You are on page 1of 4

Site Test Report

Contract No. – N-6166.1


New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108115629
Contractor: CSE Equipment: 7SJ621 MV OVolt
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F590
Substation: 132/11 kV SS at ADNEC Page: 1 of 4

Inspection, Testing and Secondary Injection of


Overvoltage Protection Relay 7SJ621
A - General Data:
Ordered MLFB: 7SJ6211-5EB90-1FE0 --0S Serial no.: BF1108115629

Built-in MLFB: 7SJ6211-5EB90-1FE0 --0S Firmware version: V4.81

Built-in rated auxiliary voltage (DC): 110 -250 VDC Feeder : E05 - Transformer T202

Built-in rated voltage VN: 110V Software used: Digsi 4 V4.84

Built-in rated current IN: 1A Frequency: 50 HZ

Relay Designation : -F590 Overvoltage Protection

B - General Inspection & Testing:

S NO General inspection & testing: Checked

1 Visual inspection of unit OK

2 Installation & wiring correct to relevant drawings OK

3 Relay case connected to local earth bar OK

4 Measured value check OK

5 Relay Binary inputs and outputs checked OK

6 Watch dog contact checked OK

7 Injection of voltage from terminal block with test plug OK

C- Configuration of protection function

Functions
Enabled Disabled
IEC No. Description

Description 59 OVER VOLTAGE PROTECTION Enabled -

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name
Date 23.08.2012 Date 23.08.2012 Date
CSE ENERGO CONSULT TRANSCO
\641617138.doc
Site Test Report
Contract No. – N-6166.1
New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108115629
Contractor: CSE Equipment: 7SJ621 MV OVolt
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F590
Substation: 132/11 kV SS at ADNEC Page: 2 of 4

D - Binary input function check

Bin. input Function Terminal Terminal Drawing Checked Remarks


(+)-X331:3
Relay Page No.
(-)-X331:16
BI 1 Test Mode F14-F16 -X331:28 /MAA1.6 Test plug inserted
BI 2 Spare F15-F16 -X331:29 /MAA1.6
BI 3 Spare F17-F18 - ZA2.1
BI 4 Protection Blocked R9-R7 -X331:30 /MAA1.6 Key switch - "OUT"
BI 5 Spare R10-R7 -X331:31 /MAA1.7
BI 6 Spare R11-R13 -X331:33 /MAA1.8
BI 7 Spare R12-R13 -X331:34 /MAA1.8
BI 8 Spare R8-R7 -X331:32 /MAA1.7

E - Binary output check

Output Function Terminal Drawing Checked Remarks


Relay TB Page No.
BO1 OV Trip F6-F7 X805:26-27 REA1.1 not used
BO2 OV Trip F8-F9 X805:28-29 REA1.2 not used
BO3 OV Trip F10-F11 X805:30-31 REA1.2 not used
BO4 OV Trip F12-F13 - RAA2.5 Cubicle alarm
BO5 OV Trip R1-R3 X805:32-33 REA1.2 not used
BO6 Spare R2-R3 X805:32-34 REA1.3 not used
BO7 OV Trip R4-R5 X805:35-36 REA1.3 not used
BO8 Pick-up R6-R5 X805:35-37 REA1.3 for testing only
Live Cont. F3-F4-F5 - RAA2.4 Cubicle alarm

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name
Date 23.08.2012 Date 23.08.2012 Date
CSE ENERGO CONSULT TRANSCO
\641617138.doc
Site Test Report
Contract No. – N-6166.1
New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108115629
Contractor: CSE Equipment: 7SJ621 MV OVolt
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F590
Substation: 132/11 kV SS at ADNEC Page: 3 of 4

F - LED function

S no Led no Function Checked Remarks


1 LED 1 Trip / relay trip
2 LED 2 Pickup / relay pickup
3 LED 3 U> Trip / 59.1
4 LED 4 U>> Trip / 59.2
5 LED 5 Spare /not used
6 LED 6 Protection blocked / Key switch - "OUT"
7 LED 7 Summary Alarm / summary alarm event

1. MEASURED VALUE TEST:

Inject voltage in the relay as per the table below. Observe the reading on the relay display, in secondary values and in
Primary values. Inject voltage through the test switch X590
VT Ratio : 11:3/011:3 kV

Phase Voltage Primary Voltage read on the relay Display


Applied applied IN KV
(Volts) UL1E UL2E UL3E UL12 UL23 UL31
R-E 63.51 6.3 0.0 0.0 6.3 0.0 6.3
Y-E 63.51 0.0 6.3 0.0 6.3 6.3 0.0
B-E 63.51 0.0 0.0 6.3 0.0 6.3 6.3
R-Y-B 110 6.3 6.3 6.3 11.0 11.0 11.0

Voltage Secondary Voltage read on the relay Display


Phase IN Volts
applied
Applied
(Volts)
UL1E UL2E UL3E UL12 UL23 UL31
R-E 63.51 63 0 0 63 0 63
Y-E 63.51 0 63 0 63 63 0
B-E 63.51 0 0 63 0 63 63
R-Y-B 110 63 63 63 110 110 110

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name
Date 23.08.2012 Date 23.08.2012 Date
CSE ENERGO CONSULT TRANSCO
\641617138.doc
Site Test Report
Contract No. – N-6166.1
New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108115629
Contractor: CSE Equipment: 7SJ621 MV OVolt
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F590
Substation: 132/11 kV SS at ADNEC Page: 4 of 4

2.1 Over Voltage function(DMT):59-1


Pick up
Relay setting Drop off
Test phase Voltage Time setting (Sec) Operating time (Sec)
U> (V) Voltage (V)
(V)
R-Y 120 * * 3.0 *

Y-B 120 * * 3.0 *

R-B 120 * * 3.0 *

RYB 120 * * 3.0 *

* Note: Refer attached OMICRON Print out for Test results

2.2 Over Voltage function(DMT):59-2

Pick up
Relay setting Drop off
Test phase Voltage Time setting (Sec) Operating time (Sec)
U>> (V) Voltage (V)
(V)
R-Y 130 * * 0.5 *

Y-B 130 * * 0.5 *

R-B 130 * * 0.5 *

RYB 130 * * 0.5 *

* Note: Refer attached OMICRON Print out for Test results

Instrument Used

Equip. 1 Equip. 2 Equip. 3


Instrument: CMC256-6

Serial No.: JG697S

Calibration Date: 30.05.2012

Remark :
- Omicron print outs will be attached along with the test report for Pickup/Drop off & Characteristics

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name
Date 23.08.2012 Date 23.08.2012 Date
CSE ENERGO CONSULT TRANSCO
\641617138.doc