You are on page 1of 23

Summery of Mech Dismantling and Erection Works

Dismantling Erection of
Sl. No. Area Pump Houses Total
Works Mechanical Works
1.00 Hanuman Jute Mill 219,500.00 733,137.60 952,637.60
2.00 Belur Math 138,500.00 335,639.68 474,139.68
3.00 Bally Khal 107,000.00 311,554.29 418,554.29
4.00 Bally AI Panchanantala 109,000.00 323,015.68 432,015.68
5.00 Salt Gola 116,500.00 328,925.45 445,425.45
6.00 Golabari 119,500.00 363,119.70 482,619.70
7.00 KONA MPS 292,000.00 1,032,218.87 1,324,218.87
8.00 BESU 206,000.00 811,211.52 1,017,211.52
9.00 CPT LAND 162,250.00 861,033.79 1,023,283.79
10.00 Arupara AI Round Tank 191,500.00 978,693.35 1,170,193.35
11.00 Ichapur PS 222,000.00 945,788.90 1,167,788.90
12.00 Arupara MPS 242,000.00 914,315.05 1,156,315.05
Matkhal/Baranagar
13.00 Baranagar AI MPS 401,500.00 997,088.30 1,398,588.30

14.00 Total 2,527,250.00 8,935,742.17 11,462,992.17


10P153 BOQ PIPING & MECH EQUIPMENT DISMANTLING WORKS L.S & MPS (ASSO. INFRA)

Arupara MPS
UOM QTY
SR NO DESCRIPTION

i)DISMANTLING AND REMOVAL OF PIPES - 350 NB , 400 NB, 500 NB, 700 NB Lot 1.0
1

ii)DISMANTLING AND REMOVAL OF FITTINGS LIKE EXPANDERS, DUCKFOOT


BENDS, ELBOWS, BELLOWS/DISMATLING JOINTS FOR INDIVIDUAL PUMPS AND Lot 1.0
THE COMMON HEADER WITHIN THE BATTERY LIMIT SPECIFIED ABOVE
2
iii)DISMANTLING AND REMOVAL OF EXISTING FOUNDATIONS FOR THE
PUMPS AND SUPPORTS FOR PIPES/FITTINGS BY BREAKING CONCRETE USING
SUITABLE MECHANIZED BREAKING EQUIPMENT AND DISPOSAL OF THE SAID Lot 1.0
MATERIAL ALONG WITH FOUNDATION BOLTS, NUTS, STRUCTURAL
3 MATERIAL USED FOR SUPPORT ETC

i)DISMANTLING AND REMOVAL OF 500 mm GATE VALVE AT PUMP SUCTION NOS 4.0
4
iv)DISMANTLING AND REMOVAL OF 500 mm GATE VALVE AT PUMP
NOS 2.0
5 DISCHARGE
v)DISMANTLING AND REMOVAL OF 500 mm NON RETURN VALVE AT PUMP
NOS 2.0
6 DISCHARGE
ii)DISMANTLING AND REMOVAL OF 250 mm GATE VALVE AT PUMP
NOS 2.0
7 DISCHARGE
iii)DISMANTLING AND REMOVAL OF 250 mm NON RETURN VALVE AT PUMP
NOS 2.0
8 DISCHARGE
9 Dismantling and Removal of Structural Supports for Pipes, Valves and Fittings Lot 1.0

VNC pump@ 170 lps with Accessories, Extension Shaft,55 HP motor at Arupara MPS Set 2.0
10

VNC Pump@ 125 lps with Accessories, Extension Shaft, 40 HP motor at Arupara MPS Set 2.0
11
12 Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1.0
13 Removal of manual bar screen (1.18 m Width X 3.630 m Height) at Arupara MPS NOS 2.0
14 CI Sluice Gate at Arupara MPS (600 mm X 600 mm Manual) NOS 2.0
15 1T HOISTS at Arupara MPS NOS 1.0
10P153 BOQ PIPING & MECH EQUIPMENT DISMANTLING WORKS L.S & MPS (ASSO. INFRA)

Besu LS
UOM QTY
SR NO DESCRIPTION

i)DISMANTLING AND REMOVAL OF PIPES - 350 NB , 400 NB, 500 NB, 700 NB Lot 1
1

ii)DISMANTLING AND REMOVAL OF FITTINGS LIKE EXPANDERS, DUCKFOOT


BENDS, ELBOWS, BELLOWS/DISMATLING JOINTS FOR INDIVIDUAL PUMPS AND Lot 1
THE COMMON HEADER WITHIN THE BATTERY LIMIT SPECIFIED ABOVE
2
iii)DISMANTLING AND REMOVAL OF EXISTING FOUNDATIONS FOR THE
PUMPS AND SUPPORTS FOR PIPES/FITTINGS BY BREAKING CONCRETE USING
SUITABLE MECHANIZED BREAKING EQUIPMENT AND DISPOSAL OF THE SAID Lot 1
MATERIAL ALONG WITH FOUNDATION BOLTS, NUTS, STRUCTURAL
3 MATERIAL USED FOR SUPPORT ETC

iv)DISMANTLING AND REMOVAL OF 300 mm GATE VALVE AT PUMP SUCTION NOS 3

ii)DISMANTLING AND REMOVAL OF 350 mm GATE VALVE AT PUMP


NOS 3
5 DISCHARGE
iii)DISMANTLING AND REMOVAL OF 350 mm NON RETURN VALVE AT PUMP
NOS 3
6 DISCHARGE

i)DISMANTLING AND REMOVAL OF 200 mm GATE VALVE AT PUMP SUCTION NOS 2


6
ii)DISMANTLING AND REMOVAL OF 250 mm GATE VALVE AT PUMP
NOS 2
8 DISCHARGE
iii)DISMANTLING AND REMOVAL OF 250 mm NON RETURN VALVE AT PUMP
NOS 2
9 DISCHARGE
10 Dismantling and Removal of Structural Supports for Pipes, Valves and Fittings Lot 1
11 VNC pump@ 170 lps with Accessories, Extension Shaft,55 HP motor at BESU Set 3
12 VNC Pump@ 125 lps with Accessories, Extension Shaft, 40 HP motor at BESU Set 2
13 Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1
14 Removal of manual bar screen (1.18 m Width X 3.630 m Height) at BESU NOS 1
15 CI Sluice Gate at BESU (600 mm X 600 mm Manual) NOS 1
16 1T HOISTS at Besu NOS 1
10P153 BOQ PIPING & MECH EQUIPMENT DISMANTLING WORKS L.S & MPS (ASSO. INFRA)

CPT Land
UOM QTY
SR NO DESCRIPTION

i)DISMANTLING AND REMOVAL OF PIPES - 350 NB , 400 NB, 500 NB, 700 NB Lot 1
1

ii)DISMANTLING AND REMOVAL OF FITTINGS LIKE EXPANDERS, DUCKFOOT


BENDS, ELBOWS, BELLOWS/DISMATLING JOINTS FOR INDIVIDUAL PUMPS AND Lot 1
THE COMMON HEADER WITHIN THE BATTERY LIMIT SPECIFIED ABOVE
2
iii)DISMANTLING AND REMOVAL OF EXISTING FOUNDATIONS FOR THE
PUMPS AND SUPPORTS FOR PIPES/FITTINGS BY BREAKING CONCRETE USING
SUITABLE MECHANIZED BREAKING EQUIPMENT AND DISPOSAL OF THE SAID Lot 1
MATERIAL ALONG WITH FOUNDATION BOLTS, NUTS, STRUCTURAL
3 MATERIAL USED FOR SUPPORT ETC

i)DISMANTLING AND REMOVAL OF 150 mm GATE VALVE AT PUMP SUCTION NOS 2

i)DISMANTLING AND REMOVAL OF 150 mm GATE VALVE AT PUMP DISCHARGE NOS 2


4
i)DISMANTLING AND REMOVAL OF 150 mm NON RETURN VALVE AT PUMP
NOS 2
5 DISCHARGE

i)DISMANTLING AND REMOVAL OF 200 mm GATE VALVE AT PUMP SUCTION NOS 3


6
v)DISMANTLING AND REMOVAL OF 200 mm GATE VALVE AT PUMP
NOS 3
7 DISCHARGE
vi)DISMANTLING AND REMOVAL OF 200 mm NON RETURN VALVE AT PUMP
NOS 3
8 DISCHARGE
9 Dismantling and Removal of Structural Supports for Pipes, Valves and Fittings Lot 1

VNC pump@ 92 lps with Accessories, Extension Shaft,20 HP motor at CPT Land Set 3
10

VNC Pump@ 46 lps with Accessories, Extension Shaft, 10 HP motor at CPT Land Set 2
11
12 Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1
13 Removal of manual bar screen (1.18 m Width X 3.630 m Height) at CPT Land NOS 1
14 CI Sluice Gate at CPT Land (600 mm X 600 mm Manual) NOS 1
15 1T HOISTS at CPT Land NOS 1
10P153 BOQ PIPING & MECH EQUIPMENT DISMANTLING WORKS L.S & MPS (ASSO. INFRA)

Round Tank LS
UOM QTY
SR NO DESCRIPTION

PIPING DISMANTLING

i)DISMANTLING AND REMOVAL OF PIPES - 350 NB , 400 NB, 500 NB, 700 NB Lot 1
1

ii)DISMANTLING AND REMOVAL OF FITTINGS LIKE EXPANDERS, DUCKFOOT


BENDS, ELBOWS, BELLOWS/DISMATLING JOINTS FOR INDIVIDUAL PUMPS AND Lot 1
THE COMMON HEADER WITHIN THE BATTERY LIMIT SPECIFIED ABOVE
2
iii)DISMANTLING AND REMOVAL OF EXISTING FOUNDATIONS FOR THE
PUMPS AND SUPPORTS FOR PIPES/FITTINGS BY BREAKING CONCRETE USING
SUITABLE MECHANIZED BREAKING EQUIPMENT AND DISPOSAL OF THE SAID Lot 1
MATERIAL ALONG WITH FOUNDATION BOLTS, NUTS, STRUCTURAL
3 MATERIAL USED FOR SUPPORT ETC

iv)DISMANTLING AND REMOVAL OF 350 mm GATE VALVE AT PUMP SUCTION NOS 3


4
ii)DISMANTLING AND REMOVAL OF 350 mm GATE VALVE AT PUMP
NOS 3
5 DISCHARGE
iii)DISMANTLING AND REMOVAL OF 350 mm NON RETURN VALVE AT PUMP
NOS 3
6 DISCHARGE

i)DISMANTLING AND REMOVAL OF 250 mm GATE VALVE AT PUMP SUCTION NOS 2


7
ii)DISMANTLING AND REMOVAL OF 250 mm GATE VALVE AT PUMP
NOS 2
8 DISCHARGE
iii)DISMANTLING AND REMOVAL OF 250 mm NON RETURN VALVE AT PUMP
NOS 2
9 DISCHARGE
10 Dismantling and Removal of Structural Supports for Pipes, Valves and Fittings Lot 1

VNC pump@ 224 lps with Accessories, Extension Shaft,40 HP motor at Round Tank Set 3
11

VNC Pump@ 112 lps with Accessories, Extension Shaft, 25 HP motor at Round Tank Set 2
12
13 Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1
14 Removal of manual bar screen (1.18 m Width X 1.800 m Height) at Round Tank NOS 1
15 CI Sluice Gate at Round Tank (1200 mm X 1000 mm Manual) NOS 1
16 1T HOISTS at Round Tank NOS 1
10P153 BOQ PIPING & MECH EQUIPMENT DISMANTLING WORKS L.S & MPS (ASSO. INFRA)

LS-02 Bellur Math


UOM QTY
SR NO DESCRIPTION

PIPING DISMANTLING

i)DISMANTLING AND REMOVAL OF PIPES - 350 NB , 400 NB, 500 NB, 700 NB Lot 1.0
1

ii)DISMANTLING AND REMOVAL OF FITTINGS LIKE EXPANDERS, DUCKFOOT


BENDS, ELBOWS, BELLOWS/DISMATLING JOINTS FOR INDIVIDUAL PUMPS AND Lot 1.0
THE COMMON HEADER WITHIN THE BATTERY LIMIT SPECIFIED ABOVE
2
iii)DISMANTLING AND REMOVAL OF EXISTING FOUNDATIONS FOR THE
PUMPS AND SUPPORTS FOR PIPES/FITTINGS BY BREAKING CONCRETE USING
SUITABLE MECHANIZED BREAKING EQUIPMENT AND DISPOSAL OF THE SAID Lot 1.0
MATERIAL ALONG WITH FOUNDATION BOLTS, NUTS, STRUCTURAL
3 MATERIAL USED FOR SUPPORT ETC

i)DISMANTLING AND REMOVAL OF 150 mm GATE VALVE AT PUMP DISCHARGE NOS 3.0
4
i)DISMANTLING AND REMOVAL OF 150 mm NON RETURN VALVE AT PUMP
NOS 3.0
5 DISCHARGE
6 Dismantling and Removal of Structural Supports for Pipes, Valves and Fittings Lot 1.0
7 Submersible pump @ 40 lps,15 HP motor at Belur Math LS Set 3.0
8 Removal of manual bar screen (1.080 m Width X 1.30 m Height) at Bellur Math NOS 1.0
9 CI Sluice Gate at Belur Math (600 mm X 600 mm Manual) NOS 1.0
10 2T HOISTS at Belur Math NOS 1.0
10P153 BOQ PIPING & MECH EQUIPMENT DISMANTLING WORKS L.S & MPS (ASSO. INFRA)

LS-03 Bally Khal


UOM QTY
SR NO DESCRIPTION

PIPING DISMANTLING
1 i) DISMANTLING AND REMOVAL OF PIPES - 150 NB Lot 1.00

ii)DISMANTLING AND REMOVAL OF FITTINGS LIKE EXPANDERS, DUCKFOOT


BENDS, ELBOWS, BELLOWS/DISMATLING JOINTS FOR INDIVIDUAL PUMPS AND Lot 1.00
THE COMMON HEADER WITHIN THE BATTERY LIMIT SPECIFIED ABOVE
2
iii)DISMANTLING AND REMOVAL OF EXISTING FOUNDATIONS FOR THE
PUMPS AND SUPPORTS FOR PIPES/FITTINGS BY BREAKING CONCRETE USING
SUITABLE MECHANIZED BREAKING EQUIPMENT AND DISPOSAL OF THE SAID Lot 1.00
MATERIAL ALONG WITH FOUNDATION BOLTS, NUTS, STRUCTURAL
3 MATERIAL USED FOR SUPPORT ETC
i)DISMANTLING AND REMOVAL OF 150 mm GATE VALVE AT PUMP DISCHARGE NOS 2.00
4
i)DISMANTLING AND REMOVAL OF 150 mm NON RETURN VALVE AT PUMP
NOS 2.00
5 DISCHARGE
6 Dismantling and Removal of Structural Supports for Pipes, Valves and Fittings Lot 1.00
7 Submersible pump @ 17 lps,5 HP motor at Bally Khal LS Set 2.00
8 Removal of manual bar screen (1.080 m Width X 1.30 m Height) at Bally Khal NOS 1.00
9 CI Sluice Gate at Bally Khal (600 mm X 600 mm Manual) NOS 1.00
10 2T HOISTS at Bally Khal NOS 1.00
10P153 BOQ PIPING & MECH EQUIPMENT DISMANTLING WORKS L.S & MPS (ASSO. INFRA)
LS & MPSs Hanuman Jute Mill Belur Math Bally Khal Panchanantala Saltgola Golabari Kona MPS BESU CPT Land Round Tank Ichapur Arupara MPS Matkhal/Baranag Total Qty WABAG Offered
Amount
ar MPS rate
SL NO

DESCRIPTION UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY

1 PIPING DISMANTLING

DISMANTLING & REMOVAL OF DI,CI,CS PIPE AND FITTINGS

Labour charges for shifting of pipes & fittings from the respective Site/Pump House to
Designated Storage Location with the help of Hydra & Crane (which is accessible in site) &
trained rigger inside pumphouse premises. The rate includes removal & proper cutting job
required for dismantling of all the size of CS/CI/ DI pipes at all the levels by providing the
necessary tools and tackles, gas cutting set with gas, etc. to complete the work and satisfy the
competent authority in site. All minor or major chipping works shall have to be taken care by
the contractor. Necessary approval shall be taken for the deployed manpower associated to
A) the work like, gas cutter, fitter (if required) etc from the competent authority at site. During 0
execution, all the safety measures shall be taken which is required for safe work at site. The
scope includes dismantling, loading at Pumping Station Site and Proper unloading and storage
at designated location inside pump house premises as specified by the Client/Wabag. The
material includes all Pipes and Fittings along with Fasteners and gaskets/O Rings connected
with the existing Pumping Machineries as well as the Common Discharge Header Pipe, etc all
complete within the Pumping Station Complex , catalogued and in a safe manner protected
from natural elements like rain, storm, etc.

i)DISMANTLING AND REMOVAL OF PIPES - 350 NB , 400 NB, 500 NB, 700 NB Lot 1 Lot 1 Lot Lot Lot Lot Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 9 30,000.00 270,000.00 30000
i) DISMANTLING AND REMOVAL OF PIPES - 150 NB Lot 1 Lot 1 Lot 1 Lot 1 Lot Lot Lot Lot Lot Lot Lot 4 15,000.00 60,000.00 0
ii)DISMANTLING AND REMOVAL OF FITTINGS LIKE EXPANDERS, DUCKFOOT BENDS, ELBOWS,
BELLOWS/DISMATLING JOINTS FOR INDIVIDUAL PUMPS AND THE COMMON HEADER WITHIN Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 13 10,000.00 130,000.00 10000
THE BATTERY LIMIT SPECIFIED ABOVE

iii)DISMANTLING AND REMOVAL OF EXISTING FOUNDATIONS FOR THE PUMPS AND SUPPORTS
FOR PIPES/FITTINGS BY BREAKING CONCRETE USING SUITABLE MECHANIZED BREAKING
EQUIPMENT AND DISPOSAL OF THE SAID MATERIAL ALONG WITH FOUNDATION BOLTS, NUTS, Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 13 5,000.00 65,000.00 5000
STRUCTURAL MATERIAL USED FOR SUPPORT ETC

DISMANTLING & REMOVAL OF VALVES

Labour charges for dismantling and shifting of Valves from the respective Pump
house/Lifting Stgation to Designated Storage Location with the help of Hydra & Crane (which is
accessible at site) & trained rigger inside pumphouse premises. Removal of the valves with the
help of hydra/ crane / Manual Derrick/ Chain Pully block/ Other Mechanical devices etc. –
(which is safer for erection and accessible to the site). The rate includes dismantling & proper
removal of all the size of valves at all the levels by providing the necessary tools and tackles etc
B) to complete the work and satisfy the competent authority in site. All minor or major chipping 0
works shall have to be taken care by the contractor. Necessary approval shall be taken for the
deployed manpower associated to the work like, gas cutter, fitter (if required) etc from the
competent authority at site. During execution, all the safety measures shall be taken which is
required for safe work at site. The scope includes dismantling, loading at Pumping Station Site
and Proper unloading and storage at designated location as specified by the Client/Wabag. The
material includes all Valves along with Fasteners, Gaskets/O Rings connected with the
individual lines of the existing Pumping Machineries as well as on the Common Discharge
Header Pipe, etc all complete within the Pumping Station Complex , catalogued and in a safe
manner protected from natural elements like rain, storm, etc.

i)DISMANTLING AND REMOVAL OF 500 mm GATE VALVE AT PUMP SUCTION NOS 4 NOS 4 NOS 3 11 5,000.00 55,000.00 15000
iv)DISMANTLING AND REMOVAL OF 500 mm GATE VALVE AT PUMP DISCHARGE NOS 2 NOS 2 NOS 3 7 5,000.00 35,000.00 15000
v)DISMANTLING AND REMOVAL OF 500 mm NON RETURN VALVE AT PUMP DISCHARGE NOS 2 NOS 2 NOS 3 7 3,500.00 24,500.00 10500
i)DISMANTLING AND REMOVAL OF 400 mm GATE VALVE AT PUMP SUCTION NOS 5 NOS 4 NOS NOS NOS NOS NOS NOS 9 4,000.00 36,000.00 0
ii)DISMANTLING AND REMOVAL OF 400 mm GATE VALVE AT PUMP DISCHARGE NOS 4 NOS NOS NOS NOS NOS NOS 4 4,000.00 16,000.00 0

iii)DISMANTLING AND REMOVAL OF 450 mm NON RETURN VALVE AT PUMP DISCHARGE NOS 4 NOS NOS NOS NOS NOS NOS 4 3,000.00 12,000.00 0

iv)DISMANTLING AND REMOVAL OF 300 mm GATE VALVE AT PUMP SUCTION NOS 2 NOS 3 NOS NOS NOS NOS NOS 5 2,500.00 12,500.00 0
v)DISMANTLING AND REMOVAL OF 300 mm GATE VALVE AT PUMP DISCHARGE NOS 2 NOS NOS NOS NOS NOS NOS 2 2,500.00 5,000.00 0
vi)DISMANTLING AND REMOVAL OF 300 mm NON RETURN VALVE AT PUMP DISCHARGE NOS 2 NOS NOS NOS NOS NOS NOS 2 2,000.00 4,000.00 0
iv)DISMANTLING AND REMOVAL OF 350 mm GATE VALVE AT PUMP SUCTION NOS NOS 3 NOS NOS NOS 2 5 3,000.00 15,000.00 6000
ii)DISMANTLING AND REMOVAL OF 350 mm GATE VALVE AT PUMP DISCHARGE NOS 5 NOS NOS 3 NOS NOS 3 NOS NOS NOS 2 13 3,000.00 39,000.00 6000

iii)DISMANTLING AND REMOVAL OF 350 mm NON RETURN VALVE AT PUMP DISCHARGE NOS 5 NOS NOS 3 NOS NOS 3 NOS NOS NOS 2 13 2,500.00 32,500.00 5000

iv)DISMANTLING AND REMOVAL OF 700 mm GATE VALVE ON COMMON HEADER NOS 1 NOS NOS NOS NOS NOS NOS NOS 1 7,000.00 7,000.00 0
i)DISMANTLING AND REMOVAL OF 150 mm GATE VALVE AT PUMP SUCTION NOS 2 NOS NOS NOS NOS 2 1,000.00 2,000.00 0
i)DISMANTLING AND REMOVAL OF 150 mm GATE VALVE AT PUMP DISCHARGE NOS NOS 3 NOS 2 NOS 2 NOS 3 NOS 3 NOS NOS NOS 2 NOS NOS NOS NOS 15 1,000.00 15,000.00 0
i)DISMANTLING AND REMOVAL OF 150 mm NON RETURN VALVE AT PUMP DISCHARGE NOS NOS 3 NOS 2 NOS 2 NOS 3 NOS 3 NOS NOS NOS 2 NOS NOS NOS NOS 15 500.00 7,500.00 0
i)DISMANTLING AND REMOVAL OF 200 mm GATE VALVE AT PUMP SUCTION NOS 2 NOS 3 NOS NOS NOS NOS 5 1,500.00 7,500.00 0
v)DISMANTLING AND REMOVAL OF 200 mm GATE VALVE AT PUMP DISCHARGE NOS 3 NOS NOS NOS NOS 3 1,500.00 4,500.00 0
vi)DISMANTLING AND REMOVAL OF 200 mm NON RETURN VALVE AT PUMP DISCHARGE NOS 3 NOS NOS NOS NOS 3 750.00 2,250.00 0
i)DISMANTLING AND REMOVAL OF 250 mm GATE VALVE AT PUMP SUCTION NOS 2 NOS NOS NOS 2 1,500.00 3,000.00 0
ii)DISMANTLING AND REMOVAL OF 250 mm GATE VALVE AT PUMP DISCHARGE NOS 2 NOS NOS 2 NOS 2 NOS 2 NOS 8 1,500.00 12,000.00 0

iii)DISMANTLING AND REMOVAL OF 250 mm NON RETURN VALVE AT PUMP DISCHARGE NOS 2 NOS NOS 2 NOS 2 NOS 2 NOS 8 1,000.00 8,000.00 0

10P153_LS_MPS MECH DIS BOQ 8 OF 23


10P153 BOQ PIPING & MECH EQUIPMENT DISMANTLING WORKS L.S & MPS (ASSO. INFRA)
LS & MPSs Hanuman Jute Mill Belur Math Bally Khal Panchanantala Saltgola Golabari Kona MPS BESU CPT Land Round Tank Ichapur Arupara MPS Matkhal/Baranag Total Qty WABAG Offered
Amount
ar MPS rate
SL NO

DESCRIPTION UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY

DISMANTLING & REMOVAL OF STRUCTURAL MEMBERS

Labour charges for removal and shifting of All Structural members used as Supports for
Pipes and Fittings from the respective LS&MPS site with the help of Hydra & Crane (which is
accessible at site) & trained rigger inside the pump house premises. The rate includes
dismantling & proper removal of all the Structural Members at all the levels by providing the
necessary tools and tackles etc to complete the work and satisfy the competent authority in
site. All minor or major chipping works shall have to be taken care by the contractor. Necessary
C) approval shall be taken for the deployed manpower associated to the work like, gas cutter, 0
fitter (if required) etc from the competent authority at site. During execution, all the safety
measures shall be taken which is required for safe work at site. The scope includes dismantling,
loading at Pumping Station Site, Transportation and Proper unloading and storage at
designated location as specified by the Client/Wabag. The material includes all Structural
Members connected with the individual lines of the existing Pumping Machineries as well as on
the Common Discharge Header Pipe, etc all complete within the Pumping Station Complex ,
catalogued and in a safe manner protected from natural elements like rain, storm, etc.

Dismantling and Removal of Structural Supports for Pipes, Valves and Fittings Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 13 10,000.00 130,000.00 10000
2 EQUIPMENT DISMANTLING 0

Dismantling & Removal of VNC & Submersible pump with drive motor

DISMANTLING OF PUMP & REMOVAL FROM PUMP HOUSE


Labour charges for removal and shifting of Pumps along with Motors (including all
accessories) from the respective work site with the help of Hydra & Crane (which is accessible
at site) & trained rigger inside the pumphouse premises. The rate includes proper dismantling
and removal of Pumps, Drive motors along with all the accessories , by providing the necessary
A) 0
tools and tackles etc to complete the work and satisfy the competent authority in site. Any
minor or major chipping works for completion of the work shall have to be taken care of by the
contractor and checking procedures shall always be followed and recorded. Manpower
required during dismantling & total removal shall be in contractor's scope. During execution, all
the safety measures shall be taken, which is required for safe work at site. The scope includes
dismantling, loading at Pumping Station Site and Proper unloading and storage , etc all
complete within the Pumping Station Complex , catalogued and in a safe manner protected
from natural elements like rain, storm, etc.

1(a)
VNC Pump@ 235 lps with Accessories, Extension Shaft, 75 HP motor at Hanuman Jute Set 3 3 12,000.00 36,000.00 0
Mill
VNC Pump@ 140 lps with Accessories, Extension Shaft, 44 HP motor at Hanuman Jute
1(b)
Mill
Set 2 2 7,000.00 14,000.00 0

1 (c ) Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1 1 2,000.00 2,000.00 0
2 Submersible pump @ 40 lps,15 HP motor at Belur Math LS Set 3 3 7,000.00 21,000.00 0
3 Submersible pump @ 17 lps,5 HP motor at Bally Khal LS Set 2 2 4,000.00 8,000.00 0
4 Submersible pump @ 20 lps,4 HP motor at Panchanantala LS Set 2 2 6,000.00 12,000.00 0
5 Submersible pump @ 20 lps,5 HP motor at Salt Gola LS Set 3 3 6,000.00 18,000.00 0
6 Submersible pump @ 40 lps, 15 HP motor at Gola Bari LS Set 3 3 7,000.00 21,000.00 0

7(a) VNC pump@ 340 lps with Accessories, Extension Shaft,100 HP motor at Kona MPS Set 4 4 20,000.00 80,000.00 0

7(b) VNC Pump@ 140 lps with Accessories, Extension Shaft, 50 HP motor at Kona MPS Set 2 2 12,000.00 24,000.00 0

7 (c ) Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1 1 2,000.00 2,000.00 0
8(a) VNC pump@ 170 lps with Accessories, Extension Shaft,55 HP motor at BESU Set 3 3 14,000.00 42,000.00 0
8(b) VNC Pump@ 125 lps with Accessories, Extension Shaft, 40 HP motor at BESU Set 2 2 10,000.00 20,000.00 0
8(c) Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1 1 2,000.00 2,000.00 0
9(a) VNC pump@ 92 lps with Accessories, Extension Shaft,20 HP motor at CPT Land Set 3 3 8,000.00 24,000.00 0
9(b) VNC Pump@ 46 lps with Accessories, Extension Shaft, 10 HP motor at CPT Land Set 2 2 5,000.00 10,000.00 0
9(c) Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1 1 2,000.00 2,000.00 0

10 ( a ) VNC pump@ 224 lps with Accessories, Extension Shaft,40 HP motor at Round Tank Set 3 3 10,000.00 30,000.00 0

10 ( b ) VNC Pump@ 112 lps with Accessories, Extension Shaft, 25 HP motor at Round Tank Set 2 2 8,000.00 16,000.00 0

10 ( c ) Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1 1 2,000.00 2,000.00 0
11 ( a ) VNC pump@ 170 lps with Accessories, Extension Shaft,55 HP motor at Ichapur Set 2 2 14,000.00 28,000.00 0
11 ( b ) VNC Pump@ 125 lps with Accessories, Extension Shaft, 40 HP motor at Ichapur Set 2 2 10,000.00 20,000.00 0
11 ( c ) Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1 1 2,000.00 2,000.00 0

12 ( a ) VNC pump@ 170 lps with Accessories, Extension Shaft,55 HP motor at Arupara MPS Set 2 2 14,000.00 28,000.00 0

12 ( b ) VNC Pump@ 125 lps with Accessories, Extension Shaft, 40 HP motor at Arupara MPS Set 2 2 10,000.00 20,000.00 0

12 ( c ) Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1 1 2,000.00 2,000.00 0

13 ( a ) VNC pump@ 650 lps with Accessories, Extension Shaft,268 HP motor at Baranagar MPS Set 3 3 22,000.00 66,000.00 66000

13 ( b ) VNC Pump@ 250 lps with Accessories, Extension Shaft, 150 HP motor at Baranagar MPS Set 2 2 18,000.00 36,000.00 36000

13 ( c ) Portable Dewatering Pump with Fixed/Flexible Pipes, Valves and Fittings NOS 1 1 2,000.00 2,000.00 2000

10P153_LS_MPS MECH DIS BOQ 9 OF 23


10P153 BOQ PIPING & MECH EQUIPMENT DISMANTLING WORKS L.S & MPS (ASSO. INFRA)
LS & MPSs Hanuman Jute Mill Belur Math Bally Khal Panchanantala Saltgola Golabari Kona MPS BESU CPT Land Round Tank Ichapur Arupara MPS Matkhal/Baranag Total Qty WABAG Offered
Amount
ar MPS rate
SL NO

DESCRIPTION UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY

Dismantling & Removal of Manual Bar Screens

DISMANTLING AND REMOVAL OF MANUAL BAR SCREENS FROM RESPECTIVE SCREEN


CHAMBERS INSIDE PUMPING STATION
Labour charges for removal and shifting of Manual bar Screens (including all
accessories) from the respective Screen Chambers within Pumping Station Compound with the
help of Hydra & Crane (which is accessible at site) & trained rigger. The rate includes proper
dismantling and removal of Screens along with all the accessories , by providing the necessary
B) 0
tools and tackles etc to complete the work and satisfy the competent authority in site. Any
minor or major chipping works for completion of the work shall have to be taken care of by the
contractor and checking procedures shall always be followed and recorded. Manpower
required during dismantling & total removal shall be in contractor's scope. During execution, all
the safety measures shall be taken, which is required for safe work at site. The scope includes
dismantling, loading at Pumping Station Site and Proper unloading and storage , etc all
complete within the Pumping Station Complex , catalogued and in a safe manner protected
from natural elements like rain, storm, etc.

1 Removal of manual bar screen (1.38 m Width X 2.822 m Height) at Hanuman Jute Mill NOS 1 1 12,000.00 12,000.00 0

2 Removal of manual bar screen (1.38 m Width X 2.822 m Height) at Belur Math NOS 1 1 12,000.00 12,000.00 0
3 Removal of manual bar screen (1.080 m Width X 3.630 m Height) at Bally Khal NOS 1 1 10,000.00 10,000.00 0

4 Removal of manual bar screen (1.080 m Width X 2.822 m Height) at Panchanantala NOS 1 1 8,000.00 8,000.00 0

5 Removal of manual bar screen (1.080 m Width X 2.822 m Height) at Salt Gola NOS 1 1 8,000.00 8,000.00 0
6 Removal of manual bar screen (1.480 m Width X 2.937 m Height) at Golabari NOS 1 1 8,000.00 8,000.00 0
7 Removal of manual bar screen (2.88 m Width X 2.937 m Height) at Kona MPS NOS 1 1 15,000.00 15,000.00 0
8 Removal of manual bar screen (1.18 m Width X 3.630 m Height) at BESU NOS 1 1 10,000.00 10,000.00 0
9 Removal of manual bar screen (1.18 m Width X 3.630 m Height) at CPT Land NOS 1 1 10,000.00 10,000.00 0
10 Removal of manual bar screen (1.18 m Width X 3.630 m Height) at Round Tank NOS 1 1 10,000.00 10,000.00 0
11 Removal of manual bar screen (1.18 m Width X 3.630 m Height) at Ichapur NOS 1 1 10,000.00 10,000.00 0
12 Removal of manual bar screen (1.18 m Width X 3.630 m Height) at Arupara MPS NOS 1 1 10,000.00 10,000.00 0
13 Removal of manual bar screen (1.83 m Width X 2.937 m Height) at Matkhal MPS NOS 2 2 10,000.00 20,000.00 20000

Dismantling & Removal of Manual Sluice Gates

DISMANTLING OF MANUAL SLUICE GATE & REMOVAL FROM PUMP HOUSE

Labour charges for removal and shifting of Manual Sluice Gates (including all accessories)
from the respective work site with the help of Hydra & Crane (which is accessible at site) &
trained rigger. The rate includes proper dismantling and removal of Manual Sluice Gates along
with all the accessories , by providing the necessary tools and tackles, dewatering & diversion
C) arrangements, etc to complete the work and satisfy the competent authority in site. Any minor 0
or major chipping works for completion of the works shall have to be taken care of by the
contractor and checking procedures shall always be followed and recorded. Manpower
required during dismantling & total removal shall be in contractor's scope. During execution, all
the safety measures shall be taken, which is required for safe work at site. The scope includes
dismantling, loading at Pumping Station Site and Proper unloading and storage , etc all
complete within the Pumping Station Complex , catalogued and in a safe manner protected
from natural elements like rain, storm, etc.

1 CI Sluice Gate at Hanuman Jute Mill (600 mm X 600 mm Manual) NOS 1 1 40,000.00 40,000.00 0
2 CI Sluice Gate at Belur Math (600 mm X 600 mm Manual) NOS 1 1 40,000.00 40,000.00 0
3 CI Sluice Gate at Bally Khal (600 mm X 600 mm Manual) NOS 1 1 40,000.00 40,000.00 0
4 CI Sluice Gate at Panchanantala (600 mm X 600 mm Manual) NOS 1 1 40,000.00 40,000.00 0
5 CI Sluice Gate at Salt Gola (600 mm X 600 mm Manual) NOS 1 1 40,000.00 40,000.00 0
6 CI Sluice Gate at Golabari (600 mm X 600 mm Manual) NOS 1 1 40,000.00 40,000.00 0
7 CI Sluice Gate at Kona MPS (600 mm X 600 mm Manual) NOS 2 2 25,000.00 50,000.00 0
8 CI Sluice Gate at BESU (600 mm X 600 mm Manual) NOS 1 1 40,000.00 40,000.00 0
9 CI Sluice Gate at CPT Land (600 mm X 600 mm Manual) NOS 1 1 40,000.00 40,000.00 0
10 CI Sluice Gate at Round Tank (600 mm X 600 mm Manual) NOS 1 1 40,000.00 40,000.00 0
11 CI Sluice Gate at Ichapur (600 mm X 600 mm Manual) NOS 1 1 60,000.00 60,000.00 0
12 CI Sluice Gate at Arupara MPS (600 mm X 600 mm Manual) NOS 2 2 40,000.00 80,000.00 0
13 CI Sluice Gate at Baranagar MPS (600 mm X 600 mm Manual) NOS 4 4 40,000.00 160,000.00 160000

DISMANTLING & REMOVAL OF HOISTS WITH PROPER ALIGNMENT

Labour charges for shifting of Manual Hoist and all the other req. accessories
including ISMB , from the respective Pump House to work site with the help of Hydra & Crane
(which is accessible at site) & trained rigger. The rate includes removal and dismantling of
Manual Hoist and all the other req. accessories including ISMB , at all the levels, by providing
the necessary tools and tackles etc to complete the work and satisfy the competent authority
in site. and any minor/major chipping works for the completion of the system shall have to be
D) 0
arranged by the contractor. During execution, all the safety measures shall be taken which is
required for safe work at site. Any minor or major chipping works for completion of the work
shall have to be taken care of by the contractor and checking procedures shall always be
followed and recorded. Manpower required during dismantling & total removal shall be in
contractor's scope. During execution, all the safety measures shall be taken, which is required
for safe work at site. The scope includes dismantling, loading at Pumping Station Site and
Proper unloading and storage , etc all complete within the Pumping Station Complex ,
catalogued and in a safe manner protected from natural elements like rain, storm, etc.

1 2 T MANUAL HOISTS at Hanuman Jute Mill NOS 1 1 6,000.00 6,000.00 0


2 2T HOISTS at Belur Math NOS 1 1 6,000.00 6,000.00 0
3 2T HOISTS at Bally Khal NOS 1 1 6,000.00 6,000.00 0
4 2T HOISTS at Panchanantala NOS 1 1 6,000.00 6,000.00 0

10P153_LS_MPS MECH DIS BOQ 10 OF 23


10P153 BOQ PIPING & MECH EQUIPMENT DISMANTLING WORKS L.S & MPS (ASSO. INFRA)
LS & MPSs Hanuman Jute Mill Belur Math Bally Khal Panchanantala Saltgola Golabari Kona MPS BESU CPT Land Round Tank Ichapur Arupara MPS Matkhal/Baranag Total Qty WABAG Offered
Amount
ar MPS rate
SL NO

DESCRIPTION UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY UOM QTY

5 2T HOISTS at Salt Gola NOS 1 1 6,000.00 6,000.00 0


6 2T HOISTS at Golabari NOS 1 1 6,000.00 6,000.00 0
7 5T HOT at Kona MPS NOS 1 1 8,000.00 8,000.00 0
8 1T HOISTS at Besu NOS 1 1 5,000.00 5,000.00 0
9 1T HOISTS at CPT Land NOS 1 1 5,000.00 5,000.00 0
10 1T HOISTS at Round Tank NOS 1 1 5,000.00 5,000.00 0
11 1T HOISTS at Ichapur NOS 1 1 5,000.00 5,000.00 0
12 1T HOISTS at Arupara MPS NOS 1 1 5,000.00 5,000.00 0
13 1T HOISTS at Baranagar MPS NOS 1 1 5,000.00 5,000.00 5000
Total= 219,500 138,500 107,000 109,000 116,500 119,500 292,000 206,000 162,250 191,500 222,000 242,000 401,500 2,527,250.00 401,500.00

10P153_LS_MPS MECH DIS BOQ 11 OF 23


10P153 BOQ PIPING & MECH EQUIPMENT DISMANTLING WORKS L.S & MPS (ASSO. INFRA)

LS-04 Panchanantal
UOM QTY
SR NO DESCRIPTION

PIPING DISMANTLING
1 i) DISMANTLING AND REMOVAL OF PIPES - 150 NB Lot 1.00

ii)DISMANTLING AND REMOVAL OF FITTINGS LIKE EXPANDERS, DUCKFOOT


BENDS, ELBOWS, BELLOWS/DISMATLING JOINTS FOR INDIVIDUAL PUMPS AND Lot
THE COMMON HEADER WITHIN THE BATTERY LIMIT SPECIFIED ABOVE
2 1.00
iii)DISMANTLING AND REMOVAL OF EXISTING FOUNDATIONS FOR THE
PUMPS AND SUPPORTS FOR PIPES/FITTINGS BY BREAKING CONCRETE USING
SUITABLE MECHANIZED BREAKING EQUIPMENT AND DISPOSAL OF THE SAID Lot
MATERIAL ALONG WITH FOUNDATION BOLTS, NUTS, STRUCTURAL
3 MATERIAL USED FOR SUPPORT ETC 1.00

i)DISMANTLING AND REMOVAL OF 150 mm GATE VALVE AT PUMP DISCHARGE NOS


4 2.00
i)DISMANTLING AND REMOVAL OF 150 mm NON RETURN VALVE AT PUMP
NOS
5 DISCHARGE 2.00
6 Dismantling and Removal of Structural Supports for Pipes, Valves and Fittings Lot 1.00
7 Submersible pump @ 20 lps,4 HP motor at Panchanantala LS Set 2.00
Removal of manual bar screen (1.050 m Width X 1.20 m Height) at Panchanantala NOS
8 1.00
9 CI Sluice Gate at Panchanantala (600 mm X 600 mm Manual) NOS 1.00
10 2T HOISTS at Panchanantala NOS 1.00
10P153 BOQ FOR PIPING & EQUIPMENT ERECTION WORKS L.S & MPS (ASSO.
INFRA)
Hanuman Jute WABAG Offered
LS & MPSs Mill Matkhal/Barana Total Qty Amount
gar MPS rate

DESCRIPTION Qty Qty


UOM

1 PIPING EQUIPMENT

ERECTION OF DI PIPE AND FITTINGS WITH PROPER ALIGNMENT AND SUPPORTING


AS PER DRAWING
Labour charges for shifting of pipes & Fiitigs from the
respective store/store –yard (inside pumphouse premises) to work site with the help
of Hydra & Crane (which is accessible in site) & trained rigger. Placing /Erecting of
the pipe shall be done as per drawing in position by the help of Hydra/ Crane
/Manual Derrick/Chain-pully block /Other mechanical devices etc –(which is safer for
erection and accessible to the site) & trained rigger. The rate includes alignment &
proper welding (for DI pipe if required) as per procedure (edge preparation, fit-up,
root, intermediate and final welding if required) and proper jointing of DI pipes and
fittings by flange bolt tightening, gasket placing, etc as per specifications (including
A) the supply of consumeables and machineries) ,hydro test & other joint test & -
arranging the necessary support for erection of all the size of DI pipes at all the levels
by providing the necessary tools and tackles, approved electrodes, gas cutting set
with gas, etc. to complete the work and satisfy the competent authority in site ,any
minor or major chipping works shall have to be taken care by the contractor. Before
starting the welding, the agency shall take care for the base preparation of welding
test, welder qualification test shall be carried and need to obtain the approval from
the competent authority at their own cost. Only qualified welder to be allowed to
carry out the work. Necessary approval shall be taken for the other manpower
associated to the work like, gash cutter, fitter (if required) etc from the competent
authority at site. During execution, all the safety measures shall be taken which is
required for safe work at site.

100 NB i)LAYING OF PIPE RM - - -


- - -
150 NB i)LAYING OF PIPE RM 39.73 150.00 5,960.10 2,801
- - -
200 NB i)LAYING OF PIPE RM 80.72 250.00 20,178.75 6,833
- - -
250 NB i)LAYING OF PIPE RM 58.35 280.00 16,337.16 490
- - -
300 NB i)LAYING OF PIPE RM 64.43 325.00 20,939.10 -
- - -
350 NB i)LAYING OF PIPE RM 29.52 400.00 11,809.20 -
- - -
400 NB i)LAYING OF PIPE RM 20.92 9.71 111.94 450.00 50,372.10 3,530
- - -
450 NB i)LAYING OF PIPE RM 19.31 500.00 9,653.00 -
- - -

10P153_EREC_MECH_AI 13 of 23
10P153 BOQ FOR PIPING & EQUIPMENT ERECTION WORKS L.S & MPS (ASSO.
INFRA)
Hanuman Jute WABAG Offered
LS & MPSs Mill Matkhal/Barana Total Qty Amount
gar MPS rate

DESCRIPTION Qty Qty


UOM
500 NB i)LAYING OF PIPE RM 3.50 7.95 43.73 600.00 26,238.00 -
- - -
600 NB i)LAYING OF PIPE RM 10.57 17.13 39.95 700.00 27,961.50 -
- - -
650 NB i)LAYING OF PIPE RM 4.40 750.00 3,300.00 -
- - -
700 NB i)LAYING OF PIPE RM 24.60 32.63 94.66 850.00 80,464.40 -
- - -
800 NB i)LAYING OF PIPE RM 16.80 1,000.00 16,800.00 -
- - -
900 NB i)LAYING OF PIPE RM 60.68 1,200.00 72,816.00 -
- - -
1000 NB i)LAYING OF PIPE RM 19.14 2,000.00 38,270.00 -
- - -

ERECTION OF VALVE WITH PROPER ALIGNMENT AND PROPER GASKETING, BOLTING


WITH TIGHTINING
Labour charges for shifting of Valves from the respective
store/store –yard (inside pumphouse premises) to work site with the help of Hydra
& Crane (which is accessible at site) & trained rigger. Placing /Erecting of the valves
as per drawing in position with the help of hydra/ crane / Manual Derrick/ Chain
Pully block/ Other Mechanical devices etc. –(which is safer for erection and
B) -
accessible to the site). The rate includes alignment & proper jointing & tightening (by
bolting or gasket fixing ) , welding (if req) , socket jointing including all the
consumeables , for erection of all the size of valves at all the levels by providing the
necessary tools and tackles etc to complete the work and satisfy the competent
authority in site. Before starting the welding, the agency shall take care for the base
preparation of welding test, welder. During execution, all the safety measures shall
be taken required for safe work at site

50 NB GATE VALVE NOS 6 6 78.00 250.00 19,500.00 1,500


150 NB KNIFE GATE VALVE NOS 7.00 350.00 2,450.00 700
NON RETURN VALVE NOS 4.00 350.00 1,400.00 700
200 NB KNIFE GATE VALVE NOS 14.00 450.00 6,300.00 1,350
NON RETURN VALVE NOS 11.00 450.00 4,950.00 1,350
250 NB KNIFE GATE VALVE NOS 18.00 550.00 9,900.00 -
NON RETURN VALVE NOS 10.00 550.00 5,500.00 -
300 NB KNIFE GATE VALVE NOS 10.00 700.00 7,000.00 -
NON RETURN VALVE NOS 8.00 700.00 5,600.00 -
350 NB KNIFE GATE VALVE NOS 9.00 750.00 6,750.00 -
NON RETURN VALVE NOS 3.00 750.00 2,250.00 -
400 NB KNIFE GATE VALVE NOS 7 2 27.00 1,000.00 27,000.00 3,000
NON RETURN VALVE NOS 2 8.00 1,000.00 8,000.00 -

10P153_EREC_MECH_AI 14 of 23
10P153 BOQ FOR PIPING & EQUIPMENT ERECTION WORKS L.S & MPS (ASSO.
INFRA)
Hanuman Jute WABAG Offered
LS & MPSs Mill Matkhal/Barana Total Qty Amount
gar MPS rate

DESCRIPTION Qty Qty


UOM
450 NB KNIFE GATE VALVE NOS 7.00 1,200.00 8,400.00 -
NON RETURN VALVE NOS 4.00 1,200.00 4,800.00 -
500 NB KNIFE GATE VALVE NOS 2 7.00 1,500.00 10,500.00 -
NON RETURN VALVE NOS 2 4.00 1,500.00 6,000.00 -
600 NB KNIFE GATE VALVE NOS 3 3 9.00 2,000.00 18,000.00 -
NON RETURN VALVE NOS 3 3.00 2,000.00 6,000.00 -
700 NB KNIFE GATE VALVE NOS 3 6 27.00 3,000.00 81,000.00 -
NON RETURN VALVE NOS 3 10.00 3,000.00 30,000.00 -
800 NB KNIFE GATE VALVE NOS - 3,500.00 - -
NON RETURN VALVE NOS - 3,500.00 - -
900 NB KNIFE GATE VALVE NOS 6.00 5,000.00 30,000.00 -
NON RETURN VALVE NOS - 5,000.00 - -
1000 NB KNIFE GATE VALVE NOS - 7,000.00 - -
NON RETURN VALVE NOS 3.00 7,000.00 21,000.00 -

ERECTION OF DJ WITH PROPER ALIGNMENT AND PROPER GASKETING,BOLTING


WITH TIGHTINING.
Labour charges for shifting of Dismantling
Joints from the respective store/store –yard (inside pumphouse premises) to work
site with the help of Hydra & Crane (which is accessible at site) & trained rigger.
Placing /Erecting of the DJ's as per drawing in position with the help of hydra/
C) NOS -
crane / Manual Derrick/ Chain Pully block/ Other Mechanical devices etc. –(which is
safer for erection and accessible to the site). The rate includes alignment & proper
jointing & tightening (by bolting or gasket fixing ) , for erection of all the size of
Dismantling Joints at all the levels, by providing the necessary tools and tackles etc
to complete the work and satisfy the competent authority in site. During execution,
all the safety measures shall be taken which is required for safe work at site

250 NB DJ NOS 1.00 900.00 900.00 -


400 NB DJ NOS 2 4.00 1,500.00 6,000.00 -
450 NB DJ NOS 6.00 1,800.00 10,800.00 1,800
500 NB DJ NOS 2 5.00 2,200.00 11,000.00 -
600 NB DJ NOS 3 4.00 3,000.00 12,000.00 -
700 NB DJ NOS 1 3 12.00 4,500.00 54,000.00 -
900 NB DJ NOS 2.00 6,000.00 12,000.00 -
1000 NB DJ NOS 1.00 9,000.00 9,000.00 -

10P153_EREC_MECH_AI 15 of 23
10P153 BOQ FOR PIPING & EQUIPMENT ERECTION WORKS L.S & MPS (ASSO.
INFRA)
Hanuman Jute WABAG Offered
LS & MPSs Mill Matkhal/Barana Total Qty Amount
gar MPS rate

DESCRIPTION Qty Qty


UOM

ERECTION OF INSTRUMENT ITEMS WITH PROPER ALIGNMENT AND PROPER


GASKETING, BOLTING WITH TIGHTINING
Labour charges for shifting of Flow meters
from the respective store/store –yard to work site with the help of Hydra & Crane
(which is accessible at site) & trained rigger. Placing /Erecting of the Flow Meter as
per drawing in position with the help of hydra/ crane / Manual Derrick/ Chain Pully
D) -
block/ Other Mechanical devices etc. –(which is safer for erection and accessible to
the site). The rate includes alignment & proper jointing & tightening (by bolting or
gasket fixing ) , for erection of all the size of Flow Meters at all the levels, by
providing the necessary tools and tackles etc to complete the work and satisfy the
competent authority in site. During execution, all the safety measures shall be taken
which is required for safe work at site

(i) 150 NB MAC FLOW METER NOS 1.00 3,000.00 3,000.00 -


(ii) 250 NB MAC FLOW METER NOS 2.00 6,000.00 12,000.00 6,000
(iii) 300 NB MAC FLOW METER NOS 1.00 10,000.00 10,000.00 -
(iv) 400 NB MAC FLOW METER NOS - 15,000.00 - -
(v) 450 NB MAC FLOW METER NOS 1.00 22,000.00 22,000.00 -
(vi) 500 NB MAC FLOW METER NOS 1 1.00 30,000.00 30,000.00 -
(vii) 600 NB MAC FLOW METER NOS 1 1.00 42,000.00 42,000.00 -
(viii) 700 NB MAC FLOW METER NOS - 45,000.00 - -
(ix) 800 NB MAC FLOW METER NOS 1.00 50,000.00 50,000.00 -
(x) 1000 NB MAC FLOW METER NOS - 55,000.00 - -

MODIFICATION OF CIVIL FOUNDATIONS FOR PUMPS IN LS/MPS (Drawings by


2 -
WABAG)

Preparation and Modification of foundation for Wet pit and Dry Pit LS/MPS with
A) anchor bolts, grouting , structural steel, welding in place, etc all complete as per -
below.

Providing and fixing the Chemical Anchor Fasteners with Hilti HIT - RE 500 V3 Injection
System With Rebar 12mm Dia (As post Install Conection) at required
(i) locations and level including drilling the hole, cleaning with blow pump Nos 65.00 157.00 701.00 450.00 315,450.00 -
and anchoring the bolt with chemical as per manufacturers specifications
etc. complete as directed by Engineer In Charge/WABAG.

10P153_EREC_MECH_AI 16 of 23
10P153 BOQ FOR PIPING & EQUIPMENT ERECTION WORKS L.S & MPS (ASSO.
INFRA)
Hanuman Jute WABAG Offered
LS & MPSs Mill Matkhal/Barana Total Qty Amount
gar MPS rate

DESCRIPTION Qty Qty


UOM

Providing and fixing the Chemical Anchor Fasteners with Hilty HIT - RE 500 V3 Injection
System With Rebar 12mm Dia (As Anchor Bolt) at required
(ii) locations and level including drilling the hole, cleaning with blow pump Nos 20.00 452.00 700.00 316,400.00 28,000
and anchoring the bolt with chemical as per manufacturers specifications
etc. complete as directed by Engineer In Charge/WABAG.

Providing and fixing the Chemical Anchor Fasteners with Hilty HIT - RE 500 V3 Injection
System With Rebar 16mm Dia (As Anchor Bolt) at required
(iii) locations and level including drilling the hole, cleaning with blow pump Nos 20.00 40.00 850.00 34,000.00 -
and anchoring the bolt with chemical as per manufacturers specifications
etc. complete as directed by Engineer In Charge/WABAG.

M25 Concrete,20MM (OPC) minimum cement- 350 kg/cum content, (river sand),
including all : Providing & casting in situ design mix cement concrete in grade M25
(iv) (Ordinary Portland cement -OPC) with minimum cement content of 350 kg/m3 using Cum 6.34 7.56 75.15 8,000.00 601,175.77 4,800
river sand & 20 mm size down graded coarse aggreagates at all levels including needle
vibrated consolidation, curing, scaffolding, , admixtures., all complete.

Providing and placing Free flow, high strength, non-shrink, cementitious


precision grout, Conbextra GP2, or similar with mechanically powered grout mixer
should as per direction of engineer/WABAG. Prior to grouting, The substrate surface
(v) must be free from oil, grease or any loosely adherent material. If the concrete surface Cum 0.08 0.32 2.22 45,000.00 99,989.54 2,442
is defective or has laitence, it must be cut back to a sound base. Bolt holes and fixing
pockets must be blown clean of any dirt or debris.

REINFORCEMENT STEEL-STEEL GRADE FE-500-0RDINARY STEEL


REINFORCEMENT STEEL - Steel Reinforcement- Fe-500 TMT (Approved
make by Client) : Fe 500 TMT bars complying to IS 1786-1985 · Supplying
(vi)
, Cutting, bending, placing & binding in position HYSD steel reinforcement including o
Kg 602.00 718.00 7,138.00 73.00 521,074.00 4,161
9mm to 1.6mm annealed binding wire .etc. all complete as per the direction of the site
in charge

SHUTTERING WORK- Formwork: Providing & fixing to correct level, line, plumb,
vertical, plain formwork at all levels made of plywood/steel for all types of RCC and all
levels including necessary strutting, scaffolding, access and working platforms bracing,
(vii)
leaving necessary recesses, opening chambers etc. all complete as per the direction of
SqM 8.41 8.30 98.97 450.00 44,534.27 150
the site incharge all lifts

10P153_EREC_MECH_AI 17 of 23
10P153 BOQ FOR PIPING & EQUIPMENT ERECTION WORKS L.S & MPS (ASSO.
INFRA)
Hanuman Jute WABAG Offered
LS & MPSs Mill Matkhal/Barana Total Qty Amount
gar MPS rate

DESCRIPTION Qty Qty


UOM

Structural steel - supply, fabrication, paint,erection (with material) :


Supplying ,Fabricating and erecting in position structural steel, for platforms/hoist
(viii) beams etc. at all levels fabricated from rolled steel sections or from plates for all types Kg 188.40 6,533.55 90.00 588,019.28 28,409
of structural works including cutting, welding, bolting, etc. including surface
preparation and painting as per specification.

3 MECHANICAL EQUIPMENT -

ERECTION OF PUMP WITH PROPER ALIGNMENT

Labour charges for shifting of Pumps along with


Motors (including all accessories) from the respective store/store –yard (inside
pumphouse premises) to work site with the help of Hydra & Crane (which is
accessible at site) & trained rigger. Placing /Erecting of the Pumps as per drawing in
A) -
position with the help of hydra/ crane / Manual Derrick/ Chain Pully block/ Other
Mechanical devices etc. –(which is safer for erection and accessible to the site). The
rate includes proper alignment with suitable Instruments & proper jointing and
tightening of all the accessories , for erection of all the types , sizes and qty of
Pumps (including motors) at the req. levels, by providing the necessary tools and
tackles etc (including

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(i) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3 3.00 60,000.00 180,000.00 -
PUMPS OF 2178 m3/h @ 28 M 3 Nos. (2W+1S) AT HANUMAN JUTE MILL PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(ii) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2 2.00 40,000.00 80,000.00 -
PUMPS OF 1116 m3/h @ 28M 2 Nos. (1W+1S) AT HANUMAN JUTE MILL PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(iii) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3.00 30,000.00 90,000.00 -
PUMPS OF 630 m3/h @ 22.28 M 3 Nos. (2W+1S) AT BELUR MATH PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(iv) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2.00 20,000.00 40,000.00 -
PUMPS OF 306 m3/h @ 22.28 M 2 Nos. (1W+1S) AT BELUR MATH PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(v) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3.00 30,000.00 90,000.00 -
PUMPS OF 114 m3/h @ 17.47 M 3 Nos. (2W+1S) AT BALLY KHAL PS

10P153_EREC_MECH_AI 18 of 23
10P153 BOQ FOR PIPING & EQUIPMENT ERECTION WORKS L.S & MPS (ASSO.
INFRA)
Hanuman Jute WABAG Offered
LS & MPSs Mill Matkhal/Barana Total Qty Amount
gar MPS rate

DESCRIPTION Qty Qty


UOM

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(vi) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2.00 20,000.00 40,000.00 -
PUMPS OF 72 m3/h @ 17.47 M 2 Nos. (1W+1S) AT BALLY KHAL PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(vii) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3.00 30,000.00 90,000.00 90,000
PUMPS OF 234 m3/h @ 11.88 M 3 Nos. (2W+1S) AT PANCHANANTALA PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(viii) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2.00 20,000.00 40,000.00 40,000
PUMPS OF 115.2 m3/h @ 11.88 M 2 Nos. (1W+1S) AT PANCHANANTALA PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(ix) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3.00 30,000.00 90,000.00 -
PUMPS OF 396 m3/h @ 14.85 M 3 Nos. (2W+1S) AT SALT GOLA PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(x) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2.00 20,000.00 40,000.00 -
PUMPS OF 198m3/h @ 14.85 M 2 Nos. (1W+1S) AT SALT GOLA PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xi) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3.00 30,000.00 90,000.00 -
PUMPS OF 774 m3/h @ 22.28 M 3 Nos. (2W+1S) AT GOLA BARI PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xii) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2.00 20,000.00 40,000.00 -
PUMPS OF 385.2 m3/h @ 22.28 M 2 Nos. (1W+1S) AT GOLA BARI PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xiii) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3.00 80,000.00 240,000.00 -
PUMPS OF 2898 m3/h @ 21.22 M 3 Nos. (2W+1S) AT KONA MPS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xiv) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2.00 65,000.00 130,000.00 -
PUMPS OF 1458 m3/h @ 21.22 M 2 Nos. (1W+1S) AT KONA MPS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xv) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3.00 70,000.00 210,000.00 -
PUMPS OF 612 m3/h @ 20 M 3 Nos. (2W+1S) AT BESU PS

10P153_EREC_MECH_AI 19 of 23
10P153 BOQ FOR PIPING & EQUIPMENT ERECTION WORKS L.S & MPS (ASSO.
INFRA)
Hanuman Jute WABAG Offered
LS & MPSs Mill Matkhal/Barana Total Qty Amount
gar MPS rate

DESCRIPTION Qty Qty


UOM

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xvi) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2.00 50,000.00 100,000.00 -
PUMPS OF 450 m3/h @ 20 M 2 Nos. (1W+1S) AT BESU PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xvii) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3.00 70,000.00 210,000.00 -
PUMPS OF 396 m3/h @ 14 M 3 Nos. (2W+1S) AT CPT LAND PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xviii) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3.00 50,000.00 150,000.00 -
PUMPS OF 198 m3/h @ 14 M 3 Nos. (2W+1S) AT CPT LAND PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xix) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3.00 70,000.00 210,000.00 -
PUMPS OF 864 m3/h @ 12 M 3 Nos. (2W+1S) AT ROUND TANK PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xx) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3.00 50,000.00 150,000.00 -
PUMPS OF 432 m3/h @ 12 M 3 Nos. (2W+1S) AT ROUND TANK PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xxi) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2.00 80,000.00 160,000.00 -
PUMPS OF 3132 m3/h @ 17 M 2 Nos. (1W+1S) AT ICHAPUR PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xxii) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2.00 50,000.00 100,000.00 -
PUMPS OF 1368 m3/h @ 17 M 2 Nos. (1W+1S) AT ICHAPUR PS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xxiii) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2.00 80,000.00 160,000.00 -
PUMPS OF 3132 m3/h @ 17 M 2 Nos. (1W+1S) AT ARUPARA MPS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xxiv) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2.00 50,000.00 100,000.00 -
PUMPS OF 1368 m3/h @ 17 M 2 Nos. (1W+1S) AT ARUPARA MPS

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xxv) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 3 3.00 70,000.00 210,000.00 -
PUMPS OF 1368 m3/h @ 17 M 2 Nos. (1W+1S) AT ARUPARA MPS

10P153_EREC_MECH_AI 20 of 23
10P153 BOQ FOR PIPING & EQUIPMENT ERECTION WORKS L.S & MPS (ASSO.
INFRA)
Hanuman Jute WABAG Offered
LS & MPSs Mill Matkhal/Barana Total Qty Amount
gar MPS rate

DESCRIPTION Qty Qty


UOM

ERECTION OF SEWAGE LIFTING & TRANSFER PUMPS WITH GUIDE PIPE, PEDESTAL
(xxvi) COUPLING, DUCK FOOT BEND, SUBMERSIBLE CABLE AND OTHER ACCESSORIES FOR NOS 2 2.00 50,000.00 100,000.00 -
PUMPS OF 1260 m3/h @ 24 M 2 Nos. (1W+1S) AT MATKHAL MPS

(xxvii) Dewatering Pumps NOS 1 1 8.00 85,000.00 680,000.00 -

ERECTION - ERECTION OF ALL BACK FRAME SLUICE GATES & OPEN CHANNEL SLUICE
GATE
Labour charges for shifting of Sluice Gates and
Actuators (if req.) all the other req. accessories , from the respective store/store –
yard (inside pumphouse premises) to work site with the help of Hydra & Crane
(which is accessible at site) & trained rigger. Placing /Erecting of the Sluice Gates as
per drawing in position with the help of hydra/ crane / Manual Derrick/ Chain Pully
block/ Other Mechanical devices etc. –(which is safer for erection and accessible to
B) -
the site). The rate includes alignment, proper jointing, tightening and welding (if req)
, for erection of all the sizes and capacity of Sluice Gates along with actuators (if
req.) and all the other req. accessories , at all the levels, by providing the necessary
tools and tackles etc to complete the work and satisfy the competent authority in
site and any minor/major chipping works for the completion of the system shall have
to be arranged by the contractor. During execution, all the safety measures shall be
taken which is required for safe work at site and Recommendations of Manufacturer
will be followed.

(i) CI Sluice Gate at Hanuman Jute Mill (Manual) NOS 1 1.00 35,000.00 35,000.00 -
(ii) CI Sluice Gate at Bally Khal (Manual) NOS 1.00 20,000.00 20,000.00 -
(iii) CI Sluice Gate at Belur Math (Manual) NOS 1.00 20,000.00 20,000.00 -
(iv) CI Sluice Gate at Panchanantala (Manual) NOS 1.00 20,000.00 20,000.00 20,000
(v) CI Sluice Gate at Salt Gola (Manual) NOS 1.00 20,000.00 20,000.00 -
(vi) CI Sluice Gate at Golabari (Manual) NOS 1.00 20,000.00 20,000.00 -
(vii) CI Sluice Gate at Kona MPS (Manual) NOS 2.00 35,000.00 70,000.00 -
(viii) CI Sluice Gate at Matkhal (Manual) NOS 4 4.00 35,000.00 140,000.00 -
(ix) CI Sluice Gate at BESUl (Manual) NOS 1.00 35,000.00 35,000.00 -
(x) CI Sluice Gate at CPT Land (Manual) NOS 1.00 35,000.00 35,000.00 -
(xi) CI Sluice Gate at Round Tank (Manual) NOS 1.00 35,000.00 35,000.00 -
(xii) CI Sluice Gate at Ichapur PS (Manual) NOS 1.00 40,000.00 40,000.00 -
(xiii) CI Sluice Gate at Arupara MPS (Manual) NOS 1.00 40,000.00 40,000.00 -

10P153_EREC_MECH_AI 21 of 23
10P153 BOQ FOR PIPING & EQUIPMENT ERECTION WORKS L.S & MPS (ASSO.
INFRA)
Hanuman Jute WABAG Offered
LS & MPSs Mill Matkhal/Barana Total Qty Amount
gar MPS rate

DESCRIPTION Qty Qty


UOM

ERECTION - ERECTION OF ALL SCREENS IN SCREENING CHAMBERS

Labour charges for shifting of Screens and Actuators (if req.)


all the other req. accessories , from the respective store/store –yard (inside
pumphouse premises) to work site with the help of Hydra & Crane (which is
accessible at site) & trained rigger. Placing /Erecting of the Screens as per drawing in
position with the help of hydra/ crane / Manual Derrick/ Chain Pully block/ Other
Mechanical devices etc. –(which is safer for erection and accessible to the site). The NOS
C) -
rate includes alignment, proper jointing, tightening and welding (if req) , for erection
of all the sizes and capacity of Sluice Gates along with actuators (if req.) and all the
other req. accessories , at all the levels, by providing the necessary tools and tackles
etc to complete the work and satisfy the competent authority in site and any
minor/major chipping works for the completion of the system shall have to be
arranged by the contractor. During execution, all the safety measures shall be taken
which is required for safe work at site and Recommendation of Manufacturer will be
followed.

(i) Erection of manual bar screen (1.38 m Width X 2.822 m Height) at Hanuman Jute Mill NOS 1 1.00 15,000.00 15,000.00 -

(ii) Erection of manual bar screen (1.1 m Width X 2.822 m Height) at Belur Math NOS 1.00 10,000.00 10,000.00 -

(iii) Erection of manual bar screen (1.080 m Width X 3.630 m Height) at Bally Khal NOS 1.00 10,000.00 10,000.00 -

(iv) Erection of manual bar screen (1.080 m Width X 2.822 m Height) at Panchanantala NOS 1.00 10,000.00 10,000.00 10,000

(v) Erection of manual bar screen (0.970 m Width X 2.822 m Height) at Salt Gola NOS 1.00 10,000.00 10,000.00 -

(vi) Erection of manual bar screen (1.480 m Width X 2.937 m Height) at Golabari NOS 1.00 10,000.00 10,000.00 -

(vii) Erection of manual bar screen (2.88 m Width X 2.937 m Height) at Kona MPS NOS 2.00 25,000.00 50,000.00 -

(viii) Erection of manual bar screen (1.83 m Width X 2.937 m Height) at Matkhal MPS NOS 1.00 25,000.00 25,000.00 -

(ix) Erection of manual bar screen (1.18 m Width X 3.630 m Height) at BESU NOS 1.00 15,000.00 15,000.00 -

(x) Erection of manual bar screen (1.18 m Width X 3.630 m Height) at CPT Land NOS 1.00 15,000.00 15,000.00 -

(xi) Erection of manual bar screen (1.18 m Width X 3.630 m Height) at Round Tank NOS 1.00 15,000.00 15,000.00 -

10P153_EREC_MECH_AI 22 of 23
10P153 BOQ FOR PIPING & EQUIPMENT ERECTION WORKS L.S & MPS (ASSO.
INFRA)
Hanuman Jute WABAG Offered
LS & MPSs Mill Matkhal/Barana Total Qty Amount
gar MPS rate

DESCRIPTION Qty Qty


UOM

(xii) Erection of manual bar screen (1.18 m Width X 3.630 m Height) at Ichapur PS NOS 1.00 25,000.00 25,000.00 -

(xiii) Erection of manual bar screen (1.18 m Width X 3.630 m Height) at Arupara MPS NOS 1 1.00 25,000.00 25,000.00 -

ERECTION OF HOT CRANES AND MANUAL HOISTS WITH PROPER ALIGNMENT

Labour charges for shifting of HOT Cranes, Manual


Hoist and all the other req. accessories including ISMB , from the respective
store/store –yard (inside pumphouse premises) to work site with the help of Hydra
& Crane (which is accessible at site) & trained rigger. Placement/Erection of HOT
Cranes, Manual Hoist and all the other req. accessories including ISMB as per
drawing in position with the help of hydra/ crane / Manual Derrick/ Chain Pully
D) -
block/ Other Mechanical devices etc. –(which is safer for erection and accessible to
the site). The rate includes alignment,proper jointing , tightening and welding (if req)
, for erection of HOT Crane, Manual Hoist and all the other req. accessories
including ISMB, modification/repair to girder(if req) , at all the levels, by providing
the necessary tools and tackles etc to complete the work and satisfy the competent
authority in site and any minor/major chipping works for the completion of the
system shall have to be arranged by the contractor. During execution, all the safety
measures shall be taken which is required for safe work at site

(i) 1) HOT FOR KONA MPS 1.00 20,000.00 20,000.00 -


(ii) 2) HOISTS at Hanuman Jute Mill 1 1.00 25,000.00 25,000.00 -
(iii) 3) HOISTS at Belur Math 1.00 15,000.00 15,000.00 -
(iv) 4) HOISTS at Bally Khal 1.00 12,000.00 12,000.00 -
(v) 5) HOISTS at Panchanantala 1.00 15,000.00 15,000.00 15,000
(vi) 6) HOISTS at Salt Gola 1.00 15,000.00 15,000.00 -
(vii) 7) HOISTS at Golabari 1.00 15,000.00 15,000.00 -
(viii) 8) HOISTS at Besu 1.00 20,000.00 20,000.00 -
(ix) 9) HOISTS at Round Tank 1.00 20,000.00 20,000.00 -
(x) 10) HOISTS at CPT Land 1.00 15,000.00 15,000.00 -

SHIFTING AND UNLOADING OF ALL MECHNICAL ITEMS FROM WABAG STORE TO


E) REPECTIVE PUMP HOUSES. -

Shifting of all mechanical items from WABAG store at Baltikuri/ Arupara to repective
(i)
pumphouses including unloading, etc all comlplete
LS 1 1 13.00 50,000.00 650,000.00 50,000

Total= 733,137.60 997,088.30 8,935,742.17