B GEOTECH PAYMENT = 1500000 INR C LAB TEST PAYMENT = 400000 INR D ADVANCE = PROOF = 100000 INR SAFETY = 100000 INR PNP = 48000 INR GEOMETRIC DESIGN = 15000 INR PAVEMET DESIGN = 20000 INR DESIGN OF DRAINAGE = 20000 INR DESIGN OF ALL CULVERT = 100000 INR DESIGN OF ALL MINOR BRIDGES = 45000 INR DESIGN OF ALL BRIDGES = 60000 INR PROJECT MAAGEMENT = 30000 INR QAP = 20000 INR ESTIMATION OF BILL OF QUANTITY = 20000 INR CONSTRUCTION METHODOLOGY = 20000 INR AS BUILT DRAWINGS = 20000 INR EOT PROPOSALS = 10000 INR SITE VISIT ATTENDING MEETINGS = 20000 INR SAFETY AUDIT REPORT = 50000 INR DOCUMENTATION = 20000 INR = 718000 INR E TOTAL BILLED AMOUNT = 3218000 INR F SITE VISTS /MISCELANIOUS AMOUNT HOTEL /TRAVEL = 54039 INR G TOTAL BILLED AMOUNT +GST 18% = 3861006 INR
PAYMENT ITEMS CLAIMED UNDER INVOICE -4 : DATA SHEET
E INTERMEDIATE PROOF = 100000 INR F INTERMEDIATE SAFETY = 100000 INR G DRAFT PNP SUBMISSION = 288000 INR H DRAFT DESIGN OF CULVERTS = 100000 INR 4 TH INVOICED AMOUNT = 588000 INR I Total Billed Amount Till Date = 3806000 INR J SITE VISTS /MISCELANIOUS AMOUNT HOTEL /TRAVEL = 54039 INR K TOTAL BILLED AMOUNT +GST 18%-TDS 4168842 INR L PAYMENT CREDIT TILL 3RD INVOICE = 4200000 INR
PAYMENT ITEMS CLAIMED UNDER INVOICE -5 : DATA SHEET
M GEOMETRIC DESIGN OF ROADS = 135000 INR N DESIGN OF DRAINAGE = 180000 INR O FINAL PNP SUBMISSION = 144000 INR P FINAL DESIGN OF CULVERTS = 100000 INR 5 TH INVOICED AMOUNT = 559000 INR