Scoof of Works Qty Unit Unit cost Amount


Mobilization 1 Lot 3,000
Tools and Equipment 1 Lot 2,500
Tubular 4x4x2mm 1 pc 2,900 2,900
Tubular 2x4x2mm 6 pcs 1,950 11,700
Poly Carbonate 3 pcs 6,490 19,470
THHN Wire 3.5 mm 30 meters 37 1,110
Switch 1- Gang 1 set 350 350
Dyna Bolt 3/8x6” 5 sets 130 650
Dyna Bolt 3/8 x4” 8 pcs 79 630
Welding Rod 6013 nihon 5 kilos 120 600
Epoxy Primer 1 gallon 870 870
Q,D,E Block 1 gallon 980 980
Baby Roller 4” cotton 5 pcs 65 325
Paint Brush 2” 3 pcs 45 135
Sand Paper # 180 10 pcs 35 350
Cutting Disc Tyrollet 15 pcs 100 1,500
Grinding Disc 2 pcs 140 280
Blue Sack 10 meters 98 980
Laquer Thiner 1 gallon 560 560
Scaffolding 3 sets 350 1,050

MATERIAL 49,412
LABOR 45,700

Terms:
30% Downpayment, remaining balance thru Progress Billing