You are on page 1of 8

No.

:…022519
TEST REPORT Page: 2/8
High Voltage Laboratory
TABLE OF CONTENTS

1. CABLE MARKINGS ...................................................................................................................................................... 3


2. TESTS PERFORMED .................................................................................................................................................. 3
3. TESTS RESULTS ......................................................................................................................................................... 4
3.1. Bending test .......................................................................................................................................................... 4
3.2. Partial discharge test ........................................................................................................................................... 4
3.3. Tan δ measurement ............................................................................................................................................ 4
3.4. Heating cycle test ................................................................................................................................................. 5
3.5. Partial discharge test after heating cycle test .................................................................................................. 5
3.6. Impulse test followed by voltage test ................................................................................................................ 5
3.7. Voltage test after impulse test ............................................................................................................................ 6
3.8. Voltage test for 4 h ............................................................................................................................................... 6
3.9. Water penetration test ......................................................................................................................................... 7
ANNEX A – Documentation ................................................................................................................................................. 8

fiet10-36/2
No.:…022519
TEST REPORT Page: 3/8
High Voltage Laboratory
1. CABLE MARKINGS
Type and nominal voltage: XHE 49-A 1x150/25 mm2 20/35 (42) kV
2. TESTS PERFORMED
1. Bending test
2. Partial discharge test
3. Tan δ measurement
4. Heating cycle test
5. Impulse test followed by voltage test
6. Voltage test after impulse test
7. Partial discharge test after heating cycle
8. Voltage test for 4 h
9. Water penetration test

Supervised by:
Dalibor Filipović-Grčić, Končar – Electrical Engineering Institute

fiet10-36/2
No.:…022519
TEST REPORT Page: 4/8
High Voltage Laboratory

3. TESTS RESULTS
3.1. Bending test
Normative documents: IEC 60502-2:2014, clause 18.2.4
Test conditions:
Test was performed at Electrophysical laboratory ELKA under supervision of supervision of
KONČAR-Electrical Engineering Institute. After bending test two test samples were cut and
prepared. The first sample for electrical tests and the second for water penetration test.
3.2. Partial discharge test
Normative documents: IEC 60502-2:2014, clause 18.2.5
Test conditions:
Test was performed at Electrophysical laboratory ELKA under supervision of supervision of
KONČAR-Electrical Engineering Institute.
Sample passed the test.
3.3. Tan δ measurement
Normative documents: IEC 60502-2:2014, clause 18.2.6
Measuring equipment:
Voltage supply / standard capacitor, Tettex, type 5281, SN:141981
C tan δ bridge, Tettex, type 2805, SN:133788
Data acquisition system, Keithley, type:2700, SN:4106528
20 channels multiplexer module, Keithley, type 7700, SN: 4106746; 4106747
Test conditions:
Cable was heated by means of AC current to conductor temperature between 95 °C and
100 °C.
Test results:

Test voltage Cable conductor Capacitance (pF) Tan δ (%) Requirement for
(kV) temperature (°C) Tan δ (%)

2 20,2 2471 0,0274 -

2 97,2 2301 0,0371 <0,4

Sample passed the test.

fiet10-36/2
No.:…022519
TEST REPORT Page: 5/8
High Voltage Laboratory
3.4. Heating cycle test
Normative documents: IEC 60502-2:2014, clause 18.2.7
Measuring equipment:
Data acquisition system, Keithley, type:2700, SN:4107336
20 channels multiplexer module, Keithley, type 7700, SN: 4107192; 4107195
Test conditions:
Temperature cycles:
Heating: 5 hours (minimum 2 hours at temperature between 95 °C and 100 °C)
Cooling: 3 hours
Test results:
20 heating cycles have been completed. After heating cycle test sample was subjected to
partial discharge test in 3.5.
Sample passed the test.
3.5. Partial discharge test after heating cycle test
Normative documents: IEC 60502-2:2014, clause 18.2.5
Test conditions:
Test was performed at Electrophysical laboratory ELKA under supervision of supervision of
KONČAR-Electrical Engineering Institute.
Sample passed the test.
3.6. Impulse test followed by voltage test
Normative documents: IEC 60502-2:2014, clause 18.2.8
Measuring equipment:
Voltage divider, Končar, type: 700/86, SN:001.
Digital system for impulse voltage measurement and registration DIAS 733, Haefely,
SN: 081 626-02.
Atmospheric data logger DL200D, Trotec, SN: 22.602.130.802.017.
Data acquisition system, Keithley, type:2700, SN:4106528
20 channels multiplexer module, Keithley, type 7700, SN: 4106746; 4106747

Test conditions:
Atmospheric conditions during the test:
temperature: 20,1 °C
pressure: 1005,3 hPa
rel. humidity: 36,7 %

Cable was heated with AC current to conductor temperature between 95 °C and 100 °C.

fiet10-36/2
No.:…022519
TEST REPORT Page: 6/8
High Voltage Laboratory
Test circuit:

Constants of the test circuit:

C1 (pF) C2 (nF) R1 (Ω) R2 (Ω) p* S1


250000 4000 280 90 166,8 -
*divider ratio
Test results:
Test voltage / kV Number of
Polarity Result
impulses
positive 170 10 PASSED
negative 170 10 PASSED

After impulse test sample was subjected to voltage test in 3.7.


Sample passed the test.
3.7. Voltage test after impulse test
Normative documents: IEC 60502-2:2014, clause 18.2.8
Test conditions:
Test was performed at Electrophysical laboratory ELKA under supervision of supervision of
KONČAR-Electrical Engineering Institute.
Sample passed the test.
3.8. Voltage test for 4 h
Normative documents: IEC 60502-2:2014, clause 18.2.9
Test conditions:
Test was performed at Electrophysical laboratory ELKA under supervision of supervision of
KONČAR-Electrical Engineering Institute.
Sample passed the test.

fiet10-36/2
No.:…022519
TEST REPORT Page: 7/8
High Voltage Laboratory
3.9. Water penetration test
Normative documents: IEC 60502-2:2014, clause 19.24

Measuring equipment:
Data acquisition system, Keithley, type:2700, SN:4106528
20 channels multiplexer module, Keithley, type 7700, SN: 4106746; 4106747
Test conditions:
Heating cycle parameters:
Heating: 5 hours (minimum 2 hours at temperature between 95°C and 100°C)
Cooling: 3 hours
Test setup:

Test results:
10 heating cycles have been completed. No leakage was observed at the ends of test sample.
Sample passed the test.

fiet10-36/2
No.:…022519
TEST REPORT Page: 8/8
High Voltage Laboratory
ANNEX A – Documentation

fiet10-36/2