You are on page 1of 18

honest, frank

polite, respectful

objective, truthful

calm , collect

canon 1

canon 2

canon 3

canon 5

ability

competence

skills

creativity

canon 1

canon 2

canon 3

canon 4

engineers

clients

foreman

teachers

conflicts of interests

misunderstanding

miscommunication

ending of relationship
canon 1

canon 5

canon 9

canon 8

welfare

safety

hygiene

sanitary

canon 1

canon 7

canon 3

canon 8

using their knowledge and skill for the enhancement of human welfare and the environment

being honest and impartial and serving with fidelity the public, their employers, and clients

striving to increase the competence and prestige of the engineering profession

all of the above

canon 6

canon 1

canon 3

canon 9

Engineers shall build their professional reputation on the merit of their services and shall not compete unfairly with
others

Engineers shall issue public statements only in an objective and truthful manner

Engineers shall not use equipment, supplies, laboratory or office facilities of their employers to carry on outside
private practice without the consent of their employer

Engineers shall act in such a manner as to uphold and enhance the honor, integrity, and dignity of the engineering
profession and shall act with zero tolerance for bribery, fraud, and corruption.

canon 8

canon 7
canon 18

canon 10

by giving them paper works

by giving them seminars

by making them your underlings

all of the above

right conduct

none of the above

ethics

morals

In what phase of design services does Reviewing, for compliance with design concepts, shop and erection drawings
submitted by the constructors done? *

Option 5

b. Study and Report Phase

d. Assisting Phase

c. Operation Phase

a. Construction Phase

Which phase in design services Issuing addenda as appropriate to interpret, clarify, expand or mend the bidding
documents done? *

d. Final Design Phase

b. Study and Report Phase

a. Construction Phase

c. Bidding of Negotiating Phase

In what phase of design services Preparing sketches required to resolve problems due to actual field conditions
encountered done?*

b. Study and Report Phase

d. Assisting Phase

c. Operation Phase

a. Construction Phase

Which of the following does not fall under the category of engineering services?*

b. Design

c. Research

a. Consultation

d. Marketing
It is the state or fact of having a duty to deal with something or of having control over someone.*

D. Responsibility

C. Client Responsibility

A. Civil Engineer

B. Client

Which of the following is not part of the report?*

b. Design Services for construction projects

c. Construction services

a. Consultations, research, investigations, and reports

d. Special services for construction projects

e. None of the above

The third role and responsibility of civil engineer is to ________ a detailed design layout, keeping the requirements of
the client in mind.*

D. develop

B. search

A. design

C. analyze

A person who engages the professional advice or services of another.*

C. Contracting Engineers

B. Consulting Engineers

D. Client

A. Civil Engineer

This is the phase in construction project where Preparations of final design criteria, preliminary drawings, outline
specifications, and preliminary opinions of probable construction cost is to be done.

c. Final Design Phase

d. Bidding and Negotiating

b. Study and Report Phase

a. Preliminary Design Phase

These services deal primarily with collecting, interpreting, and reporting information, together with formulating
conclusions and making recommendations.

c. Investigations and Reports

a. Consultations

d. Consultations, Research, Investigations And Reports

b. Research

The ____________ must also plan the construction project that will be taking place in conjunction with the results they
found due to their analysis of the proposed project.*

D. Client

C. Contracting Engineers

A. Civil Engineer

B. Consulting Engineers
In what phase of design services Providing services during construction by a full-tie resident project representative, and
by supporting staff as required, to enable construction to be accomplished in conformance to the construction
drawings, specifications, and other contract documents done?*

c. Operation Phase

b. Study and Report Phase

d. Assisting Phase

a. Construction Phase

Which phase in design services Advising the client as to whether additional data or services of the type described under
the study and report phase above are required and assisting the client in obtaining such data and services done?*

d. Final Design Phase

c. Bidding of Negotiating Phase

a. Construction Phase

b. Preliminary Design Phase

The _______ can, under certain circumstances, hand over all or part of their work environment responsibility. The
person who takes over the responsibility is called the client's delegee.*

B. Consulting Engineers

D. Client

C. Contracting Engineers

A. Civil Engineer

It is a track of steel rails along which trains run.*

D. Railway

B. Highways

A. Road

C. Train

Which phase in design services Preparing basic documents related to construction contracts for review and approval
by the client. These may include contract agreement forms, bid, instructions to bidders, insurance and bonding
requirements, and other contract-related documents done?*

c. Bidding of Negotiating Phase

a. Construction Phase

b. Study and Report Phase

d. Final Design Phase

These services may include investigations and analyses of existing conditions; capital and operating costs; overhead
costs and costs of financing; and revenues as needed to evaluate a property or to recommend establishment of
prospective rates.

b. Appraisals, Valuations and Rate Studies

c. Materials Engineering Tests

d. Planning Studies

a. Preliminary and Feasibility Investigations and Reports

It is a structure carrying a pathway or roadway over a depression or obstacle (such as a river). *

B. Highways

C. Bridge

D. Tunnels

A. Buildings
What are the two crucial aspect in the field of Civil Engineering?*

A. Civil Engineer and Client

C. Consulting and Contracting Engineers

B. Consulting and Civil Engineers

D. Contracting Engineers

This is the phase where Preparation of design calculations, construction drawings, specifications, estimated construction
cost, and other contract documents is to be done.*

b. Study and Report Phase

a. Preliminary Design Phase

d. Bidding and Negotiating

c. Final Design Phase

It is any public or private road or other public way on land. It is used for major roads, but also includes other public roads
and public tracks.*

C. Bridge

B. Highways

D. Tunnels

A. Roads

Which phase in design services Assisting the client in advertising for and obtaining bids or negotiating proposals for each
separate prime construction contract, maintaining a record prospective bidders to whom bidding documents have been
issued, attending pre-bid conferences, and receiving and processing deposits for bidding documents done?

a. Construction Phase

b. Study and Report Phase

d. Bidding of Negotiating Phase

c. Operation Phase

Which phase in design services Consulting with the client, reviewing preliminary reports, clarifying and defining the
project requirements, reviewing available data, and discussing general scheduling. Conferences may also be required
with approving and regulatory governmental agencies and applicable utilities done?

d. Final Design Phase

c. Bidding of Negotiating Phase

a. Construction Phase

b. Preliminary Design Phase

The types of infrastructure under the domain of civil engineering, pursuant to RA 544, as amended include:*

c. Hangars

a. Streets

b. Bridges

d. Railroads

all of the above

This service may include the broad areas of developing the engineering requirements of master plans for long-range
capital improvement programs; preparation of preliminary engineering of land development plans, urban plans, and
regional plans; and investigation of environmental conditions and preparation of environmental impact studies with
subsequent engineering planning to improve or maintain exiting condition.*

d. Planning Studies

c. Materials Engineering Tests


a. Preliminary and Feasibility Investigations and Reports

b. Appraisals, Valuations and Rate Studies

Which phase in design services Preparing basic documents related to construction contracts for review and approval
by the client. These may include contract agreement forms, bid, instructions to bidders, insurance and bonding
requirements, and other contract-related documents done?*

b. Study and Report Phase

a. Construction Phase

d. Final Design Phase

c. Bidding of Negotiating Phase

In what phase of design services does the Civil Engineer may as a basic service, assist in the start-up of project
operations?*

d. Assisting Phase

c. Operation Phase

a. Construction Phase

b. Study and Report Phase

Many engineering works are conceived, designed, and constructed through the efforts of __________ employed in
governmental agencies or in industry.*

C. Client- Civil Engineer

A. Civil Engineer

B. Client

D. Responsibility

This is the phase in construction project where analysis of the client’s conceptual design, conceptual opinions of
probable construction cost is to be done.*

c. Final Design Phase

b. Study and Report Phase

a. Preliminary Design Phase

d. Bidding and Negotiating

Which phase in design services Furnishing to the client specified number of copies of drawings, specifications and other
documents done?

a. Construction Phase

d. Final Design Phase

c. Bidding of Negotiating Phase

b. Preliminary Design Phase

It is any public or private road or other public way on land. It is used for major roads, but also includes other public roads
and public tracks.*

D. Tunnels

C. Bridge

B. Highways

A. Roads

15. This is the phase in construction project where Preparations of final design criteria, preliminary drawings,
outline specifications, and preliminary opinions of probable construction cost is to be done.

c. Final Design Phase

a. Preliminary Design Phase

b. Study and Report Phase


d. Bidding and Negotiating

18. Which phase in design services Preparing basic documents related to construction contracts for review and
approval by the client. These may include contract agreement forms, bid, instructions to bidders, insurance and
bonding requirements, and other contract-related documents done?*

d. Final Design Phase

c. Bidding of Negotiating Phase

b. Study and Report Phase

a. Construction Phase

7. These services may include investigations and analyses of existing conditions; capital and operating costs; overhead
costs and costs of financing; and revenues as needed to evaluate a property or to recommend establishment of
prospective rates.

d. Planning Studies

c. Materials Engineering Tests

b. Appraisals, Valuations and Rate Studies

a. Preliminary and Feasibility Investigations and Reports

22. Many engineering works are conceived, designed, and constructed through the efforts of __________ employed in
governmental agencies or in industry.*

C. Client- Civil Engineer

D. Responsibility

B. Client

A. Civil Engineer

13. This is the phase where Preparation of design calculations, construction drawings, specifications, estimated
construction cost, and other contract documents is to be done.*

b. Study and Report Phase

c. Final Design Phase

a. Preliminary Design Phase

d. Bidding and Negotiating

26. It is a structure carrying a pathway or roadway over a depression or obstacle (such as a river). *

A. Buildings

D. Tunnels

B. Highways

C. Bridge

20. In what phase of design services Providing services during construction by a full-tie resident project
representative, and by supporting staff as required, to enable construction to be accomplished in conformance to the
construction drawings, specifications, and other contract documents done?*

d. Assisting Phase

a. Construction Phase

b. Study and Report Phase

c. Operation Phase

27. It is a track of steel rails along which trains run.*

A. Road

C. Train

D. Railway
B. Highways

1. Which of the following does not fall under the category of engineering services?*

c. Research

b. Design

d. Marketing

a. Consultation

29. The _______ can, under certain circumstances, hand over all or part of their work environment responsibility.
The person who takes over the responsibility is called the client's delegee.*

B. Consulting Engineers

D. Client

C. Contracting Engineers

A. Civil Engineer

23. What are the two crucial aspect in the field of Civil Engineering?*

D. Contracting Engineers

C. Consulting and Contracting Engineers

A. Civil Engineer and Client

B. Consulting and Civil Engineers

9. Which phase in design services Issuing addenda as appropriate to interpret, clarify, expand or mend the bidding
documents done?*

b. Study and Report Phase

a. Construction Phase

c. Bidding of Negotiating Phase

d. Final Design Phase

5. In what phase of design services does Reviewing, for compliance with design concepts, shop and erection drawings
submitted by the constructors done?*

d. Assisting Phase

c. Operation Phase

b. Study and Report Phase

a. Construction Phase

Option 5

14. Which of the following is not part of the report?*

a. Consultations, research, investigations, and reports

c. Construction services

d. Special services for construction projects

b. Design Services for construction projects

e. None of the Above

8. Which phase in design services Assisting the client in advertising for and obtaining bids or negotiating proposals for
each separate prime construction contract, maintaining a record prospective bidders to whom bidding documents have
been issued, attending pre-bid conferences, and receiving and processing deposits for bidding documents done?

c. Operation Phase

d. Bidding of Negotiating Phase

b. Study and Report Phase


a. Construction Phase

10. Which phase in design services Preparing basic documents related to construction contracts for review and approval
by the client. These may include contract agreement forms, bid, instructions to bidders, insurance and bonding
requirements, and other contract-related documents done?*

c. Bidding of Negotiating Phase

b. Study and Report Phase

d. Final Design Phase

a. Construction Phase

17. Which phase in design services Furnishing to the client specified number of copies of drawings, specifications
and other documents done?

a. Construction Phase

d. Final Design Phase

b. Preliminary Design Phase

c. Bidding of Negotiating Phase

12. Which phase in design services Advising the client as to whether additional data or services of the type described
under the study and report phase above are required and assisting the client in obtaining such data and services done?*

a. Construction Phase

b. Preliminary Design Phase

d. Final Design Phase

c. Bidding of Negotiating Phase

3. These services deal primarily with collecting, interpreting, and reporting information, together with formulating
conclusions and making recommendations.

a. Consultations

c. Investigations and Reports

b. Research

d. Consultations, Research, Investigations And Reports

30. The third role and responsibility of civil engineer is to ________ a detailed design layout, keeping the
requirements of the client in mind.*

B. search

C. analyze

A. design

D. develop

4. In what phase of design services does the Civil Engineer may as a basic service, assist in the start-up of project
operations?*

b. Study and Report Phase

c. Operation Phase

a. Construction Phase

d. Assisting Phase

21. It is the state or fact of having a duty to deal with something or of having control over someone.*

D. Responsibility

B. Client

A. Civil Engineer

C. Client Responsibility
24. The ____________ must also plan the construction project that will be taking place in conjunction with the results
they found due to their analysis of the proposed project.*

A. Civil Engineer

C. Contracting Engineers

D. Client

B. Consulting Engineers

6. This service may include the broad areas of developing the engineering requirements of master plans for long-range
capital improvement programs; preparation of preliminary engineering of land development plans, urban plans, and
regional plans; and investigation of environmental conditions and preparation of environmental impact studies with
subsequent engineering planning to improve or maintain exiting condition.*

d. Planning Studies

b. Appraisals, Valuations and Rate Studies

a. Preliminary and Feasibility Investigations and Reports

c. Materials Engineering Tests

19. In what phase of design services Preparing sketches required to resolve problems due to actual field conditions
encountered done?*

d. Assisting Phase

c. Operation Phase

b. Study and Report Phase

a. Construction Phase

2. The types of infrastructure under the domain of civil engineering, pursuant to RA 544, as amended include:*

c. Hangars

b. Bridges

a. Streets

all of the above

d. Railroads

25. A person who engages the professional advice or services of another.*

D. Client

A. Civil Engineer

C. Contracting Engineers

B. Consulting Engineers

16.This is the phase in construction project where analysis of the client’s conceptual design, conceptual opinions of
probable construction cost is to be done.*

d. Bidding and Negotiating

c. Final Design Phase

a. Preliminary Design Phase

b. Study and Report Phase

11. Which phase in design services Consulting with the client, reviewing preliminary reports, clarifying and defining the
project requirements, reviewing available data, and discussing general scheduling. Conferences may also be required
with approving and regulatory governmental agencies and applicable utilities done?

c. Bidding of Negotiating Phase

d. Final Design Phase

a. Construction Phase

b. Preliminary Design Phase


9. On receipt of proposals, the civil engineers or firms are invited to meet individually with the
selection committee for interviews and discussions of the ________.*
0/5
a. desired end results of the project
b. engineering services required
c. both a and b

11. .They are normally used to ascertain the general qualifications in a selected area of expertise.*
5/5
d. Request For Acceptance
c. Request For Verification
b. Request For Qualification
a. Request For Approval

16. A Civil Engineer is able to clearly get across any technical issues, as well as take in to
consideration the ideas and suggestions of others in the team. What skill does the Civil Engineer
have?*
0/5
B. Leadership skill
C. Technical skill
A. Communicating skill
Option 4

12. It is one of the most important decisions to be made during the development of an engineering
project.*
5/5
A. Engagement of a Civil Engineer
C. Decisions of a Civil Engineer
B. Becoming a Civil Engineer
D. Retirement of a Civil Engineer

4. The client should establish administrative policy and ¬¬¬_______ for the selection of qualified Civil
Engineers for particular projects.*
5/5
d. laws
a. regulations
c. rules
b. criteria

17. Which of these qualities is not required to be a good Civil Engineer?*


5/5
D. Time conscious
C. Skillful
B. Good looking
A. Competent

20. An engineer have the ability to manage different personalities, knowing how to motivate your
team and also knowing how to discipline someone professionally and how to give them credit when
it’s deserved. What skill does he have?*
5/5
Technical skill
D. Negotiating skill
C. Management skill
B. Communicating skill

5. When agreement has been reached on scope, schedule and compensation, the client and selected
Civil Engineer should formalize their agreement in a written contract.*
5/5
b. written contract
c. none of these
a. oral contract

6. This should be considered in the selection of a civil engineer or firm.*


5/5
b. reputation d. all of the above
c. experience
d. all of the above
a. understanding of the project c. experience

18. The client wants a Civil Engineer with passion to his work. They want a Civil Engineer to be at
work on time, can work overtime but still come at work on time the next day. What quality of a Civil
Engineer do they want?*
5/5
C. Kindness
A. Technical skill
B. Commitment to work
D. Communication skill

19. When discussing the fees of the Civil Engineer, what should you do best?*
5/5
B. Negotiate with him to have a discount
whether they take it or leave it
work to avoid conflicts and demand of additional compensation
A. Let them name their price
D. Discuss with him the scope of work and name your price and let them decide
C. Discuss with the Civil Engineer the expectations and clearly defined scope of

1. Who is responsible for making recommendations after conducting appropriate investigation


interviews, and inquiries?*
5/5
a. the committee
b. the engineer
c. the contractor
d. the worker

7. If satisfactory agreement is not reached with the first Civil Engineer, the negotiations should be
________ and the Civil Engineer or firm be ________ in writing to that effect.*
5/5
d. notified, terminated
b. avoided, accepted
c. terminated, notified
a. accepted, avoided

3. Select at least ____civil engineers or forms that may appear to be best qualified for the specific
project.*
5/5
b. two
a. five
d. three
c. one

13. A Civil Engineer scolds his team when his team makes a mistake in the implementation of the
project without even listening to what they have to say. What skill does the engineer possess?*
0/5
B. Critical Thinking skill
A. Leadership skill
C. Communicating skill
D. None of the above

8. What is needed to be checked in order to determine the quality of the performance of the civil
engineer or firm?*
5/5
a. recent civil cases
c. recent relationships
d. recent clients
b. recent studies

15. All good engineers are strong at devising ways to make particular aspects of a project work
better. What skill do they possess?*
5/5
C. Commitment to work
A. Analytical-thinking skill
D. Enthusiasm
B. Time Management skill

10. Selection of the most qualified Civil Engineer for a specific project will result in a ________
project.*
5/5
b. economical
d. all of the above
c. successful
a. well-planned and designed

14. A Civil Engineer makes sure that every small part of designing and implementing infrastructure
needs to be precise. What skill does he have?*
5/5
C. Technical skill
A. Attention to details
D. Analytical skill
B. Leadership skill

2. The person appointed should be __________ with the project requirements and should be
kept free of internal or external pressure during the selection process.*
5/5
a. familiar
b. expert
c. not familiar
d. none of the above

25. A person who engages the professional advice or services of another.*


C. Contracting Engineers
B. Consulting Engineers
A. Civil Engineer
D. Client

5. In what phase of design services does Reviewing, for compliance with design concepts, shop and
erection drawings submitted by the constructors done?*
Option 5
c. Operation Phase
d. Assisting Phase
b. Study and Report Phase
a. Construction Phase
30. The third role and responsibility of civil engineer is to ________ a detailed design layout,
keeping the requirements of the client in mind.*
D. develop
C. analyze
B. search
A. design

29. The _______ can, under certain circumstances, hand over all or part of their work environment
responsibility. The person who takes over the responsibility is called the client's delegee.*
D. Client
C. Contracting Engineers
B. Consulting Engineers
A. Civil Engineer

24. The ____________ must also plan the construction project that will be taking place in conjunction
with the results they found due to their analysis of the proposed project.*
C. Contracting Engineers
B. Consulting Engineers
D. Client
A. Civil Engineer

22. Many engineering works are conceived, designed, and constructed through the efforts of
__________ employed in governmental agencies or in industry.*
D. Responsibility
C. Client- Civil Engineer
B. Client
A. Civil Engineer

9. Which phase in design services Issuing addenda as appropriate to interpret, clarify, expand or
mend the bidding documents done?*
c. Bidding of Negotiating Phase
b. Study and Report Phase
a. Construction Phase
d. Final Design Phase

12. Which phase in design services Advising the client as to whether additional data or services of
the type described under the study and report phase above are required and assisting the client in
obtaining such data and services done?*
b. Preliminary Design Phase
c. Bidding of Negotiating Phase
d. Final Design Phase
a. Construction Phase

6. This service may include the broad areas of developing the engineering requirements of master
plans for long-range capital improvement programs; preparation of preliminary engineering of land
development plans, urban plans, and regional plans; and investigation of environmental conditions
and preparation of environmental impact studies with subsequent engineering planning to improve or
maintain exiting condition.*
b. Appraisals, Valuations and Rate Studies
c. Materials Engineering Tests
a. Preliminary and Feasibility Investigations and Reports
d. Planning Studies

28. It is any public or private road or other public way on land. It is used for major roads, but also
includes other public roads and public tracks.*
A. Roads
C. Bridge
B. Highways
D. Tunnels

27. It is a track of steel rails along which trains run.*


C. Train
B. Highways
D. Railway
A. Road

20. In what phase of design services Providing services during construction by a full-tie resident
project representative, and by supporting staff as required, to enable construction to be accomplished
in conformance to the construction drawings, specifications, and other contract documents
done?*
a. Construction Phase
c. Operation Phase
b. Study and Report Phase
d. Assisting Phase

13. This is the phase where Preparation of design calculations, construction drawings,
specifications, estimated construction cost, and other contract documents is to be done.*
a. Preliminary Design Phase
b. Study and Report Phase
c. Final Design Phase
d. Bidding and Negotiating

8. Which phase in design services Assisting the client in advertising for and obtaining bids or
negotiating proposals for each separate prime construction contract, maintaining a record prospective
bidders to whom bidding documents have been issued, attending pre-bid conferences, and
receiving and processing deposits for bidding documents done?
d. Bidding of Negotiating Phase
a. Construction Phase
b. Study and Report Phase
c. Operation Phase

2. The types of infrastructure under the domain of civil engineering, pursuant to RA 544, as
amended include:*
a. Streets
d. Railroads
all of the above
c. Hangars
b. Bridges

1. Which of the following does not fall under the category of engineering services?*
c. Research
b. Design
d. Marketing
a. Consultation

4. In what phase of design services does the Civil Engineer may as a basic service, assist in the
start-up of project operations?*
b. Study and Report Phase
a. Construction Phase
c. Operation Phase
d. Assisting Phase

19. In what phase of design services Preparing sketches required to resolve problems due to
actual field conditions encountered done?*
b. Study and Report Phase
d. Assisting Phase
a. Construction Phase
c. Operation Phase
18. Which phase in design services Preparing basic documents related to construction contracts
for review and approval by the client. These may include contract agreement forms, bid,
instructions to bidders, insurance and bonding requirements, and other contract-related documents
done?*
b. Study and Report Phase
d. Final Design Phase
c. Bidding of Negotiating Phase
a. Construction Phase

16. This is the phase in construction project where analysis of the client’s conceptual design,
conceptual opinions of probable construction cost is to be done.*
c. Final Design Phase
b. Study and Report Phase
d. Bidding and Negotiating
a. Preliminary Design Phase

21. It is the state or fact of having a duty to deal with something or of having control over
someone.*
A. Civil Engineer
B. Client
C. Client Responsibility
D. Responsibility

17. Which phase in design services Furnishing to the client specified number of copies of
drawings, specifications and other documents done?
a. Construction Phase
d. Final Design Phase
c. Bidding of Negotiating Phase
b. Preliminary Design Phase

23. What are the two crucial aspect in the field of Civil Engineering?*
C. Consulting and Contracting Engineers
B. Consulting and Civil Engineers
D. Contracting Engineers
A. Civil Engineer and Client

15. This is the phase in construction project where Preparations of final design criteria,
preliminary drawings, outline specifications, and preliminary opinions of probable construction cost is
to be done.
d. Bidding and Negotiating
c. Final Design Phase
a. Preliminary Design Phase
b. Study and Report Phase

3. These services deal primarily with collecting, interpreting, and reporting information, together
with formulating conclusions and making recommendations.
d. Consultations, Research, Investigations And Reports
c. Investigations and Reports
a. Consultations
b. Research

10. Which phase in design services Preparing basic documents related to construction contracts for
review and approval by the client. These may include contract agreement forms, bid,
instructions to bidders, insurance and bonding requirements, and other contract-related documents
done?*
c. Bidding of Negotiating Phase
a. Construction Phase
b. Study and Report Phase
d. Final Design Phase

26. It is a structure carrying a pathway or roadway over a depression or obstacle (such as a


river). *
C. Bridge
B. Highways
D. Tunnels
A. Buildings

11. Which phase in design services Consulting with the client, reviewing preliminary reports, clarifying
and defining the project requirements, reviewing available data, and discussing general scheduling.
Conferences may also be required with approving and regulatory governmental agencies and
applicable utilities done?
a. Construction Phase
c. Bidding of Negotiating Phase
d. Final Design Phase
b. Preliminary Design Phase

14. Which of the following is not part of the report?*


d. Special services for construction projects
a. Consultations, research, investigations, and reports
c. Construction services
b. Design Services for construction projects

7. These services may include investigations and analyses of existing conditions; capital and
operating costs; overhead costs and costs of financing; and revenues as needed to evaluate a
property or to recommend establishment of prospective rates.
d. Planning Studies
c. Materials Engineering Tests
b. Appraisals, Valuations and Rate Studies
a. Preliminary and Feasibility Investigations and Reports

You might also like