You are on page 1of 32

ESD Daily Check Sheet for oppo

Project Line Date

Result
Check Check
NO Check the contents ( Ok or Not Remarks
method frequency Ok )

Check the main ground connection loose or not ,is it


1 firmly fixed? Whether it is directly connected to the Visual 1 Time / day
main / sub-ground wire.

Check the plant equipment grounding periodically


2 inspected? Inspection table has got or not the Visual 1 Time / day
grounding requirements? Is it recorded ?

Ensure the all workstation surface to be covered with an


3 electrostatic mat? Workstation ESD mat has grounding Visual 1 Time / day
or not?

4 Ensure the ESD trolley grounding . Visual 1 Time / day

Ensure the all employees are wearing the static Wrist


5 Visual 1 Time / day
Strap while handling the senstive materials.

Ensure all operator are wear the Static Wrist Strap


6 correctly, Knob touch with the skin?Is it loose? Is it Visual 1 Time / day
properly wear or not?

Check the electrostatic Wrist strap grounded correctly?


7 Visual 1 Time / day
Is there a series grounding or not?

Combo
8 Check the ESD Wrist strap breakover or not? 1 Time / day
Tester

Does the operator have to wear ESD garments ,


9 Visual 1 Time / day
slipper,cap ? Does it meet the requirements?

ESD Workstation surface has unnecessary things pasted


10 Visual 1 Time / day
or drawn?

check the all employees are handling the senstivity


11 materials that time wearing ESD finger cats /glove or Visual 1 Time / day
nots?

Ensure ESD finger gloves wear as per as the SOP


12 Visual 1 Time / day
requirements?

Is the ion fan on? used correctly? Aligned with the


13 Visual 1 Time / day
operating area?

14 Charging article can not touch sensitive materials? Visual 1 Time / day

15 Ensure the ESD slipper washed &keep clean or not? Visual 1 Time / day

Check the all employee ESD slipper whether it is Combo 1 Time /


16
qualified or not? Tester 2 day

Ensure the temperature and humidity checked in


17 Visual 1 Time / day
production line ? there are maintain record or not ?

Ensure the Temperature and humidity meet the


18 Visual 1 Time / day
requirements?

Approved By Prepared By

MAPQA-014-20A

You might also like