OAJV Health, Safety & Environment Observation Report

DATE: 30/12/2022
REPORTED BY: Ms. Nancy Gagma

SITE INSPECTED HSE ISSUE


New PTB
SITE PHOTOS
HSE Observation(s):
1. Poor illumination/Inadequate Lighting

Improvement (s):
1. Provided lights on corridors area on rooms
inside the building for sufficient lighting.

On The Spot Discussion:


Done

Responsible Contractor:
DNJV/FMC

Risk Level:
High

Closing target:
Immediately

Before

After
HSE Observation(s):
1. Burnable waste materials like plastic laying near
welding/grinding works.

Improvement (s):
1. Screens shall be erected by fire blanked around
welding/grinding works to prevent flying sparks
showering nearby personnel/equipment or materials.

On The Spot Discussion:


Done

Responsible Contractor:
DNJV/FMC

Risk Level:
High

Closing target:
Immediately

Before

After
HSE Observation(s):
1. Plastering workers not wearing correct PPE while
chipping off defective plasters.

Improvement (s):
1. Issue mask and safety glass to plastering workers.

On The Spot Discussion:


Done

Responsible Contractor:
DNJV/FMC

Risk Level:
High

Closing target:
Immediately

Before

After
HSE Observation(s):
1. Entrance way obstructed with material storage

Improvement (s):
Properly arrange material storage to create a safe
access.

On The Spot Discussion:


Not Done

Responsible Contractor:
DNJV/FMC

Risk Level:
High

Closing target:
1-2 Day