1.0 Objective
To outline the method statements by which the site clearing is carried out. This work
method statement covers the clearing works at Menaiktaraf Jalan FT060 Jalan Damar
Laut-Changkat Jering, Perak Darul Ridzuan (Pakej 1).
2.0 Scope
This method statement shall apply for site clearing work in Ch 0.00 to Ch 10400.00
left and right hand side direction as per bill of quantities where it require to cut and
uprooting the trees, clearing of bushes and cut the trees on the slope area.
3.0 References
i. Safety Officer/Supervisor
ii. Site Engineer
iii. Site Supervisor
4.0 Definitions
- NIL
5.0 Responsibilities
i. Safety Officer/Supervisor
ii. Site Engineer
iii. Site Supervisor
6.0 Materials
- NIL
Page 1
MEGA SASA sdn.
bhd. METHOD STATEMENT FOR SITE CLEARING
570332 – U Revision :
Effective Date : 2016 - 2018
Doc. No : MSSB/MS/DLP1/003
MENAIKTARAF JALAN FT60 JALAN DAMAR LAUT-CHANGKAT JERING, PERAK DARUL
RIDZUAN (PAKEJ 1).
- Nil
i. Excavators
ii. Lorries
iii. Chainsaw
10.0 Methodology
ii. Shrubs, bushes and trees are cleared using excavators and other approved
machineries.
iii. All the cleared trees and shrubs are piled and placed at convenient places.
iv. The cleared trees and shrubs are then loaded on to lorry and disposed at
approved disposal site. Maintain records of disposal records at relevant
inspection checklist.
v. Submit Request for Inspection Form for joint inspection and record joint
measurement with client / client’s representative in Surveying Record Book.
Page 1
MEGA SASA sdn.
bhd. METHOD STATEMENT FOR SITE CLEARING
570332 – U Revision :
Effective Date : 2016 - 2018
Doc. No : MSSB/MS/DLP1/003
MENAIKTARAF JALAN FT60 JALAN DAMAR LAUT-CHANGKAT JERING, PERAK DARUL
RIDZUAN (PAKEJ 1).
The construction team shall maintain all existing site excess, roads,
service drain, etc. and reinstate any damage caused by any reason
whatsoever during the progress of the works.
It will be the Safety Officer/Supervisor’s responsibility to ensure that
ingress and egress to the site are kept free from obstruction brought
about by the work on this site and in no way shall cause hindrance to
traffic or ancillary works either by his own vehicles or by his work people,
material, etc.
Page 1
MEGA SASA sdn.
bhd. METHOD STATEMENT FOR SITE CLEARING
570332 – U Revision :
Effective Date : 2016 - 2018
Doc. No : MSSB/MS/DLP1/003
MENAIKTARAF JALAN FT60 JALAN DAMAR LAUT-CHANGKAT JERING, PERAK DARUL
RIDZUAN (PAKEJ 1).
The access as well as the portion of public road and access connected
with it shall be kept clean and safe at all time.
As the slope area will not be disturbed, the existing turf or grown grass
shall be remain and only manually cut the grown trees without uprooting
it. Plastic sheet /canvas will be provided on site on standby basis in order
to be used as slope protection if necessary.
Any effluent discharges from the site must comply with the Third Schedule
of the Environmental Quality (Sewage and Industrial Effluents) Regulation
1979.
Any construction wastes, solid wastes and domestic wastes other than
schedule wastes must be disposed off at the approved disposal site. On
site compositing for biodegradable waste is allowable but land filling and
open burning activities for the solid waste are strictly prohibited.
Page 1
MEGA SASA sdn.
bhd. METHOD STATEMENT FOR SITE CLEARING
570332 – U Revision :
Effective Date : 2016 - 2018
Doc. No : MSSB/MS/DLP1/003
MENAIKTARAF JALAN FT60 JALAN DAMAR LAUT-CHANGKAT JERING, PERAK DARUL
RIDZUAN (PAKEJ 1).
Page 1