Construction Methodology
Construction Methodology
All approach will be as per plan. Designs will duly follow by the construction team.
Surface up for waterproofing will be properly prepare and cleared.
Rough surfaces will be well grinded
Reglet Terminations will be up for chipping
Bitumen Membrane Will be well applied
Surface applied will be flood tested to ensure no leak will arise
PURPOSE
This procedure is designed to provide instructions and to assign responsibilities for
safety control.
SAFETY POLICY
a.) Safety precedes all activities.
b.) It shall be a duty for each person to create the safety environment.
Project Engineer shall take responsibilities for the safety of all activities and promote
the safety consciousness among all workers at every stage of the work. Specifically, he shall
adjust and coordinate construction work in the safest manner based on the detailed work
schedule.
b.) Hand gloves for jobs which have potential for hand injuries, burns, chemical
infections,etc.
c.) Safety belts at heights of over 2.0m above the ground level were properly
constructed working platforms are neither available nor practical.
d.) Welding shield while doing welding works, anti-glare eye protection (safety
goggles while doing gas cutting or any similar activities.
e.) All workers are required to wear face mask and face shield
a.) The following three basic principles shall be applied to and govern the safe use of hand and
power tools, and which principles are :
1. To use the correct tool for the job in the correct way.
2. To use only tools in good conditions
3. To maintain and store tools properly after use.
WARRANTY
- 1 year after work completion
KELVENE SILVA
CIVIL ENGINEER