LS Internship Project Timeplan

Aug/20 Sep/20 Oct/20

Proposed Planner
W31 W32 W33 W34 W35 W36 W37 W38 W39 W40 W37 W38 W39
Project Nomination 100%

Specification Completion 50%

Concept Design
80% Product CAD + FEA
100% Product CAD + FEA
Report Generation
Yellow: Under Progress
Red: Alert
Green: On Track
Blue: Planned Start Date
Activities
Scope of Work
Understand Scope of Work/Project
Information gather, Benchmarking for Specification
Understand existing performances of Benchmark Vehicle
Understand Vehicle Regulation / standard Requirement
Raw Material Selection
Concept layout free hand diagram with dimensions
Fixation methods of product to environment
Concept Design
Concept surface modelling of Product
Concept surface modelling of Environment/Packaging Parts
Initial FEA study with thickness assumption
Prepare Product 3D design for 60% as per benchmark
Conduct FEA Analysis (Static/Dynamic/Thermal/Flow/Freqency) as required
Analyse the issues/Hot spots and Prepare design action plan
Finalise Product Design
Update Product 3D design for 100% as per benchmark
Conduct FEA Analysis (Static/Dynamic/Thermal/Flow/Frequency)
Compare FEA results (Loop1 and Loop2)
Final Report Submission