GENERAL REQUIREMENTS

Effectivity Date: June 29, 2018 Review Date: June 29, 2019

HOTEL BUILDINGS
A. CHECKLIST
REQUIREMENTS
 Building Laws and Local Ordinances ADDITIONAL REQUIREMENTS
 Vicinity Map (As need arises)
 Existing Site Conditions  Project Description
 Perspectives  Title and Logo Options
 Floor Plans  Design Highlights
 Design Feature  Material Specifications
 Computations  Elevator Traffic Study
 Floor Area Ratio  Flood Level Study
 Architect's Budgetary Estimates  Site Development Plan
 Market Value  Perspectives
 Cost Analysis  Interior Perspectives
 Parking Requirements  Spot Perspectives
 Unit Tabulation  Color Preferences
 Pre-sale Feasibility Study  Summary of Areas
 Animation/ Walkthrough  Elevations
 Study Section

Prepared by / Date: Reviewed by / Date: Approved by / Date:

James Paul T. Uy Joshua G. Ramos Jose Siao Ling


Architect Senior Architect Principal Architect
Document Number: -
Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS

Effectivity Date: June 29, 2018 Review Date: June 29, 2019

B. PLANNING GUIDELINE SUPPORT FACILITIES NEEDED TO


LOCATE:
EFFICIENCY:  Reception/Concierge
 Building Efficiency: atleast 50%  Luggage Room/Security Deposit
 Typical Hotel Floor: atleast 70%  Admin/HR
 Typical Parking: maximum of 40sm/slot  Engineering Office
(floorplate of 1,500sm and above)
 BOH
 Maximum of 45sm/slot (floorplate of
 Housekeeping
1,500sm and below)
 Staff Quarters
 Rentable Income: atleast 40%
 Pantry
 Linen Room
COLUMN SPAN:
 BOH with slop sink / Floor
 Ranges from 8.00m. – 12.00m. for
conventional type  Transformer Vault
 Primary Metering Room
TYPICAL FLOOR TO FLOOR HEIGHT:  HVSG/LVSG
 Ground – 4.00m.-6.00m.  Genset Room with Day Tank
 Parking – 3.60m.-4.00m.  Garbage Room
 Hotel – 3.20m.-3.60m.  Access to STP
 Location of STP (Underground)
RAMP SLOPE:  Pump Room
 Ideal – less than 16% slope  Location of Cistern (Underground)
 Maximum – not more than 18% slope  Telco Rooms (approx.. 3-4 rooms)
 Parking ramp - 5% - 8% slope  Pipe Chases for Utilities
 Fireman’s Lift

THINGS TO REMEMBER:
 Elevator Traffic Analysis should be
facilitated by Project In-charge
 Hotel 101
 Window Type AC

Prepared by / Date: Reviewed by / Date: Approved by / Date:

James Paul T. Uy Joshua G. Ramos Jose Siao Ling


Architect Senior Architect Principal Architect
Document Number: -
Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS

Effectivity Date: June 29, 2018 Review Date: June 29, 2019

 21.00sqm./Hotel Units o (4 star rating – w/ Balcony)


o (3star rating – w/o balcony)
 25.00sqm./Hotel Units (4 star)

Prepared by / Date: Reviewed by / Date: Approved by / Date:

James Paul T. Uy Joshua G. Ramos Jose Siao Ling


Architect Senior Architect Principal Architect