You are on page 1of 3

BE Form 03

Republic of the Philippines


Department of Education
National Capital Region
SCHOOLS DIVISION OF MAKATI
Fort Bonifacio High School

JP Rizal Extension, West Rembo, Makati City


School Year 2022-2023

BRIGADA ESKWELA
RESOURCE MOBILIZATION FORM

Instruction: Using the completed BE Form 01: Physical Facilities Needs Assessment as basis, summarize the resources (materials and manpower) needed and
list down the potential source or partners to be tapped. Add additional sheet if needed. The Status and Remarks columns should be updated regularly to determine
progress in acquiring resources needed.

Key
Strategies/Plan of
Materials Needed Quantity Persons/Organization to Person Responsible Status Remarks
Action
be Tapped

Cleaning Materials ALERT Lead Man Request Letters BE Focal Person Completed Done
Invitations SSG Adviser

 Brooms Volunteers Orientation for the Participants English Teachers

 Mops ALERT Utility Personnel Planning and brainstorming TLE Teachers

 Rags Donors (Internal and external stakeholders Assigning Team leaders SHS Teachers

 Scrubs

 Screws, doorknobs

Paint and brush

Steel Bars

Glass windows

Plants, cement

Garden soil

Labor Skills/Volunteers Needed Quantity Key persons/Organizations to be tapped Strategies/Plan of Action Persons Responsible Status Remarks
Internet Installation  Maila Talamisan-ICT Coordiantor The School Head decided to change  Maila Talamisan-ICT Coordiantor Completed Completed and accessible

 Mr. Gumera-ICT Teacher subscriptions for the internet provider of the  Mr. Gumera-ICT Teacher
 Mr. Alvin Delos Santos school to make sure that teaching and non-
teaching personnel can access properly as well

as the students in the future.

Wall Painting  ALERT Utility personnel Inspections were done as to which part of the  ALERT Utility personnel Completed School gutter, cross walk and other areas that needed repainting
Signages  Mr. Ruben school areas needed repainting were done.

Painting of School fence


Painting of School Gutter
Painting of Distance markers
Painting of Crosswalks

Carpentry  School facilities Coordinator During the Pre-Assessment of physical  School facilities Coordinator On going Function rooms and offices that needed improvement were
Improvement of School Canteen and Clinic  ALERT Lead Man facilities and maintenance needs of the school,  ALERT Lead Man sustained.

 Mr. Ruben Mr. Palatan together with the ALERT Lead  Mr. Ruben
Man and Mr. Ruben conducted a school-wide
inspection as to what facilities need to be

improved.

Gardening/Landscaping  ALERT Lead Man As part of the Project WOW FBHS, school  Alert Lead man and utility personnel Completed Continuously maintained
garden was enhanced and maintained.  SHS Teacher-volunteers

Handwashing Facilities and  School facilities Coordinator  School facilities Coordinator Completed The school repaired and improved washing and toothbrushing
Repairing of electric wiring  ALERT Lead Man  ALERT Lead Man areas both placed in Building 1 and 2

 Mr. Ruben Dela Cruz  Mr. Ruben


 Mr. Alvin  Mr. Alvin

Prepared by: Noted:


ROMALDO C. GAMILLA ROSALITO N. PALATAN

Resource Mobilization Committee Chairperson School Head

You might also like