The document outlines the schedule for electrical and plumbing works for Energy Center 2 and Toilets. It lists the activity, duration, start and finish dates, method statements, and status of ITP submittals. Various electrical activities are scheduled between March 2023 to January 2024 including underground works, 1st and 2nd fix, equipment installation, switchboards, generator works and testing. Plumbing activities for toilets include pipe laying, containments, plastering, waterproofing, flooring, wall finishes and final fixing between August 2023 to February 2024.
The document outlines the schedule for electrical and plumbing works for Energy Center 2 and Toilets. It lists the activity, duration, start and finish dates, method statements, and status of ITP submittals. Various electrical activities are scheduled between March 2023 to January 2024 including underground works, 1st and 2nd fix, equipment installation, switchboards, generator works and testing. Plumbing activities for toilets include pipe laying, containments, plastering, waterproofing, flooring, wall finishes and final fixing between August 2023 to February 2024.
The document outlines the schedule for electrical and plumbing works for Energy Center 2 and Toilets. It lists the activity, duration, start and finish dates, method statements, and status of ITP submittals. Various electrical activities are scheduled between March 2023 to January 2024 including underground works, 1st and 2nd fix, equipment installation, switchboards, generator works and testing. Plumbing activities for toilets include pipe laying, containments, plastering, waterproofing, flooring, wall finishes and final fixing between August 2023 to February 2024.