Revision Number: 00
Document Type: GUIDELINE
Title:
GENERAL REQUIREMENTS
Effectivity Date: June 29, 2018 Review Date: June 29, 2019
HOTEL BUILDINGS
A. CHECKLIST
REQUIREMENTS
Building Laws and Local Ordinances ADDITIONAL REQUIREMENTS
Vicinity Map (As need arises)
Existing Site Conditions Project Description
Perspectives Title and Logo Options
Floor Plans Design Highlights
Design Feature Material Specifications
Computations Elevator Traffic Study
Floor Area Ratio Flood Level Study
Architect's Budgetary Estimates Site Development Plan
Market Value Perspectives
Cost Analysis Interior Perspectives
Parking Requirements Spot Perspectives
Unit Tabulation Color Preferences
Pre-sale Feasibility Study Summary of Areas
Animation/ Walkthrough Elevations
Study Section
Effectivity Date: June 29, 2018 Review Date: June 29, 2019
THINGS TO REMEMBER:
Elevator Traffic Analysis should be
facilitated by Project In-charge
Hotel 101
Window Type AC
Effectivity Date: June 29, 2018 Review Date: June 29, 2019