Document Number: -

Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS

Effectivity Date: June 29, 2018 Review Date: June 29, 2019

BASIC PROJECT REQUIREMENTS


A. CHECKLIST  Study Section
B. PLANNING GUIDELINE
REQUIREMENTS
 Vicinity Map EFFICIENCY:
 Existing Site Conditions  Building Efficiency: atleast 50%
 Exterior Perspectives  Typical Office Floor: atleast 80%
 Floor Plans
 Design Feature
 Summary of Areas
 Animation/ Walkthrough
ADDITIONAL REQUIREMENTS
(As need arises)
 Project Description
 Title and Logo Options
 Design Highlights
 Material Specifications
 Elevator Traffic Study
 Building Laws and City Ordinances
 Flood Level Study
 3 km. & 5 km. Radius
 Perspectives
 Interior Perspectives
 Spot Perspectives
 Color Preferences
Computations
 Floor Area Ratio
 Architect's Budgetary Estimates
 Market Value/ Rentable Cost
 Cost Analysis
 Parking Requirements
 Unit Tabulation
 Pre-sale Feasibility Study
 Elevations

Prepared by / Date: Reviewed by / Date: Approved by / Date:

Rovi Niña D. Mariñas Ava Joanne M. Gonzales Jose Siao Ling


Design Architect Senior Architect Principal Architect
Document Number: -
Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS

Effectivity Date: June 29, 2018 Review Date: June 29, 2019

Prepared by / Date: Reviewed by / Date: Approved by / Date:

Rovi Niña D. Mariñas Ava Joanne M. Gonzales Jose Siao Ling


Design Architect Senior Architect Principal Architect
Document Number: -
Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS

Effectivity Date: June 29, 2018 Review Date: June 29, 2019

OFFICE BUILDINGS
A. CHECKLIST
REQUIREMENTS
 Design Highlights
 Material Specifications
 Elevator Traffic Study
 Building Laws and City Ordinances
 Vicinity Map
 Existing Site Conditions
 Exterior Perspectives
 Floor Plans
 Design Feature
 Computations
 Floor Area Ratio
 Architect's Budgetary Estimates
 Rentable Cost
 Cost Analysis
 Animation/ Walkthrough

ADDITIONAL REQUIREMENTS
(As need arises)
 Project Description
 Flood Level Study
 Perspectives
 Interior Perspectives
 Spot Perspectives
 Color Preferences
 Facade Options
 Elevations
 Study Section

Prepared by / Date: Reviewed by / Date: Approved by / Date:

Rovi Niña D. Mariñas Ava Joanne M. Gonzales Jose Siao Ling


Design Architect Senior Architect Principal Architect
Document Number: -
Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS

Effectivity Date: June 29, 2018 Review Date: June 29, 2019

Prepared by / Date: Reviewed by / Date: Approved by / Date:

Rovi Niña D. Mariñas Ava Joanne M. Gonzales Jose Siao Ling


Design Architect Senior Architect Principal Architect
Document Number: -
Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS

Effectivity Date: June 29, 2018 Review Date: June 29, 2019

B.

OFFICE BUILDINGS
 Primary Metering Room
C. PLANNING GUIDELINE  HVSG/LVSG
 Genset Room with Day Tank
EFFICIENCY:  Garbage Room
 Building Efficiency: atleast 50%  Administration Office
 Typical Office Floor: atleast 80%  Security Room
 Typical Parking: maximum of 40sm/slot  Access to STP
(floorplate of 1,500sm and above)  Location of STP (Underground)
 Maximum of 45sm/slot (floorplate of  Pump Room
1,500sm and below)  Location of Cistern (Underground)
 Rentable Income: atleast 10-12%  Telco Rooms (approx.. 3-4 rooms)
 Pipe Chases for Utilities
COLUMN SPAN:  Fireman’s Lift
 Ranges from 10.00m. – 13.00m. for
conventional type THINGS TO REMEMBER:
 Elevator Traffic Analysis should be
TYPICAL FLOOR TO FLOOR HEIGHT: facilitated by Project In-charge
 Ground – 5.00m.-6.00m.  Wet pipes (WP) should be indicated on
 Regular Parking – 3.60m.-4.00m. leasable areas for provisions
 Mechanical Parking
o Sedan/ Sedan – 4.00m.
o Sedan/ SUV – 4.20m.
o SUV/ SUV – 5.20m.
 Office – 3.60m.-4.00m.
 Last Office Floor – Addt’l .20m.

RAMP SLOPE:
 Ideal – less than 16% slope
 Maximum – not more than 18% slope

UTILITIES:
 Transformer Vault

Prepared by / Date: Reviewed by / Date: Approved by / Date:

Rovi Niña D. Mariñas Ava Joanne M. Gonzales Jose Siao Ling


Design Architect Senior Architect Principal Architect
Document Number: -
Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS

Effectivity Date: June 29, 2018 Review Date: June 29, 2019

CONDOMINIUM BUILDINGS
A. CHECKLIST  Design Highlights
 Material Specifications
REQUIREMENTS
 Elevator Traffic Study
 Building Laws and City Ordinances
 Flood Level Study
 Vicinity Map
 Site Development Plan
 Existing Site Conditions
 Perspectives
 Perspectives
 Interior Perspectives
 Floor Plans
 Spot Perspectives
 Blow-up Plans/ Flexibility Plans
 Color Preferences
 Design Feature
 Summary of Areas
 Computations
 Elevations
 Floor Area Ratio
 Study Section
 Architect's Budgetary Estimates
 Market Value
 Cost Analysis
 Parking Requirements
 Unit Tabulation
 Pre-sale Feasibility Study
 Animation/ Walkthrough

ADDITIONAL REQUIREMENTS
(As need arises)
 Project Description
 Title and Logo Options

Prepared by / Date: Reviewed by / Date: Approved by / Date:

Rovi Niña D. Mariñas Ava Joanne M. Gonzales Jose Siao Ling


Design Architect Senior Architect Principal Architect
Document Number: -
Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS

Effectivity Date: June 29, 2018 Review Date: June 29, 2019

CONDOMINIUM BUILDINGS
B. PLANNING GUIDELINE

EFFICIENCY: UTILITIES:
 Building Efficiency: atleast 50%  Transformer Vault
 Typical Office Floor: atleast 70%  Primary Metering Room
 Typical Parking: maximum of 40sm/slot  HVSG/LVSG
(floorplate of 1,500sm and above)  Genset Room with Day Tank
 Maximum of 45sm/slot (floorplate of  Garbage Room
1,500sm and below)  Administration Office
 Rentable Income: atleast 40%  Security Room
 Access to STP
COLUMN SPAN:  Location of STP (Underground)
 Ranges from 8.00m. – 12.00m. for  Pump Room
conventional type  Location of Cistern (Underground)
 Telco Rooms (approx. 3-4 rooms)
TYPICAL FLOOR TO FLOOR HEIGHT:  Pipe Chases for Utilities
 Ground – 4.00m.-6.00m.  Fireman’s Lift
 Parking – 3.60m.-4.00m.  BOH
 Residential – 3.20m.-3.60m.
THINGS TO REMEMBER:
RAMP SLOPE:  Elevator Traffic Analysis should be
 Ideal – less than 16% slope facilitated by Project In-charge
 Maximum – not more than 18% slope

Prepared by / Date: Reviewed by / Date: Approved by / Date:

Rovi Niña D. Mariñas Ava Joanne M. Gonzales Jose Siao Ling


Design Architect Senior Architect Principal Architect
Document Number: -
Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS

Effectivity Date: June 29, 2018 Review Date: June 29, 2019

Prepared by / Date: Reviewed by / Date: Approved by / Date:

Rovi Niña D. Mariñas Ava Joanne M. Gonzales Jose Siao Ling


Design Architect Senior Architect Principal Architect