INTEGRATED DESIGN PROJECT

IDP ASSESSMENT : INVITED SPEAKERS


OBJECTIVES : PROFESSIONAL PRACTICES

Full Name of Speaker


IR SOFIANA BALKHIS BINTI TALHA
Designation of
GENERAL MANAGER, GEOTECHNICAL DIVISION, MINCONSULT
Speaker SDN BHD

Topic of Professional Conceptual Planning, Detailed Design, Construction and CCC for Main
Talk & Date Infrastructure Works (Soil Investigation Works and Its Application)
Objective of What is Soil Investigation
Professional Talk How to determine Boreholes Spacing
Explain about Field Testing

Lesson Learned Boreholes spacing building works


- Boreholes in buildings with more than one story are usually spaced
15m to 45m apart.
- Two boreholes for a block of low rise building on flat land
- Limestone locations, uncontrolled filled ground or boulders, and
abundant places need more boreholes.
Boreholes spacing Road works
- Highway drilling spacing should be 60m–600m.
- Road alignments through the same geological strata require fewer
boreholes.
- Three vertical boreholes are recommended for sloppy hilly terrain.
Rock Quality Description
- 0-25% = very poor
- 25-50% = poor
- 50-75% = Fair
- 75-90% = Good
- 90-100% = Excellent
Type of Penetrometer
- Mackingtosh Probe
- JKR Probe

Name of Student & MUHAMMAD HAZIQ BIN ABD RASHID (2020963337)


UiTM ID

Name of Instructor &


Group IR. MUHD SALMIZI JAAFAR (EC2208C1)

Student’s Signature Grade (Instructor) as per PC

1 2 3 4 5 6 7 8 9 10