Professional Documents
Culture Documents
Greetings of Peace!
As we will be going to start a limited face-to-face learning modality for this upcoming School Year 2022-2023
and respond to the mandated physical required facilities for face to face classes set by DepEd and
Department of Health, subject, “Guidelines on the Implementation of Face-to-Face Learning Modality (JMC
No.1, series of 2021 dated September 27, 2021, I would like to brief you on the present infrastructure
condition of the classrooms located at Main, ASEAN and Millenium Building only, that will be utilized by our
students and teachers in the conduct of the said modality.
At the present moment, we have some broken windows and floor tiles that needs repair or replacement.
Below are the specifics:
Therefore, overall quantity of the tiles size 30 x 30 is 20 pcs. that will be replaced and 6 window glass. 1
Ceiling Fan to be repair and 1 Ceiling fan to be bought and 2 bulbs to be bought. Thank you very much for
your attention.
CC: Cashier Office, Office of the President, VP for Finance, Office of the Assistant Principal