Sub Total-1
2 BORE HOLE DRILLING
Clearing of site before and after construction, setting up and
2.1. Ls 1
dismantling equipment and material 50,000.00
2.20 DRILLNG IN SOFT FORMATION -
Well Diameter10" M 20 18,000.00
2.30 DRILLNG IN ALL CONSOLIDATED FORMATION -
6" Inch Dia M 300 14,062.50
2.40 Lithological Logging with 2m interval Ls 1 39,062.50
Geophysical Borehole Logging with logging techniques(SP,short
2.50 Ls 1
and Long Normal) 93,750.00
Sub Total-2
3 SUPPLY, INSTALLATION AND CONSTRUCTION
3.10 Supply and Install Retrievable OD Φ 12" HDPE Surface Casing M 20 4,716.74
3.20 Supply and Install Steel Blind Casing Φ 8" ID M 146 5,268.69
3.30 Supply and Install Steel Screen Casing Φ 8" ID M 84 5,770.47
Supply and Install Galvanized Observation pipe, Φ 3/4" Class B
3.40 M 200 100.36
GI pipe
Sub Total-2
WELL COMPLETION AND SANITARY PROTECTION
4
WORK
4.10 Supply and pack well rounded basaltic origin river gravel M3 10 12,937.50
lv:945m Drilling
opian regines)
Amount in Br.
250,000.00
250,000.00
500,000.00
50,000.00
360,000.00
4,218,750.00
39,062.50
93,750.00
4,761,562.50
94,334.71
769,229.32
484,719.85
20,071.22
1,368,355.09
129,375.00
101,250.00
12,375.00
10,125.00
11,250.00
56,250.00
45,000.00
365,625.00
4,500.00
40,500.00
81,000.00
236,250.00
4,050.00
9,562.50
375,862.50
180,000.00
135,000.00
315,000.00
-
79,888.22
-
23,670.58
-
66,573.52
-
985,650.00
-
43,346.76
-
277,389.66
-
-
221,911.73
-
281,088.19
1,979,518.66
9,665,923.76
1,449,888.56
11,115,812.32