Professional Documents
Culture Documents
Bow Shackles
Bow Shackles
Location of Testing : MPCL, SGPC Sil£, :Johdrki Inspection Date September 28, 2022
Client Name : Joint Engineering Services Valid Up to: March 27, 2023
Description of Inspection:
02 BS-11 inch Screw Pin Bow Shackle, Size: 1-3/4 12Ton Satisfactory
03 BS-12 inch Screw Pin Bow Shackle, Size: 1-3/4 12Ton Satisfactory
. ·- ·-
t 04 BS-13 Screw
inch Pii1 Bow Sh.:�kle, Size: 1-�/4 inch 12Ton Satisfactory
Remarks:
e Nona
• Above mentioned items are "SAFE FOR USE" as per manufacturer's guidelines.
Test Statement
The Items mentioned above has gone through Inspection in a prescribed manner against the set parameter mentioned abo n*6f�
� v
per applicable code. At the time of inspection no discrepancy was noted and results found satisfactory. ._, ��
� -if:.\; ��
l 1I;\\
Prepared By Reviewed By Approved . · :.. �����f�i:;'I
v� .
c,'
·.s.q ,,�1'1
rX:
Disclaimer:
"This report does not mnkc any wai tnl'ty, stated or in erred; concerning the subject equipment, furthermore, neither Vclosi nor its employee shall be
Hccotmtable in any manner for uni• personal injury nr property damage or loss of any kind arising from or counectcd with this inspection. The above
reveals our lindings at th.: 1i111c and place or in·pcclion. This report does not relief the Owner/operator from its contractual and regulatory
responsibilities with respect tn int..:grity and safety or its pl.mt during all time of its operations."