Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS
Effectivity Date: June 29, 2018 Review Date: June 29, 2019
Effectivity Date: June 29, 2018 Review Date: June 29, 2019
Effectivity Date: June 29, 2018 Review Date: June 29, 2019
OFFICE BUILDINGS
A. CHECKLIST
REQUIREMENTS
Design Highlights
Material Specifications
Elevator Traffic Study
Building Laws and City Ordinances
Vicinity Map
Existing Site Conditions
Exterior Perspectives
Floor Plans
Design Feature
Computations
Floor Area Ratio
Architect's Budgetary Estimates
Rentable Cost
Cost Analysis
Animation/ Walkthrough
ADDITIONAL REQUIREMENTS
(As need arises)
Project Description
Flood Level Study
Perspectives
Interior Perspectives
Spot Perspectives
Color Preferences
Facade Options
Elevations
Study Section
Effectivity Date: June 29, 2018 Review Date: June 29, 2019
Effectivity Date: June 29, 2018 Review Date: June 29, 2019
B.
OFFICE BUILDINGS
Primary Metering Room
C. PLANNING GUIDELINE HVSG/LVSG
Genset Room with Day Tank
EFFICIENCY: Garbage Room
Building Efficiency: atleast 50% Administration Office
Typical Office Floor: atleast 80% Security Room
Typical Parking: maximum of 40sm/slot Access to STP
(floorplate of 1,500sm and above) Location of STP (Underground)
Maximum of 45sm/slot (floorplate of Pump Room
1,500sm and below) Location of Cistern (Underground)
Rentable Income: atleast 10-12% Telco Rooms (approx.. 3-4 rooms)
Pipe Chases for Utilities
COLUMN SPAN: Fireman’s Lift
Ranges from 10.00m. – 13.00m. for
conventional type THINGS TO REMEMBER:
Elevator Traffic Analysis should be
TYPICAL FLOOR TO FLOOR HEIGHT: facilitated by Project In-charge
Ground – 5.00m.-6.00m. Wet pipes (WP) should be indicated on
Regular Parking – 3.60m.-4.00m. leasable areas for provisions
Mechanical Parking
o Sedan/ Sedan – 4.00m.
o Sedan/ SUV – 4.20m.
o SUV/ SUV – 5.20m.
Office – 3.60m.-4.00m.
Last Office Floor – Addt’l .20m.
RAMP SLOPE:
Ideal – less than 16% slope
Maximum – not more than 18% slope
UTILITIES:
Transformer Vault
Effectivity Date: June 29, 2018 Review Date: June 29, 2019
CONDOMINIUM BUILDINGS
A. CHECKLIST Design Highlights
Material Specifications
REQUIREMENTS
Elevator Traffic Study
Building Laws and City Ordinances
Flood Level Study
Vicinity Map
Site Development Plan
Existing Site Conditions
Perspectives
Perspectives
Interior Perspectives
Floor Plans
Spot Perspectives
Blow-up Plans/ Flexibility Plans
Color Preferences
Design Feature
Summary of Areas
Computations
Elevations
Floor Area Ratio
Study Section
Architect's Budgetary Estimates
Market Value
Cost Analysis
Parking Requirements
Unit Tabulation
Pre-sale Feasibility Study
Animation/ Walkthrough
ADDITIONAL REQUIREMENTS
(As need arises)
Project Description
Title and Logo Options
Effectivity Date: June 29, 2018 Review Date: June 29, 2019
CONDOMINIUM BUILDINGS
B. PLANNING GUIDELINE
EFFICIENCY: UTILITIES:
Building Efficiency: atleast 50% Transformer Vault
Typical Office Floor: atleast 70% Primary Metering Room
Typical Parking: maximum of 40sm/slot HVSG/LVSG
(floorplate of 1,500sm and above) Genset Room with Day Tank
Maximum of 45sm/slot (floorplate of Garbage Room
1,500sm and below) Administration Office
Rentable Income: atleast 40% Security Room
Access to STP
COLUMN SPAN: Location of STP (Underground)
Ranges from 8.00m. – 12.00m. for Pump Room
conventional type Location of Cistern (Underground)
Telco Rooms (approx. 3-4 rooms)
TYPICAL FLOOR TO FLOOR HEIGHT: Pipe Chases for Utilities
Ground – 4.00m.-6.00m. Fireman’s Lift
Parking – 3.60m.-4.00m. BOH
Residential – 3.20m.-3.60m.
THINGS TO REMEMBER:
RAMP SLOPE: Elevator Traffic Analysis should be
Ideal – less than 16% slope facilitated by Project In-charge
Maximum – not more than 18% slope
Effectivity Date: June 29, 2018 Review Date: June 29, 2019