You are on page 1of 6

CONFIDENTIAL UHL2422 SEM I 2020/2021

Centre for Modern Languages

UHL2422 ENGLISH FOR TECHNICAL COMMUNICATION


SEMESTER I 2020/2021

ANSWER SHEET
Assessment 2A (CO3, CO4, PO4)
Reading (15%)
Pair Work

WEEK 9
Duration: 10 hours
No Matric No. Name Marks Marks
CO3 CO4 (Language)
(Content)
1 JENNY LOH
KA17256
2 WAN NUR HUDA SYAKIRAH BINTI
KA18073
WAN SANUSI
SECTION 07G TOTAL /20 / 20

LEARNING OUTCOMES:
CO3: Transfer salient information from technical reading materials and documents into
appropriate format.

CO4: Apply appropriate and accurate language in written and/or spoken discourse.

INSTRUCTIONS:
1. This answer sheet consists of one (1) part ONLY.
2. Read the instructions carefully in the question paper.
3. Write your 5-7 page SOP in the SOP template provided within the given time.
4. The procedure must be in Graphic Operating Procedure format and you MUST include
illustrations as per required by the SOP.
5. Append your assigned article along with a minimum of 2 other related references.
6. To submit, rename the SOP Template (Word doc.) with BOTH your names in this format:
SOP name_student ID_name_student ID_section no
a. Example: SOP Siti _CB12345_Idris_CA67890_40P

VERIFIED BY:
DR FATIMAH BINTI ALI
HEAD OF PROGRAMME (ENGLISH LANGUAGE)
CENTRE FOR MODERN LANGUAGES
CONFIDENTIAL UHL2422 SEM I 2020/2021

Complete the SOP document based on the article assigned as well as 2 other related
references.

Ref. No.
Date 24/12/2020
Page No. 1 of 7

Title : Standard Operating Procedures on Sewer Collection System

Department/ This SOP has been written for the Environmental Services Department
Unit

Purpose
The purpose of the SOP is to maintain and improve the condition of the
wastewater treatment and collection system infrastructure

Who can
perform this TU management, staffs
SOP?

Equipment/Tools Needed:
Personal Safety helmet, Safety boots,
Protective
Equipment

Tools Vacuum truck, portable pumps, generators, camera

Englent, R. (2017). City of Modesto Utilities Department Sanitary Sewer


Reference Management Plan. Retrieved from
Materials https://www.modestogov.com/DocumentCenter/View/9552/Sanitary-
Sewer-Management-Plan-2017-PDF

Others None
CONFIDENTIAL UHL2422 SEM I 2020/2021

Ref. No.
Date 24/12/2020
Page No. 2 of 7

Preparing Tools

Routine Operation

- Initiate a 30 minutes settleometer test by operator


- Ensure the disinfection system is operating properly and
add chlorine if needed
- Clean weirs and baffles
- Knock down pop-ups if needed
Procedures
- Inspect chlorine contact chamber for solid

Operation and Maintenance

- Checking the lift stations of submersible and above-ground


pump
- For both, check electrical panel integrity and clean float switches
- Turn pumps on/off to check for clogging
- Test audible and float alarms
- Check conduit and piping to see if it is secure
- Check lift station lid and panel and ensure it is locked at arrival
and departure
- For above-ground pump, check integrity of belt and oil level
CONFIDENTIAL UHL2422 SEM I 2020/2021

Ref. No.
Date 24/12/2020
Page No. 3 of 7

Design and Performance Provision

- Design and construct standards and specifications for


the installation of new sanitary sewer system
- Repair the existing sanitary sewer system
- Inspect and test the installation of new sewers, pumps
and other equpments

Overflow Emergency Response Plan

- Identified the code of “SSO” (Sanitary Sewer Overflow)


identified when a customer call with a complaint of
Procedures sewer spill
- Ensure an appropriate response to all overflow via a
program

Equipment and Replacement

- Develop a list of pump and motor needs for each sewer


lift station
- Determine the specific replacement inventory to have
in stock for back up purposes
CONFIDENTIAL UHL2422 SEM I 2020/2021

Ref. No.
Date 24/12/2020
Page No. 4 of 7

Procedures
CONFIDENTIAL UHL2422 SEM I 2020/2021

Ref. No.
Date 24/12/2020
Page No. 5 of 7
Jenny Loh
(Jenny Loh, Senior Assistant)
Prepared by:
Huda Syakirah
(Wan Nur Huda Syakirah, Senior Assistant)

Reviewed by: Monica St. Cyr, Administrative Assistant

Approved by: Dreg Gorden, Director

(40 marks)

You might also like