Project: Inspection Report

Participants Name: NRIC/FIN Number:

Chen Weikun S8672272J


Course Name: Batch ID:
Workplace Safety and Health Management
in Construction Industry (WSHMCI) 18
Participants Email ID: Participants Phone Number:

Cwk0595@gmail.com 8852 2926


Facilitator Name:

Md Matiar Rahman
Participants Signature: Submission Date:

Chen weikun 01 Jan 2021

Inspection Report

1. Purpose and objectives for the safety inspection

Safety inspections helps to prevent incidents, injuries, and illnesses.

Safety inspections helps to identify and record hazards for corrective action.

Safety inspections enables HSW committees better understanding of task and work
procedures.

Safety inspections also enables workers and supervisor to share their concern at
workplace.

It helps HSW committees to better eliminate hazards and control the risk in monitor
step.

Lastly, once the inspection report was generated after the analysing the evidence and
interview with workers. The daily briefing and preventive action must apply.

Eversafe Academy
Page 1 of 7
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

2. Inspection Findings – Hazards (Unsafe conditions / Unsafe acts)

Finding 1:

Figure 1

Location/Date/Time: Block 123 #20-20 29/12/2020 10am

Description of Unsafe Condition/Unsafe Act:

Poor Housekeeping at site

Possible reasons for the unsafe condition/unsafe act (Root Causes):

Plan to clean up on the completed date

Lack of manpower

Preventive Actions:

Supervisor needs conduct ‘toolbox’ meeting before work.

Workers need to submit photos once they complete the housekeeping.

To rectify by: 29/12/2020 Action by: weik

Re-inspection on (Date /Time): 30/12/2020 -8.30AM

Re-inspection finding: Rectified and closed

Eversafe Academy
Page 2 of 7
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

Finding 2:

Picture 2

Location/Date/Time: Site Block 122 #20-20 29/12/2020 12am

Description of Unsafe Condition/Unsafe Act:

The worker was not wearing safety shoes.

Possible reasons for the unsafe condition/unsafe act (Root Causes):

They unaware of the hazards of not wearing their personal protection equipment.

It may be uncomfortable or wrong Size when wear the safety shoes.

Preventive Actions:

Stop his work immediately and issues warning letter

Conduction daily “Toolbox” meeting and provide proper PPE for work

To rectify by: 29/12/2020 Action by: weik

Re-inspection on (Date /Time): 30/12/2020 9am

Re-inspection finding: Rectified and closed

Eversafe Academy
Page 3 of 7
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

Finding 3:

Picture 3

Location/Date/Time: Site Block 122 #20-20 29/12/2020 1:30 pm

Description of Unsafe Condition/Unsafe Act:

Water leaking from the water pipe and the wire is on the floor

Possible reasons for the unsafe condition/unsafe act (Root Causes):

Poor workmanship and forgot to turn off the main switch and water riser

Preventive Actions:

Assign HDB approved electrical and plumbing specialist for the work

Issues “Lock-out “Master Tag and displays “Danger” signboard before work.

To rectify by: 30/12/2020 Action by: weik

Re-inspection on (Date /Time): 30/12/2020 10am

Re-inspection finding: Rectified and closed

Eversafe Academy
Page 4 of 7
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

Finding 4:

Picture 4

Location/Date/Time: Site Block 11 Landed house 29/12/2020 2:30 pm

Description of Unsafe Condition/Unsafe Act:

Inappropriate set up of scaffolding by the contractor

Possible reasons for the unsafe condition/unsafe act (Root Causes):

Insufficient of equipment and tools to set up

Save cost

Preventive Actions:

Assign approved scaffolding contractor.

Display signboard to warn others.

To rectify by: 30/12/2020 Action by: weik

Re-inspection on (Date /Time): 30/12/2020 4pm

Re-inspection finding: Rectified and closed

Eversafe Academy
Page 5 of 7
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

Finding 5:

Picture 5

Location/Date/Time: Site block 5 #05-05 29/12/2020 4:30 pm

Description of Unsafe Condition/Unsafe Act:

Stepladder was used folded up and leaning against a pillar.

The worker was lean off the side of a ladder while working.

Possible reasons for the unsafe condition/unsafe act (Root Causes):

The worker was not well trained for the work at height course.

The proper stepladder was inadequate.

Preventive Actions:

Apply bubby system (2 workers) to work when use the stepladder.

Request for scaffolding if the ladder cannot reach the height.

To rectify by: 30/12/2020 Action by: weik

Re-inspection on (Date /Time): 30/12/2020 5pm

Re-inspection finding: Rectified and closed

Eversafe Academy
Page 6 of 7
Workplace Safety and Health Management in Construction Industry
(WSHMCI) (BL) - Project

4. Recommendations to prevent the repeat of the similar findings:

1) Supervisors must conduct “Toolbox” meeting daily before work starts to remind the
workers to do housekeeping.

2)Supervisors must ensure the assigned contractors and workers with required permit
and certificate for the work.

3)Assign safety officers to patrol and identify any unsafe act and unsafe workplace in
site.

4) Record the hazard and re-inspection the findings.

------------End of the Report------------