Item Description Contract Previous Amount Current Amount Total % Total Amount
Amount % RM % RM
(a) Preparation of As-built drawings 500.00 30% 150.00 50% 250.00 80% 400.00
Instruction Manuals and Operation and
(b) 500.00 30% 150.00 50% 250.00 80% 400.00
Maintenance Manual
Testing and commisioning as per Specification
(c) 500.00 30% 150.00 50% 250.00 80% 400.00
and allow for
Grand Total (RM) 84,000.00 30% 25,200.00 50% 42,000.00 80.0% 67,200.00