Professional Documents
Culture Documents
Activity 3
Activity 3
COLLEGE OF ENGINEERING
ELECTRONICS ENGINEERING DEPARTMENT
OBJECTIVES:
1. Be able to establish a full-duplex communication link with the use of wires, switches, and
LEDs
2. Be able to perform this activity within the standard of safety
GROUP MEMBERS: ARBADO, KIRK RYAN ANDERSON DATE: OCTOBER 26, 2022
BOLO, PHEBE KAYE
FLORES, CRIS JOHN
MONTIFLOR, YULIE VIC
TANGUAN, PHEBE JOY G.
MATERIALS:
INSTRUCTIONS:
1. Connect the electrical circuit as shown in figure 2.2.
2. Switch ON the power supply and set it at 5 V.
3. Close switch Sl and open switch S2 to observe the LEDs status. Note down in Table 1.
4. Open the switch Sl and close the switch, observe the LEDs status. Note down in Table 1.
5. Close the switches S1 and S2, and observe the LED’s status. Note down in Table 1.
6. Open the switch Sl and S2, and observe the LED’s status. Note down in Table.
RESULTS:
Observations: Table 1
2 Sl OFF; S2 ON OFF ON
3 Sl ON; S2 ON ON ON
Figure 3.1 (image on the left) - Experimental setup of Full-Duplex Communication Link when both LEDs are OFF
Figure 3.2 (image on the right) - Experimental setup of Full-Duplex Communication Link when green LED is ON
Figure 4.1 (image on the left) - Experimental setup of Full-Duplex Communication Link when red LED is ON
Figure 4.2 (image on the right) - Experimental setup of Full-Duplex Communication Link when both LEDs are ON
Group Pictures: