You are on page 1of 1

SOC Information

Where

Physical Location Construction Yard MKK, Const. Detailed Location Asia Yard MKK
Sites - MKK, MKK

When

Date of SOC 2023-02-06

Observer Department
Department Pakistan / Contractor / ASIA
ENGINEERS-MKK

Who
Observer contractor-ASIA ENGINEERS-
MKK

SOC Details
Contractor No
Related

Partner   Key Safety All spools are placed at wooden


Concern/Comments/Agreements
planks and sheets while
Made fabrication and welding good
practice was observed.

Hazard Details
SOC Source Assurance SOC Type Positive

SELECT AT LEAST ONE OF THE FOLLOWING HAZARDS:


People People Competent
Process Work Well Organised, Systematic

Correct Procedures Used


Plant  
Performance  
Has Work Been No Outside UEP Fence Yes
Stopped

SOC Form Type (To add corrective actions, save the form)
Closed SOC

Checklist Selection
Checklist SOC

Audit Trail
Status Log
2023-02-06 11:04 contractor-ASIA ENGINEERS-MKK Changed Status FROM [Draft] TO [Closed]
2023-02-06 11:04 contractor-ASIA ENGINEERS-MKK Created with Status: Draft

Edit Log
2023-02-06 11:04 contractor-ASIA ENGINEERS-MKK Physical Location changed TO [Construction Yard
MKK, Const. Sites - MKK, MKK]

You might also like