(BI/MD) Business Interruption / Material / Fire Brief Disruption to Operation / 10k SR to Less Than Partial Loss of Operation/1M SR Substantial or Total Loss of Operation / 10M SR
Damage & Other Consequential Losses No disruption to operation / 1000 SR to Less than 10k SR 100k SR Partial Shutdown/100k SR to Less than 1M SR To Less than10M SR and more
LIKELIHOOD Examples (Consider Near-Hits as well as actual events) RISK RATING / PROFILE
(5) ALMOST The unwanted event has occurred frequently : Occurs in order of (1) or more per year & is likely to reoccur within 1
CERTAIN year 11 (M) 16 (H) 20 (H) 23 (Ex) 25 (Ex)
(4) LIKELY The unwanted event has occurred infrequently : Occurs in order of less than once per year & is likely to reoccur
7 (M) 12 (M) 17 (H) 21 (Ex) 24 (Ex)
within 5 yrs.
(3) POSSIBLE The unwanted event has occurred in the business at some time: or could happen within 10 years.
4 (L) 8 (M) 13 (H) 18 (H) 22 (Ex)
(2) UNLIKELY The unwanted event has occurred in the business at some time: or could happen within 20 years.
2 (L) 5 (L) 9 (M) 14 (H) 19 (H)
(1) RARE The unwanted event has never known to occur in the business or it is highly unlikely to occur within 20 years.
1 (L) 3 (L) 6 (M) 10 (M) 15 (H)
RA TEAM (Names) DESIGNATION SIGNATURE RISK RATING RISK LEVEL GUIDELINES FOR RISK MATRIX
Stop operation and review controls- Eliminate, avoid risk & implement high
1. -SULAIMIN AL AQALI SAFETY MANAGER 21 to 25 (Ex) - Extreme priority action plans
Proactively manage & implement specific controls/action plans-Review
2. - 13 to 20 (H) - High after 7 days
Actively manage & monitor – Additional controls is advised & review after
3. - 6 to 12 (M) - Medium 14 days
Risk acceptable – Monitor & manage as appropriate with frequent review
4. - 1 to 5 (L) - Low
DEPARTMENT / AREA: AL KHONAINI COMPANI (AL JUBAIL) APPROVED BY / MANAGER or DATE: 4/5/2022 NEXT REVIEW DATE:
SUPERVISOR MOHAMMAD CHUMER
Identify the hazard on the given task and conduct assessment of the actual site condition, all identified risk should provide with a plan to eliminate or control the risk.
Risk Ranking /
Risk Ranking /
Consequence
Consequence
Risks Issue
Likelihood
Likelihood
Item Work Activity Improve existing
Profile
Profile
Hazards (Possible incident)
Existing Controls controls / implement new Follow up by Whom Controls Implemented
# (Process, Equipment,
Materials)
[What can go wrong]
(Accident / ill health to persons, fire controls
(name) & By When (date) Yes/No
or property loss)
1 SERIOUS INJURIES IN CASE OF FLASH 1) MAKE SURE GAS TEST DONE BEFORE ENTRING
OVER RESPIRATORY PROBLEM INSIDE CONFINE SPACE 2) AIR VENTILATION
4 4 16 Safe Work Procedures 0 0 Yes or No
WORKING INSIDE CONFIND SPACE PROPERLY KEEP INSIDE CONFINE SPACE 3) MAKE
HANDHOLE,S SURE PROPER ACCESS AND EGRESS
0
2 P P E GAS TESTER ,DEWATRING PUMP LADER 2 2 4 Training 0 0 Yes or No
DEWATERING OF HAND ERGONOMICS BACK PAIN ELECTRIC SHOCK
HOLES
0
3 PPE GLOVES ARC SUITS CABLE TESTER BABLE
SANSOE
3 4 8 Select Control Methods 0 0 Yes or No
REPAIR AND REPLACE
CABLE FAULT INSIDE HAND FLASHOVER MAJOR INJURIE
HOLES
0
4 AIR VANTILLATION PPE ARC SUIT CAT 2 CABLE
SENSOR
4 2 4 Select Control Methods 0 0 Yes or No
PROVIDE DUCT SEALING
INSIDE HAND HOLES NEAR LIVE CABLE DEADLY INJURIES ELECTRIC SHOCK
0
5
MANHOLE & CONFIND SPACE ELECTRIC
DEALING WITEH LOW VOLTAGE LIVE
PARTS PPE WORKING GLOVES ARC SUIT VOLTAGE
4 4 16 Select Control Methods 0 0 Yes or No
(BI/MD) Business Interruption / Material / Fire Damage & No disruption to operation / 1000 SR Brief Disruption to Operation / 10k
Other Consequential Losses to Less than 10k SR SR to Less Than 100k SR