To be prepared by the authorized representative of the LGU. Please fill up the information on the space provided and
put a (√) on the appropriate items.
Mode of Ownership
[ ] TCT/ OCT
1|Page
PHYSICAL CHARACTERIZATION OF THE DISPOSAL FACILITY
2|Page
Length = 5 meters; Ht. = 1 m. Cross Section taken fr. Width = 3 meters cut away view
CROSS SECTION: 15 square meter dumpsite showing height / thickness & width
Type of waste dumped in the disposal facility (provide percentage of each waste if
determinable):
[ / ] Biodegradable [ / ] Non-biodegradable
(All Biodegradable waste) (Recyclable, Residual & Special)
[ / ] others, Flat land at the front with 10 ft. ravine at back area
3|Page
Surrounding dominant land use condition (approximately 1km radius)
[ ] Groundwater
[ ] Deep well
[ ] Shallow well (estimate depth in meters)
[ / ] none
4|Page
LOCATION OF DUMPSITE WITHIN ONE KM. RADIUS
[ / ] No
5|Page
Occurrence of Hazardous waste dumping (i.e., household hazardous waste,
hospital waste)
Some special hazardous wastes like busted bulbs and batteries are
spotted and mixed on residual wastes in the dumpsite
[ ] No
[ / ] No
[ / ] No
Other issues and concerns, please specify (use additional sheet if needed):
Clayish soil cover materials are available at the dumpsite and nearby area
and use as soil covering at the dumpsite.
6|Page
(The closure management program extended to particular disposal sites to address significant physical and environmental impacts and these
are the activities that will be scheduled in the Gantt Chart. The sub-activities in every major activity may apply depending on the situation at
the dumpsite).
__________________________
[ ] removal of squatters
[ ] benching
[ /] provision of embankment
7|Page
Please discuss process/ mode of site grading and stabilization of slopes:
The grade of the land and the final slopes will be done ranging from
2 to 4 % to prevent ponding and promote natural drainage.
All wastes are compacted and covered, the final cover application at
least 60 cm of clay-rich soil which include a 15 cm topsoil to
minimize surface water infiltration . An additional 30 - 45 cm of soil
will be placed over the compacted clay layer to protect it from
erosion.
[ / ] construction of canals/ditches
Leachate Management
Note: Not Applicable the area for closure is about 15 square meters only
[ ] leachate treatment
[ ] evaporation
[ ] re-circulation
[ ] natural attenuation
8|Page
Gas Management (follow the guidebook on safe closure and rehabilitation of
disposal facilities)
Signage
Strategic locations: At the Entrance Gate and Outside the disposal facility.
9|Page
POST CLOSURE LAND USE (PCLU)
(The closure management of the open dumpsite or the controlled dumpsite should be returned to some form of productive use.)
Site Maintenance
[ ] Leachate treatment
[ ] Park
[ ] Recreational Use
[ ] Golf Course
Biodegradable Waste
[ /] Centralized composting
[ / ] Barangay composting
10 | P a g e
[ ] Cluster (barangay) composting
[ / ] Household composting
Recyclable Waste
Residual Waste
[ ] Sanitary landfilling
11 | P a g e
[ / ] Residual waste processing technology
12 | P a g e
13 | P a g e
Annex 1 GANTT CHART OF IMPLEMENTATION of SAFE CLOSURE & REHABILITATION PLAN INCLUDING ITS POST
CLOSURE ACTIVITIES (BUCLOC, ABRA)
RESPONSIBLE
TIME FRAME OF IMPLEMENTATION CY 2016 COST REMARKS
ACTIVITIES ENTITY/ OFFICE
J F M A M J J A S O N D
Site Clearing, Slope For 15 m2 active
MPDC 7,000.00
Stabilization, Soil Covering area with waste
Construction of Lined Canal
MPDC 7,000.00
at every side (5m x 3m)
Construction of Perimeter
MPDC 6,000.00
Fence
Signage (Tarpaulin Printing) MPDC 500.00
TOTAL: 20,500.00
Prepared by:
SONNYBOY B. SAGUDANG
MPDC
14 | P a g e
Annex 2 GANTT CHART OF PROPOSED ESWM ACTIVITES FOR LGU BUCLOC
RESPONSIBLE
TIME FRAME OF IMPLEMENTATION CY 2016 COST REMARKS
ACTIVITIES ENTITY/ OFFICE
J F M A M J J A S O N D
Information and Education Campaign
on the Solid Waste Management MPDC 10,000.00
Program
Distribution of IEC Materials for all
MPDC 5,000.00
barangays and critical establishments
Establishment of collection of
residual waste across the cater MPDC -
barangay (Poblacion)
Full operation of Materials Recovery
MPDC -
Facility with personnel support
Strengthened partnership among
MPDC -
junkshop owners
Enforcement of RA 9003 on
MPDC 10,000.00
Segregation and Composting
25,000.00
TOTAL
Prepared by:
SONNYBOY B. SAGUDANG
MPDC
15 | P a g e
ACCOUNTABILITY STATEMENT
In witness whereof, I/we hereby set our hands this __________ day of
_______________ at ___________________________________.
SONNYBOY B. SAGUDANG
MPDC
16 | P a g e
ACKNOWLEDGMENT
______________________________
Notary Public
Doc. No. _______
Page No. _______
Book No. _______
Series of _______
SONNYBOY B. SAGUDANG
MPDC
17 | P a g e
18 | P a g e