INTEGRATED DESIGN PROJECT

IDP ASSESSMENT : INVITED SPEAKERS


OBJECTIVES : PROFESSIONAL PRACTICES

Full Name of Speaker IR. ZARINA BINTI MOHAMAD ALI


Designation of GENERAL MANAGER, INFRASTRUCTURE & WATER SUPPLY
Speaker DIVISION, MINCONSULT SFN BHD

Topic of Professional
Talk & Date Conceptual Planning, Detailed Design, Construction and CCC for Main
Infrastructure Works (MAIN INFRASTRUCTURE WORK)
Objective of
To explain about infrastructure work.
Professional Talk What is infrastructure work
How to design infrastructure work

Lesson Learned
How to design Earthworks
- Based on S.I. data, earthworks have set the proposed platform levels
that work best with the surrounding level and the 100-year flood level
(Ground Improvement).
Roadworks
- Design preliminary road formation levels considering surrounding
earthworks platforms.
- Set the widths of the lanes for different types of roads.Stormwater
Drainage
- Review the drainage system's main discharge point.
- Prepare a preliminary drainage system layout based on MSMA 2nd
edition and necessary authorities.
- Find the point where the water comes out of the outlet and where the
detention pond is.
Water tank and water supply
- Review all the information and get any new information from
inspections on the ground or from the authority.
- Figure out how much water will be needed for the planned
development.
- Figure out the path of the pipe that brings water in.
- Find out where the supply comes from and how much pressure is on
DO.
Name of Student &
UiTM ID MUHAMMAD HAZIQ BIN ABD RASHID (2020963337)

Name of Instructor &


Group IR. MUHD SALMIZI JAAFAR (EC2208C1)

Student’s Signature Grade (Instructor) as per PC

1 2 3 4 5 6 7 8 9 10

*Note : All students shall submit this form to the instructor immediately after attending the talk
FCE/OCL/2018