You are on page 1of 1
U 910712 Appendix A: Command Menus Page A-LI A.4.1.3 Measuring Program ‘This formis used to create a measuring program, by selecting from the range of defined channel options. A combination of fixed and Programmable Goniometer channels can be used. The channels must first be defined in the “Fixed Chan- nels Scalers” and the “Programmable Goniometer Channels" screens, both of which can be accessed via the “Configu- ration” option in the main menu. The measuring program action form is shown below. MEASURING PROGRAM 26-may 88 10:14:22 Minimal measuring time fixed channels (sec) : 60 Delay time (sec) : 10 Spinner on Channel Time Channel Time Channel Time Channel Time Channel Time (sec) (sec) (sec) (sec) (sec) Na fixed = 2nl_— 20 Mg fixed Al fixed Si fixed PR fixed Ss fixed K fixed ca fixed Ti fixed mn fixed Fe fixed srl 30 [ print, Edit, Add, INeert, Delete, Clear program, / ] : Edit “The minimum measuring time for the fixed channels is defined in the first field. The measuring time for each program- mable goniometer channel is defined in the “Time” column, for that channel. Measuring times must be multiples of 10 seconds, in the range from 10 lo 990 seconds. In addition, a delay time may be specified (thats, a waiting time while the ‘sample is irradiated before the measurement starts). Ifthe sum of all measuring times of programmable goniometer channels exceeds the given measuring time of the fixed channels, the fixed channel time is made equally long, up to a maximum of 990 seconds. ‘Spinner rotation during measurement may be selected. ‘Amaximumot 60 measuring channels canbe programmed. The datais outputin the same order as the channel orderin the measuring program. ‘Channels can be “Added”, “inserted” or ‘Deleted’ using the options in the command line; or by typing INS for Insert or ‘blanks’ for delete, in the “Channel” field of the action form. ‘The program may also be ‘Printed’, “Edited” or “Cleared”.

You might also like