
540

420
850
850

GROUT THK 25mm

150
E

E
2
F
620

2
620

EL. 100.200 TOC.

420
620

320
GROUT THK 25mm

150

600
1
150 320 150 EL. 99.600
F

F
z
MATERIALS
CHARACTERISTIC STRENGTH OF REINFORCED CONCRETE MATERIALS:
4000
5700

3380
4000
5700

3380

- STRUCTURAL CONCRETE : f'c=25 Mpa (CYLINDRIC AT 28 DAYS)


SECTION F-F - CEMENT : ASTM C150 TYPE V SULPHATE RESISTANCE PORTLAND OR
Scale 1 : 20 EQUIVALENT
- LEAN CONCRETE : f'c = 10 Mpa (CYLINDRIC AT 28 DAYS)
- REINFORCEMENT : Fy= 420 MPa (ASTM A615, GRADE 60)
GROUT THK 25mm - NON SHRINK GROUT f'c= 34,5 MPa (CYLINDRIC AT 28 DAYS) AS PER
ASTM C109-M
2000 - MINIMUM CONCRETE COVER SHALL BE AT LEAST 75MM
G

G
- ALL ANCHOR BOLTS SHALL BE A36 GRADE 36 CONFORMING TO ASTM
690 620 690 F1554 AND NUTS SHALL CONFORM TO ASTM A563 GRADE A. ALL
EL. 100.200 TOC. WASHERS SHALL BE ACCORDING TO ASTM F436. ALL THREADING SHALL
BE COARSE SERIES CONFORMING TO ASME B 1.1.
EL. 100.000 HPP

600
EL.99.600
LEGEND

1100

900
1 - FGL FINISHED GRADE LEVEL
620

1
620

- TOC TOP OF CONCRETE

500
EL.99.100 BOC. - BOC BOTTOM OF CONCRETE
H

H
- HPP HIGH POINT OF PAVEMENT
850
850

No NORTHING PIPE SUPPORT FOUNDATION COORDINATE


540
540

2 COATS OF COAL TAR X EASTHING PIPE SUPPORT FOUNDATION COORDINATE


EPOXY COATING MINIMUM
TOTAL THK. 300-400 µm (TYP) REFERENCE DOCUMENTS
690 620 5380 620 690 LEAN CONCRETE THK 50mm
DOCUMENTS TITLE
G 8000 0.40mm POLYETHYLENE SHEET
CONSTRUCTION JOINT 8015-0151-SC03-00-000-CI-SP-00007 GENERAL DESIGN SPECIFICATION FOR CIVIL WORKS AND STEEL STRUCTURES
8015-0151-SC03-00-000-SB-DA-00012 GENERAL NOTES FOR STEEL AND CONCRETE STRUCTURES
G 8015-0151-SC03-00-000-CI-SP-00010 SPECIFICATION FOR CONCRETE WORKS
STANDARD DRAWING RE-BAR ARRANGEMENT

H
8015-0151-SC03-00-000-ST-DA-00021
SECTION G-G 8015-0151-SC03-22-000-CI-DN-00101 PILE AND FOUNDATION LOCATION PLAN FOR CPF AREA
H

C SECTION H-H D 1 Scale 1 : 20


2 8015-0151-SC03-22-000-SB-CC-00010 CIVIL/STRUCTURAL CALCULATION REPORT FOR PIPE RACK SC-00-PR-003 FOR
Scale 1 : 20 CPF AREA - FOUNDATION & STEEL STRUCTURE
8015-0151-SC03-22-000-SB-DD-00008 STRUCTURAL STEEL DRAWING-PIPE RACK SC-00-PR-003-CPF AREA

GROUT THK 25mm GROUT THK 25mm

8000 5700

690 620 5380 620 690 540 620 3380 620 540 00 12-10-22 AFC APPROVED FOR CONSTRUCTION F.PAOLINI M.ANDREOZZI M.LADESIO
EL. 100.200 TOC. EL. 100.200 TOC.
B 30-09-22 IFR ISSUED FOR REVIEW F.PAOLINI M.ANDREOZZI M.LADESIO
EL. 100.000 HPP EL. 100.000 HPP A 08-04-21 IDC ISSUED FOR INTERDISC. CHECK V.LOSI S.CONTI G.STAGNI
REV DATE STATUS ISSUE PURPOSE ISSUED REVIEWED APPROVED
H

H
600

600

COMPANY: CONTRACTOR:
EL.99.600 EL.99.600
1100

1100

OIL COMPANY
900

900
LUKOIL MID-EAST LIMITED

SUB-CONTRACTOR: PROJECT NAME


500

500

EPC OF PRODUCED WATER


EL.99.100 BOC. EL.99.100 BOC. TREATMENT AND WATER INJECTION
FACILITIES EXPANSION PHASE 1,
FILENAME: 8015-0151-SC03-22-000-CI-DF-00011_B

WEST QURNA-2 (PHASE 2)


CONTRACTOR DWG. No: IQ077-00-4110-EN-0471
6000 4000 This document is property of the COMPANY and it shall not be disclosed to third parties, and/or reproduced
without permission of the COMPANY
DRAWING TITLE
CONSTRUCTION JOINT CONSTRUCTION JOINT FOUNDATION DRAWING
PIPE RACK SC-00-PR-003
2 COATS OF COAL TAR LEAN CONCRETE THK 50mm 2 COATS OF COAL TAR LEAN CONCRETE THK 50mm CPF AREA
EPOXY COATING MINIMUM EPOXY COATING MINIMUM
H

H
PLAN AND DETAILS
TOTAL THK. 300-400 µm (TYP) 0.40mm POLYETHYLENE SHEET TOTAL THK. 300-400 µm (TYP) 0.40mm POLYETHYLENE SHEET
Drawing No. Page Rev.

8015 0151 SC03 22 000 CI DF 00032 1 of 3 00


Corporate Contract Prod. Prod. Doc. Scale
Territory Origin Facility System Disc. Type Serial No.
Code -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 PAPER SIZE: A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
PREVAILING
WIND PN

FOUNDATION TYPE 1 TYPE A - COLUMN DETAIL N


SLAB REINFORCEMENT REINFORCEMENT THIS DRAWING
Scale 1 : 10
Scale 1 : 20
A

A
MATERIAL SUMMARY QUANTITY FOR TYPE 1 FOUNDATION (TOTAL QUANTITIES - FOR n.4 ITEMS)
T4 - 13 Ø20/150 TOP EXCAVATION 57 CUM
T4 - 13 Ø20/150 BOTTOM BAR BENDING FOR FOUNDATION TYPE 1 (SINGLE ITEM) FORMWORKS 43 SQM
BLINDING 5.05 CUM
T2 - 4 Ø10 POLYETILENE SHEET 42 SQM
CONCRETE 25 CUM
Bar Bend Length Total Total A B C D E
Image REBARS 3806 KG
T3 - 4 Ø16 Bar Mark Diameter
[mm]
Diameter
[mm]
of each bar
[m]
No. Length
[m]
[mm] [mm] [mm] [mm] [mm]
GROUT 0.05 CUM

1830 470
ANCHOR BOLTS TYPE A - M24 32 PCS

470

470
80 0
T1 10 mm 60 mm 2.04 8 16.32 470 470 470 160

8
470 470

80 80
T2 10 mm 60 mm 0.77 32 24.64 80 80 450 80 80

80

80
B

B
450

F
420

T3 16 mm 96 mm 1.72 24 41.28 405 895 420


2 NOTES

895
405

T1- 4 Ø10
T1- 4 Ø10 T2 - 4 Ø10
1 2 T4 20 mm 120 mm 6.17 26 160.42 310 5550 310 5550
1. ALL DIMENSIONS ARE IN MILLIMETERS AND COORDINATES AND
ELEVATIONS ARE IN METERS, UNLESS OTHERWISE NOTED.

310

310
TYPE A
1850
2. PLAN ELEVATION OF H.P.P. +100.000 CORRESPONDS TO 1.50m
T5 20 mm 120 mm 2.55 74 188.70 350 1850 350
ABOVE M.S.L.

350

350
COLUMN DETAIL
T3 - 2 Ø16 T3 - 2 Ø16 3. COORDINATE SYSTEM INFORMATION:
REBARS FOR TYPE 1 FOUNDATION (SINGLE ITEM) SPHEROID: WGS84,
Sized used
Material: Ø20
Mass per Unit Length Total Length Total Weight
GEOID: EGM2008
20 mm
Material: Ø16
2.466 kg/m 349.12 m 860.93 kg PROJECTION: UTM ZONE 38N
T3 - 4 Ø16 16 mm 1.578 kg/m 41.28 m 65.14 kg ELEVATION: ELEVATION 0.00M CORREPONDS TO MSL OF "AL-FAW"
T5 - 37 Ø20/150 TOP
Material: Ø10
STATION
C

C
10 mm 0.617 kg/m 40.96 m 25.27 kg

T5 - 37 Ø20/150 BOTTOM T2 - 4 Ø10 4. MATERIAL FOR SUBGRADE AND SUB-BASE SHALL BE COMPACTED UP
95% OF MAXIMUM DRY DENSITY AS PER ASTM D-1556
5530
D

D
1
E

E
TYPE A
COLUMN DETAIL

G
F

F
SECTION F-F SECTION G-G
Scale 1 : 10 Scale 1 : 10

MATERIALS
1 2 CHARACTERISTIC STRENGTH OF REINFORCED CONCRETE MATERIALS:
- STRUCTURAL CONCRETE : f'c=25 Mpa (CYLINDRIC AT 28 DAYS)
- CEMENT : ASTM C150 TYPE V SULPHATE RESISTANCE PORTLAND OR
EQUIVALENT
T1 T1 T1 - LEAN CONCRETE : f'c = 10 Mpa (CYLINDRIC AT 28 DAYS)
- REINFORCEMENT : Fy= 420 MPa (ASTM A615, GRADE 60)
T3 T3 T3 T3 T3 T3 - NON SHRINK GROUT f'c= 34,5 MPa (CYLINDRIC AT 28 DAYS) AS PER
ASTM C109-M
- MINIMUM CONCRETE COVER SHALL BE AT LEAST 75MM
G

G
- ALL ANCHOR BOLTS SHALL BE A36 GRADE 36 CONFORMING TO ASTM
F1554 AND NUTS SHALL CONFORM TO ASTM A563 GRADE A. ALL
WASHERS SHALL BE ACCORDING TO ASTM F436. ALL THREADING SHALL
BE COARSE SERIES CONFORMING TO ASME B 1.1.

T2 T2 T2 T2 T2 T2
T5 - 37 Ø20/150
TOP
T4 - 13 Ø20/150 TOP LEGEND
T4 - 13 Ø20/150 T5 - 37 Ø20/150 TOP
- FGL FINISHED GRADE LEVEL
TOP - TOC TOP OF CONCRETE
- BOC BOTTOM OF CONCRETE
H

H
- HPP HIGH POINT OF PAVEMENT
No NORTHING PIPE SUPPORT FOUNDATION COORDINATE
T5 - 37 Ø20/150 BOTTOM
X EASTHING PIPE SUPPORT FOUNDATION COORDINATE

REFERENCE DOCUMENTS
DOCUMENTS TITLE
8015-0151-SC03-00-000-CI-SP-00007 GENERAL DESIGN SPECIFICATION FOR CIVIL WORKS AND STEEL STRUCTURES
T4 - 13 Ø20/150 BOTTOM
8015-0151-SC03-00-000-SB-DA-00012 GENERAL NOTES FOR STEEL AND CONCRETE STRUCTURES
T4 - 13 Ø20/150 BOTTOM 8015-0151-SC03-00-000-CI-SP-00010 SPECIFICATION FOR CONCRETE WORKS
T5 - 37 Ø20/150 STANDARD DRAWING RE-BAR ARRANGEMENT

H
8015-0151-SC03-00-000-ST-DA-00021
BOTTOM
8015-0151-SC03-22-000-CI-DN-00101 PILE AND FOUNDATION LOCATION PLAN FOR CPF AREA
H

8015-0151-SC03-22-000-SB-CC-00010 CIVIL/STRUCTURAL CALCULATION REPORT FOR PIPE RACK SC-00-PR-003 FOR


CPF AREA - FOUNDATION & STEEL STRUCTURE
8015-0151-SC03-22-000-SB-DD-00008 STRUCTURAL STEEL DRAWING-PIPE RACK SC-00-PR-003-CPF AREA

00 12-10-22 AFC APPROVED FOR CONSTRUCTION F.PAOLINI M.ANDREOZZI M.LADESIO


B 30-09-22 IFR ISSUED FOR REVIEW F.PAOLINI M.ANDREOZZI M.LADESIO
A 08-04-21 IDC ISSUED FOR INTERDISC. CHECK V.LOSI S.CONTI G.STAGNI
REV DATE STATUS ISSUE PURPOSE ISSUED REVIEWED APPROVED
H

H
COMPANY: CONTRACTOR:

OIL COMPANY
LUKOIL MID-EAST LIMITED

SUB-CONTRACTOR: PROJECT NAME


EPC OF PRODUCED WATER
TREATMENT AND WATER INJECTION
FACILITIES EXPANSION PHASE 1,
FILENAME: 8015-0151-SC03-22-000-CI-DF-00011_B

WEST QURNA-2 (PHASE 2)


CONTRACTOR DWG. No: IQ077-00-4110-EN-0471
This document is property of the COMPANY and it shall not be disclosed to third parties, and/or reproduced
without permission of the COMPANY
DRAWING TITLE
FOUNDATION DRAWING
PIPE RACK SC-00-PR-003
CPF AREA
H

H
PLAN AND DETAILS

Drawing No. Page Rev.

8015 0151 SC03 22 000 CI DF 00032 2 of 3 00


Corporate Contract Prod. Prod. Doc. Scale
Territory Origin Facility System Disc. Type Serial No.
Code -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 PAPER SIZE: A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
PREVAILING
WIND PN

FOUNDATION TYPE 2 N
TYPE A -COLUMN DETAIL
SLAB REINFORCEMENT THIS DRAWING
Scale 1 : 20 REINFORCEMENT
Scale 1 : 10
A

A
T2 - 4 Ø10
C D T3 - 4 Ø16
T6 - 54 Ø20/150 TOP
T6 - 54 Ø20/150 BOTTOM

7980
B

B
T1- 4 Ø10
T1- 4 Ø10 T2 - 4 Ø10
1 2
2 NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS AND COORDINATES AND
T3 - 2 Ø16 T3 - 2 Ø16 ELEVATIONS ARE IN METERS, UNLESS OTHERWISE NOTED.
TYPE A TYPE A 2. PLAN ELEVATION OF H.P.P. +100.000 CORRESPONDS TO 1.50m
COLUMN DETAIL COLUMN DETAIL ABOVE M.S.L.
3. COORDINATE SYSTEM INFORMATION:
SPHEROID: WGS84,
T3 - 4 Ø16
GEOID: EGM2008
T7 - 38 Ø20/200 TOP T2 - 4 Ø10 PROJECTION: UTM ZONE 38N
T7 - 38 Ø20/200 BOTTOM
ELEVATION: ELEVATION 0.00M CORREPONDS TO MSL OF "AL-FAW"
STATION
C

C
4. MATERIAL FOR SUBGRADE AND SUB-BASE SHALL BE COMPACTED UP
95% OF MAXIMUM DRY DENSITY AS PER ASTM D-1556
5680

MATERIAL SUMMARY QUANTITY FOR TYPE 2 FOUNDATION


BAR BENDING FOR FOUNDATION TYPE 2
D

D
EXCAVATION 57 CUM
FORMWORKS 26 SQM
BLINDING 4.60 CUM
Bar Bend Length Total Total A B C D E
Bar Mark Diameter Diameter of each bar No. Length [mm] [mm] [mm] [mm] [mm] Image POLYETILENE SHEET 70 SQM
[mm] [mm] [m] [m] CONCRETE 5.5 CUM
REBARS 3514.26 KG
GROUT 0.025 CUM

470

470
80 0
T1 10 mm 60 mm 2.04 16 32.64 470 470 470 160 ANCHOR BOLTS TYPE A - M24 16 PCS

8
L 470 470

1
80 80
T2 10 mm 60 mm 0.77 64 49.28 80 80 450 80 80

80

80
450

420

TYPE A TYPE A T3 16 mm 96 mm 1.72 24 82.56 405 895 420

895
COLUMN DETAIL COLUMN DETAIL 405

5700

T6 20 mm 120 mm 6.40 108 691.20 350 5700 350

350

350
8000

T7 20 mm 120 mm 8.70 76 661.20 350 8000 350


E

E
350

350
REBARS FOR TYPE 2 FOUNDATION
Sized used Mass per Unit Length Total Length Total Weight
Material: Ø20
20 mm 2.466 kg/m 1352.40 m 3335.02 kg
Material: Ø16
16 mm 1.578 kg/m 82.56 m 128.70 kg
Material: Ø10
10 mm 0.617 kg/m 81.92 m 50.54 kg
F

F
MATERIALS
CHARACTERISTIC STRENGTH OF REINFORCED CONCRETE MATERIALS:
SECTION L-L - STRUCTURAL CONCRETE : f'c=25 Mpa (CYLINDRIC AT 28 DAYS)
Scale 1 : 10
- CEMENT : ASTM C150 TYPE V SULPHATE RESISTANCE PORTLAND OR
EQUIVALENT
- LEAN CONCRETE : f'c = 10 Mpa (CYLINDRIC AT 28 DAYS)
- REINFORCEMENT : Fy= 420 MPa (ASTM A615, GRADE 60)
- NON SHRINK GROUT f'c= 34,5 MPa (CYLINDRIC AT 28 DAYS) AS PER
ASTM C109-M
- MINIMUM CONCRETE COVER SHALL BE AT LEAST 75MM
G

G
C D - ALL ANCHOR BOLTS SHALL BE A36 GRADE 36 CONFORMING TO ASTM
F1554 AND NUTS SHALL CONFORM TO ASTM A563 GRADE A. ALL
WASHERS SHALL BE ACCORDING TO ASTM F436. ALL THREADING SHALL
BE COARSE SERIES CONFORMING TO ASME B 1.1.
T1 T1

T3 T3 T3 T3 LEGEND
- FGL FINISHED GRADE LEVEL
- TOC TOP OF CONCRETE
- BOC BOTTOM OF CONCRETE
H

H
- HPP HIGH POINT OF PAVEMENT
No NORTHING PIPE SUPPORT FOUNDATION COORDINATE
T2 T2 T2 T2 X EASTHING PIPE SUPPORT FOUNDATION COORDINATE
T7 - 38 Ø20/150 TOP
REFERENCE DOCUMENTS
T6 - 54 Ø20/150 TOP DOCUMENTS TITLE
8015-0151-SC03-00-000-CI-SP-00007 GENERAL DESIGN SPECIFICATION FOR CIVIL WORKS AND STEEL STRUCTURES
8015-0151-SC03-00-000-SB-DA-00012 GENERAL NOTES FOR STEEL AND CONCRETE STRUCTURES
8015-0151-SC03-00-000-CI-SP-00010 SPECIFICATION FOR CONCRETE WORKS
STANDARD DRAWING RE-BAR ARRANGEMENT

H
8015-0151-SC03-00-000-ST-DA-00021
T6 - 54 Ø20/150 BOTTOM
8015-0151-SC03-22-000-CI-DN-00101 PILE AND FOUNDATION LOCATION PLAN FOR CPF AREA
H

8015-0151-SC03-22-000-SB-CC-00010 CIVIL/STRUCTURAL CALCULATION REPORT FOR PIPE RACK SC-00-PR-003 FOR


CPF AREA - FOUNDATION & STEEL STRUCTURE
8015-0151-SC03-22-000-SB-DD-00008 STRUCTURAL STEEL DRAWING-PIPE RACK SC-00-PR-003-CPF AREA

T7 - 38 Ø20/150 BOTTOM

00 12-10-22 AFC APPROVED FOR CONSTRUCTION F.PAOLINI M.ANDREOZZI M.LADESIO


B 30-09-22 IFR ISSUED FOR REVIEW F.PAOLINI M.ANDREOZZI M.LADESIO
A 08-04-21 IDC ISSUED FOR INTERDISC. CHECK V.LOSI S.CONTI G.STAGNI
REV DATE STATUS ISSUE PURPOSE ISSUED REVIEWED APPROVED
H

H
COMPANY: CONTRACTOR:

OIL COMPANY
LUKOIL MID-EAST LIMITED

SUB-CONTRACTOR: PROJECT NAME


EPC OF PRODUCED WATER
TREATMENT AND WATER INJECTION
FACILITIES EXPANSION PHASE 1,
WEST QURNA-2 (PHASE 2)
FILENAME: 8015-0151-SC03-22-000-CI-DF-00011_B

CONTRACTOR DWG. No: IQ077-00-4110-EN-0471


This document is property of the COMPANY and it shall not be disclosed to third parties, and/or reproduced
without permission of the COMPANY
DRAWING TITLE
FOUNDATION DRAWING
PIPE RACK SC-00-PR-003
CPF AREA
H

H
PLAN AND DETAILS

Drawing No. Page Rev.

8015 0151 SC03 22 000 CI DF 00032 3 of 3 00


Corporate Contract Prod. Prod. Doc. Scale
Territory Origin Facility System Disc. Type Serial No.
Code -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 PAPER SIZE: A0

You might also like