XN-72, AD-128

SLB Equipment List

8-1/2" LWD QAQC _20/07/2021


Equipment Qty Inspection Type Requirements Comments

1. Visual Body inspection


2. NDT/ Dim. inspection reports review
3. Assembly requirements record reviwe (replaced O-rings and soft seals prior to reassembly)
Resistivity/Neutron/ Density
Ecoscope Tool, Triple 2 4. Connections Makeup (make up the midbody connectons using the torque values) Standard DS-1; tool
Combo service 5. Shock testing report review or witnessing (what applicable) SLB Specification Radioactive
6. Pressure and temperature testing report review or witnessing (what applicable)
7. Any applcable tests (Extender check, if D&I tool - then roll test)
8. Packing

1. Visual Body inspection


2. NDT/ Dim. inspection reports review
3. Assembly requirements record reviwe (replaced O-rings and soft seals prior to reassembly)
4. Connections Makeup (make up the midbody connectons using the torque values) Standard DS-1;
Sonic tool 2 5. Shock testing report review or witnessing (what applicable) SLB Specification -
6. Pressure and temperature testing report review or witnessing (what applicable)
7. Any applcable tests (Extender check, if D&I tool - then roll test)
8. Packing

1. Visual Body inspection


2. NDT/ Dim. inspection reports review
3. Assembly requirements record reviwe (replaced O-rings and soft seals prior to reassembly)
4. Connections Makeup (make up the midbody connectons using the torque values) Standard DS-1;
Support LWD Kits 2-3 -
5. Shock testing report review or witnessing (what applicable) SLB Specification
6. Pressure and temperature testing report review or witnessing (what applicable)
7. Any applcable tests
8. Packing

Safety:
Due to situation of COVID -19 the guidelines are to:
• All field personnel must be vaccinated with a government-approved UAE vaccine.
• PCR test result issued within 48 hours of the site visit.
• Use personal protection: mask, gloves, sanitizer

At rig site:
• Wear the required PPE
• Wear fall protection when working at height
• Do not walk under suspeded loads
• Do not run. Walk and use available handrail

Additional information:

For this operation:


• Pre-shipment QAQC inspection will be condacted at SLB facility.