JEL, XN-72, AD-128

WFT Equipment List

Weatherford
Wellbore Clean Up tools (WBCU) on 24th Aug, 2021

Equipment Offered Actual Serial # QA/QC Requirements Comments


Qty Qty

1. Visual Body inspection.


2. Visual inspection of Pin & Box.
3. Assembly requirements record reviwe (replased O-rings and soft seals and elastomers prior to reassembly)
9-5/8" ClearMAX™ 2 1 1985405 4. Verify sizes & type of tools. Standard DS-1 -
Retriever Filter Tool 5. Connections Makeup (make up the midbody connectons using the torque values). WFT Specification
6. Photograph and document the as-received condition of tools.
7. All applicable functional tests
8.
1. Packing
Visual Body inspection.
2. Visual inspection of Pin & Box. 1985405
3. Assembly requirements record reviwe (replased O-rings and soft seals and elastomers prior to reassembly)
1.
4. Visual Body &
Verify sizes inspection.
type of tools. Standard DS-1
ClearMAX™ MIT Packer 2 1 5708600 2. -
5. Visual inspection
Connections of Pin
Makeup & Box.
(make up the midbody connectons using the torque values). WFT Specification 5708600
3.
6. Assembly
Photograph requirements
and document record
the reviwe (replased
as-received O-rings
condition and soft seals and elastomers prior to reassembly)
of tools.
9-5/8" MAX-Brush™ Tool 2 2 1965895 4. Verify sizes & type of tools.
7. All applicable functional tests Standard DS-1 - 1965895
WFA3298 5.
1. Connections
8. Visual Makeup (make up the midbody connectons using the torque values).
PackingBody inspection. WFT Specification WFA3298
6. Visual
2. Photograph and document
inspection the as-received condition of tools.
of Pin & Box.
1591229 7. Assembly
3. All applicable functional record
requirements tests reviwe (replased O-rings and soft seals and elastomers prior to reassembly)
9-5/8" MAX-Force™ String 1768542 8. Verify
4. Packingsizes & type of tools. Standard DS-1 1591229
4 4 - 1768542
Magnet 2228033 5. Visual
1. Connections Makeup (make up the midbody connectons using the torque values).
Body inspection. WFT Specification
1501033 6. 2228033 -
2. Photograph and document
Visual inspection the as-received condition of tools.
of Pin & Box. 5558605
1501033
7. Assembly
3. All applicable functional record
requirements tests reviwe (replased O-rings and soft seals and elastomers prior to reassembly) upper;
9-5/8" MAX-Blade™ Casing 1947795 8. Verify
4. Packingsizes & type of tools. Standard DS-1 00174667 5558604-
2 2 - 1947795 upper;
-lower;
Scraper SCR9022 5.
1. Connections Makeup (make up the midbody connectons using the torque values).
Visual Body inspection. WFT Specification SCR9022
6. Visual
2. Photograph and document
inspection the as-received condition of tools.
of Pin & Box. 1161727- 5441123 -
#5558605 - upper; 7. Assembly
3. All applicable functional record
requirements tests reviwe (replased O-rings and soft seals and elastomers prior to reassembly) lift sub; lower;
#00174667 - lower; 8.
4. Packing
Verify sizes & type of tools. Standard DS-1 5441118- 4672109-
#1161727 - lift sub; 5. Connections Makeup (make up the midbody connectons using the torque values). WFT Specification - Spaser x- lift sub;
#5441118 - Spaser 6. Photograph and document the as-received condition of tools. over 3240408-
7. All applicable functional tests spaser
7" Tie-Back Mill Assembly 2 2
#5558604 - upper; 8. Packing
#5441123 - lower;
#4672109 - lift sub; 1. Visual Body inspection.
#3240408 - Spaser 2. Visual inspection of Pin & Box.
3. Assembly requirements record reviwe (replased O-rings and soft seals and elastomers prior to reassembly)
7" ClearMAX™ Retriever 1.
4. Visual Body &
Verify sizes inspection.
type of tools. Standard DS-1
Filter Tool 2 1 3375149 2.
5. Visual inspection
Connections of Pin
Makeup & Box.
(make up the midbody connectons using the torque values). WFT Specification -
3375149
3.
6. Assembly
Photograph requirements
and document record
the reviwe (replased
as-received O-rings
condition and soft seals and elastomers prior to reassembly)
of tools.
SIM7008 4. Verify
7. Visual
1. sizes
Body &
All applicable type of tools.
functional
inspection. tests Standard DS-1 SIM7008
7" MAX-Brush™ Tool 2 2 -
1528677 5.
2. Connections
8. Packing Makeup
Visual inspection (make
of Pin & Box.up the midbody connectons using the torque values). WFT Specification 1528677
6. Assembly
3. Photograph and document
requirements the reviwe
record as-received condition
(replased of tools.
O-rings and soft seals and elastomers prior to reassembly)
7" MAX-Force™ String 1476233 7. Verify
4. All applicable functional tests
4 2 8. Visual sizes
1. PackingBody & type of tools.
inspection. Standard DS-1
- 1476233
Magnet 2123024 5.
2. Connections Makeup
Visual inspection (make
of Pin & Box.up the midbody connectons using the torque values). WFT Specification
6. Assembly
Photograph and document the reviwe
as-received condition of tools. 2123024
3. requirements record (replased O-rings and soft seals and elastomers prior to reassembly)
7" MAX-Blade™ Casing 2153626 7.
4. All applicable
Verify sizes functional tests
2 2 1.
8. Visual Body & type of tools.
inspection. Standard DS-1
- 2153626
Scraper 3412538 5. Packing
2. Connections
Visual Makeup
inspection (make
of Pin & Box.up the midbody connectons using the torque values). WFT Specification
6. 3412538
3. Photograph and document
Assembly requirements the reviwe
record as-received condition
(replased of tools.
O-rings and soft seals and elastomers prior to reassembly)
1233344 7.
4. All applicable
Verify sizes & functional tests
type of tools. Standard DS-1
6" OD Watermelon Mill 2 2 8. Connections
Packing - 1233344
254674 5. Makeup (make up the midbody connectons using the torque values). WFT Specification
6. Photograph and document the as-received condition of tools. 254674
Additional information: 7. All applicable functional tests
8. Packing
For this operation:
• JEL has assigned BV to conduct the QA/QC inspection.
• The inspection will be carried out at WFT facility.
• WFT should provide to BV QAQC inspector all requested information.

Safety:

Due to situation of COVID -19 the guidelines are to:


• All field personnel must be vaccinated with a government-approved UAE vaccine.
• PCR test result issued within 48 hours of the site visit.
• Use personal protection: mask, gloves, sanitizer

At rig site / site:


• Wear the required PPE
• Wear fall protection when working at height
• Do not walk under suspeded loads
• Do not run. Walk and use available handrail

Schlumberger-Private
#