You are on page 1of 3

LOAD TEST REPORT OF BATTERY

BANK
CLIENT AL DHAFRAH REGION MUNCIPALITY DATE
PROJECT NO DRM/062/19 SUBSTATION NAME RWS PRY 17
ELE. CONTRACTOR JUPITER EMC LLC W. ORDER NO

SS: 33/6.6 kV RWS PRY 17

********* TESTED BY CONTRACTOR APPROVED BY


COMPANY NAME JUPITER EMC LLC JUPITER EMC LLC AL DHAFRAH REGION MUNCIPALITY
ENGINEER NAME USMAN CP SUKHBIR SINGH
SIGNATURE

Tel: 02-6419541, Fax: 02-6419542 E-Mail: testing@jupiteremc.com


Page 1 of 3
LOAD TEST REPORT OF BATTERY
BANK
CLIENT AL DHAFRAH REGION MUNCIPALITY DATE
PROJECT NO DRM/062/19 SUBSTATION NAME RWS PRY 17
ELE. CONTRACTOR JUPITER EMC LLC W. ORDER NO

BATTERY NAME PLATE DETAILS:


Battery Make:
Type:
Number of Cells:
Nominal Cell Voltage:
Year of installation: Injected Current:
BATTERY BANK LOAD TEST

Cell Cell
No No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
TOTAL VOLTAGE

Before discharge test reading = V After discharge test reading within 100 minutes = V

********* TESTED BY CONTRACTOR APPROVED BY


COMPANY NAME JUPITER EMC LLC JUPITER EMC LLC AL DHAFRAH REGION MUNCIPALITY
ENGINEER NAME USMAN CP SUKHBIR SINGH
SIGNATURE

Tel: 02-6419541, Fax: 02-6419542 E-Mail: testing@jupiteremc.com


Page 2 of 3
LOAD TEST REPORT OF BATTERY
BANK
CLIENT AL DHAFRAH REGION MUNCIPALITY DATE
PROJECT NO DRM/062/19 SUBSTATION NAME RWS PRY 17
ELE. CONTRACTOR JUPITER EMC LLC W. ORDER NO

Result:.

Test Equipment Details:


Equipment Name Manufacture /Model Serial no Calibration due date
Battery load unit

********* TESTED BY CONTRACTOR APPROVED BY


COMPANY NAME JUPITER EMC LLC JUPITER EMC LLC AL DHAFRAH REGION MUNCIPALITY
ENGINEER NAME USMAN CP SUKHBIR SINGH
SIGNATURE

Tel: 02-6419541, Fax: 02-6419542 E-Mail: testing@jupiteremc.com


Page 3 of 3

You might also like