Professional Documents
Culture Documents
المتطلبات العامة لمشروع جديد - 2018
المتطلبات العامة لمشروع جديد - 2018
GFA
GFA drawing should be submitted separately as a PDF and المساحات الطابﻘية
it must be stamped by the developer and the consultant
Applicant shall prepare the architectural drawings
based on international best practice in architectural
CAD drafting standards, symbols and graphic
representation of the building components.
Remove all irrelevant symbols from drawings if no
legend is provided.
Colors must be clear and light
Please show the following information in the
landscape plans/drawings:
1. Paving without hatch in brown or orange
2. Grass areas in green
Landscape plan 3. Water features in blue
المناظــر الطبيعية
4. Levels
5. Planter boxes and provide details under400
series drawings and show if its recess in the
floor or above it.
6. Shading devises
7. Pedestrian rout
Don’t show plants
Hatch the building and show the landscape only
Don’t show any playground items just write the use
For all shading devices, pedestrian walkways,
temporary structures and swimming pool follow
ADIBC 2013 /ADIBC _ chapter31