QUESTION BANK
UNIT -1 INTRODUCTION
PART - A
PART - B
1. Construct a pareto chart with top priority for the a following data
PART-A
1. Enumerate the objectives and advantages of network analysis
2. Compare CPM & PERT with advantages
3. Find the te and standard deviation from the network given below.
4. Find the te and variance for the activity P,Q,R in a project are as follows
Activity to tm tp
P 10 12 14
Q 6 8 12
R 5 10 12
2. Write the formula for the following: Total float, Free float, Independent float,
Interfering float.
3. Discuss in detail about resource levelling.
4. Calculate the slack for each event and also find the critical path in Figure.2
7. In the table given below, activities and their uncertainty induration captured in terms of
optimistic, mostlikely andpessimistic duration (to, tm and tp respectively). Determine the
project duration.
Activity IPA to tm tp
ID
A - 10 12 16
B A 6 9 12
C B, 2 3 5
D
D - 8 10 14
E D 5 6 8
F E 2 3 4
G - 1 2 3
H G 7 9 11
I E, 1 2 3
H
PART - A
1. Discuss the data required for construction planning.
2. Quote the functions of construction planning.
3. Enumerate the types of resources involved in construction.
4. Bring out the importance of materials management.
5. Discuss about the organizing in construction planning.
6. Write short notes on directing and leading.
7. Enumerate about work force planning.
8. Discuss the need for mechanization in construction projects.
9. Discuss the important aspects to be considered in materials procurement
PART -B
1. Write down the importance of Preliminary estimates.
2. Discuss about the method of estimating the progress of a project.
3. Explain about EEF and OPA
4. Write short note on Schedule control and budget update.
5. Explain the main considerations necessary in the storing and stacking of civil engineering materials.
6. Enumerate the different types of material cost.
7. Describe in detail the various factors affecting the selection of construction equipment.
8. Explain about the obsolescence cost in construction equipment management.
9. Explain the different financial aspect of procuring construction equipment.
10. Illustrate the factors affecting selection of construction equipment.
11. Discuss the different types of layout for stores management.
12. Explain the following (i) Down time cost (ii) Replacement Cost
13. Explain the significance of preliminary estimate and relevant data collection helpful in preparing preliminary
estimate.
14. Elucidate the method of estimating the progress of a project.
15. Describe the various factors affecting the selection of construction equipment
16. Explain the obsolescence cost related to construction equipment management.