MEGA SASA sdn.

bhd. METHOD STATEMENT FOR SITE CLEARING


570332 – U Revision :
Effective Date : 2016 - 2018
Doc. No : MSSB/MS/DLP1/003
MENAIKTARAF JALAN FT60 JALAN DAMAR LAUT-CHANGKAT JERING, PERAK DARUL
RIDZUAN (PAKEJ 1).

1.0 Objective

To outline the method statements by which the site clearing is carried out. This work
method statement covers the clearing works at Menaiktaraf Jalan FT060 Jalan Damar
Laut-Changkat Jering, Perak Darul Ridzuan (Pakej 1).

2.0 Scope

This method statement shall apply for site clearing work in Ch 0.00 to Ch 10400.00
left and right hand side direction as per bill of quantities where it require to cut and
uprooting the trees, clearing of bushes and cut the trees on the slope area.

3.0 References

i. Safety Officer/Supervisor
ii. Site Engineer
iii. Site Supervisor

4.0 Definitions
- NIL

5.0 Responsibilities

i. Safety Officer/Supervisor
ii. Site Engineer
iii. Site Supervisor

6.0 Materials

- NIL

Page 1
MEGA SASA sdn.
bhd. METHOD STATEMENT FOR SITE CLEARING
570332 – U Revision :
Effective Date : 2016 - 2018
Doc. No : MSSB/MS/DLP1/003
MENAIKTARAF JALAN FT60 JALAN DAMAR LAUT-CHANGKAT JERING, PERAK DARUL
RIDZUAN (PAKEJ 1).

7.0 Handling And Storage Of Materials

- Nil

8.0 Plant, Machinery And Equipment

i. Excavators
ii. Lorries
iii. Chainsaw

9.0 Preparatory Works

i. Obtain relevant approved construction drawings from client / client’s


representative.
ii. The site will be visited in order to acquaint nature, extent and practicality of
the site clearing and temporary works. Surveyor shall take the existing ground
and formation levels as required are correct.
iii. Set out the location, centre line, right of way and limits of works to minimize
exposed areas and prevent additional clearing.

10.0 Methodology

i. Where necessary, prepare access to the area to be cleared.

ii. Shrubs, bushes and trees are cleared using excavators and other approved
machineries.

iii. All the cleared trees and shrubs are piled and placed at convenient places.

iv. The cleared trees and shrubs are then loaded on to lorry and disposed at
approved disposal site. Maintain records of disposal records at relevant
inspection checklist.

v. Submit Request for Inspection Form for joint inspection and record joint
measurement with client / client’s representative in Surveying Record Book.

Page 1
MEGA SASA sdn.
bhd. METHOD STATEMENT FOR SITE CLEARING
570332 – U Revision :
Effective Date : 2016 - 2018
Doc. No : MSSB/MS/DLP1/003
MENAIKTARAF JALAN FT60 JALAN DAMAR LAUT-CHANGKAT JERING, PERAK DARUL
RIDZUAN (PAKEJ 1).

vi. On completion of joint inspection, request client / client’s representative to


sign on the Request for Inspection Form and file as per Project Filing Index.

vii. Carry out computation and submit for claim.

11.0 Traffic Management And Monitoring

i. Maintenance of Existing Road and Service Drains, etc.

 The construction team shall maintain all existing site excess, roads,
service drain, etc. and reinstate any damage caused by any reason
whatsoever during the progress of the works.
 It will be the Safety Officer/Supervisor’s responsibility to ensure that
ingress and egress to the site are kept free from obstruction brought
about by the work on this site and in no way shall cause hindrance to
traffic or ancillary works either by his own vehicles or by his work people,
material, etc.

12.0 Safety Programme

i. Temporary Works and Public Safety

 The Safety Officer/Supervisor shall be responsible for submission of plans


and drawings to the relevant Authorities for the construction of all the
necessary temporary drains and desilting pits, safety tools for the works.
 The Safety Officer/Supervisor shall provide adequate signboards at all
strategic positions warning the public to keep away from the work site and
erect temporary hoarding and barriers where necessary around the site to
prevent unauthorized trespassing during works.

13.0 Environmental Programme

i. All works should be carried out in accordance to best practice environmental


management as defined in the EMP for the Menaiktaraf Jalan FT060 Jalan
Damar Laut-Changkat Jering, Perak Darul Ridzuan.

ii. Site Access

Page 1
MEGA SASA sdn.
bhd. METHOD STATEMENT FOR SITE CLEARING
570332 – U Revision :
Effective Date : 2016 - 2018
Doc. No : MSSB/MS/DLP1/003
MENAIKTARAF JALAN FT60 JALAN DAMAR LAUT-CHANGKAT JERING, PERAK DARUL
RIDZUAN (PAKEJ 1).

 The access as well as the portion of public road and access connected
with it shall be kept clean and safe at all time.

iii. Temporary Work

 Existing drain shall be identified by contractor together with the flow of


drain until discharge point in order to make use of it during clearing work.
Silt trap shall be provided before any discharge of surface water within
site towards existing drain. This work should be completed prior to the
commencement of any site clearing activities.

 Temporary earth drain shall be constructed along clearing area to retain


the surface water from dismissal directly towards existing drain. Desilting
work shall be carried out regularly and the existing drain will be
maintained during site clearing work.

 As the slope area will not be disturbed, the existing turf or grown grass
shall be remain and only manually cut the grown trees without uprooting
it. Plastic sheet /canvas will be provided on site on standby basis in order
to be used as slope protection if necessary.

 Any effluent discharges from the site must comply with the Third Schedule
of the Environmental Quality (Sewage and Industrial Effluents) Regulation
1979.

iv. Waste Management

 Any construction wastes, solid wastes and domestic wastes other than
schedule wastes must be disposed off at the approved disposal site. On
site compositing for biodegradable waste is allowable but land filling and
open burning activities for the solid waste are strictly prohibited.

Page 1
MEGA SASA sdn.
bhd. METHOD STATEMENT FOR SITE CLEARING
570332 – U Revision :
Effective Date : 2016 - 2018
Doc. No : MSSB/MS/DLP1/003
MENAIKTARAF JALAN FT60 JALAN DAMAR LAUT-CHANGKAT JERING, PERAK DARUL
RIDZUAN (PAKEJ 1).

Page 1