You are on page 1of 20

CONSTRUCTION NOTES

ENGR. ALBERTO V. JONSON JR.


_______________________________________
STRUCTURAL ENGINEER

0095993 JAN. 18, 2021

1501655 JAN. 6, 2021

937-334-264 P.P.C.

MRS. FRANILY C. PASCUA

Construction Notes
STANDARD DETAILS

GRID GRID GRID


L3 = CLEAR SPAN
L1 L2 = CLEAR SPAN
L3 /3 L3 /3

L2 /3 L2 /3 TOP BARS @ TOP BARS @


MIDSPAN EXT. SUPPORT

CANTILEVER BEAM BOTTOM BARS


BOTTOM BARS BOTTOM BARS
@ INT. SUPPORT @ MIDSPAN @ EXT. SUPPORT
L2 /5 L2 /5 L3 /5 L3 /5

ENGR. ALBERTO V. JONSON JR.


_______________________________________
STRUCTURAL ENGINEER

TYPICAL BEAM REINFORCEMENT 0095993 JAN. 18, 2021

(NOT TO SCALE)
1501655 JAN. 6, 2021

937-334-264 P.P.C.
1 L 2 L

. 100 100 .
1/4 L .
2/4L 100 100 .
2/4L

1/5 L

.t
TYPICAL SLAB REINFORCEMENT MRS. FRANILY C. PASCUA
(NOT TO SCALE)

Standard Details

1. AT ANY LEVEL NO MORE THAN


ALTERNATE BARS SHOULD BE SPLICED.
PROVIDE THESE ADDITIONAL BARS FOR ALL OPENINGS PLUS BARS
H (CLEAR HEIGHT OF COL.)

2. MIN. DISTANCE BETWEEN TWO ADJACENT (SHOWN AS DOTTED LINES) PARALLEL TO SIDE OF OPENING EQUAL TO
BAR SPLICES SHALL BE 600mm.
THE NUMBER OF INTERRUPTED BARS BY THE OPENING. SEE
ARCHITECTURAL & MECHANICAL PLANS FOR SLAB OPENING LOCATION. GRID
L
WITHIN CENTER
HALF OF "H"

L/4 W W VERIFY ARCH'L


ANCHORAGE LENGTH
SEE TABLE OF

TOP BARS @ SUPPORT (CONT.)

30 BAR DIA.
(TYP.)
(TYP.)

REQ'D. BOT. BARS @ SUPPORT #12X1000 LONG


DIAGONALS AT
MID-DEPTH OF WALL
AT EACH CORNER
JT. REINF.
CONF. REINF. TIES LAT. TIES

BEAM HEIGHT
H
@ 125mm.O.C.
1-#16 EACH FACE WINDOW
(TYPICAL) OPENING
H

DOOR
EXTRA BOT. BARS
@ MIDSPAN
OPENING
LONG'L BARS
0.165L 1-#16 EACH
SPLICE
FACE OF OPENING
BOT. BARS
(TYPICAL)
@ MIDSPAN
0.22L EXTRA TOP BARS

125

100
@ SUPPORT ANCHORAGE LENGTH
(TYP.)

GIRDER TO COLUMN CONNECTION DETAIL


(NOT TO SCALE) DOOR & WINDOW OPENING DETAIL TYPICAL LEDGE DETAIL
(NOT TO SCALE) (NOT TO SCALE
FOOTING SCHEDULE (C21:Fy275)

FOOTING DIMENSION FOOTING REINFORCEMENT


FOOTING COLUMN FOOTING REMARKS
BOTTOM
NUMBERS NUMBERS TYPE L B T Df
ALONG B ALONG L
F1 C1 SPREAD 1500 1500 300 2000 7-#16 7-#16 CENTER

F2 C1 SPREAD 1650 1650 300 2000 8-#16 8-#16 CENTER

F3 C2 SPREAD 1850 1850 300 2000 9-#16 9-#16 CENTER

F4 C3 SPREAD 2350 2350 300 2000 12-#16 12-#16 CANTILEVERED

F5 C1 SPREAD 1900 1900 325 2000 9-#16 9-#16 CENTER


ENGR. ALBERTO V. JONSON JR.
_______________________________________
STRUCTURAL ENGINEER

0095993 JAN. 18, 2021


A B C
1501655 JAN. 6, 2021
4850 4850
100MM THICK CHB WITH 937-334-264 P.P.C.

1850 #10 VERT. AND HORIZONTAL


1650
WF-1 WF-1 REBARS @ 600MM O.C. E.W.
GB10

GB13

GB17
FIN. FLR. LVL.

VARIES
GB1 GB2
1650

1850

3 C1 C2 C3 NAT. GRD. LVL.


DOWEL BARS TO MATCH
F2

600 (MIN.)
F3 CHB VERTICAL BARS
F4
#10 BOTT. BARS
@ 300 O.C.

250
GB12

GB16
4850

GB9

3-#10 BOTT. BARS


2350 MRS. FRANILY C. PASCUA
1500
400
GB3 GB4
2350
1500

2 C1 C2 C3 DETAIL OF WALL FOOTING WF-1 Footing Schedule


Foundation Plan
F1 (NOT TO SCALE)
F3 Typ, Slab on Ground det.
F4 Wall Footing Detail
GB11

GB15

#10 REBAR
4850

GB8

100
#10 REBAR
1900

200
GB5 GB6 100 THK BEDDING
1900

1 C1 C1 C3
200 100
GB14
GB7

F1
F5
F4

TYP. SLAB-ON-GROUND DETAIL


(NOT TO SCALE)
FOUNDATION PLAN
(SCALE 1:100)
LD
7-#16 (B)
12-#16 (B)
#16@250 C/C (B)
EL. 2.000
7-#16 (B) BOF

300

LD
1500

12-#16 (B)
100 THK BEDDING

2350
#16@250 C/C (B) #16@210 C/C (B)

300
EL. 1.500
1500 1500 BOF
ENGR. ALBERTO V. JONSON JR.
_______________________________________
STRUCTURAL ENGINEER

FOOTING F1- PLAN DETAIL OF FOOTING F1 #16@265 C/C (B) 100 THK BEDDING
0095993 JAN. 18, 2021

(SCALE 1:50) (SCALE 1:50) 2350 1501655 JAN. 6, 2021


2350
937-334-264 P.P.C.

FOOTING F4- PLAN DETAIL OF FOOTING F4


(SCALE 1:50)
(SCALE 1:50)

LD
8-#16 (B)

8-#16 (B) 9-#16 (B)

LD
8-#16 (B) EL. 2.000
BOF
300
1650

9-#16 (B)
MRS. FRANILY C. PASCUA
9-#16 (B)
EL. 2.000
100 THK BEDDING

1900
BOF

325
8-#16 (B)

1650 1650
100 THK BEDDING Footing Plans and Details

FOOTING F2- PLAN DETAIL OF FOOTING F2 9-#16 (B)


(SCALE 1:50) (SCALE 1:50) 1900 1900

FOOTING F5- PLAN DETAIL OF FOOTING F5


(SCALE 1:50) (SCALE 1:50)

9-#16 (B)
LD

9-#16 (B)
9-#16 (B) EL. 2.000
BOF
300
1850

100 THK BEDDING


9-#16 (B)
1850
1850

FOOTING F3- PLAN DETAIL OF FOOTING F3


(SCALE 1:50)
(SCALE 1:50)
EL. 9.450
TOC

EL. 8.600 (1) 4-#20


TOC

(1) 4-#20

EL. 6.950 EL. 6.950 EL. 6.950


TOC TOC TOC ENGR. ALBERTO V. JONSON JR.
_______________________________________
STRUCTURAL ENGINEER

0095993 JAN. 18, 2021

(1) 4-#20 (1) 4-#20 1501655 JAN. 6, 2021

(1) 4-#20 937-334-264 P.P.C.


1 1

EL. 3.600 EL. 3.600 EL. 3.600


TOC TOC TOC
MRS. FRANILY C. PASCUA

(1) 4-#20 (1) 4-#20

1 1 (1) 4-#20
Columns Details

EL. 0.000 EL. 0.000 EL. 0.000


TOC TOC TOC

(1) 4-#20 (1) 4-#20

(1) 4-#20
EL. -2.00 EL. -2.00 EL. -2.00
BOF BOF BOF

DETAIL OF COLUMN C1 DETAIL OF COLUMN C2 DETAIL OF COLUMN C3


(SCALE 1:50) (SCALE 1:50) (SCALE 1:50)
C3, C6, C9
300

300

300

300
ENGR. ALBERTO V. JONSON JR.
_______________________________________
300 300 300 300 STRUCTURAL ENGINEER

0095993 JAN. 18, 2021

1501655 JAN. 6, 2021

937-334-264 P.P.C.

C2, C5
300

300

300
300 300 300

MRS. FRANILY C. PASCUA

Column Schedule

C1, C4, C7, C8


300

300

300

300
COLUMN SCHEDULE (C21:Fy275)

300 300 300 300

COLUMN MARKED
9.45M

6.95M

6.95M

-1.5M
8.6M

8.6M

3.6M

3.6M
TO

TO

TO

0M

TO

TO

0M
GRADE BEAM SCHEDULE (C21:Fy275) (LEVEL: 0m)
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS
SIDE FACE REMARKS
NUMBERS REINF. (SFR)
B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
GB1,GB2,GB3,GB4 200 350 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 17-2L-#10@100 C/C 15-2L-#10@100 C/C 17-2L-#10@100 C/C - -
,GB5,GB6,GB8,GB9
,GB11,GB12,GB15
,GB16
GB7,GB10,GB13 200 350 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - CANTILEVERED
,GB14,GB17

ENGR. ALBERTO V. JONSON JR.


SECOND FLOOR BEAM SCHEDULE (C21:Fy275) (LEVEL: 3.6m) _______________________________________
STRUCTURAL ENGINEER

BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS 0095993 JAN. 18, 2021

SFR REMARKS 1501655 JAN. 6, 2021


NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
937-334-264 P.P.C.

2B1 250 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - CANTILEVERED

2B2,2B3,2B12 250 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 12-2L-#10@150 C/C 10-2L-#10@150 C/C 12-2L-#10@150 C/C - -

2B4 250 400 2-#16 2-#16 2-#16 4-#16 4-#16 4-#16 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - CANTILEVERED
+ + +
2-#16 2-#16 2-#16

2B5 250 400 2-#16 3-#16 2-#16 4-#16 4-#16 4-#16 12-2L-#10@150 C/C 10-2L-#10@150 C/C 12-2L-#10@150 C/C - -
+ +
2-#16 3-#16

2B6,2B8,2B10 250 400 4-#16 4-#16 4-#16 4-#16 4-#16 4-#16 12-2L-#10@150 C/C 10-2L-#10@150 C/C 12-2L-#10@150 C/C - -
+
3-#16

2B7 250 400 4-#16 4-#16 4-#16 4-#16 4-#16 4-#16 12-2L-#10@150 C/C 10-2L-#10@150 C/C 12-2L-#10@150 C/C - -
+ MRS. FRANILY C. PASCUA
3-#16

2B9 250 400 4-#16 4-#16 4-#16 4-#16 4-#16 4-#16 22-2L-#10@75 C/C 15-2L-#10@100 C/C 12-2L-#10@150 C/C 2-#16EF -
+
3-#16

2B11 250 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 8-2L-#10@150 C/C 6-2L-#10@150 C/C 8-2L-#10@150 C/C - -
Grade Beam Schedule
2B13 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - -

2B14,2B23,2B26 300 400 3-#16 3-#16 3-#16 5-#16 5-#16 5-#16 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - CANTILEVERED

2B15,2B24,2B25 300 400 3-#16 3-#16 3-#16 5-#16 5-#16 5-#16 12-2L-#10@150 C/C 10-2L-#10@150 C/C 12-2L-#10@150 C/C - -

2B16 300 400 3-#16 3-#16 3-#16 5-#16 5-#16 5-#16 12-2L-#10@150 C/C 10-2L-#10@150 C/C 12-2L-#10@150 C/C - -
+
2-#16

2B17 300 400 3-#16 3-#16 3-#16 5-#16 5-#16 5-#16 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - CANTILEVERED
+ + +
2-#16 2-#16 2-#16

2B18 250 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - CANTILEVERED

2B19,2B22 300 400 3-#16 3-#16 3-#16 5-#16 5-#16 5-#16 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - CANTILEVERED
+ + +
3-#16 3-#16 3-#16

2B20 300 400 4-#16 4-#16 4-#16 5-#16 5-#16 5-#16 12-2L-#10@150 C/C 10-2L-#10@150 C/C 12-2L-#10@150 C/C - -
+ +
3-#16 2-#16

2B21 300 400 4-#16 4-#16 4-#16 5-#16 5-#16 5-#16 12-2L-#10@150 C/C 10-2L-#10@150 C/C 12-2L-#10@150 C/C - -
+ +
2-#16 3-#16
ROOF BEAM SCHEDULE (C21:Fy275) (LEVEL: 6.95m)
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS
SFR REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
RB1,RB2,RB3,RB4 200 350 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 12-2L-#10@150 C/C 10-2L-#10@150 C/C 12-2L-#10@150 C/C - -
,RB5,RB6,RB7,RB8
,RB10,RB13
RB9,RB16 200 350 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - CANTILEVERED

RB11,RB14,RB17 200 350 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 12-2L-#10@150 C/C 10-2L-#10@150 C/C 12-2L-#10@150 C/C - -
+
2-#16

RB12,RB15,RB19 200 350 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - CANTILEVERED
+ + + ENGR. ALBERTO V. JONSON JR.
2-#16 2-#16 2-#16 _______________________________________
STRUCTURAL ENGINEER

RB18 200 350 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 12-2L-#10@150 C/C 10-2L-#10@150 C/C 12-2L-#10@150 C/C - -
+ +
2-#16 2-#16 0095993 JAN. 18, 2021

1501655 JAN. 6, 2021

937-334-264 P.P.C.

SLAB SCHEDULE (C21 : FY275) (LEVEL : 3.6M)


SHORT SPAN LONG SPAN
t
MARK @ SUPPORT MID - SPAN @ SUPPORT MID - SPAN
(MM) REMARKS
TOP BOT. BOT. TOP BOT. BOT. MRS. FRANILY C. PASCUA
BAR BAR BAR BAR BAR BAR
S1 100 @150 @150 @300 @150 ONE WAY SLAB

S2 100 @150 @150 @150 @150 TWO WAY SLAB


Roof Beam Schedule
S3 125 @150 @150 @150 @150 Slab Schedule
TWO WAY SLAB

LEDGE 150/125 @150 @150 TEMPERATURE BAR CANTILEVER SLAB


A B C A B C
4850 4850 4850 4850
2B1 2B2 2B3 RB1 RB2
S1 S1 ENGR. ALBERTO V. JONSON JR.
_______________________________________

RB12

RB15

RB19
2B17

2B22

2B26
2B13

STRUCTURAL ENGINEER

(100THK) (100THK) (100THK) RB3 RB4 0095993 JAN. 18, 2021

3 C1 C2 C3
3 C1 C2 C3 1501655 JAN. 6, 2021
2B4 2B5 2B6
937-334-264 P.P.C.

S2 S2

RB11

RB14

RB18
2B16

2B21

2B25
4850

4850
(125THK) (125THK)

2B7 2B8 RB5 RB6


2 C1 C2 C3
2 C1 C2 C3

MRS. FRANILY C. PASCUA

S2 S2

RB10

RB13

RB17
2B15

2B20

2B24
4850

4850
(125THK) (125THK) Second Floor Framing Plan
Roof Beam Layout

2B9 2B10 RB7 RB8


1 C1 S1 C1 S1 C3
1 C1 C1 C3
2B19

2B23

RB16
2B14

2B18

RB9
(100THK) (100THK)
2B11 2B12

SECOND FLOOR FRAMING PLAN ROOF BEAM LAYOUT


(SCALE 1:100) (SCALE 1:100)
A B C
300 300 300
4550 4550

2-#16

ENGR. ALBERTO V. JONSON JR.


_______________________________________
2-#16 STRUCTURAL ENGINEER

32-2L-#10 32-2L-#10 0095993 JAN. 18, 2021

@150 C/C @150 C/C 1501655 JAN. 6, 2021

RB7:200x350 RB8:200x350 937-334-264 P.P.C.

1140 1140
4-#16
3-#16

2-#16EF

4-#16

22-2L-#10 15-2L-#10 12-2L-#10 32-2L-#10


@75 C/C @100 C/C @150 C/C @150 C/C
MRS. FRANILY C. PASCUA
1517 1517

2B9:250x400 2B10:250x400

2-#16 Frame Reinforcement Detail


along Grid Line 1

2-#16

47-2L-#10 47-2L-#10
@100 C/C @100 C/C

GB5:200x350 GB6:200x350
C1 C1 C3

FRAME REINFORCEMENT DETAIL ALONG GRID LINE 1


(SCALE: H = 1:50 / V = 1:50)
A B C
300 300 300
4550 4550

2-#16
ENGR. ALBERTO V. JONSON JR.
_______________________________________
STRUCTURAL ENGINEER

0095993 JAN. 18, 2021


2-#16
1501655 JAN. 6, 2021

32-2L-#10 32-2L-#10
937-334-264 P.P.C.
@150 C/C @150 C/C

RB5:200x350 RB6:200x350
1140 1140
4-#16
3-#16

4-#16
MRS. FRANILY C. PASCUA
32-2L-#10 32-2L-#10
@150 C/C @150 C/C

2B7:250x400 2B8:250x400
Frame Reinforcement Detail
along Grid Line 2

2-#16

2-#16

47-2L-#10 47-2L-#10
@100 C/C @100 C/C

GB3:200x350 GB4:200x350
C1 C2 C3

FRAME REINFORCEMENT DETAIL ALONG GRID LINE 2


(SCALE: H = 1:50 / V = 1:50)
A B C
300 300 300
4550 4550

2-#16

ENGR. ALBERTO V. JONSON JR.


_______________________________________
STRUCTURAL ENGINEER

2-#16
0095993 JAN. 18, 2021

32-2L-#10 32-2L-#10 1501655 JAN. 6, 2021

@150 C/C @150 C/C


937-334-264 P.P.C.

RB3:200x350 RB4:200x350
1500
1500 1140 1140
4-#16
2-#16 3-#16

2-#16 3-#16 2-#16 4-#16


1500 760
11-2L-#10 32-2L-#10 32-2L-#10 MRS. FRANILY C. PASCUA
@150 C/C @150 C/C @150 C/C

2B4:250x400 2B5:250x400 2B6:250x400


C1 C2 C3
Frame Reinforcement Detail
2-#16 along Grid Line 3

2-#16

47-2L-#10 47-2L-#10
@100 C/C @100 C/C

GB1:200x350 GB2:200x350
C1 C2 C3
FRAME REINFORCEMENT DETAIL ALONG GRID LINE 3
(SCALE: H = 1:50 / V = 1:50)
1 B C
250 250 300 300
1525 2925 4550

2-#16 3-#16

2-#16 2-#16

12-2L-#10 21-2L-#10 32-2L-#10


@150 C/C @150 C/C @150 C/C
2B9 2B18 2B19 2B23
ENGR. ALBERTO V. JONSON JR.
2B18:250x400 2B11:250x400 2B12:250x400 _______________________________________
STRUCTURAL ENGINEER

(SCALE: H = 1:50 / V = 1:50)


0095993 JAN. 18, 2021

FRAME REINFORCEMENT DETAIL ALONG SECOND FLOOR BALCONY


1501655 JAN. 6, 2021
(SCALE: H = 1:50 / V = 1:50)
937-334-264 P.P.C.

A B C
200 200 200
4650 4650

2-#16

MRS. FRANILY C. PASCUA

2-#16

32-2L-#10 32-2L-#10
@150 C/C @150 C/C
3 RB12 RB15 RB19 Frame Reinforcement Detail

250 250
RB1:200x350 RB2:200x350 along 2nd Flr Balcony
1400 1500

2-#16 3-#16

2-#16 2-#16

11-2L-#10 11-2L-#10 32-2L-#10 32-2L-#10


@150 C/C @150 C/C @150 C/C @150 C/C
2B4 2B1 2B17 2B22 2B26
2B13:250x400 2B1:250x400 2B2:250x400 2B3:250x400

FRAME REINFORCEMENT DETAIL ALONG SECOND FLOOR CORRIDOR


(SCALE: H = 1:50 / V = 1:50)
1 2 3

300 300 300


1500 4550 4550 1500
1500
2-#16
2-#16

2-#16
ENGR. ALBERTO V. JONSON JR.
_______________________________________
11-2L-#10 32-2L-#10 32-2L-#10 11-2L-#10 STRUCTURAL ENGINEER

@150 C/C @150 C/C @150 C/C @150 C/C


0095993 JAN. 18, 2021

RB9:200x350 RB10:200x350 RB11:200x350 RB12:200x350 1501655 JAN. 6, 2021

937-334-264 P.P.C.
1500
5-#16
2-#16

3-#16

11-2L-#10 32-2L-#10 32-2L-#10 11-2L-#10


@150 C/C @150 C/C @150 C/C @150 C/C

2B14:300x400 2B15:300x400 2B16:300x400 2B17:300x400


MRS. FRANILY C. PASCUA

2-#16

Frame Reinforcement Detail


along 2nd Flr Corridor
2-#16

11-2L-#10 47-2L-#10 47-2L-#10 11-2L-#10


@150 C/C @100 C/C @100 C/C @150 C/C

GB7:200x350 GB8:200x350 GB9:200x350 GB10:200x350


C1 C1 C1

FRAME REINFORCEMENT DETAIL ALONG GRID LINE A


(SCALE: H = 1:50 / V = 1:50)
1 2 3

300 300 300


4550 4550 1500
1500
2-#16
2-#16 ENGR. ALBERTO V. JONSON JR.
_______________________________________
STRUCTURAL ENGINEER

0095993 JAN. 18, 2021

2-#16 1501655 JAN. 6, 2021

32-2L-#10 32-2L-#10 11-2L-#10 937-334-264 P.P.C.

@150 C/C @150 C/C @150 C/C

RB13:200x350 RB14:200x350 300


RB15:200x350
1500 1500
1500 1140 1140 1500
5-#16
3-#16 2-#16 3-#16

3-#16 4-#16 3-#16


MRS. FRANILY C. PASCUA
465 1500
11-2L-#10 32-2L-#10 32-2L-#10 11-2L-#10
@150 C/C @150 C/C @150 C/C @150 C/C

2B19:300x400 2B20:300x400 2B21:300x400 2B22:300x400 Frame Reinforcement Detail


along Grid Line A

2-#16

2-#16

47-2L-#10 47-2L-#10 11-2L-#10


@100 C/C @100 C/C @150 C/C
C1 C2 C2
GB11:200x350 GB12:200x350 GB13:200x350

FRAME REINFORCEMENT DETAIL ALONG GRID LINE B


(SCALE: H = 1:50 / V = 1:50)
1 2 3

300 300 300


1500 4550 4550 1500
1140 1140 1500
2-#16
2-#16 2-#16
ENGR. ALBERTO V. JONSON JR.
_______________________________________
STRUCTURAL ENGINEER

0095993 JAN. 18, 2021


2-#16
1501655 JAN. 6, 2021
11-2L-#10 32-2L-#10 32-2L-#10 11-2L-#10
@150 C/C @150 C/C @150 C/C @150 C/C 937-334-264 P.P.C.

RB16:200x350 RB17:200x350 RB18:200x350 RB19:200x350

5-#16

3-#16

11-2L-#10 32-2L-#10 32-2L-#10 11-2L-#10 MRS. FRANILY C. PASCUA


@150 C/C @150 C/C @150 C/C @150 C/C

2B23:300x400 2B24:300x400 2B25:300x400 2B26:300x400


1140 1140 1500
Frame Reinforcement Detail
4-#16 along Grid Line B
2-#16 2-#16

2-#16 3-#16 2-#16 3-#16 2-#16


1500 760 760 1500
11-2L-#10 30-2L-#10 30-2L-#10 11-2L-#10
@160 C/C @160 C/C @160 C/C @160 C/C
C3 C3 C3
2B14:250x400 2B15:250x400 2B16:250x400 2B17:250x400

FRAME REINFORCEMENT DETAIL ALONG GRID LINE C


(SCALE: H = 1:50 / V = 1:50)
200 200 200

2-#16
2-#16 2-#16
2-#16

350

350

350
STP 2L-#10 STP 2L-#10 STP 2L-#10
2-#16 2-#16 2-#16

TYPICAL SECTION DETAIL OF GRADE BEAM TYPICAL SECTION DETAIL OF ROOF BEAM
ENGR. ALBERTO V. JONSON JR.
_______________________________________
(SCALE 1:25) (SCALE 1:25) STRUCTURAL ENGINEER

0095993 JAN. 18, 2021

1501655 JAN. 6, 2021

250 250 250 250 250 937-334-264 P.P.C.

4-#16 4-#16
2-#16 3-#16 4-#16
2-#16 3-#16
400

400

400

400

400
STP 2L-#10 STP 2L-#10 STP 2L-#10 STP 2L-#10 STP 2L-#10
2-#16 2-#16 2-#16 2-#16 3-#16

250 250 250 250 250

4-#16 4-#16 4-#16


4-#16 4-#16
3-#16 3-#16 3-#16
STP 2L-#10 STP 2L-#10
400

400

400

400

400
STP 2L-#10 STP 2L-#10 STP 2L-#10 MRS. FRANILY C. PASCUA
SFR 2-#16EF SFR 2-#16EF
3-#16 4-#16 4-#16 4-#16 4-#16

300 300 300 300 300


Frame Reinforcement Detail
5-#16 5-#16 5-#16 along Grid Line C
5-#16 5-#16
2-#16 2-#16 3-#16
400

400

400

400

400
STP 2L-#10 STP 2L-#10 STP 2L-#10 STP 2L-#10 STP 2L-#10
3-#16 3-#16 3-#16 3-#16 4-#16

300 300

5-#16 5-#16
2-#16 3-#16
400

400

STP 2L-#10 STP 2L-#10


4-#16 4-#16

TYPICAL SECTION DETAIL OF SECOND FLOOR BEAM


SCHEDULE OF WELDS & TRUSS MEMBERS
ENGR. ALBERTO V. JONSON JR.
_______________________________________
STRUCTURAL ENGINEER

TRUSS MEMBERS 0095993 JAN. 18, 2021


REMARKS
( mm ) 1501655 JAN. 6, 2021

STANDARD NUTS AND 937-334-264 P.P.C.


WASHERS (STAGGERED)
(A) 2L-50mm x 50mm x 6mm DOUBLE BACK-TO-BACK
A-36 ANGLE BAR WITH STD. 6MM GUSSET

(B) L-50mm x 50mm x 6mm SINGLE


A-36 ANGLE BAR WITH STD. 6MM GUSSET

PURLINS = LC 75mmX45mmX15mmX1.6mm @ 650mm C/C


MRS. FRANILY C. PASCUA
CROSS-BRACE 12mm DIA. PLAIN BAR W/ 12mm TURN BUCKLE

SAGROD 10mm DIA. W/ NUTS & WASHERS


Typical Section Detail of:
GUSSET PLATE = 6mm THICK Grade Beam
Roof Beam
BASE PLATE= 12mm THICK Second Floor Beam

21 PCS. - LC 75x45x15x1.6mm
STEEL C-PURLINS
Mass = 2.31 kg/m
1 2 3

11506
A
1136

A B B B B B B B B B B B B B B B B B B
A A
1650 1213 1213 1213 1212 1213 1213 1213 1212 1750 ENGR. ALBERTO V. JONSON JR.
_______________________________________
STRUCTURAL ENGINEER

13100
0095993 JAN. 18, 2021

T -1 DIAGRAM - 2 SETS 1501655 JAN. 6, 2021

(SCALE 1:50) 937-334-264 P.P.C.

1 2 3

11506
A
1136

MRS. FRANILY C. PASCUA


B B B B B B B B B B B B B B B B
B
A A
1213 1213 1213 1212 1213 1213 1213 1212 1750 Roof Framing Plan
11450 T-1 Diagram

T -2 DIAGRAM - 2 SETS
1 (SCALE 1:50)

T-1 T-1

1650

T -3 DIAGRAM - 2 SETS
(SCALE 1:50)
T -4 DIAGRAM - 1 SET
(SCALE 1:50)
PU
RLI
(SE NS
EF PA
RA CIN
MIN G
GP
LAN
)

STANDARD NUTS &


WASHERS @ EACH END

ENGR. ALBERTO V. JONSON JR.


_______________________________________
STRUCTURAL ENGINEER

0095993 JAN. 18, 2021

1501655 JAN. 6, 2021

SAGROD CONNECTION DETAIL 937-334-264 P.P.C.

(NOT TO SCALE)

6mm GUSSET PLATE


250
BOTTOM CHORD (FULLY
29 30 25 38 38 25 30 29 WELDED TO BASE PLATED)

STAIR REINFORCEMENT DETAIL


3 (SCALE 1:50) ANCHOR BOLTS

250 200
1425
250x200x10mm BASE PLATE MRS. FRANILY C. PASCUA
250
29 30 25 38 38 25 30 29
2-#16 STB-1 (200x400)
6mm GUSSET PLATE
1 - T16 EF
BOTTOM CHORD COLUMN OR BEAM Stair Reinforcement Detail
Sagrod Connection Detail
2-#16 Typ. Truss Anchorage Det.
ANCHOR BOLTS
10-2L-#10
@160 C/C
250x200x10mm BASE PLATE
STB1:200x400
200

PLAN SECTION
TYPICAL TRUSS ANCHORAGE DETAIL TYPICAL TRUSS ANCHORAGE DETAIL
(SCALE 1:5) (SCALE 1:5)