Professional Documents
Culture Documents
NOTE:
SPAN LENGTH = "S"
¢ BOLT SPLICE #1 ¢ BOLT SPLICE #2 ¢ BOLT SPLICE #2 ¢ BOLT SPLICE #1 1. SPANS GREATER THAN 150'-0" SHALL
"L1" "L2" "L3" 'L2" "L1" INCORPORATE AN "L4" MIDSPAN SEGMENT
AND SHALL HAVE TWO "L3" INTERMEDIATE
T SPAN SEGMENTS AND TWO BOLT SPLICE #3.
10.1-A1-3
FALL RESTRAINT. SEE STD.
¢ SPAN PLAN G-95.20 FOR DETAILS
¢ BEAM
10.1-A1-2
"YB"
"YA"
"YB/2"
"YA/2"
MAX. CAMBER
@ ¢ SPAN
(SEE TABLE)
H = "¸"
20'-0" MIN.
SEE STD. PLAN G-95.20. NEMA 3R TERMINAL
H = "¸"
FOR DETAILS (NOTE PLATFORM REQUIRED CABINET (FAR SIDE)
@ ALL ACCESS DOORS)
ERECT VERTICAL ±¼" @
SURVEY LINE ¢ BEAM ( TYP. BOTH LEGS)
ELEV. "A"
"¸" "¸" "¸" "¸" "¸" "¸" "¸" (BOTTOM OF
LANE LANE GORE LANE SHLD. BASE PLATE)
"¸"
ELEV. "¸" BARRIER SHAPE CAP
(BOTTOM OF SEE SHEET 10.1-A5-1
BASE PLATE)
ELEV. "¸"
ELEV. "¸" ELEV. "¸"
ELEV. "¸"
"Þ"
SEE DETAIL 3 "¸"
FOUNDATION TYPE 1,
SEE SHEET 10.1-A4-1 ELEVATION 10.1-A1-2
SIGN BRIDGE NO. _ - STA. _______
THE MAXIMUM SIGN AREA ON THIS
notes to the designer STRUCTURE SHALL BE ___ SQ. FT. FOUNDATION TYPE 2 OR 3
SEE BR. SHT. 10.1-A4-3
delete all lighting and electrical
details, callouts & notes if no * CONTRACTOR TO VERIFY NIPPLE
electrical items required on the LOCATION TO MATCH VMS SIGN
sign structure, except conduit in OR LIGHT FIXTURE CONDUIT
foundation. LOCATIONS, PRIOR TO SIGN HORIZONTAL ¢ SPAN
STRUCTURE FABRICATION. NO
¢ BEAM
"¸" ± 1" CAMBER
existing roadway lines dashed and FIELD WELDING OR DRILLING
new roadway is solid. SHALL BE PERMITTED. 0.75 CAMBER